Brazilian Investments Partnerships Program - PPI
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Brazilian Investments Partnerships Program – PPI This is an unofficial translation intended for an overview of the PPI and its portfolio. Please, check the PPI website or contact the Secretariat for updates and detailed information on specific projects. August, 2021
Brazil in the world 5th largest 11thlargest economy: 6th largest population: land area: USD 1.4 trillion GDP 212.6 million people 8,515,767 km² Opportunities for sustainable 8th largest FDI One of the main global destination in 2020: producers and exporters infrastructure development of iron ore, soy bean, with great social benefits - ESG USD 34.2 billion animal protein, coffee, Agenda (Source: Central Bank) machinery and aircraft
Reforms The path for economic recovery Pension Reform Infrastructure Reform USD 160 billion to be saved in More legal certainty, the next 10 years, limiting transparency and privileges predictability for domestic and foreign investors Administrative Reform Tax Reform Streamlining civil service to Simplifying the tax system bring more efficiency to boost economy
COVID-19 IMPACTS ON PROJECTS Concessions under preparation: • Public audiences in virtual format; • Postponement of consultations with indigenous peoples in environmental permit processes; • Review of demand studies in sectors affected by the pandemic. • Review of investment cycles ... Concessions in force: • Contractual rebalances recognized in the contracts that imputed the risk to the procuring authority (act of God and force majeure); • Legal and regulatory measures to avoid default by users and postponement of investments (cash relief); • Deferral of taxes • Emergency Program for the Maintenance of Employment and Income • Stand-still financing ...
Pro-Investment Bills: The path for economic recovery • Law 14026, as of July 15th, 2020 – New Legal Framework for Sanitation • Law 14134, as of April 8, 2021 – New Gas Market • Law 14.182,as of July 12, 2021 – Privatization of Eletrobrás • Bill 4199/2020 - Cabotage ...............................................................CD SF (under debate) • Bill 414/2021 - Modernization of the Power Sector ..................................SF CD (under debate) • Bill 7063/2017 - Concessions and PPPs ..............................................SF CD (under debate) • Bill 5387/2019 - Brazilian foreign exchange market, Brazilian capital abroad, foreign ....CD SF capital in the country and the provision of information to the Central Bank of Brazil (under debate) • Bill 3729/2004 - Environmental Licensing ........................................CD SF (under debate) • Bill 2646/2020 – Infrastructure debentures........................................CD SF (under debate) • Bill 591/2021 – Correios [The National Post]..............................CD SF (under debate) CD- Chamber of Deputies, Brazilian lower • Bill 3178/2019 – Oil&Gas Production-Sharing Agreement (PSA) SF (under debate) house • Bill 261/2018 - Railways Authorization.................................................SF (under debate) SF – Federal Senate
PPI Council President and Ministers Economy Presidency of the Republic Executive Office Infrastructure Mines and Energy Ministry of Economy Environment Regional Development Secretariat of Government PPI Council Federal Banks BNDES Caixa Econômica Federal Special Secretariat of PPI Banco do Brasil The PPI Council President is the Minister of Economy. The Special Secretary serves as the Executive Secretary of the PPI Council.
PPI works as a hub for investments National and international investors Sectorial Sectorial Ministries Unions Adds on efficiency and value to the process Financial Regulatory Agents Agencies (banks, investment Governance, coordination, funds, etc.) monitoring and oversight Transparency, dialogue, Legislative Branch PPI Multilateral Organizations credibility and predictability Well-designed projects Control Concessionaries Technical and legal framework Entities enhancement Licensing Embassies Entities Subnational Governments
PPI in Figures ACCOMPLISHED AUCTIONS/BIDS AND PROJECTS Accomplished Concession Qualified auctions/bids Investments fees/Bonuses projects and projects USD 159.5 billion USD 34.1 billion 429 243 (BRL 797.3 billion) (BRL 170.5 billion) 1 USD = BRL 5
2019-2020: 65 auctions/projects concluded Projected Concession investments fees/Bonuses USD 97.7 bi USD 19.6 bi 1 USD = BRL 5
Mining 36 Auctions carried out in 2019 1 auction Palmeirópolis (Auction 10/21) Oil and Gas Ports Investments: USD 58.6 million 4 auctions 13 auctions Concession Fee: USD 3.44 million 11 Terminals of liquid bulk Regular Offer (Auction 9/10) • 3 in Cabedelo/PB (Auction 3/22) Lotex • 1 in Vitória/ES (Auction 3/22) 1 auction (10/22) Bonus: USD 5.05 million • 5 in Belém/PA (Auction 4/5) Round 16 under the concession agreement (Auction 10/10) • 1 in Vila do Conde/PA (Auction 4/5) Concession Fee: USD 187.9 million • 1 in Santos/SP (Auction 8/13) Highway Bonus: USD 2.04 billion 1 Terminal of paper pulp in Paranaguá/PR 1 auction (Auction 8/13) BR-364/365/GO/MG (Auction 9/10) Petrobras Transfer of Rights Surplus (Auction 11/6) 1 Terminal of Solid Bulk in Santos/SP (Auction Investments: USD 473.5 million 8/13) Concession fee: lower toll fee (33% discount) Bonus: USD 16.07 billion Round 6 Production Sharing Agreement - PSA (Auction 11/7) Investments: USD 210 million Airports Concession Fee: USD 163.2 million 12 assets Bonus: USD 1.16 billion 12 airports in 3 clusters (Auction 3/15): Energy Northeast: Total Bonus: USD 19.3 billion 3 auctions Recife/PE; João Pessoa ,Campina Grande/PB; Maceió/AL; Total Investments: USD 96.38 billion Generation Aracaju/SE; and Juazeiro do Norte/CE • New Energy A-4 (Auction 6/28) Midwest: Railway All in MT: Várzea Grande (Cuiabá), Alta Floresta, Barra do • New Energy A-6 (Auction 10/18) Garças, Rondonópolis and Sinop. 1 auction Transmission Southeast: North-South Railway (FNS) (Auction 3/18) • 12 lots of transmission lines Vitória/ES and Macaé/ RJ Investments: USD 625.2 million Investments: USD 3.97 billion Investments: USD 809 million 11 Concession Fee: USD 625.2 million Auction fee: lower power tariff Concession fee: USD 546.3 million
29 auctions held in 2020 Support to subnational level entities (11) Railway (4) Mining (1) Public street lighting (Municipalities) Early extension of Rumo Malha Paulista _____ ___May 27 1st round – ANM available areas November 25 9 auctions Early extension of Ferrovias da Vale (EFVM and EFC) _Dec 18 FICO (cross investment)_______________________Dec 18 • Aracaju/SE (FEP): _____August 14 Pilot round: 168 areas for research. • Feira de Santana/BA (FEP): August 14 Investments: USD 5.11 billion • Franco da Rocha/SP (FEP): August 14 Concession fee: USD 960 million • Belém/PA (FEP): ___November 06 Parks (1) • Sapucaia do Sul/RS (FEP): _____________ November 06 Highway (1) • Teresina/PI (BNDES): __ February 13 Aparados da Serra (RS) and Serra Geral (SC) Dec 15 • Vila Velha/ES (BNDES): _August 03 • Macapá/AP (BNDES): _October 07 BR-101/SC February 21 • Petrolina/PE (BNDES): _______ November 18 Investments: USD 52,44 million Investments: USD 680 million Discount: -62% Investments: USD 187 million Energy (1) Average discount: -56,2% Ports (6) 11 blocks of transmission installation Dec 17 Wastewater (Municipality) 2 Port Terminals in Santos/SP (STS 14 and 14A)____Ago 28 1 auction 2 Port Terminals in Aratu/BA (ATU 12 and 18)_____Dec 18 1 Port Terminal in Paranaguá/P (PAR12)__________Dec 18 Investment: USD 1,47 billion • Cariacica+Viana /ES (BNDES): October 20 1 Port Terminal in Maceió/AL (MAC 10)___________Dec 18 Discount: -55,24% Investments: USD 163 million Investments: USD 116 million Concession fee: USD 118 million Liquidation of SOE (3) Discount: -38% Oil and Gas (1) CASEMG – Minas Gerais Warehouses and Silos State Water and wastewater (BNDES) Company. Liquidation concluded at October 29. 1 auction 2nd cycle of open acreage in areas for exploitation and CODOMAR – Maranhão Docks State Company. production of oil and gas December 04 • Metropolitan region of Maceió/AL: October 07 Liquidation concluded at September 09. Investments: USD 31 million CEITEC – National Centre of Advanced Electronic Investments: USD 514 million Concession fee: USD 11 million Technology S.A. Liquidation began on December 15. Concession fee: USD 400 million
2021: 46 assets auctioned off Parks and Forests (2) Canela/RS___________12/jul Water and wastewater São Francisco de Paula/RS ___29/07 Railroad (1) Fishery Terminal (1) services(1) Investiments: US$ 33mi CEDAE – State of Rio de Janeiro_apr/30 Concession fee: US$ 148.2 th East-West Integration Railroad Cabedelo/PB___________jan/28 (FIOL)_______________apr/08 Investments: USD 1 billion Investments: USD 46 million Investments: USD 5.52 billion Expected Concession fee: USD 4.54 billion Concession fee: USD 6.5 million Concession fee: USD 37,209 Investments Ports - Terminals (8) Energy (6) Highway (2) 4 in Itaqui/MA (IQI 03,11, 12 , 13)__Apr,09 USD 11.12 bi Supply of isolated systems BR-153/080/414/GO/TO__08/apr 1 in Pelotas/RS (PEL01) ________ Apr,09 ________________April 30 BR-163/230/MT/PA______08/jul 1 in Santana/AC (MCP02)_______ Aug,13 Existing energy A-4 and A-5 1 in Mucuripe/CE (MUC01)_____Aug,13 Investments: USD 1.94 billion ________________June 25 New energy A-3 and A-4 Outorga: USD 64 million 1 in Salvador/BA (SSD09)______ Aug,13 Concession Investments: USD 122.4 million ________________July 8 Concession fee: USD 43.26 million fee/bonus Mining (3) 1º Auction of electricity transmission 2021___jun/30 2nd & 3rd Round of ANM AvailableAreas_mar/29 & jun/30 Airports (22) USD 5.4 bi Phosphate-(Miriri/PB/PE)_jun/10 6ª Round of Airports Concession (south, Investments: USD 1.14 billion north and central blocks)________apr/07 Discount: -19.4%, -52.47% e -45.79% Investments: USD 38 million Investments: USD 1.22 billion -48.12; -30.83%; -28.82% Concession fee: USD 47.6 million 1 USD = BRL 5 Concession fee: USD 660 million
Current PPI Portfolio
Current PPI Project Portfolio Defense and Security Communications and Public Fishery National Parks and Tourism – 8 (PPP’s) - 3 Technology – 4 Terminals – 7 Forests – 23 8 Concessions of national 1 Air force Communications 7 Fishery Terminals heritage historical sites (CE, MG, 1 Police Communications 3 Privatization (Telebras, ( Belém/PA, Manaus/AM, Aracaju/AL, PB, PE, SP and RJ) 1 Vehicle impoundment – National Post, and EBC) Natal/RN, Santos/SP, Cananeia/SP 14 concessions of parks Federal Highway Police 5G and Vitória/ES) 9 concessions of forests Ports – 35 Highways – 20 Railways– 11 5 Concessions (3 Privatizations) 3 concession renewals Energy – 12 28 Port Terminals 12 Concessions 1 Transmission Lines Auctions Oil and Gas – 5 1 Waterway (Permit) 4 new concessions 1 Port access channel 2 Privatizations (Eletrobras and 8 Licensing 3 investments in strategic Nuclep) 17th Round under the concession railway networks Transmission Line Manaus-Boa agreement 1 privatization Vista Shale Gas Fracking (Env. Licensing) 7 Hydroelectric plants 2 Blocks of Transfer o Rights Economy – 6 Regional Development – 5 (Environmental Permit) 4 Privatizations (ABGF, 3rd Cycle of Open Acreage 1 Generation (New Energy A-5) EMGEA, Serpro and Dataprev) 2 privatizations (CBTU and 2 Lottery (Fixed odds and Trensurb) Mining – 12 Lotex) Belo Horizonte subway Line 2 PISF Irecê basin irrigation) Airports – 26 16 airports for concession 6 CPRM Mining Rights 6 ANM Available Areas 180 Projects Supply – 2 8 regional airports 1 privatization (Ceasaminas) 2 rebiddings Health – 1 1 concession H (CONAB warehouses and facilities) Hospital Fêmina/Porto Alegre
Public Policies Health TRIIP “Sea Road” services Opening market to competitiveness, cabotage Alternatives for partnerships for Tourism decreasing ticket prices and improving concessions aiming at building, services Boosting fleet and the naval modernizing, operating, industry, increasing maintaining and improving the Policy for attracting private + 13 million and 416 cities don’t have investments for the tourism access to road transportation competitiveness and fostering management of the Basic Health ports (permit for temporary Units network on municipal duty industry. contracts) Program Revive Brasil Reducing imports of essential Alternative solutions to enable more Bidsim PPP prisons minerals; searching for efficient public services, quality and Strategic competitive advantages for + effective social reinsertion of Improving methodology for minerals generating trade surplus and correctional prisoners through work and defining technical / exploiting high technology facilities qualification economic standards for oil minerals auctions Universalizing PPP Supporting regulatory improvement sanitation + daycares and project designing for supplying solid waste PPP public Projects in which private partners are in street lighting projects, including charge of accomplishing works, equipping, lighting developing, modernizing, expanding, Coordinating regional level projects design maintaining and operating daycare units, energy efficiency, operating and and regional bankable projects that enable with service quality indicators and maintaining power grid adequate public services to citizens standards to meet
North II Block USD 236 million in Airports São Gabriel da Macapá 7th round investments Cachoeira Barcelos Santarém Parintins Belém Altamira Carauari Coari Maués Marabá Natal Lábrea Carajás Eirunepé SP-MS Block USD 480 million in 7th round investments Montes Claros 16 Airports (3 blocks) : 7th round Campo Grande Uberlândia and Uberaba RJ-MG Block USD 338 million in Corumbá 7th round investments Campinas Investments USD 1 billion Londrina Santos Dumont and Ponta Porã Jacarepaguá Congonhas and 2 Airports for Rebidding: Campo de Marte Natal/RN and Campinas/SP 8 Regional Airports São Gabriel da Cachoeira, Barcelos, Parintins, Maués, Coari, Lábrea, Carauari and Eirunepé 1 USD = BRL 5
Railroads Ferrogrão Sinop/MT a Miritituba/PA 933 km Inv.: USD 4.3 bi New concession FIOL 2 and FIOL 3 FCA Caetité/BA – Barreiras/BA; 485 km 7,215 km Barreiras/BA – Figueirópolis/TO; 505 km Inv.: USD 2.7 bi Inv.: USD 1.9 bi Malha Oeste 1,973 km Inv.: to be defined MRS Contracts 1,686 km Renewal Railroad portfolio Inv.: USD 3.3 bi USD 16.18 billion • New: USD 6.2 billion Investiments • Renewal: USD 8.2 billion Rumo Malha Sul 7,223 km • Privatization: USD 1.7 billion Inv.: USD 2.1 bi • Rebidding: to be defined 21,390 Km: • New: 1,923 km Total Lenght • Renewal: 16,124 km Ferroeste • Privatization: 1,370 km 1.370 km Inv.: USD 1.7 bi • Rebidding: 1,973 km 1 USD = BRL 5
RAILWAYS - FERROGRÃO Project • Section: from Sinop (state of Mato Grosso) to Miritituba (state of Pará) - 933 km • Concession period: 69 years, extension is prohibited • Auction criterion: highest concession fee amount (USD 3.6 million minimum) • Gauge: 1.60 m • Train type: 3 locomotives and 160 wagons Financial aspects • CAPEX: USD 1.68 bi (implementation) + USD 2.62 bi (maintenance capex) • OPEX: USD 12.74 bi • Demand: 20.7 mi net tons (2030); 48.6 mi net tons (2060) • Soybean and corn tariff: USD 16.28 / net tons (Sinop-Miritituba) • Total Revenue: USD 35.36 billion (start of operation): • Year 10 revenue USD 400 million • WACC: 11.04% per year (in real terms and net of tax) • Ebitda margin after ramp up: 59% (year 2037) Social aspects • The railroad route does not overlap with Indigenous Lands or Quilombola communities • The nearest indigenous lands are located at a distance of 4 km (Praia do Mangue) and 7 km (Praia do Índio), in Itaituba • The railway's reference layout does not cross any Conservation Unit • Reduction of USD 3.84 billion in freight costs compared to the highway mode 1 USD = BRL 5 19
BR-135/316/MA 438 km Junction BR-135 (via Pedrinhas) – Junction Highways Itaqui/Bacanga; Access to Tirirical Airport – Junction BR-316(B) (Peritoró); Junction BR-135(B)/MA-020 (Peritoró) – Junction BR-226(B)/343(A) (Div. MA/PI) (Teresina/Timon) BR-158/MT/PA 1,135 km Ribeirão Cascalheira/MT and Marabá/PA BR-116/493/495/RJ/MG (antiga CRT) 727 km Section of BR-116/RJ Section between Além Paraíba/RJ and BR-040/MG Concession of 7,213 km of highways BR-381/MG and BR-262/MG/ES - 670 km Section of BR-381/MG between Belo Rebidding Horizonte/MG and Gov. Valadares/MG BR-163/MS Section of BR-262/MG/ S between João Monlevade/MG and Viana/ES 845 km Section between borders MT/MS and MS/PR BR-040/495/MG/RJ (Concer) 443 km Integrated Highways Section between Juiz de Fora/MG and Rio of Paraná state – de Janeiro/RJ Highways portfolio 3,328 km Rebidding BR-116/465/101 /SP/RJ (Dutra) Investments USD 27.4 bi BR-470/282/153/SC 625 km 502 km BR-040/DF/GO/MG – Section between Rio de Janeiro/RJ and São Total Length 16,638.2 km Section between 709 km Paulo/SP Navegantes/SC and RS/SC Section between Brasília/DF and Juiz de Fora/MG 1 USD = BRL 5
Highways – next auctions (2021/2022) Highway Length Capex (USD) Auction BR-381/MG and BR-262/MG/ES • BR-381/MG between Belo Horizonte/MG and Gov. Valadares/MG 670.6 km 1.54 bi 2021/Q4 • BR-262/MG/ ES between João Monlevade/MG and Viana/ES BR-116/465/101 /SP/RJ (Dutra) 625.8 km 2.89 bi 2021/Q4 • Rio de Janeiro/RJ and São Paulo/SP BR-116/493/495/RJ/MG (antiga CRT) 727 km 1.72 bi 2022/Q1 INTEGRATED HIGHWAYS OF PARANÁ STATE 3,328 km 8.42 bi 2022/Q1 • BR- 153/158/163/272/277/369/373/376/476/PR and relevant state highways STUDIES FOR THE CONCESSION OF SECTIONS OF THE 7,213 KM OF 6,600 km 10.72 bi 2022/Q3 FEDERAL HIGHWAYS BR- 040/495/MG/RJ (CONCER) 443 km 620 mi 2022/Q4 • Rio de Janeiro to Belo Horizonte BR-040/DF/GO/MG (rebidding - 679,7 km ) 679.7 km 1.48 bi 2022/Q4 13,074,1 km USD 27.4 bi 1 USD = BRL 5
Vila do Conde/PA (2) Liquid and solid bulk Fortaleza/CE (2) Passengers and liquid bulk Ports Areia Branca/RN (1) Sea salt Recife/PE (1) Solid bulk Maceió/AL (4) General cargo, grain and liquid bulk Port of Salvador/BA - CODEBA Paranaguá/PR (5) General cargo, grain and liquid bulk Port of Vitória/ES - CODESA Ongoing Ports portfolio Paranaguá/PR (1) Itaguaí/RJ (1) Investments USD 4.14 billion Port access channel Solid mineral bulk Port leasings 21 Port of São Sebastião/SP Port of Itajaí/SC Privatizations 3 Santos/SP (4) Solid and liquid/fuel bulk and containerized cargo Concessions 2 Imbituba/SC (1) Liquid bulk Port of Santos/SP – CODESP Acess channel 1 1 USD = BRL 5
Ports - Privatizations Port of Santos/SP (SPA) Port of Itajaí/SC Status: Feasibility assessments Status: Feasibility assessments Public Hearing: 2021/Q3 Bidding Notice: : 2022/Q3 Bidding Notice: 2022/Q2 Auction: 2022/Q4 Auction: 2022/Q3 Investments: under assessment Investments: USD 1.56 billion Port of Vitória/ES (CODESA) Port of São Sebastião/SP Status: Public Hearing Status: Feasibility assessments Bidding Notice: 2021/Q4 Bidding Notice: : 2021/Q4 Auction: 2022/Q1 Auction: 2022/Q1 Investments: USD 250 million Investments: USD 114.8 million Ports of Salvador, Aratu- Candeias and Ilhéus (CODEBA) Status: Feasibility assessments Bidding Notice: 2022/Q4 Auction: 2023/Q1 Investments: under assessment 1 USD = BRL 5
Fishery Terminal in Fishery Terminals Manaus (AM) A Public Fishery Terminal (PFT) is the structure Fishery Terminal in necessary for fish handling and storage activities, Belém (PA) trading post, fish processing and support for vessel navigation. Fishery Terminal in Making PFTs operational is crucial for the provision of Natal (RN) an favorable phytosanitary environment needed to further developing the fish industry. Fishery Terminal in Aracaju (SE) The PFT area can include facilities such as anchorages, docks, wharves, berths and piers, cold storage warehouses, Fishery Terminal in and infrastructure for waterway access Vitória (ES) and protection. Fishery Terminals in Santos and Cananeia (SP)
Fishery Terminals Qualification for Public TCU* Bidding Assessments Auction Contract PPI Hearing Approval Notice Completed Completed Completed Completed Completed Completed Completed Cabedelo (PB) (2/18/2020) (5/11/2020) (6/11/2020) (11/18/2020) (12/2/2020) 1/28/2021 Apr/ 29 Belém (PA) Completed Manaus (AM) (2/18/2020) Natal (RN) Completed Completed July/14 Aracaju (SE) Q3/2021 Q4/2021 Q1/2022 (April/27 ) (June 13) (filed) Completed Vitória (ES) (6/10/2020) Santos (SP) Cananéia (SP) TCU: Portuguese acronym for the Brazilian Federal Court of Accounts
Mining Limestone - Aveiro/PA Kaolinite - Rio Capim/PA Gypsum – Rio Cupari/PA Diamond – Santo Inácio/BA Copper - Bom Jardim/GO Mining legal rights Investments USD 690 million *In case projects reach mining phase Coal - Candiota/RS 1 USD = BRL 5
MINING National Mining Agency (ANM) Available Areas • Procedure for selecting investors interested in proceeding with mining projects returned to the National Mining Agency portfolio. • Areas are subject to a public offer; those with two or + interested investors are submitted to an e-auction and awarded to the bidder offering the highest fee. • There are more than 40,000 areas for new investments. • In the first 3 rounds, more than 11,000 areas have been offered, representing a total area of about 10.6 million hectares, larger than the State of Ceará. 1st Round (Sep/20): 499 areas for research (+ than 30% of them were auctioned off). Round Auction notice 2nd Round (Dec/20): 6,879 areas for research/mining offered, + than 60% of them were auctioned off, Federal Government 4 July/2021 shoudl collect USD 33 million. 5 Aug/2021 3rd Round (Mar/21): 2,663 areas offered (auction concluded, 6 Sep/2021 ratification in July/2021). 7 January/2022 4th Round (Jun/21): 1,658 research areas offered, clarification 8 March/2022 Areas offered in the first 4 rounds of available areas. stage until July 6, challenge requests up to July 20 and the 9 May/2022 Source: National Mining Agency Public Offer stage opened until August 17. 1 USD = BRL 5
Oil and Gas 17th Round Transfer of rights 3rd Cycle of Open Acreage Potiguar Basin Data Capacity 92 blocks (offshore) Potiguar, Campos, Santos Basins (4) Round 17 and Pelotas Auction (scheduled) October 7, 2021 Blocks (2) Sépia and Atapu Campos Basin Transfer of Expected Investments USD 40.8 billion Rights (CAPEX + OPEX) Transfer of rights Auction December 17, 2021 Santos Basin 1,068 blocks 3rd Cycle of Blocks Pelotas Basin Open Acreage Auction (planned schedule) Q4/2021 1 USD = BRL 5
Electric Power Energy portfolio (USD) License + Implementation of the Transmission 360 mi Line Manaus – Boa Vista New Energy Generation (A-5) Tbc Transmission auction 2021 Transmission Line Manaus/AM - 2nd auction of transmission installation 2021 400 mi Boa Vista/RR Total 760 mi Energy Generation 1 USD = BRL 5
Privatization/Capitalization – Eletrobras - Brazilian Power SOE Brownfield project. Power generation capacity: 50.648,2 MW ( 29% of 174.412,68 MW installed capacity in Brazil). 61,2% Eletrobras System´s entire property, 23,1% SPEs and 15,7% shared property, including half of Itaipu Binacional capacity (7.000 MW) Generators (total): 125 plants (58 Corporate and 67 SPEs) Hydropower : 46,259 MW Nuclear Power: 1,990 MW o Features: holding comprising Eletrobras CGTEE; Eletrobras Chesf; Thermal power (other technologies): 1,870 MW Eletrobras Eletronorte; Eletrobras Eletronuclear; Eletrobras Furnas; Wind and Solar: 1,025 and direct and indirect shareholding in 136 Special Purpose Transmission Lines: 76.128,54 Km, being 70.091,89 km with tension > 230 KV Vehicles (SPVs). (43,54% of total Transmission Lines in Brazil ) o Procuring authority: Ministry of Mines and Energy Direct and indirect shareholding of the Brazilian Government o Expected outcomes: CS – 72.22% o Increased investment in the Brazilian energy sector, generating PS – 6.52% jobs and income; Total – 61.69% o An attractive environment for investors, increasing Privatization model: increase in share capital through public subscription of competitiveness in the sector and reducing prices for consumers; common shares, without the Federal Government's participating in this o Reduction of price volatility in the electricity tariff caused by subscription hydrological risk; Status: Provisional Measure 1031/21, which establishes the guidelines for o Recovery of basins and investments in generation and local privatization by capitalization and permits the beginning of studies by BNDES energy networks, benefiting the local population and energy (Brazilian Development Bank), was approved by Congress on June 21. Bill consumers now awaits presidential sanction.
The process of capitalization of Eletrobras will be carried out with the issuance of new shares by the company in a sufficient amount for the Union to leave its control. Therefore, there is a privatization process by means of a capital market operation. Next steps on the With the sanction of Law 14,182/2021, the government is authorised to proceed with the capitalisation process. capitalization of Eletrobrás The next stage is the conclusion of the Eletrobras studies with the definition of the price and the quantity of shares to be issued. At this stage, the current situation of the company, its assets, liabilities, and its capacity to generate value and growth prospects over the years are evaluated. 1. COMPLETION OF STUDIES BY BNDES 2. APPROVAL BY THE CPPI 3. APPROVAL BY THE TCU 4 MEETING AND ISSUE OF SHARES The Board of the Investment After approval by the TCU and the The studies are being conducted Partnerships Program (CPPI) is CPPI, the next step is for Eletrobras by the National Bank for Economic responsible for approving the BNDES' The studies carried out by BNDES to hold a shareholders' meeting to and Social Development (BNDES), studies and defining the final model for will be sent to the Federal Audit approve the issue of new shares, which is responsible for the capitalization operation. At this Court (TCU), which must approve at which the Federal Government implementing and monitoring the stage, the capitalization guidelines will them in order to continue the will not vote. The issuance process entire Eletrobras privatisation be defined, such as: corporate process. will be carried out by Eletrobras process. restructuring, minimum sale price and with the assistance of the BNDES. conditions for the process. The process is expected to be concluded in the first quarter of 2022.
Auction on 5G technology Most important auction on radio frequency spectrum ever held • Procuring authority: ANATEL in Brazil. • Preliminary investment estimates + concession fees: USD 7 billion Alta700 MHz Baixa2,3 cobertura GHz Baixa3,5 cobertura GHz Baixíssima cobertura 26cobertura GHz and baixa 20 MHz and alta 90 Capacity MHz 400Capacity’ and alta MHz 3200 MHz and altíssima Capacity • Expected date for the auction: Q4/2021 Capacity Tudo quelow existe disponível • Next steps: Technical Pricing Assessment of Wide coverage 4x Low coverage and Low coverage and Very coverage and and low capacity high capacity high capacity para serviços móveis the highest capacity the object and commitments of the bidding notice in progress 4x Everything available for • Contract Term: 20 years (with the exception of mobile services the 700 MHz band with a term until 12/08/2029 and an extension under the terms in force at the Auction criterion is not based on bonus/concession fee – the time) auction notice establishes national and regional compromises Auction Notice Signing of as to investments in 5G coverage and backhaul. published authorization terms Feb/20 Q4/21 Until December, 31, 2029 – all municipalities in Brazil must Q3/21 2022 2025 have 5G coverage Ordinance No. 1,924 / SEI-MCOM, January 29, 2021: Project filed with Auction Federal Audit Court session Main Investments Implementation of PAIS - Integrated and Sustainable Amazon Program Implementation of the Federal Private Network 1 USD = BRL 5
Preliminary estimates: Privatizations USD 18.36 billion 1 USD = BRL 5
FEDERAL PRIVATIZATIONS – PERSPECTIVE 2T21 2Q21 3T21 3Q21 4T21 4Q21 1T22 1Q22 2T22 2Q22 2S22 2S22 AUCTIONS - PRIVATIZATIONS LIQUIDATIONS SALE OF SHARES / DELIVERY OF QUOTAS TO THE FEDERAL GOVERNMENT
The National Post Service Biggest employer 11,177 post offices USD 3.6 billion company in Brazil Located in almost every city in More than 93,000 employees 2018 Net Revenue Brazil Status: assessments in progress aiming at evaluating alternatives for partnering with the private sector - Bill 591/2021 aims to permit delegation of services to private partners. Bill aprooved in the Chamber of Deputies. - Stage 1 of studies has been completed. Stage 2, about modelling and alternatives, is in progress and should be concluded in August/2021
Project’s Stage 1 has been concluded in April. Stage 2 is ongoing. Sep 2020 - Apr 2021 May – Sep 2021 Oct – Dec 2021 Q1/ 2022 STAGE 1 STAGE 3 STAGE 2 DISPOSAL AND Preparation G1 DIAGNOSIS AND EVALUATION OF G2 G3 IMPLEMENTATION OF G4 DETAILED PROPOSALS CONCESSION ALTERNATIVES OF PARTNERSHIPS PARTNERSHIPS • Draft agreements for • Diagnosis of the Brazilian and international postal sector entering into partnerships Auction session • Detailed proposal for modeling private and offers partnerships for the Brazilian postal sector Service C • Legal and regulatory diagnosis Offers to • Roadshows and meetings employees Postar Consortia • Detailed partnership modeling proposal for • Accenture • Company Reviews the company • MMSO • Public audiences and Final report on consultations the process • Structuring of alternative partnerships for • Reports Updates the sector • Disclosure of rules Service B Carta Brasil consortia: DUE DILIGENCE Valuation 2 • KPMG • Manesco Service A Valuation Valuation22 To be defined Service D Financial Advice and Attraction of Investors We’re here TBD KEY STEPS Presentation of Bill [Feb 24) Kick-off Stage 2 [27/mai] 22ª CI – Approval of stage 1 [Mar 10) Sanction of Bill [Aug/21] Operation concluded (Jan/22) Resolution 168/21 CPPI [Mar 16) Approval CPPI [Sep/21] Court of Accounts Beginning of approval [Dec/21] studies– Service C Decree 10,674/21 - PND [Apr 13) Publication of auction rules [August 27/2020] OS Service C - Stage 2 (May 14) Opening of Data Room [Oct/21] [Dec/21] Source: BNDES
Privatization – Trensurb (Urban Trains Company of Porto Alegre S.A) Brownfield project Extension : 43,8 Km of operating lines CAPEX projected investments: USD 70 million for requalification OPEX projected investments: to be defined Contract period: 25 years. Auction criteria: to be defined IRR: to be defined o Object of the concession: public passenger transport services Lease / concession / consideration value/ etc: to be defined in the State of Rio Grande do Sul Public Guarantees: to be defined o Model: Privatization Capacity: 228,000 pax / day o Structurer: BNDES Status: under assessment o Procuring authority: State of Rio Grande do Sul Bidding auction expected for Q3/2021 o Sector Ministry: Ministry of Regional Development Auction session expected for Q4/2021 o Regulator: Metroplan 1 USD = BRL 5
Privatization – CBTU (Brazilian Company of Urban Trains) Brownfield project Extension: 220,8 Km of operating lines CAPEX projected investments: USD 400 million for requalification OPEX projected investments: to be defined Contract period: 25 years. Auction criteria: to be defined IRR: to be defined o Object of the concession: public passenger transport services Lease / concession / consideration value: to be defined in the States of Alagoas, Minas Gerais, Paraíba, Pernambuco Public Guarantees: to be defined and Rio Grande do Norte Capacity: 567,000 passengers / day o Model: Privatization Status: under assessment o Structurer: BNDES Bidding auction expected for Q3/2021 o Procuring authority: above-mentioned States Auction session expected for Q4/2021 o Sector Ministry: Ministry of Regional Development o Regulator: respective States’ Regulatory Agencies 1 USD = BRL 5
Concession of Subway Line 2 - Metropolitan Region of Belo Horizonte Greenfield project Extension : 10,5 Km of operating lines CAPEX projected investments: USD 320 million OPEX projected investments : to be defined Contract period: 25 years. Auction criteria: to be defined IRR: to be defined o Object of the concession: public passenger transport services Lease / concession / consideration value: to be defined o Model: Concession Public Guarantees: to be defined o Structurer: BNDES Capacity: 50,000 passengers / day o Procuring authority: State of Minas Gerais Status: under assessment o Sector Ministry: Ministry of Regional Development Bidding notice expected for: Q3/2021 o Regulator: State of Minas Gerais Auction session: Q4/2021 1 USD = BRL 5
National Parks (13) Serra da Capivara National Park (PI) Lençóis Ubajara National Maranhenses Park (CE) National Park (MA) Jericoacoara National Park (CE) Jaú National Park (AM) Anavilhanas National Park (AM) Brasília National Park (DF) Serra da Bocaina National Park (RJ) Chapada dos Guimarães National Park (MT) Serra dos Órgãos National Park (RJ) São Joaquim National Park (SC) Serra da Bodoquena National Park (MS) Iguazu Falls - Foz do Iguaçu National Park (PR)
Concession of Forests for recreational activities Brasília (DF)
Hiring Public Federal Court Bidding Project Assessments Auction assessments Hearing of Accounts Notice Aparados da Serra and Serra Geral Canela São Francisco de Paula July, 26 São Joaquim Brasília Foz do Iguaçu Jericoacoara Accomplished In progress Lençóis Maranhenses
Forest concessions Brazil has the largest tropical forest and the The concession projects of National Forests 2nd largest forest area of Iquiri, Humaitá, Balata-Tufari, Jatuarana, Gleba Castanho in the world Pau-Rosa and Gleba Castanho, all in the state Pau-Rosa of Amazonas; Três Barras and Chapecó in the states of Santa Catarina; and Irati in the state Jatuarana of Paraná have been qualified by the PPI Balata-Tufari Council as national priorities. Iquiri Humaitá Payments to the Federal Government by the concessionaires are destined to the states and municipalities where the forests are located, to the National Fund for Forestry Development and to ICMBio - Chico Mendes Institute for Biodiversity Conservation. Irati Computerized system for managing concession contracts. Procedural manuals for sustainable management. Três Barras Greater preservation of forests, less deforestation, less fires, greater control and a better fight against Chape illegal activities. có
The Stages of a Forest Concession
National Heritage Sites Fort Nossa Senhora dos Remédios and Aldeia dos Sentenciados The Forts of Nossa Senhora dos Remédios and Palace Carvalho Mota Fernando de Noronha (PE) Orange, located in the State of Pernambuco; the Fortress of Santa Catarina (PB) and the Farm Pau Fortaleza (CE) D`Alho (SP) were qualified in PPI portfolio for concession of their usage/management, under the policy for attracting private investments in the tourism sector. These projects will be pilots of Fortress of Santa Catarina the so-called Program “Revive Brasil”, João Pessoa (PB) part of a Brazil-Portugal cooperation protocol signed by the Ministry of Tourism, and whose objective is the concession of vacant historical/cultural heritage sites. Fort Orange Ilha de Itamaracá (PE) Farm Pau D’Alho Campinas (SP) Old train station in Diamantina (MG)
PISF – Project for integrating São Francisco river into the water basins in the north part of the Northeast region of Brazil (NE) Features: Assessments for modeling a partnership for the operation and maintenance of the raw water supply infrastructure, aiming to ensure water security for the beneficiary states. Its main use is human supply and animal drinking, with other uses being admitted. It benefits 12 million people in four States (CE, RN, PB and PE) and 390 cities. The North Axe has 96% of accomplishment and the East Axe 98%. Object of the assessments: Operation and maintenance of 477 km of channels; 9 pumping stations; 27 reservoirs in the axes; 4 tunnels; 14 aqueducts; 9 230 kV substations; Installed power 100.5 MW; annual consumption of 709 GWh; Estimated energy consumption 58,300 MWh/month. Pumping operational capacity of 38 m3/s and average annual flow granted: 26.4 m3/s. Model: Common or sponsored concession Brownfield project (under assessment) Executed CAPEX Investments : USD 2.4 billion Structurer: BNDES with MDR, ANA, SPPI and Projected CAPEX investment: USD 360 million SDI/Ministry of Economy. Projected OPEX Investments: USD 100 million/year Procuring authority: Federal Government Contract period: 35 years Sector Ministry: Ministry of Regional Auction criterion: to be defined Development - MDR Public Guarantees: Infrastructure Guarantee Fund - FGIE Regulator: ANA and FPE States Regulation: Mechanism defined in the Status: stage 1 assessments completed in Feb/2021 concession contract Bidding: Q4/2021 1 USD = BRL 5
Irecê basin irrigation perimeter (BA) Features: located in the municipalities of Xique-Xique and Itaguaçu da Bahia, 500 km away from capital Salvador, the Baixio de Irecê perimeter has a total area of 104,000 hectares, out of which 48,000 hectares are suitable for irrigated agriculture. The project was subdivided into 9 stages; the first two have been tendered and are in the occupation phase. About USD 240 million have been invested in the acquisition and regularization of land property and execution of 42 km of the main channel, main pumping station, pipelines, pressurization station and energy infrastructure. Object of the study: Concession of Real Right of Use (aka CDRU) of a total area of 51,000 hectares, out of which 31,500 are irrigable, corresponding to stages 3 to 9 of the project, aiming at the implantation of the irrigation infrastructure, the operation and maintenance of this infrastructure and the occupation of the area with agricultural production. Production potential is estimated at 150,000 tons of grains and 200,000 tons of fruit per year, resulting in a gross production value of BRL 900 million / year when the entire area is occupied. Model: Concession of Real Right of Use Executed investments: USD 240 million (Pumping Station Structurer: Codevasf/MDR/PPI. of 10.5 m³/s and 42 km of channels) Procuring authority: BR Government/Codevasf Projected CAPEX investments: USD 320 million Sector Ministry: Ministry of Regional Development Contract term: 35 years Regulator: None Auction criterion: highest concession fee Regulation: Mechanism defined in the concession Status: Public consultation contract Auction: 2021
Integrated Communication Network of the Brazilian Air Force Command - PPP Features: The Air Force Telecommunications Network covers the entire Brazilian airspace (territorial waters included), an area of 22 million km2 Object of the concession: designing, installing, updating, expanding, operating, managing and maintaining a communications, control and management infrastructure for the Operational Network, Administrative Network, Corporate Network, Telephone Networks, Aeronautical Command Network, Tariff System Data Link, International Links, Network Management Center and Security Management Center integrated through an administrative concession contract. Brownfield project Projected CAPEX investments : USD 308 million Projected OPEX investments : USD 448 million Model: Administrative Concession Contract term: 25 years Structurer: Committee for the Implementation of the Airspace Auction criterion: lowest consideration value per month Control System - CISCEA, with support of FIA - USP. Maximum consideration per month: USD 3.51 million Procuring authority: Federal Government/ CISCEA Public Guarantees: Infrastructure Guarantee Fund - FGIE: value of Sector Ministry: Ministry of Defense - Air Force Command 6 monthly consideration installments; Regulator: None Status: revised assessments expected Regulation: Mechanism defined in the concession contract Auction: 2022 1 USD = BRL 5
PPP – Critical Digital Radio Communication for Defense and Public Security Features: Assessments for Modeling the National System for Integrated Critical Digital Radio Communication for Defense and Security of the Federal Government, States, the Federal District and Municipalities. Establishment of a single operator for a national integrated LTE radio communication network, with service levels, availability and encryption compatible with the requirements of the Public Security and Armed Forces. Object of the assessments: Structuring a high capacity trunk backbone network, public and private, for signal transport and convergence of technology and secure communications protocols for critical missions. It must be capable of connecting different technologies and integrating security forces of the Federal Government, States and Municipalities, as well as the Armed Forces, involving common applications. It may include end-use equipment. Diversity of applications and technological transition in an interchangeable platform for data services. It reaches the entire national territory and security and defense organizations using digital radio communication for voice and data traffic on secure and exclusive frequencies, with infrastructure to be shared with other public or private uses with converging standards. Investment made by the Ministry of Justice and its subsidiary bodies of USD 465 million in its own network and equipment. Model: Public-Private Partnership of the BR Federal Projected CAPEX investments: USD 400 million Gov jointly with subnational level entities Projected OPEX investments: to be defined Structurer: Assessments to be hired by BNDES, Public Guarantees: Infrastructure Guarantee Fund – FGIE together with MJSP, MD, MCTIC and SPPI. Status: definition of requirements Procuring authority: Federal Government Completion of assessments: to be defined Sector Ministry: Ministry of Justice and Public Auction: 2022 Security - MJSP Regulator: None Regulation: Mechanism defined in the concession contract 1 USD = BRL 5
Fêmina Hospital in Porto Alegre, State of Rio Grande do Sul Features: Assessments of partnership alternatives aiming at modernizing and improving public services of a new specialized hospital care unit in an area of the “Conceição Hospital Group”, in the city of Porto Alegre, State of Rio Grande do Sul. The initiative involves designing, constructing, installing, maintaining and operating health support services in a new location. Fêmina Hospital, a reference in women’s care for the Metropolitan Region of Porto Alegre, has been in operation since 1956. It has 12,300 m2 of built area, 166 beds and 917 workers. In 2018, the unit performed 126,000 medical consultations, 9,000 hospitalizations, 6,400 surgeries and 2,100 deliveries. The new unit should involve expanding the service, as well as improving the quality of service provision. Object of the assessments: alternative partnerships to adapt current structures, as well as constructing, renovating and expanding facilities and improving services management. Model: Public-Private Partnership Greenfield project Structurer: Assessments under analysis by BNDES Projected CAPEX Investments: USD 30 million Procuring authority: Federal Government Projected OPEX Investments: to be defined Sector Ministry: Ministry of Health Contract term: to be defined Regulator: None Auction criterion: to be defined Regulation: Mechanism defined in the concession Status: Requirements definition contract Auction date: 2022 Public Guarantees: Infrastructure Guarantee Fund – FGIE 1 USD = BRL 5
Environmental Licensing • Brazil is the most biodiverse country on Earth and that implies a major responsibility. • Brazil has a strong legal framework, which comprises a specific chapter about environmental licensing enshrined in the 1988 Federal Constitution. • Even before the Constitution, Brazil had already established an Environment National Policy (1981), which is still in force. • The main purpose of this policy is making social, economic development compatible with preserving environment quality and ecological balance. • Environmental licensing is the main control mechanism in the Brazilian legislation and is required for carrying out any activity that, effectively or potentially, could result in environmental degradation.
Energy Transmission Line Tocantins Manaus – Boa Vista Waterway Rock Dredging Supporting environmental Highway Highway licensing and BR-319/AM/RO Highway BR-242/MT Highway BR-235/PE expropriation BR-158/MT Highway Highway BR-174/RO/MT BR-135/BA/MG Shale Gas Fracking Highway Highway • site to be defined BR-080/MT BR-135/MG Hydropower Plants • Castanheira – MT • Telêmaco Borba – PR • Tabajara – RO • Bem Querer – RR • Formoso – MG • Ercilândia – PR • Aparados - PR
PPI projects for supporting subnational level partnerships
Current PPI pipeline for supporting subnational level projects Public Street Lighting – 20 Wastewater – 6 Municipal Solid Waste - 5 Daycares - 1 FEP (cities): 17 FEP (5) FEP (3 cities): • Teresina/PI 1 PPP • Nova Lima/MG • Cachoeiro do • Crato/CE • Cities cluster Convale/MG (Uberaba, • Teresina/PI (40 units) • Campinas/SP Itapemirim/ES • Volta Redonda /RJ Conceição das Alagoas, Sacramento, Delta, • Patos de Minas • Camaçari/BA Planura, Campo Florido, Veríssimo and Água • São Gonçalo do Amarante/RN • Toledo/PR • Barreiras/BA Comprida) BNDES (3 states): • Bauru/SP Prisons - 2 • Corumbá • Alagoinhas/BA • State of Rio Grande do Sul • Cities cluster Comares/CE (Altaneira, • Valparaíso de • Itanhaem/SP 2 PPP’s • State of Ceará Barbalha, Caririaçu, Crato, Farias Brito, Jardim, Goiás/GO • Ariquemes/RO Missão Velha, Nova Olinda and Santana do • State of Rio Grande do Sul • State of Bahia Cariri) • State of Santa Catarina • Crato/CE • Nova Iguaçu/RJ • Colatina/ES • Araçatuba/SP • Cities cluster Codepampa/RS (Alegrete, Barra do Quaraí, Caçapava do Sul, Lavras do Sul, • Timon/MA Correctional facilities- 2 Manoel Viana, Quaraí, Rosário do Sul, Santa Water, Wastewater and Municipal Margarida do Sul, Santana do Livramento, São BNDES (cities): 3 Solid Waste - 1 2 PPP’s Gabriel, Uruguaiana, Vila Nova do Sul • State of Minas Gerais • Curitiba/PR • Jaboatão dos • State of Santa Catarina FEP (1 city) Water Supply and Wastewater • Caruaru/PE Guararapes/PE • São Simão/GO Treatment - 7 BNDES (6) • State of Amapá Hospital – 1 H Urban Drainage - 1 FEP (cities) • • • • State of Alagoas – Blocos B e C State of Minas Gerais State of Paraíba State of Rio de janeiro (CEDAE) 46 Projects Guarulhos/SP: Municipal Hospital of Children • Porto Alegre/RS • Porto Alegre/RS (city) and Adolescents (HMCA) FEP (1) • Engenho Maranhão –State of Pernambuco
The challenge of universalizing basic sanitation Goals USD 150 • In Brazil, a population equivalent to that BILLION IN of Canada has no access to clean water INVESTMENTS • More than 100 million Brazilians have no UNTIL 2023 access to wastewater treatment • Enhancing private partnerships subnational level bodies (an estimate of USD 51 USD 99 NORTH MIDWEST SOUTH SOUTHEAST NORTHEAST BILLION OF BILLION IN USD 9 USD 10 USD 18 USD 35 USD 28 USD 150 billion in investments ) DEPRECIATION EXPANDING THE SYSTEM BILLION BILLION BILLION BILLION BILLION • Structuring bankable projects to provide WATER WATER WATER WATER WATER WATER USD 28 USD 3 USD 3 USD 4 USD 11 USD 9 proper services to Brazilians BILLION BILLION BILLION BILLION BILLION BILLION WASTEWATER SEWAGE SEWAGE SEWAGE SEWAGE SEWAGE USD 68.5 USD 6 USD 8 USD 14 USD 24 USD 19 BILLION BILLION BILLION BILLION BILLION BILLION Source: ABCON SINDCON 1 USD = BRL 5
Basic sanitation projects State of Amapá 01 2 million Under assessment Urban drainage (not to add) State of Projects Benefited citizens Projected Ceará São Gonçalo Capex+ Opex - Total Crato do Amarante Teresina Municipal solid 04 2 million USD 640 million State of Paraíba waste Consortia Crato Projects Benefited citizens Projected Comares (pilot projects) Capex+ Opex - Total Engenho Maranhão State of Acre State of Alagoas 05 838,000 USD 700 million Blocks B and C Basic sanitation Projects Benefited citizens Projected Capex+ Opex - Total São Simão State of Consortia Minas Gerais 02 6.6 million USD 1.88 billion Convale Wastewater Projects Benefited citizens Projected investments - Total Bauru Volta Redonda State of Rio de Urban drainage - FEP Janeiro - Block 3 05 7.0 million USD 2.56 billion Water and wastewater Urban solid waste - FEP Projects Benefited citizens Projected investments - Total Basic sanitation - FEP Water distribution and Porto Alegre sewage - BNDES State of Total 17 Projects 18.4 million USD 5.78 billion Sewage - BNDES Rio Grande do Sul 1 USD$= BRL 5
Sanitation projects - FEP Banco de serviços: destaque para saneamento São Gonçalo Consortia Consortia São Volta Porto Bauru/SP Teresina/PI Crato/CE do Amarante/ Convale/MG Comares/CE Simão/GO Redonda/RJ Alegre/RS RN Concession Business Concession Concession Concession Concession MSW, water Concession Concession Concession Concession Model MSW MSW MSW MSW and wastewater wastewater wastewater drainage wastewater Entitled Population 376,000 865,000 428,000 343,000 20,000 132,000 273,000 102,000 1.4 million Projected USD 43.4 Investments USD 23.6 mi USD 26.4 mi USD 10 mi USD 9.6 mi USD 38.8 mi USD 64 mi USD 24 mi - mi Auction Auction Auction Auction Auction Auction Auction Auction Auction Auction data Q4 2021 Q4 2021 August/21 Q2 2022 Q4 2021 Q1 2022 Q2 2022 Q3 2022 Q4 2022 For more information: https://www.ppi.gov.br/Projects-concessoes-e-parcerias Beneficiary population Total projected investment 4.8 million USD 240 million 1 USD = BRL 5
BNDES pipeline of projects on sanitation Banco de serviços: destaque para saneamento Alagoas Rio de Rio Cariacica / Rio de Porto Alagoas – Minas RM Amapá Acre Janeiro Grande Ceará Paraíba ES Janeiro Alegre / RS Blocks B&C Gerais Maceió Blocks 3 do Sul Full Concessio Full Concession Concession Concession concession Concession n of water Sewage concession of water of water Business of water of water of water Sewage Sewage To be To be distributio PPP of water and/or and/or Model distribution and and/or PPP PPP defined defined n and and sewage sewage and sewage sewage sewage sewage sewage Beneficiary 2.42 4.17 11.6 1.3 million 423,000 11.5 million 734,000 629,000 1.5 million 2.2 million 1.93 million 2.2 million Population million million million Projected USD 498 USD 116 USD 600 USD 287 USD 720 USD 600 USD 1.28 To be 800 USD 5.5 bi USD 434 mi USD 520 mi Investments mi mi mi mi mi mi bi defined million Auction To be expected Sep, 02 TBD Q4/21 Q1/22 Q1 /22 Q4/21 Q2/22 Q4/22 defined date Signature Signature of Discussion of the Auction Updating Assessment Preparing Current the PPP Auction with Evaluation by Under Under Hiring concession Notice the under for stage contract (04/30/21) municipaliti audit courts assessment assessment Consultants contract Published assessment revision assessment (AEGEA) es (BRK) Benefited population Under preparation: Total projected investment Segipe and Rondônia +40 million For more information: http://saneamento.bndes.gov.br/ USD + 10 billion 1 USD = BRL 5
FEP – PROJECTS IN THE PIPELINE URBAN DRAINAGE 1 2.2 millions 2 To be defined projects Benefited citizens Cities STREET LIGHTING 18 4.5 millions 22 260 million projects Benefited citizens Cities Total Capex + opex foreseen URBAN SOLID WASTE (PILOT 04 2 millions 19 640 million projects Benefited citizens Cities Total Capex + opex PROJECTS) foreseen BASIC 05 838,000 06 700 million SANITATION projects Benefited citizens Cities Total Capex + opex foreseen UNIDADES 02 - - 12 million Urban Drainage SOCIOEDUCATIVAS projects Benefited citizens Cities Total Capex + opex (projetos pilotos) foreseen Street Lighting Sewage Total 30 projects 9.5 Millions 49 1.62 Billion Environmental Sanitation Correctional Facilities (State) PARTNERS 1 USD = BRL 5
Projects in Municipalities – FEP – Street Lighting UF Municipalities % executed Auction date BA Alagoinhas Not started 2022 Projects Benefited population RO Ariquemes 1 2022 18 4.5 mi SP Araçatuba Not started 2022 Municipalities CAPEX OPEX BA Barreiras 13 2022 ES Cachoeiro de Itapemirim 81 2021 22 USD 135.98 mi USD 126 mi BA Camaçari* 78 2021 SP Campinas* 89 2021 Project preparation guidelines ES Colatina Not started 2022 • Administrative PPP MS Corumbá 20 2022 • Scope: modernizing, expanding, operating and running the power grid CE Crato 20 2022 • Energy efficiency and less impact in the environment RJ Nova Iguaçu Not started 2022 • Short-term investments, up to 3 years MG Nova Lima 65 2021 • Remote management (main streets) MG Patos de Minas 57 2021 SP Itanhaém Not started 2022 Supporters: Executor: MA Timón Not started 2023 PR Toledo 60 2021 GO Valparaíso de Goiás 9 2022 2nd Public Call for Street Lightening: BA Consórcio Alto Sertão BA Not started * Projects supported by IFC/Banco Mundial - Disclosed results: 46 cities and 10 qualified consortia 1 USD = BRL 5
Public lighting FEP projects FEP in the post public consultation phase Projected Projected Number of Term Max. consideration % of remote Population CAPEX OPEX lighting points Efficiency goal (years) USD million (BRL million/ year) management USD million (in thousands) Campinas/SP 1,204,073 13 31.12 20.1 7.92 122 25% 65% Cachoeiro do 208,972 13 6.59 8.1 1,4 23 23,5% 39% Itepemirim/ES FEP Projects for handling of Municipal Solid Waste after Public Consultation Household Projected Projected Term Waste Type of User billing Population CAPEX OPEX Scope (years) Generation concession method USD million BRL million (t / day) 1. Collection, transhipment, Tariff, co-billed transport, treatment and final Common Convale/MG 424,676 30 26.5 167.6 322 Concession with the water destination of solid household bill waste; and 864,845 43.4 252.6 2. Environmentally appropriate final disposal of public urban waste 1 USD = BRL 5