CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca

Page created by Christina Stephens
 
CONTINUE READING
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
CHILE’S NEW
COPPER DISCOVERY
Exceptional Development Project,
Outstanding Exploration Potential
  Investor presentation | April 2021   TSX: MARI
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Disclaimer                                                                                                                                2

             This presentation includes certain forward-looking statements about future events and/or financial results which are forward-
             looking in nature and subject to risks and uncertainties. Such forward-looking statements or information, including but not
             limited to those with respect to the development of the Marimaca project, metal prices, metallurgical results and resource
             estimates, involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance
             or achievements of the Company to be materially different from any future results, performance or achievements expressed or
             implied by such forward-looking statements or information. Forward-looking statements include without limitation, statements
             regarding the company’s plans, goal or objectives and future completion of mine feasibility studies, mine development
             programs, capital and operating costs, production, potential mineralization, resources and reserves, exploration results and
             future plans and objectives of Marimaca Copper Corp. (“MCC”) Forward-looking statements can generally be identified by the
             use of forward-looking terminology such as “may”, “will”, “expect”, “intend”, “estimate”, “anticipate”, “believe”, or “ continue”
             or the negative thereof or variations thereon or similar terminology. There can be no assurance that such statements will prove
             to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important
             factors that could cause results to differ materially from expectations include risks associated with mining generally and pre-
             development stage projects in particular. The company is an exploration, development & mining company. Many references to
             resources and other geological and technical information contained herein have not been verified by an independent expert and
             are either not in accordance with the requirements under National Instrument 43-101 or have not been prepared in accordance
             with a preliminary or final feasibility study. Potential investors should conduct their own investigations as to the suitability of
             investing in securities of Marimaca Copper Corp. The potential target tonnage and grade noted for the Marimaca project are
             conceptual in nature as there has been insufficient exploration to define mineral resources, and it is uncertain if further
             exploration will result in these targets being delineated as mineral resources.

             Unless otherwise indicated, MCC has prepared the technical information in this presentation (“Technical Information”)
             based on information contained in the technical reports and news releases (collectively the “Disclosure Documents”)
             available under Marimaca Copper Corp.’s company profile on SEDAR at www.sedar.com. Each Disclosure Document was
             prepared by or under the supervision of a qualified person (a “Qualified Person”) as defined in National Instrument 43-101 –
             Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43-101”). For readers to fully
             understand the information in this presentation, they should read the Technical Reports (available on www.sedar.com) in
             their entirety, including all qualifications, assumptions and exclusions that relate to the information set out in this
             presentation which qualifies the Technical Information. Readers are advised that mineral resources that are not mineral
             reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole,
             and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and
             qualifications contained in the Disclosure Documents. All Dollar amounts in this presentations are US Dollars unless
             otherwise stated. All maps and diagrams are for illustrative purposes only and not to scale.

             Sergio Rivera VP Exploration of Marimaca Copper Corp, a geologist with more than 35 years of experience is the Qualified
             Person for the purposes of NI 43-101 and has approved this written disclosure.

                                                                                                         CHILE’S NEW COPPER DISCOVERY
                                                                                       Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Introduction: Marimaca Copper Project                                                                            3

Marimaca has the potential to be a low capital cost, high margin,
copper development

           Significant oxide copper         Outstanding location, tier
           resource                         1 mining jurisdiction

           Simple, low strip ratio,
                                            Identified near mine
           open pit mining oxide
                                            exploration potential
           copper resource

           Likely low cost,                 Substantial district scale
           SX-EW processing                 exploration potential

                                                                                      CHILE’S NEW COPPER DISCOVERY
                                                                    Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca Copper – Commitment to Sustainability                                                                           4

Marimaca is committed to creating long-term value for all our stakeholders through
integrating ESG best practice into the ongoing development of the Company

       Transparency & Accountability                              Building Together with our Communities
       Transparent corporate governance ensures we are            We value the trust and support from our local
       accountable to all our stakeholders. We strive to ensure   communities. We endeavor to work collaboratively with
       that appropriate checks and balances are carried out to    our local communities to deliver shared value.
       safeguard ownership at all levels of the business.

       Health, Safety and Security                                Our People
       The health, safety and wellbeing of our employees is at    We are committed to employing locally, upskilling our
       the forefront of everything we do. We implement the        workforce, respecting all cultures and promoting
       highest standards of safety to mitigate risks.             diversity and inclusion.

       Environmental Stewardship                                  Sustainable Development
       We operate in an environmentally responsible manner,       In exploration, development and eventual production,
       minimizing the impact of our activities and, where         sustainable practices are of paramount importance.
       possible, aiming to improve and enhance the
       environment in which we operate.

                                                                                              CHILE’S NEW COPPER DISCOVERY
                                                                            Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: Why is it unique?                                                                                  5

Location & Access to Infrastructure/Utilities = Lower Execution Risk

                                        Close proximity to                Within 25km of Port
                                        first class utilities             of Mejillones
                                        and infrastructure
                                        ›   Water                         › One of the primary
                                        ›   Power                           import ports for
                                        ›   Transport                       H2SO4 to Chile
                                        ›   Communications                › Access to skilled
                                                                            workforce

                                        Land predominantly                Within 40km of
                                        government owned or               Antofagasta
                                        controlled                        › Major regional center
                                        › No local land owner             › No requirement for
                                          negotiations                      site accommodation /
                                                                            housing
     Close to all aspects required to                                     › Airport with good
          build a copper mine                                               connections

                                                                                  CHILE’S NEW COPPER DISCOVERY
                                                                Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: Why is it unique?                                                                             6

Location & Access to Infrastructure/Utilities = Lower Execution Risk

     Antofagasta – 40km
                             Route 1 – National Highway   Port of Mejillones – 25km

           Process Plant                                         Existing 110kV Powerline

                                                                 Existing Seawater Pipeline

                                                    7km

                              Open Pit

                                                                                       N

                                                                             CHILE’S NEW COPPER DISCOVERY
                                                           Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: Why is it unique?                                                                        7

Industry Leading Capital Intensity Among Greenfields Projects

Source: Tamesis Partners

                                                                        CHILE’S NEW COPPER DISCOVERY
                                                      Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: Why is it unique?                                                                                                                           8

Expected to be in the lowest 15% of the AISC curve

                      $5.00

                      $4.50

                      $4.00

                      $3.50
AISC (US$/lb CuEq.)

                                                                                                               Current Copper Price: US$3.06/lb
                      $3.00

                      $2.50
                                   ~57% Cash Margin
                      $2.00

                      $1.50
                                            Marimaca
                      $1.00

                      $0.50

                      $0.00
                              0%      10%         20%   30%        40%          50%           60%       70%           80%           90%           100%
                                                              Cumulative Percent of Global Production
Source: Wood Mackenzie
Note: Based on Q3 2020 data; AISC proxied by global C2 pro-rata cash costs

                                                                                                                           CHILE’S NEW COPPER DISCOVERY
                                                                                                         Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: Compelling Results from the PEA                                                                                                                                                       9

 Item                                                                                         Value                                           Low Upfront Capital Cost
 Copper Price Assumption                                                                      US$3.15/lb flat real                            ›   US$285m among the lowest in the copper
 Pre-Tax NPV8 & IRR                                                                           US$757 million / 39.9%                              development peer group
 Post-Tax NPV8 & IRR                                                                          US$524 million / 33.5%
 Payback Period from First Production                                                         2.6 years
                                                                                                                                              NPV / Capex – 2.0x4
 Pre-Production Capital               Costs1                                                  US$285 million
                                                                                                                                              ›   Profitability index a key comparison
 Life of Mine Sustaining Capital                                                              US$66 million                                       against development peers
 Ave. Annual Steady State EBITDA                                                              US$169 million                                  ›   Very few peers have PI > 1 at US$3/lb Cu
                                                                                                                                              ›   Marimaca is >1x at US$2.55/lb
 Life of Mine C1 Operating Costs3                                                             US$1.22/lb of copper
 Life of Mine All-in-Sustaining Cash Costs2                                                   US$1.29/lb of copper
 Mine Life                                                                                    12 years
                                                                                                                                              Bottom 15% of AISC curve
 Ave. Annual Metal Production (first 6 years)                                                 Approximately 40,000 tonnes                     ›   Well positioned to make money through
 Ave. Annual Metal Production Life of Mine (incl. ramp                                                                                            the copper cycle
                                                                                              35,600 tonnes
 up)
 Steady State Average Process Recovery (Heap and ROM)                                         76% / 40%
                                                                                                                                              Further advanced than typical PEA
[1] Assumes mining fleet is financed through a lease to own contract structure to minimize upfront capital cost.
                                                                                                                                              ›   Met recoveries are supported by four
[2] All in sustaining costs is defined as cash cost (C1) plus general and administrative expenses, sustaining capital expenditure, deferred       phases of met testing
stripping, royalties and lease payments and is used by management to evaluate performance inclusive of sustaining expenditure required to
maintain current production levels.                                                                                                           ›   Many numbers are budget quotes from
[3] C1 cash cost includes all mining and processing costs less any profits from by-products and is used by management to arrive at an
approximated cost of finished metal.                                                                                                              equipment suppliers
[4] At US$3.30/lb

                                                                                                                                                                     CHILE’S NEW COPPER DISCOVERY
                                                                                                                                                   Advancing Development With Further Growth Potential
CHILE'S NEW COPPER DISCOVERY Exceptional Development Project, Outstanding Exploration Potential - Marimaca
Marimaca: A standout among developers                                           10
NPV/Pre-Production Capital Costs

                  Source: Tamesis Partners

                                                                       CHILE’S NEW COPPER DISCOVERY
                                                     Advancing Development With Further Growth Potential
Marimaca: A standout among developers                                           11

Source: Tamesis Partners

                                                     CHILE’S NEW COPPER DISCOVERY
                                   Advancing Development With Further Growth Potential
Marimaca: A standout among developers                                                                                                                                       12

A rare combination of low upfront capital and bottom quartile operating cost
                         $3.5

                                                                                                                               Los Helados
                         $3.0                          Taca Taca

                                                         Josemaria

                         $2.5                       Casino
Initial Capex (US$bln)

                         $2.0
                                                                                                 Rosemont

                         $1.5                                        Santo Domingo
                                                                      Cotabambas
                                                                                 Ann Mason
                                     Filo del Sol
                                                                                                                                              Zafranal
                         $1.0                                                                           Harper Creek
                                                                                             Kamoa-Kakula
                                                                        Ambler
                                              Skouries
                                           Timok                                                         Pumpkin Hollow (OP)
                         $0.5
                                                                                                   Eva Copper
                                            Marimaca

                         $0.0
                             $1.20                  $1.40                 $1.60                  $1.80                 $2.00                   $2.20                    $2.40
Source: Wood Mackenzie                                                                 LOM AISC (US$/lb CuEq.)

                                                                                                                                                 CHILE’S NEW COPPER DISCOVERY
                                                                                                                               Advancing Development With Further Growth Potential
Marimaca: PEA Based on Large Oxide Resource                                                                              13

Mineral Resource Estimate (MRE) updated in Dec ‘19

     Depending on cut-off grade:
     › Nearly 420kt of contained copper in M&I
     › Nearly 225kt of contained copper in Inferred

     Represents approx. 100% increase over maiden MRE
     released April 2018
                                                                                 April 2018

     Resources contained in single continuous open pittable
     deposit

     Mineralization commencing from surface

     All oxide MRE
     › Significant sulphide resource potential exists                        December 2019

Mineral Resource Category                  Mt           CuT (%)   CuS (%)            kt CuT                   kt CuS
Measured (M)                             20.7            0.66     0.44               136.3                     91.8
Indicated (I)                            49.7            0.57     0.37               283.7                    183.7
M&I                                      70.4            0.60     0.39               419.9                    275.5
Inferred                                 43.0            0.52     0.31               224.5                    131.7

                                                                                              CHILE’S NEW COPPER DISCOVERY
                                                                            Advancing Development With Further Growth Potential
Marimaca: Simple Open Pit Mining                                                                      14

    Open pit developed over 8 phases

    Single continuous pit
                                                                        900m

    Significant proportion of the Mineral Resource
    Estimate is captured within the open pit design in
                                                                                          1,500m
    the PEA

    Virtually no pre-strip

    No capitalized cut-backs during life of mine

                                                                           CHILE’S NEW COPPER DISCOVERY
                                                         Advancing Development With Further Growth Potential
Marimaca: Simple Open Pit Mining                                                                               15

Favorable deposit geometry improves economics

      Very low strip ratio of 0.84:1 in PEA mine plan
      ›   Favorable geometry of ore body has further
          reduced strip from MRE

                                                                                                   1,500m
      High grade zones from surface
      ›   First five years grade is 0.78% CuT
      ›   Green oxides with met strong recoveries                High Grade
                                                                   Zones
      ›   Improves early years head grade delivered to
          leach pads
      ›   Shortens payback period                        GRADE
                                                         % CuT
      ›   Improves economics

                                                                 Plan view, 980m elevation

                                                                                    CHILE’S NEW COPPER DISCOVERY
                                                                  Advancing Development With Further Growth Potential
Marimaca: Simple SX-EW Processing                                                16

                                                      CHILE’S NEW COPPER DISCOVERY
                                    Advancing Development With Further Growth Potential
Marimaca: Supported by Four Phases of Met Work                                                            17

Marimaca has completed rigorous met testing on materials across the deposit

   Tests completed on materials from across the
   full extent of the deposit and addressed all
   defined mineral subzones

   Addressed all key operating parameters for
                                                        Underpins PEA Assumptions
   heap leach operations
                                                        ›   LOM ave. total copper
   ›   Agglomeration characteristics
   ›   Granulometry
                                                            recovery of 76% in heap
   ›   Column height                                        leach
   ›   Irrigation rates                                 ›   LOM ave. total copper
   ›   Acid consumptions                                    recovery of 40% in dump
   ›   Testing with and without seawater                    leach

   Two phases of column tests complete
   ›   30cm “mini” columns
   ›   1.5m columns at different operating parameters

                                                                               CHILE’S NEW COPPER DISCOVERY
                                                             Advancing Development With Further Growth Potential
Marimaca: Summary of Marimaca PEA                                                                                                                                            18

        LOW RISK                                                                                                   TIER 1 LOCATION
Low execution and financing risk due to location,                                                   Lowers execution risk and capital cost
simple mining and processing

        LOW CAPEX                                                                                                  HALF A BILLION NPV
Industry leading capital intensity for new greenfields                                              Post tax NPV8 of US$524m or approximately C$10.8
copper projects                                                                                     per share1 on an unfunded basis

        LOW OPEX                                                                                                  STRONG INVESTMENT RETURNS

Lowest 15% AISC based on industry cost curve                                                        Highly profitable, strong return on invested capital

                                                                                                                                                  CHILE’S NEW COPPER DISCOVERY
          1) Calculated assuming post tax NPV8 of US$524m with CAD:USD exchange rate of 0.75 and 64.4 million shares on issue
                                                                                                                                Advancing Development With Further Growth Potential
Marimaca: New, high quality, discoveries are rare!                                                                                                                                                                                                        19

                                  20

                                  18                                                    17

                                  16                                      15                                                                    15            15
                                                                                                                                                                                             Marimaca is the only discovery
Number of Major Discoveries (#)

                                  14                               13
                                                                                               12                                                                                                globally in five years +
                                  12                                             11                          11 11
                                              10            10                                                                                                       10
                                  10                                                                  9
                                       8             8                                                                     8
                                   8                                                                                              7      7
                                                                                                                                                       6                                   6
                                   6                                                                                                                                        5
                                                                                                                                                                                                         4
                                   4                                                                                                                                                                            3

                                   2                                                                                                                                               1              1                           1

                                   0
                                                                   1994

                                                                                        1997

                                                                                                             2000

                                                                                                                                  2003

                                                                                                                                                       2006
                                       1990
                                              1991
                                                     1992
                                                            1993

                                                                          1995
                                                                                 1996

                                                                                               1998
                                                                                                      1999

                                                                                                                    2001
                                                                                                                           2002

                                                                                                                                         2004
                                                                                                                                                2005

                                                                                                                                                              2007
                                                                                                                                                                     2008
                                                                                                                                                                            2009
                                                                                                                                                                                   2010
                                                                                                                                                                                           2011
                                                                                                                                                                                                  2012
                                                                                                                                                                                                         2013
                                                                                                                                                                                                                2014
                                                                                                                                                                                                                       2015
                                                                                                                                                                                                                              2016
                                                                                                                                                                                                                                     2017
                                                                                                                                                                                                                                            2018
                                                                                                                                                                                                                                                   2019
Source: S&P Global Market Intelligence – As of 1 June 2020

                                                                                                                                                                                                            CHILE’S NEW COPPER DISCOVERY
                                                                                                                                                                                          Advancing Development With Further Growth Potential
Marimaca: Where to from here?                                                                                 20

  Continue to move Marimaca towards production while assessing the exceptional
                exploration potential near Marimaca and beyond

        Feasibility Study                                Exploration Potential

    Technical Workstreams are advanced
                                                      Dual Track Exploration Strategy
    well beyond PEA level

    Significant proportion of deposit in Measured
    and Indicated
    Metallurgical work complete
    Geotech complete                                NEAR MINE                    DISTRICT SCALE
    Baseline enviro studies complete                Oxides and                   Marimaca
                                                    Sulphide                     Repetition?
    Infill drilling on remaining inferred
    Engineering studies

                                                                                   CHILE’S NEW COPPER DISCOVERY
                                                                 Advancing Development With Further Growth Potential
21

DUAL
TRACK EXPLORATION
STRATEGY                   Potential for a game
                           changing discovery

Exciting near mine and
district scale potential

                                             CHILE’S NEW COPPER DISCOVERY
                           Advancing Development With Further Growth Potential
Marimaca: Sulphide Potential below Oxide Deposit                                            22

•   Large magnetic anomaly adjacent to Oxide   •   Volume of favorable magnetic anomaly –
    Deposit                                        175 million m3
•   Coincident with interpreted extension of
    mineralizing structures at surface
Marimaca: Sulphide Potential below Oxide Deposit          23

Chargeability anomaly provides exciting target to drill
Marimaca: Sulphide Potential below Oxide Deposit                               24

First drill hole provides an indication of extensions to higher grade mineralization
Marimaca Region: Repetitions of Marimaca?                                             25

                              •   Structural conduits at Marimaca are
                                  regionally extensive

                              •   IOCG requires proximity to large regional
                                  structures

                              •   Potential for generation of additional
                                  Marimaca style targets?

                              •   Regional drone mounted high resolution
                                  mag survey identified four large scale
                                  magnetic anomalies believed to be
                                  prospective for Marimaca Style

                                                           CHILE’S NEW COPPER DISCOVERY
                                         Advancing Development With Further Growth Potential
Marimaca Region: Repetitions of Marimaca?                                        26

                                         •     Similarities with Marimaca
                                               are clear

                                         •     Spatial relationship with the
                                               Naguayan Fault

                                         •     Orientation and dip of the
                                               magnetic anomalies

                                         •     Historical artisanal workings
                                               at Cindy and Mercedes

                                                  •     Key feature of
                                                        Marimaca

                                         •     Potential for oxides and
                                               sulphides

                                                      CHILE’S NEW COPPER DISCOVERY
                                    Advancing Development With Further Growth Potential
Marimaca Region: Mercedes Target                                                27

                                                     CHILE’S NEW COPPER DISCOVERY
                                   Advancing Development With Further Growth Potential
Marimaca Region: Mercedes Target                                                                   28

Same structural controls (flat sheeted veining) and host rocks as Marimaca

                                                                        CHILE’S NEW COPPER DISCOVERY
                                                      Advancing Development With Further Growth Potential
Marimaca Region: Cindy Target                                                29

                                                  CHILE’S NEW COPPER DISCOVERY
                                Advancing Development With Further Growth Potential
Marimaca Region: Cindy Target
                                                                                                            30

C
I
    Massive Magnetite-Chalcopyrite Mineralization   Historic Artisanal Adit at Cindy Target
N
D
Y

          Magnetite-Breccia with Chalcopyrite         Historic Artisanal Adit at Cindy Target
                                                                                 CHILE’S NEW COPPER DISCOVERY
                                                               Advancing Development With Further Growth Potential
Marimaca: Near Mine Exploration Potential                                                    31

                              Deposit remains open to the north and south and
                              at depth

                              Multiple near surface oxide exploration targets
                              identified within close proximity to Marimaca
                              › Potential to add near term tonnes to mine life

                 Near Mine
                   Oxide
                              The Hanging Wall Alteration (HWA) zone is regionally
                 Potential    pervasive
                              › Extension identified more than 10km across project area
                              › Strong association with copper mineralization

                              Exciting potential for sulphide extensions at depth
                              › Multiple drill holes ended in sulphide mineralization
                                • Grades as high as 2% Cu
                                • Generally in similar range to Marimaca
                              › Down dip sulphide extensions have not been tested but have
                                the potential to extend several hundred meters

                                                                  CHILE’S NEW COPPER DISCOVERY
                                                Advancing Development With Further Growth Potential
Marimaca: Summary                                                                   32

                         A unique development stage copper asset
                         with exceptional economics in a Tier 1
                         jurisdiction

                         Outstanding exploration potential near
                         mine

                         Potential for district scale discoveries

  High Quality Copper
  Development Asset
                         Multiple value catalysts over next 12
  in a Tier 1 Location
                         months

                                                         CHILE’S NEW COPPER DISCOVERY
                                       Advancing Development With Further Growth Potential
Appendices

                           CHILE’S NEW COPPER DISCOVERY
         Advancing Development With Further Growth Potential
Experienced Board                                                                                                                                             34

                  Experienced and                                                                                               Leading explorational,
                                                                            Deep experience in
                  invested Board and                                                                                            regional and financial
                                                                            copper and Chile
                  management team                                                                                               experience

Michael Haworth                            Hayden Locke                                Clive Newall                            Tim Petterson
Non-Executive Chairman                     CEO, President & Director                   Non-Executive Director                   Non-Executive Director
› Nearly 30yrs in resources across         › Over 15 years’ experience in mining       › Co-founder of First Quantum            › Deep mining industry experience
  advisory and investment                    and finance                               › Geologist by training                    spanning research, finance and
› Co-founder of Greenstone                 › Former Head of Corporate for              › Broad experience in exploration,         corporate
  Resources                                  Papillon Resources, CEO of                  construction and production in         › Founder and Exec-Chair of Minera
                                             Emmerson Plc                                copper                                   Cobre

                                     Colin Kinley                                                     Alan Stephens
                                     Non-Executive Director                                           Non-Executive Director
                                     › Internationally respected                                      › Co-founded MCC in 2005
                                       explorationist                                                 › Exploration geologist, former VP of
                                     › Currently CEO Kinley & Exploration                               Exploration for First Quantum
                                       and Founder and COO of Eco
                                       Atlantic

                                                                                                                                   CHILE’S NEW COPPER DISCOVERY
                                                                                                                 Advancing Development With Further Growth Potential
Experienced Management                                                                                                                              35

     Experienced and                                                                                                  Leading explorational,
                                                             Deep experience in
     invested Board and                                                                                               regional and financial
                                                             copper and Chile
     management team                                                                                                  experience

    Hayden Locke                                                Petra Decher                                           Luis Albano Tondo
    CEO, President & Director                                   Chief Financial Officer                                Chief Operating Officer
    › Over 15 years’ experience in mining                       › Strong finance, Co Sec and                           › Mining Engineer
      and finance                                                 Governance background                                › 30yrs experience in project
    › Former Head of Corporate for                              › Former VP and Co Sec Franco                            development
      Papillon Resources, CEO of                                  Nevada                                               › Project Development for Kinross in
      Emmerson Plc                                                                                                       Chile and Rio Tinto in Brazil

                                 Laura Rich                                               Sergio Rivera
                                 General Counsel and Co Sec.                              Vice President of Exploration
                                 › Former Deputy GC of Acacia Mining                      › Over 30yrs experience in
                                   (African Barrick)                                        exploration geology
                                 › Associate M&A at Shearman and                          › Credited with several large copper
                                   Sterling LLP                                             discoveries including the Marimaca
                                                                                            Deposit

                                                                                                                        CHILE’S NEW COPPER DISCOVERY
                                                                                                      Advancing Development With Further Growth Potential
Corporate Structure                                                                                                                                                          36

                                                                                  12-Mth Share Price and Volume
                           6                                                                                                                                      1200000

                           5                                                                                                                                      1000000
  Share Price - C$/Share

                                                                                                                                                                             Volume Traded
                           4                                                                                                                                      800000

                           3                                                                                                                                      600000

                           2                                                                                                                                      400000

                           1                                                                                                                                      200000

                           0                                                                                                                                      0

                                                                                              Volume          Adj Close

                               Capital Structure1                                      Board                                             Management
Stock Exchange                         TSX “MARI”                                                                           Luis Tondo         Chief Operating Officer
                                                                            Michael Haworth     Non-Executive Chairman
Market Cap                             C$438 million (C$5.00 share price)
                                                                            Hayden Locke        CEO, President & Director   Petra Decher       CFO
Shares Out                             87,608,067
                                                                                                                            Sergio Rivera      VP Exploration
Options Out                            1,719,822                            Colin Kinley        Lead Independent Director

Cash                                   US$45m (31 March 2021)                                                               Laura Rich         General Counsel and Corp. Secretary
                                                                            Clive Newall        Non-Executive Director
Debt                                   $0.0m
                                                                            Tim Petterson       Non-Executive Director
Shareholders                           Greenstone 29.0%
                                       Tembo 11.5%
                                                                            Alan Stephens       Non-Executive Director

                                 1) Post consolidation
                                                                                                                                              CHILE’S NEW COPPER DISCOVERY
                                                                                                                            Advancing Development With Further Growth Potential
Marimaca: Roadmap towards FS                                                                                                      37

Work Stream                                              2015   2016   2017   2018           2019            2020            2021+

Early exploration work                        ✓

Discovery Drilling                            ✓

Initial Mineral Resource Estimate             ✓

Resource Expansion & Infill Drilling          ✓

Updated Mineral Resource Estimate             ✓

Resource Expansion and Infill Drilling        ✓

Updated Mineral Resource Estimate             ✓
Preliminary Geotechnical
Programmes                                    ✓

Preliminary Economic Assessment               ✓

Preliminary Metallurgical Testing
Programmes                                 Q3 2020

Follow – Up Geological Planning            Ongoing

Detailed Metallurgical Testwork
Programmes                               Start Q3 2020

Follow – Up Exploration and Infill         Planning
Drilling                                  underway
                                           Planning
Pre – Feasibility Study
                                          underway

Environmental and Social Engagement        Ongoing

Permitting                                 Ongoing

                                                                                                       CHILE’S NEW COPPER DISCOVERY
                                                                                     Advancing Development With Further Growth Potential
Marimaca: Simple Open Pit Mining                                                                             38

Favorable deposit geometry delivers very low strip ratios

                                                                          HIGH
                                                                         GRADE
                                                                         ZONES

                                         1,500 meters

                               Long section looking northeast

                                                                                  CHILE’S NEW COPPER DISCOVERY
                                                                Advancing Development With Further Growth Potential
Mineral Resource Estimate                                                                                                              39

                       Measured                     Indicated             Measured + Indicated                       Inferred
   Cut-off
    grade
   (% CuT)   Mineral     CuT      CuS     Mineral     CuT       CuS    Mineral     CuT          CuS       Mineral       CuT         CuS
               kt        (%)      (%)       kt        (%)       (%)      kt        (%)          (%)         kt          (%)         (%)

    0.60      9,272      1.00     0.65     18,375     0.91      0.58    26,727     0.95        0.61       12,182        0.90        0.48

    0.50      11,397     0.91     0.61     23,285     0.83      0.53    34,682     0.85        0.56       16,926        0.80        0.44

    0.40      14,403     0.81     0.55     30,600     0.74      0.48    45,003     0.76        0.50       23,607        0.70        0.40

    0.30      17,865     0.72     0.49     40,253     0.64      0.42    58,118     0.67        0.44       33,410        0.60        0.35

    0.22      20,721     0.66     0.44     49,666     0.57      0.37    70,387     0.60        0.39       43,015        0.52        0.31

    0.18      22,072     0.63     0.42     54,109     0.54      0.35    76,181     0.57        0.37       47,164        0.49        0.29

    0.10      23,087     0.61     0.41     57,619     0.52      0.33    80,706     0.54        0.35       50,641        0.47        0.27

                           CuT means total copper and CuS means acid soluble copper. Mineral resources that are not mineral
                           reserves do not have demonstrated economic viability. Does not include primary sulphides. Detailed
                           information by mineral type in Appendix. Refer to news release “Coro Announces Substantial Increase
                           in Resources; Development Studies Underway” 2 December 2019. Technical and economic parameters
Discovery cost             included: copper price US$3.00/lb; mining cost US$2.00/t; HL processing cost including G&A US$9.00/t;
under US 2 cents/          ROM processing cost including G&A US$2.50/t; selling cost US$0.07/lb; heap leach recovery 76% of CuT;
lb copper                  ROM recovery 40% of CuT; pit slope angle 44-46°.

                                                                                                            CHILE’S NEW COPPER DISCOVERY
                                                                                          Advancing Development With Further Growth Potential
Mineral Resource Estimate by Mineralization                                                                                  40

                               Mineral    CuT      CuS      CuT       CuS
Mineral Resource Category
                                (kt)      (%)      (%)       (t)       (t)
Measured
Brochantite                      10,890     0.76     0.55    82,418    59,835
Chrysocolla                       4,918     0.59     0.45    29,016    22,191
Wad/Black oxides                  3,262     0.34     0.20    11,118     6,555
Mixed                               475     1.02     0.26     4,865     1,217
Enriched                          1,176     0.75     0.17     8,874     1,974
Total Measured                   20,721     0.66     0.44   136,283    91,772    CuT means total copper and CuS means
Indicated                                                                        acid soluble copper. Mineral resources
Brochantite                      24,719     0.68     0.49   167,463   121,418    that are not mineral reserves do not
Chrysocolla                       9,581     0.50     0.37    48,298    35,668    have demonstrated economic viability.
Wad/Black oxides                 10,722     0.32     0.18    34,160    19,299    Does not include primary sulphides.
Mixed                             1,177     0.86     0.21    10,076     2,457
Enriched                          3,468     0.69     0.14    23,769     4,899
                                                                                 Detailed information by mineral type
Total Indicated                  49,666     0.57     0.37   283,654   183,741    in Appendix. Refer to news release
Measured and Indicated                                                           “Coro Announces Substantial Increase
Brochantite                      35,609     0.70     0.51   249,881   181,253    in Resources; Development Studies
Chrysocolla                      14,499     0.53     0.40    77,314    57,859    Underway” 2 December 2019. Technical
Wad/Black Oxides                 13,984     0.32     0.18    45,281    25,854    and economic parameters included:
Mixed                             1,652     0.90     0.22    14,941     3,675    copper price US$3.00/lb; mining cost
Enriched                          4,644     0.70     0.15    32,644     6,873    US$2.00/t; HL processing cost including
Total Measured and Indicated     70,387     0.60     0.39   419,937   275,513
                                                                                 G&A US$9.00/t; ROM processing cost
Inferred
                                                                                 including G&A US$2.50/t; selling cost
Brochantite                      17,618     0.63     0.42   110,712    74,266
Chrysocolla                       9,978     0.47     0.33    47,077    32,680    US$0.07/lb; heap leach recovery 76%
Wad/Black oxides                  9,565     0.31     0.17    29,834    16,498    of CuT; ROM recovery 40% of CuT; pit
Mixed                             3,661     0.63     0.15    23,197     5,525    slope angle 44-46°.
Enriched                          2,193     0.63     0.13    13,786     2,777
Total Inferred                   43,015     0.52     0.31   224,471   131,746

                                                                                                  CHILE’S NEW COPPER DISCOVERY
                                                                                Advancing Development With Further Growth Potential
Marimaca: Early Work has Commenced                                                                                      41

•   IP/Resistivity surveys underway at Marimaca Sulphide Targets
      •   Delineate high priority zones for drilling in early 2021
•   Surface geological work has commenced on Mercedes and Cindy district targets
      •   1:1000 geological mapping, surface geochem, reconnaissance work
•   IP/Resistivity planned for district targets
•   Objective to identify regional oxide and sulphide targets to drill in 1H 2021

M
E
R
C
E
D
E
     Atacamite Outcrop with Actinolite-Magnetite           Intensely Albitized Magnetite Breccia
S
                      Veining
                                                                                             CHILE’S NEW COPPER DISCOVERY
                                                                           Advancing Development With Further Growth Potential
CHILE’S NEW COPPER DISCOVERY
Advancing Development With Further Growth Potential