Border Rivers Map

2   WaterNSW
Border ROSCCo 22 July 2020 - (River Operations Stakeholder Consultation Committee) - WaterNSW
Part 1 - Overview of 2019/2020

• Rainfall and climate
• Allocations and Usage
• Restrictions applied
• Supplementary access
• 14 media releases relating to restrictions and extraction in northern valleys alone
  from 17 Jan to 25 Feb 2020
• https://www.waternsw.com.au/__data/assets/pdf_file/0007/145285/Operations-
  Update-Border-Rivers-1-July.pdf
• https://www.waternsw.com.au/about/newsroom/2020/324-temporary-pump-
  restrictions-for-northern-valleys

3   WaterNSW
Border ROSCCo 22 July 2020 - (River Operations Stakeholder Consultation Committee) - WaterNSW
Rainfall – last 24 months

4   WaterNSW
Border ROSCCo 22 July 2020 - (River Operations Stakeholder Consultation Committee) - WaterNSW
Rainfall – last 12 months

5   WaterNSW
Border ROSCCo 22 July 2020 - (River Operations Stakeholder Consultation Committee) - WaterNSW
Temperature – last 12 months

6   WaterNSW
Border ROSCCo 22 July 2020 - (River Operations Stakeholder Consultation Committee) - WaterNSW
Rainfall – last 3 months

7   WaterNSW
2019/20 Water
Availability
    https://waterregister.waternsw.com.au/water-register-frame

8    WaterNSW
Northern Basin First Flush Event
• The 2020 Northern Basin First Flush Event:
  • Followed an extensive period of hot and dry conditions with record low rainfall and record low inflows
  • Included significant inflows from across the Northern Basin including the Border, Moonie, Gwydir, Namoi, Culgoa,
     Bokhara, Macquarie, Bogan and Warrego systems.
  • Involved a large number of Temporary Water Restrictions being placed on extractions in the Northern Basin.
  • Raised issues regarding communication and decision making processes.
  • Resulted in the appointment of an Independent Panel to assess the management of the event
      – https://www.industry.nsw.gov.au/water/allocations-availability/northern-basin-first-flush-assessment
      – Terms of Reference, consultation, Water User Reference Group
      – Final report with recommendations – end of August 2020
  • Resulted in around 585 GL of inflow arriving into the Menindee Lakes system.

       WaterNSW published regular Operations Updates throughout the event at
       https://www.waternsw.com.au/supply/regional-nsw/operations-updates

       A draft report is available at https://www.industry.nsw.gov.au/water/allocations-availability/northern-basin-first-
       flush-assessment

       A webinar will also be held on Monday 27 July from 1:00 to 2:30pm. For details or to sign up use the above link.

9   WaterNSW
Media releases
• 17 Jan - https://www.waternsw.com.au/about/newsroom/2020/324-temporary-
  pump-restrictions-for-northern-valleys
• 26 Jan - https://www.waternsw.com.au/about/newsroom/2020/pump-restrictions-
  lifted-for-peel-high-security-and-unregulated-use-on-mooki-and-quirindi-systems
• 31 Jan - https://www.waternsw.com.au/about/newsroom/2020/324-pump-
  restrictions-extended-for-northern-valleys
• 7 Feb - https://www.waternsw.com.au/about/newsroom/2020/temporary-rule-
  change-to-allow-some-stock-water-trade
• 7 Feb - https://www.waternsw.com.au/about/newsroom/2020/temporary-pump-
  restriction-on-floodplain-harvesting
• 10 Feb - https://www.waternsw.com.au/about/newsroom/2020/approval-to-take-
  under-temporary-water-restrictions-information
• 11 Feb - https://www.waternsw.com.au/about/newsroom/2020/approval-to-take-
  under-temporary-water-restrictions-11-february
• 11 Feb - https://www.waternsw.com.au/about/newsroom/2020/324-orders-on-
  floodplain-harvesting-in-the-northern-basin

10 WaterNSW
Media releases
• 12 Feb - https://www.waternsw.com.au/about/newsroom/2020/amendment-to-
  temporary-pump-restriction-on-floodplain-harvesting
• 12 Feb - https://www.waternsw.com.au/about/newsroom/2020/temporary-
  water-restriction-northern-nsw-murray-darling-basin-yarraman-creek-12-
  february-2020
• 13 Feb - https://www.waternsw.com.au/about/newsroom/2020/temporary-
  water-restrictions-on-river-and-overland-flows-in-the-northern-basin
• 14 Feb - https://www.waternsw.com.au/about/newsroom/2020/324-pump-
  restrictions-extended-for-northern-valleys2
• 21 Feb - https://www.waternsw.com.au/about/newsroom/2020/barwon-darling-
  flows-a-blessing-for-towns,-farmers
• 25 Feb - https://www.waternsw.com.au/about/newsroom/2020/324-pump-
  restrictions-lifted-in-namoi,-border-rivers

11 WaterNSW
Supplementary Access 19/20
                 2019/2020 WATER YEAR
                 FLOW EVENT No 1 (February March 2020)
                           Volume Passing                                                Volume Passing
                   BOOBA                                                    Boggabilla
                   SANDS      GLENARBON     HOLDFAST                           Weir                                MUNGINDI
                     G/S          G/S          G/S                         Goondiwindi                                G/S
                    (ML)         (ML)         (ML)                          Flow (ML)                                (ML)
     9/02/2020            0            1           40                             2860              18-Feb-20         537
    10/02/2020         4618           79          115   13/02/2020 0:00           4359              19-Feb-20        1593
    11/02/2020         6863          206           70   14/02/2020 0:00           7063              20-Feb-20        2104
    12/02/2020         1262          124          146   15/02/2020 0:00           8010              21-Feb-20        3024
    13/02/2020         4090           50          150   16/02/2020 0:00          13544              22-Feb-20        3732
    14/02/2020         4692         1910          150   17/02/2020 0:00          10181              23-Feb-20        4333
    15/02/2020          867        10595          280   18/02/2020 0:00          11501              24-Feb-20        4975
    16/02/2020          469        14364          260   19/02/2020 0:00          12915              25-Feb-20        5300
    17/02/2020          368         7907          340   20/02/2020 0:00          14456              26-Feb-20        5131
    18/02/2020          247        13868          293   21/02/2020 0:00          10033              27-Feb-20        4517
    19/02/2020          305         7910         4004   22/02/2020 0:00           6201              28-Feb-20        2352
    20/02/2020          189        10161         5028   23/02/2020 0:00           3827              29-Feb-20        1602
    21/02/2020          105         6362         2481   24/02/2020 0:00           2475              1-Mar-20         1379
    22/02/2020           70         3986         1094   25/02/2020 0:00           1363              2-Mar-20         1086
    23/02/2020           52         2709          714                                               3-Mar-20         1006
    24/02/2020           40         1945          570                                               4-Mar-20          847
    25/02/2020           37         1569          440              total        105928              5-Mar-20          757
    26/02/2020           33         1297          363
                                                                                                           Total        42981

12 WaterNSW
Water Sharing Analysis
                                               Announce 1                Announce 2     Announce 3         Announce 4
                                                                                                                             Review
                                                14-Feb-20                 17-Feb-20      20-Feb-20          24-Feb-20
                              Flow @ Boggabilla             44504            84512            108976           102090              105928
                    add extraction u/s Boggabilla               0                0                 0             1500                7377
                            add Weir River inflow               0                0                 0                0               22548
                                         Balance            44504            84512            108976           103590              135853
                 less water order d/s Goondiwindi                  0                0             0                   0                0
                          less fill Boggabilla weir                0                0             0                   0                0
                                         Balance            44504            84512            108976           103590              135853
                         less transmission loss %           30.0%            30.0%             35.0%            20.8%               31.0%
                                        Balance             31153            59158             70834             82043              93738
                   less 25% environmental share              7788            14790             17709             20511              23435
                          Available for Sharing             23365            44369             53126             61532              70304

                                                      Queensland          NSW                                          Mungindi flow check
                   State Share                          35152            35152                         flow @ Mungindi                       42981
                 Announced Share                        30766             9594                         less un-announced share               20661
                Announced hours/%                                      3% to 25%                       less unextracted share                 2715
                                                                                                                     Balance                 19605
                                                                                                       less take d/s of Mungindi              3427

                 Extraction (Total)                     27216             9209                         Balance (Pass Flow Volume)            16178
                                                                                                       Required Pass flow Volume             16170

                                                                       Queensland       NSW
                             Un-Announced Share                           4386          25558              29944

                                                                       Queensland       NSW            Total (Qld + NSW)
                             Metered take - D/S of Mungindi               3427            0                 3427

                                                                       Queensland       NSW            Total (Qld + NSW)
                             Unextracted share                            3550           385                3935

13 WaterNSW
       event loss applied to unannounced share and to unextracted share
          event loss applied to environmental share
          NSW extractions ranged from from 3% in upstream sections up to 25% at Mungindi
Part 2 - Current Situation

• Drought Update
• Drought Map
• Inflows
• Allocations
• WNSW Water Insights Portal

14 WaterNSW
WaterNSW
Regional drought map

WaterNSW
Border Rivers Inflows

• Glenlyon Dam inflows since Jan 2020
  to end June 2020 have been 29GL
• Just below 50th%ile of 30GL

• Glenlyon Dam inflows since July 2018
  to end June 2020 have been 46GL
  just below 95th%ile of 48GL

17 WaterNSW
Border Rivers Inflows
• Pindari Dam inflows since Jan 2020 to
  end June 2020 have been 30GL
• Below 50th%ile inflows of 43GL
• Downstream tributary flow has been
  approximately 161GL.

• Pindari Dam inflows since July 2018 to
  end June 2020 have been 45GL below
  previous minimum of 65GL
• Downstream tributary flow for the 24
  month period has been approximately
  165GL. (minimum 108GL, 95th%ile 236GL)
• The 24 month period Feb 2018 to Jan
  2020 (inclusive) tributary inflows were
  approximately 7GL. The previous
  minimum was 65GL for any consecutive
  24 month period.

18 WaterNSW
Water Insights
                 • Storage levels
                 • Inflows
                 • Releases
                 • Compare
                   multiple years
                 • Allocations
                 • Outlook
                 • more

                                    19
Glenlyon & Pindari
Dam

https://waterinsights.waternsw.com.au/14681-border-regulated-river/storage

20 WaterNSW
Allocations
(screen shot from Water Insights)

21 WaterNSW
Part 3 – Outlook for 2020/2021

• Storage Forecasts
• Climate outlook
• Allocations and Operations

22 WaterNSW
Storage Forecast Pindari

23 WaterNSW
Storage Forecast

24 WaterNSW
Rainfall outlook
August to October

25 WaterNSW
Rainfall outlook September to
November

26 WaterNSW
Operations
2020/2021
    River section   Licence            Type of restriction        Period of       Method of placing
                    category                                      applicability   water order
    Glenlyon        High Security      Delivery of account        Until further   Via iWAS or the help
    Dam to the                         water will be made using   notice          desk.
    Junction                           tributary flows where
                    General Security   possible and generally
                                       not from dam releases.                     Confirmation of water
                                                                                  order from WaterNSW
                    Stock &                                                       is required.
                    Domestic           A water order is still
                                       required to be placed
                                       and needs to be
                                       approved by WaterNSW.
    Pindari Dam     High Security      Delivery of account        Until further   Via iWAS or the help
    to the                             water will be made using   notice          desk.
    Junction                           tributary flows where                      Confirmation of water
                    General Security   possible and generally                     order from WaterNSW
                                       not from dam releases.                     is required.

                    Stock &            A water order is still
                       Domestic         required to be placed
                                        and needs to be
                                        approved by WaterNSW.

27 WaterNSW
Operations
2020/2021
    River section   Licence            Type of restriction          Period of       Method of placing
                    category                                        applicability   water order
   Downstream       High Security    No Dam releases will be        Until further   Via iWAS or the help
    of the                            made to supply orders or      notice          desk.
    Junction to                       the Boomi replenishment                       Confirmation of water
    Mungindi        General Security flow.
                                                                                    order from WaterNSW
                                                                                    is required.
                    Stock & Domestic Limited access may
                                      become available from
                                      tributary inflows.

                                       A water order is still
                                        required to be placed
                                        and needs to be
                                        approved by WaterNSW.
   All river        Local Water        Releases will be made to     Until further   Via iWAS or the help
    sections        Utility and Town    ensure supplies for towns   notice          desk.
                    Water Supplies      including Goondiwindi                       Confirmation of water
                                        and Boggabilla, however                     order from WaterNSW
                                        releases are not able to                    is required.
                                        be made to supply
                                        Mungindi.

28 WaterNSW
Discussion Points

  • Potential Block release
    • S&D/riparian/replenishment/general security

  • Potential deliveries Pindari to Junction 2020/2021

29 WaterNSW
Water Carting Rebate

• $2000 Water Carting rebate
  available through Service NSW
• https://www.service.nsw.gov.au
  /transaction/apply-water-
  carting-rebate
• helps with the cost of carting
  water or installing water tanks
  and pipes
• to help secure domestic water
  needs
• currently available downstream
  of Goondiwindi

30 WaterNSW
To keep updated
              Visit the website at:
              waternsw.com.au/drought
              For information including water availability reports and
              drought reports go to:
              https://www.waternsw.com.au/supply/drought-
              information/regional-nsw
              Call us on:
              1300 662 077

              Subscribe at:
              waternsw.com.au/subscribe
              For weekly customer drought updates and more
              information
31 WaterNSW
End of Presentation

WaterNSW
You can also read