THE INTEGRATED VAAL RIVER SYSTEM PILOT STUDY C1. INTRODUCTION C1.1 BACKGROUND Although well-known for its vast mineral resources, South Africa is a land of many contrasts with respect to its water resources. With its very low and highly variable rainfall and as a result frequent severe cyclic droughts, more attention has been drawn to the efficient management of water resources to ensure reliable supplies. The region supported by Vaal River System, due to its strategic importance to the country, has received much of the attention with respect to water resources availability. The region embraces the industrial hub of South Africa and includes portions of some five provinces. It supports a number of major water boards (including, Rand Water, Midvaal Water and Sedibeng Water), some municipalities (including Witbank and Middleburg), power stations (Eskom), the petrol-chemicals industry (Sasol), irrigators (including the Vaalharts Scheme - the largest in the country) and number of major mines (platinum, gold and coal producing). The region is the first in the country where the water demands have long outstripped the local supplies. These insatiable demands have motivated the development of a complex water supply infrastructure in the region. The components (or sub-systems) of this complex infrastructure were initially separately and independently operated, however, as the requirements increased, they became inter-linked and inter-dependent thus culminating in the Integrated Vaal River System (IVRS). The system is operated by the Department of Water Affairs and Forestry (DWAF) and following the severe droughts of the early nineteen eighties it is analysed on an annual basis. C1.2 PURPOSE The Integrated Vaal River System is one of the selected four pilot systems being examined as a prelude to the development of the “Generic Guidelines for Operation and Management of Bulk Water Supply Systems under both normal and drought conditions”. Consequently, the purpose of this document is to highlight the characteristics and capture the experiences on the operation of the Integrated Vaal River System. The rest of this document is structured into four sections and three supporting annexures (C1, C2 and C3). Section C2 provides a list of the main sources of information. The main characteristics of the Integrated Vaal River System are described in Section C3. Section C4 sets outs the principles and procedures followed in operating the system. Finally, the lessons learnt from operations of the system are described in Section C5. APPENDIX C : VAAL PILOT STUDY October 2006
C2 C2. AVAILABLE INFORMATION Information in this document has been extracted from personal discussions with lead practitioners of the system, from reports from a number of studies commissioned by the Department of Water Affairs and Forestry, and from input by stakeholders at the Vaal System Workshop, held as a part of this Study. The literature contains descriptions of operating analyses for the Integrated Vaal River System dating back to around 1985. Over the years, a process has been implemented which culminates in revision of the operating rules on an annual basis. Most of the reports specifically relate to the Annual Operating Analysis (AOA) of the system. These reports have, in the past, been submitted on regular basis to the Department’s Management Committee, Regional Offices, Directorates and appropriate external organisations. The following reports have been referenced: DWAF No Document Title PC000/00/7889 Analysis of the Integrated Vaal River System, by BKS DF//R-System-Vaal-0189 Vaalrivierstelsel :Risko-ontleding van Damstande, 1 Mei 1989 to 30 April 1990 PC000/00/10090 Vaalrivierstelsel :Risko-ontleding, 1 Mei 1990 PC000/00/10491 Vaalrivierstelsel :Risko-ontleding, 1 Mei 1991 PC000/00/11192 Annual Operating Analysis for the Total Integrated Vaal River System (1992/1993), BKS Inc PC000/00/12593 Annual Operating Analysis for the Total Integrated Vaal River System (1993/1994), by BKS Inc. PC000/00/15695 Annual Operating Analysis for the Total Integrated Vaal River System (1995/1996), by BKS Inc PC000/00/19596 Annual Operating Analysis for the Total Integrated Vaal River System (1996/1997), by BKS Inc PC000/00/19897 Annual Operating Analysis for the Total Integrated Vaal River System (1997/1998), by BKS (Pty) Ltd PC000/00/19998 Annual Operating Analysis for the Total Integrated Vaal River System (1998/1999), by BKS (Pty) Ltd Assessment of the Eastern Sub-systems with Respect to Releases from Vygeboom Dam, by BKS (Pty) Ltd PC000/00/21398 Evaluation of the Influence of Releases Downstream of Vygeboom Dam on the Reliability of Supply from the Eastern Sub-systems, by BKS (Pty) Ltd PC000/00/21699 Annual Operating Analysis for the Total Integrated Vaal River System (1999/2000), by BKS (Pty) Ltd. PC000/00/21800 Annual Operating Analysis for the Total Integrated Vaal River System (2000/2001), by BKS (Pty) Ltd PC000/00/22101 Assessment of the Influence of Additional Releases from Vygeboom Dam on the Reliability of Supply of the Eastern Sub-systems (2001/2002), by WRP (Pty) Ltd PC000/00/22201 Vaal River: Continuous Investigations (Phase 2) Annual Operating Analysis (2001/2002) as part of the Vaal River: Continuous Investigations (Phase 2), by WRP (Pty) Ltd PC000/00/22602 Vaal River: Continuous Investigations (Phase 2) Annual Operating Analysis (2002/2003) (Phase 2), by WRP (Pty) Ltd 10-4 AOA2003-2004 V8 Annual Operating Analysis for the Total Integrated Vaal River System (2003/2004) Vaal River Continuous Investigations (Phase 2), by WRP (Pty) Ltd APPENDIX C : VAAL PILOT STUDY October 2006
C3 C3. CHARACTERISTICS OF THE INTEGRATED VAAL RIVER SYSTEM C3.1 DESCRIPTION OF THE SYSTEM The Integrated Vaal River System supports the industrial heartland of South Africa and includes portions of five provinces, namely: Free State, Gauteng, Mpumalanga, Northern Cape and North West. It covers the whole of the Vaal River Basin as far as the Vaal/Riet River confluence and includes both the associated source basins and demand basins. Figure C1 below provides a geographic presentation of the system and illustrates the various inter-basin transfers, main dams and demand centres. Figure C1 Location of the Integrated Vaal River System C3.2 MAIN COMPONENTS OF THE SYSTEM The Integrated Vaal River System comprises ten sub-systems, seven transfer schemes, and a number of internal supply schemes. The main components of the system are briefly described in Annexure C1. Figure C2 illustrates a schematic presentation of the system, highlighting the sub- systems, existing and proposed transfer and internal schemes. A more detailed schematic of the system is provided in Figure C2-1 of Annexure C2. APPENDIX C : VAAL PILOT STUDY October 2006
C4 Figure C2 Schematic of the Integrated Vaal River System APPENDIX C : VAAL PILOT STUDY October 2006
C5 The main dams of the Integrated Vaal River System are listed in Table C1 and grouped according to their location within each sub-system. Table C1 Main Dams in the Integrated Vaal River System Yield at 99 % Sub-system Major Dam Gross Capacity Assurance Owner (106 m3) (106 m3/a) Komati Nooitgedacht 78 - DWAF Vygeboom 83 - DWAF Total for Sub-system 161 100 Usutu Morgenstond 101 - DWAF Westoe 61 - DWAF Jericho 60 - DWAF Total for Sub-system 222 71 Heyshope Heyshope 453 58 DWAF Zaaihoek Zaaihoek 185 50 DWAF Grootdraai Grootdraai 356 130 DWAF Witbank Witbank 104 28 Emalahleni LM Middelburg Middelburg 48 14 Middelburg LM Total for VRES 1529 451 Bloemhof Woodstock 373 DWAF Sterkfontein 2 617 DWAF Vaal 2 610 DWAF Bloemhof 1 240 DWAF Other major dams 490 DWAF Total for Sub-system 7 330 1560 Senqu Katse 1 950 LHDA Mohale 938 LHDA Total for Sub-system 2 888 726 Lower Vaal Vaalharts Weir 49 DWAF Major dams in Harts 123 DWAF River Total for Sub-system 172 Total for Integrated System 11 919 2737 Note LM : Local Municipality DWAF : Department of Water Affairs and Forestry LHDA : Lesotho Highlands Development Authority VRES : Vaal River Eastern Sub-system The sub-systems, Komati, Usutu, Heyshope, Zaaihoek, Grootdraai, Witbank and Middelburg are collectively known as the Vaal River Eastern Sub-system (VRES). APPENDIX C : VAAL PILOT STUDY October 2006
C6 C3.3 STORAGE IN DAMS AND DECISION DATE The Integrated Vaal River System is located in a summer rainfall area where about 90% of the rainfall occurs in the summer months. The driest period of the year is from May to September. The annual operating analysis is performed in May each year (based on dam storage on 28 April) to determine the medium and long term supply capability of the system. The projected system curtailment levels are of particularly interest, showing the influence of the starting storages and other variables on the system’s supply reliability. Some sub-systems are monitored with the objective to insure a balanced draw down of all reservoirs. Further, the objective is to prepare reservoir projections for a three year horizon of all major dams in the system. These projections are used to report on the actual behaviour of the system by plotting the recorded storage levels onto the projections, using weekly intervals. The dams are at their lowest in April with May being an appropriate month to make operating decisions. A typical summary review of the AOA is presented in Annexure C3. C3.4 THE DECISION SUPPORT SYSTEM The decision support system comprises the following tools: • The Water Resources Yield Model (WRYM) The WRYM, configured for the IVRS is used to simulate the steady state operation of the integrated system or sub-systems, including the effects on the yield from changes in land- use, system operating rules, and/or the construction of additional dams or other water resource infrastructure. Important and useful outputs from the WRYM are sets of Short Term Characteristic Curves (STCCs) which it is able to produce. The characteristic curves developed within this model are currently used to manage the operation of the system. These curves are used to reflect the short term yield capability as a function of the live storage available in the dams of a sub- system for multiple assurances of supply to water user sectors. • The Water Resources Planning Model (WRPM) The WRPM is configured for the total IVRS and is used for development planning and annual operating analysis. The model takes expected growth in water demands, changes in return flows, and changes in surface water runoff (as a result of land-use change) into account. It is also used during periods of anticipated drought conditions to assess (at a pre-determined decision date) how the system should be operated during the following year to ensure required reliabilities of supply. Current water levels in the dams of the system and expected increases in water demands over a planning horizon of about five years are used to assess whether or not, and at what level of severity, restrictions will be required. The IVRS model also simulates the salinity (Total Dissolved Solids) regime of most parts of the system and is capable of evaluating the impact of blending and dilution operating rules. This capability makes it possible to assess the interdependencies between operating rules and water quality through the analysis of scenarios. APPENDIX C : VAAL PILOT STUDY October 2006
C7 • The Vaal Hydrological Information Management System (VHIMS) The VHIMS, also currently referred to as the Water Resources Yield Model Information Management System (WRYM-IMS), is under development. The objective of the software is to handle information management for both the WRYM and WRPM, and eventually other water resource models. The development is undertaken in phases and the current version incorporates the functionality to manage the data (input and results) of the Water Resources Yield Model. C3.5 WATER QUALITY CONSIDERATIONS Salinity is the most important water quality variable in the Vaal River System and the WRPM for the IVRS was therefore configured and calibrated to simulate salinity (Total Dissolved Solids). With this capability the WRPM is used to evaluate the impact of operating rules on blending, dilution and preferential sources of supply. With the salinity modelling feature integrated with the quantity modelling features, it is possible to simulate the impact that salinity related rules have on the reliability of supply of the system. C3.6 GROUNDWATER USE The use of groundwater resources is in general indirectly accounted for in the calibration of the hydrological models and therefore reflected in the hydrological database. Groundwater is widely used for water supply in areas remote from the rivers and serves as a valuable local water resource to various towns and agricultural activities. Areas where dolomite aquifers are present represent a large potential resource, such as the Zuurbekom Aquifer which is utilised by Rand Water at about 3,6 million m3 per annum. This supply is taken into consideration in the operating analysis by means of a constant supply time series. The dynamics of the aquifer is however not simulated explicitly in the WRPM. C3.7 ECOLOGICAL RESERVE The Ecological Reserve has not been determined for the IVRS as a whole and is therefore not implemented in the operating analysis. There are however compensation releases made from several dams in the system which are included in the operating analysis. Preliminary analysis has shown that the Ecological Reserve could potentially have a significant impact on the water availability to the other water users. Careful consideration and planning would therefore be required to select the appropriate management class for the Ecological Reserve. C3.8 INTERNATIONAL OBLIGATIONS There are no direct international obligations that affect the operation of the IVRS. The system is however dependent on the transfer from the Lesotho Highlands Water Project (LHWP), currently consisting of Katse and Mohale Dams, Matsoku Diversion Weir and transfer tunnels diverting water into Vaal Dam. The transfer of water from the LHWP is governed by a Treaty which prescribes what volumes will be transferred on an annual basis. The IVRS incorporates the LHWP water resource components as part of the system and the agreed transfer volumes are implemented in the annual operating analysis. APPENDIX C : VAAL PILOT STUDY October 2006
C8 C4. PRINCIPLES AND PROCEDURES FOR DERIVING OPERATING RULES C4.1 OPERATING PRINCIPLES Operating as an integrated system An important characteristic of the Integrated Vaal River System is the inter-dependencies that exist due to the numerous inter-basin transfers which form a complex network of inter-linked reservoirs located in catchments with different hydrological characteristics. This necessitates that the operating rules developed, be done so in an integrated manner to ensure that the effects of operating rules are evaluated in an integrated system context. In so doing, the behaviour of all the components of the water resource system are evaluated and monitored. Therefore, as a general operation principle, the Integrated Vaal River System must be operated as an integrated system irrespective of who owns or operates each individual component of the system. Maintaining assurance of supply The primary objective of the operation of the Integrated Vaal River System is to maintain the assurance of supply to all water users receiving water from the system. This is achieved by transferring water between sub-systems with the aim of balancing the drawdown of the reservoirs during drought periods and preventing spillage and wastage from the system during wet periods. The main indicator variable, produced by the Integrated Vaal River System model and used for operation planning decisions, is the future projection of the probability of restrictions for the system. Cost saving operating rules As a secondary objective, consideration is also given to the implementation of cost saving operating rules during wet hydrological conditions when the dams are full. This entails reducing the pumping of water through the inter-basin transfers for limited periods with the proviso that the long term assurance of supply is not jeopardised. Restriction of demands The operations and development planning of the Integrated Vaal River System is based on the principle that water requirements are restricted during severe drought events. The objective of restrictions is to reduce the supply to less essential water use in order to conserve water, over the longer term, as a measure to protect the assurance of supply for more essential use. The basis on which the restrictions are implemented is defined by means of a user priority classification definition which specifies the portion of each user sector’s demand that is allocated to the different assurance of supply categories. Table C2 presents typical priority classifications, assurances of supply and curtailment levels for the water use sectors. APPENDIX C : VAAL PILOT STUDY October 2006
C9 Table C2 Priority classifications, assurance of supply and curtailment levels User priority classification (assurance of supply) Low Medium High User (95 %) (99 %) (99.5 %) Percentage of water demand NOT guaranteed (at increasing levels of curtailment) 1 Domestic 20 30(1) 50(2) 2 Industrial 10 30 60 3 Strategic industries 0 0 0 4 Irrigation 20 30 50 Curtailment levels: 0 1 2 3 Note: (1) 70% of the demand for domestic water in the Vaal System can be supplied with an assurance of at least 99% (2) A proportion of 50% of domestic water in the Vaal system can be supplied at the high assurance. When restrictions are imposed, low priority users are restricted first, followed by the medium and then the high priority users. Curtailment level “0” implies that all requirements are supplied. At a curtailment level of “3”, all users except for strategic industries are curtailed, implying a total failure of the system. If curtailment level “1” is used as an example, the curtailment of the various users will be as illustrated in Table C3. Table C3 Example of curtailment at level 1 User Curtailment (% of total requirement) 1 Domestic 20% 2 Industrial 10% 3 Strategic industries None 4 Irrigation 20% C4.2 ANALYSIS TECHNIQUES Water resources allocation Figure C3 shows the basic components that make up the Water Resources Planning Model (WRPM) and illustrates the information linkages and basic output that can be produced by the model. As indicated, the Water Resources Allocation Algorithm (WRAA) receives, on each decision date, the storage state of the reservoirs in the system and communicates the allocation decision back to the Network Simulation Algorithm. The main output from the WRAA is the allocation to users in the system which only deviates from the imposed requirements during drought periods when curtailments are implemented. APPENDIX C : VAAL PILOT STUDY October 2006
C10 Figure C3 Model components of the Water Resources Planning Model The allocation decision also involves calculating the volume of support required between sub- systems and in some cases may be used (depending on the definition) to impose minimum flow limits on inter-basin transfer channels of the system network. Figure C4 gives a more detailed schematic representation of the allocation algorithm and illustrates the main aspects of the procedure as described below. APPENDIX C : VAAL PILOT STUDY October 2006
C11 Figure C4 Schematic representation of the Water Resources Allocation Algorithm Scenario analysis The method applied to determine the influence a particular operating decision has on the projected supply capability of the system is scenario assessments where the system response is measured on the basis of risk or probability. The probability distribution of any component or variable in the water resource system can be evaluated and are usually presented as projections of monthly or annual box plots covering the planning period. It has been noted that the Vaal River System has a historical critical period in excess of nine years and as such it is important to undertake these assessments for periods not less than fifteen years. This ensures that the long-term effect of starting conditions or decisions taken in the first year are observed in the results of the projection analyses. The most important variable used for decision-making is the probability of curtailments, which represent the system’s supply capability as projected into the future along with growing water requirements and changing system configurations. The procedure applied to obtain the projected probability of curtailments is illustrated in Figure C5 and shows the main iteration loops of the model. The stochastic loop is usually circled a thousand times and one allocation decision is taken in a year for the Vaal River System. This means a thousand curtailment results are generated for a particular year in the planning period of which the distribution is presented graphically as box plots. APPENDIX C : VAAL PILOT STUDY October 2006
C12 Figure C5 Procedure to derive the projected probability of curtailment C4.3 OPERATION PROCEDURE Institutional Arrangements Meetings with selected stakeholders are held annually where the results of the operating analysis are discussed and if necessary alternatives proposed. The stakeholder organizations that are represented at this meeting are listed below: Department of Water Affairs and Forestry Directorates: • National Water Resource Planning • Option Analysis • Water Resource Planning System • Gauteng Regional Office • Free State Regional Office • Northern Cape Regional Office Other stakeholders: • Eskom • Rand Water • Sasol APPENDIX C : VAAL PILOT STUDY October 2006
C13 During periods when restrictions are implemented, DWAF has in the past formed a water users forum consisting of a wide group of stakeholders. The forum would meet regularly to discuss the successes of achieving (or not) the target reductions in use and report on the status of the water resources. Typically all the water user sectors would be represented at these meetings. Given that several catchment forums have been established in the Vaal River System over the past five years, these forums will certainly in future play a prominent role in the implementation and monitoring of restrictions in the system. The AOA involves analysis of various scenarios where the operating rules are changed and the effects thereof assessed by comparing the behaviour of the system. The results of the scenarios are discussed at the annual meeting referred to above. The water resource management from DWAF, in consultation with the stakeholders, then select a scenario according to which the system will be operated. DWAF officials then communicate these decisions to the operating staff who then implement the rules. Operating approach The operating rules involve controlling the transfer of water between reservoirs and sub-systems and the drawdown of dams in the system. Two main trigger mechanisms are used to control the transfer volumes and timing of transfers, as described below: • Dam levels Trigger levels in dams are used to control the event when transfer should commence or cease. The objective of such triggers is to prevent a dam from spilling or to reserve water for use by local or other users than those benefiting from the transferred water. • Short term yield capability of sub-system The second operating rule mechanism is based on a comparison of the short term yield to the water requirements of the sub-systems. In general, when the balance is negative (demand exceeds supply) support is requested by one sub-system from another and, if it is available, transfer occurs. The volume of water transferred varies and is determined by either the required shortfall or the available surplus. The short-term yield versus demand balance referred to above, is based on stochastic short-term yield characteristic curves for each sub-system. These curves reflect the short- term yield capability as a function of the live storage that is available in the dams of a sub- system and make provision for multiple assurances of supply to water user sectors. The detailed operation of each sub-system is presented in Annexure C2. The application of the above decision procedure along with the stochastic streamflow generator allows for scenario analysis to be undertaken, as briefly described below. Operating planning The operation of the Integrated Vaal River System is governed by an operating rule planning activity, commonly referred to as the Integrated Vaal River System Annual Operating Analysis. This planning activity involves, among other things, using the Integrated Vaal River Model as a decision support system to analyse and assess different scenarios of operation. The results are presented to DWAF and bulk water users who then make decisions on what the appropriate operating rules should be for the subsequent twelve months. APPENDIX C : VAAL PILOT STUDY October 2006
C14 The system analyses are usually undertaken using the first of May’s starting storage levels in the dams and updated system data. The updated system data includes revised water requirement projections, implementation dates of maintenance activities and operating rule definitions that define a particular scenario. During periods of drought the analyses may be repeated several times in the year to investigate alterations to the operating rule as the need arises. Implementation process The operating decisions and/or restrictions are implemented through a process which includes the following : • Initially “warnings” of possible restrictions are communicated to the water users and the users are requested to save water. • Once the decision is taken to implement restrictions, supported by analysis to show it is necessary, it is published in the government gazette. • At that time, the user forum is activated and meetings are conducted to inform the users of the restrictions and to monitor how the restriction targets are met. • At local authority level, the need for restrictions and the “rules” are implemented through municipal regulations and largely left to each local authority. • In the last drought, Rand Water initiated a publicity campaign including newspaper advertisements and articles in newspapers as well as television advertisements. • DWAF would also have “high ranking” officials on national television and radio explaining the situation and informing the public of the restrictions. • During the last drought, some of the graphs and output information from the analysis were presented on the national news in support of the request for restrictions. APPENDIX C : VAAL PILOT STUDY October 2006
C15 C5. CURRENT OPERATION OF THE INTEGRATED VAAL SYSTEM C5. 1 PURPOSE OF ASSESSMENTS Since 1989, operating analyses were undertaken on an annual basis and in general the purpose was to provide answers with respect to the following aspects: • Should restrictions be implemented over the following twelve months? This is only required during drought periods when the storage levels in the reservoirs of the system are low. • Could reduced inter-basin support be tolerated for a twelve-month period? During periods when the system reservoirs are exceptionally full the question arises if cost savings could be achieved through reduced pumping for a year without jeopardising the long-term reliability of supply. • What blending or dilution operating rule should be applied? Different salinity related operating rules have been identified and applied in the past to support the water requirements of Rand Water and the users downstream of Vaal Barrage. These analyses aim to lower the TDS (Total Dissolved Solids) concentration of water supplied to the users but with limited impact on the projected supply capability. • Assess the influence that the starting storage volumes have on the implementation date of subsequent augmentation options. C5.2 ANNUAL OPERATING ANALYSIS General approach The general approach adopted in the annual operating analysis includes water balance analysis for the current season and an assessment of the integrity of the system for planning purposes. In addition, the augmentation needs and impacts of water demand management are identified. (A summary of a typical review is presented in Annexure C3). Analysis is undertaken at the beginning of May for the forthcoming 12 months, three years and 20 to 25 years. A five year period has been considered for demand management. The aspects considered under each of these time frames are discussed in the following section in an attempt to develop a generic description of the processes as undertaken in these analyses. Development planning and operational analysis Traditionally operating analysis has also included analysis for development planning purposes. For example, the 1996/97 operating analysis includes demand projections for three purposes namely; operating analysis, scheduling augmentation and evaluation of demand management. This section highlights how development planning was incorporated into operational analysis. Long-term planning focuses on the disparities between system yield and water requirements as well as system yield and capacity of treatment and conveyance infrastructure. Planning analysis is seldom concerned with the optimisation of current operations and assumes that the current conditions apply for all planning years. It tests the system integrity from a number of hypothetical APPENDIX C : VAAL PILOT STUDY October 2006
C16 but possible scenarios. For example, in the Eastern Sub-system, planning analysis assumes that the following takes place when shortfalls occur : • Middelburg sub-system (deficit imposed on Witbank sub-system); • Witbank sub-system (deficit imposed on Grootdraai sub-system); • Komati sub-system (deficit imposed on Usutu sub-system); • Usutu sub-system (deficit imposed on Heyshope sub-system); • Grootdraai sub-system (deficit imposed on Zaaihoek sub-system); • Zaaihoek sub-system (deficit (only Grootdraai portion) imposed on Heyshope sub-system); As such, the deficit calculated at Heyshope is representative of the total augmentation requirement of the Eastern Sub-system. A number of medium to long-term issues are also covered in operating analysis. For example, in the 2001/2002 the following were also covered: • projected storages of the Grootdraai Dam and requirements for augmentation of the Eastern Sub-system; • impact on pumping costs of reduced inter-basin transfers from the Heyshope and Zaaihoek Dams to the Grootdraai Dam over a planning horizon of five years; • impact of the revised implementation programme for the Mohale Dam and its transfer tunnel; • evaluation of impacts of projected curtailments for the period 2001 to 2030 with existing and planned infrastructure (Phase 1 of Lesotho Highlands Water Project). Scenario tests conducted on the 2001/2002 analyses evaluated the impact of additional Komati Irrigation Board (KIB) releases and the changed Komati operating rules. Such scenario tests are actually done as separate more detailed studies. For example, the impact of additional the Komati Irrigation Board releases is addressed in the following reports : • Assessment of the Additional Releases from the Vygeboom Dam on the reliability of Supply of the Eastern sub-systems (2000/2001) • Assessment of the Additional Releases from the Vygeboom Dam on the reliability of Supply of the Eastern sub-systems (2001/2002) Adjustment of criteria of reliability of supply is also undertaken as separate studies. For example, on the Komati Sub-system the “Reassessment of the Influence of Operational Decisions Regarding the Komati on the Reliability of Supply of the Western Sub-systems" (1999/2000) resulted in revision and adoption of criteria to ensure that the Nooitgedacht and Jericho Dams are not emptied at a risk exceeding 0.5%. Future augmentation schemes are also reviewed as part of the annual operating analysis. Consideration is given to the impoundment and start delivery dates. For example, the 2000/2001 analysis considered augmentation dates for the Lesotho Highlands Water Project as follows : APPENDIX C : VAAL PILOT STUDY October 2006
C17 Scheme name Impoundment date Start delivery date Lesotho Highlands Water Project Phase 1a Katse dam and tunnel Oct 1995 Jan 1998 Motsoku weir and tunnel - Jan 2001 Lesotho Highlands Water Project Phase 1b Mohale dam and transfer tunnel (initial Oct 2001 Jan 2003 schedule) In addition to the above dates the 2001/2002 analysis considered the following augmentation dates for the LWHP as follows: Scheme name Impoundment date Start delivery date Lesotho Highlands Water Project Phase 1b Mohale dam and transfer tunnel (option1) Oct 2002 Feb 2004 Mohale dam and transfer tunnel (option2) Feb 2003 Feb 2004 Guiding principles objectives and strategies In the current methodology, deficits (shortfalls) are dealt with in a cascaded manner until support is required from the Heyshope sub-system. The strategy is to use Heyshope as backup support. One of the benefits of the annual operating analysis frequently referred to is the decision made to lift water restrictions in September 1988. This was before the start of the following rainy season. As each drought condition is different there is need to review the past experiences in terms of the following: • Agreed principles for sharing the limited available water, • the operational objectives for each sub-system, and • the strategies put in place. As a result of diligent augmentation planning and water resources development undertaken in the past to maintain risk of curtailments at acceptable levels, restrictions are only required during severe drought periods. General approach on projecting water requirements Water requirement projections cover the forthcoming year and a twenty to thirty year planning horizon. Water balance information is provided for at least two years during the planning period. Current practice utilises a spreadsheet model to conduct annual water balance projection calculations, providing a first order estimate of future augmentation requirements for a sub-system. The balance projection calculation is based on an annual water resources availability (yield) assessment and projected water requirements. For a particular year, the total water requirement in a sub-system is subtracted from the locally available yield, in order to determine whether it is in surplus or deficit. Should a deficit occur, that deficit is “imposed” on a second sub-system, in accordance with the capability of the second sub-system to support the sub-system in need. APPENDIX C : VAAL PILOT STUDY October 2006
C18 The 1996/97 operating analysis demand projection applied the same scheduling augmentation until 1997, beyond which the most probable TR134 projections were applied. These projections were obtained from the Report of the Committee of Water Demands in the Vaal River Supply Area, forecast to 2025 (DWAF, 1988). Eskom provided projected water demands for its power stations for each point of abstraction. The demands were different from those in the Vaal Augmentation Planning Study Report. Return flows were calculated as part of the analysis. It was assumed that through demand management, a 10% reduction in demand could be achieved spread over five years. This scenario showed a shift in the violation of curtailment criteria from 2004 to 2010, resulting in postponement of the implementation of the Southern Tugela-Vaal Transfer Scheme by six years. Scenarios for the durations required to undertake repairs to the Woodstock-Sterkfontein canal considered a probability of curtailment equal to 5%. Investigations by BKS in 1998 showed that make-up releases from the Vygeboom Dam for the KIB releases cause assurance of supply in the Komati and Usutu sub-systems to deteriorate to unacceptable levels. The operating rule on inter-basin transfers was changed to increase transfers to the Komati and Usutu sub-system and at the same time ensure that pumping costs were kept to a minimum. The inter-reservoir operating rule for the Usutu sub-system reservoirs was adjusted to transfer water earlier from Morgenstond to Jericho Dam to ensure that water foes not remain in Morgenstond when Jericho Dam is empty. The 1999 annual operating analysis indicated violation of the reliability criteria for the Nooitgedacht Dam leading to revision of inter- sub-system rules on water transfer to the Komati sub-system. A new criterion that Nooitgedacht and Jericho Dams may not be emptied at a risk of 0.5% was implemented. The 1999 study also looked at the implications on pumping costs and resulted in a revised Komati (1999) operating rule, which defined the water to be transferred from the Usutu sub-system. The 1998/99 annual analyses also applied demand projections from the Vaal River System Analysis Update Study conducted in March 1997 as well as the TR134 projections. In August 1997, Eskom provided future projections for their water requirements for thermal power stations. Historical demands were applied fro 1995 to 1997 and projections were done for 1998 to 2030. The 2000/2001 annual analyses applied the June 1999 Eskom water requirement projections. The Midvaal Water Company provided updated figures which were 12% lower than their 1999 projection. The 2000/2001 analysis applied information from the report Future Demand and Return Flows (BKS 1994) but later updated to the 1997 Vaal River System Analysis Update Study. The 2001/2002 annual operating analysis applied projections of future urban and industrial requirements from the NWRS and its water usage database. Water requirement projections for Midvaal Water Company (April 2001) and Sedibeng Water (April 2001) provided on the dates in brackets were applied. Two possible scenarios for the Rand Water requirements were analysed; namely August 2000 Rand Water projections and projections from the NWRS database. Eskom, ISCOR and SASOL provided their own projected requirements. C5.3 OPERATIONAL LESSONS LEARNT The following operational lessons have been learned: • Annual operating analysis planning and operational scenarios are to be assessed. • Related studies and documents are identified to support the scenarios selected. APPENDIX C : VAAL PILOT STUDY October 2006
C19 • Recommendations are made for new studies. • The decision date for the IVRS is 1 May of the current year. • Actual performance of each dam is compared against three yearly projections. • Reservoir storage levels recorded at end of April (28 April, 1 May) are applied as the starting conditions for the following annual analysis. • Review storage status and water requirements against current assurance of supply criteria. Implications on the short and medium-term operating regime are assessed. Options for analysis are identified. These include augmentation plans. • User requirements are updated or re-confirmed. For example Eskom, Rand Water Sasol- Secunda are approached for revised figures of their annual requirements. • Data on compensation releases from Vygeboom, Zaaihoek, Grootdraai, Katse and Mohale Dams is obtained. • The WRPM system configuration is reviewed and updated. • Any additional analysis identified is undertaken. The following appear to be the main drivers for the operating analysis of the IVRS: • Demand projections, • Court orders on releases, • IFR releases, • Blending requirements, • Reduction of pumping costs, • Demand management. APPENDIX C : VAAL PILOT STUDY October 2006
ANNEXURE C1 : DESCRIPTION OF MAIN COMPONENTS OF THE SYSTEM
C1-1 A brief description of each of the sub-systems within the IVRS is given in this section. C1-1 Lower Vaal Sub-system There are three main dams in this sub-system namely Wentzel, Taung and Spitskop with a combined storage capacity of 123 million m3. They are all located in the Harts River and their function is to supply local water requirements. The Vaalharts Weir, with a capacity of 49 million m3, is a regulation structure that diverts water into the canal system feeding the Vaalharts Irrigation Scheme. It also releases water for the downstream users along the Vaal River. C1-2 Bloemhof Sub-system The Bloemhof Sub-system consists of four large dams namely Bloemhof, Vaal and Sterkfontein in the Vaal River catchment, and Woodstock Dam in the upper part of the Thukela River catchment. These dams have a combined capacity of 6 840 million m3. A major component of the sub-system is the Thukela-Vaal Transfer Scheme, which transfers water from Woodstock Dam via Driel Barrage into Sterkfontein Dam at a nominal capacity of 20 m3/s or 631 million m3/annum. The transfer from the Senqu Sub-system into Liebenbergsvlei and thence into Vaal Dam, contributes significantly to the water resources in the system and represents the supply augmentation from Phases 1A and 1B of the Lesotho Highlands Water Project. There are various other major dams in the sub-system, with an additional total storage capacity of 490 million m3. These dams are located on tributary rivers in the incremental catchment between Vaal and Bloemhof Dams, and their function is to support local water requirements of several irrigation schemes as well as urban water users. Rand Water’s abstractions, the largest water use from the Integrated Vaal River System, are from the Vaal Dam and Vaal Barrage. Other notable abstractions are Midvaal Water and Sedibeng Water, both abstracting water from the Vaal River downstream of Vaal Barrage. C1-3 Senqu Sub-system This sub-system is within the boarders of Lesotho and represents the water resource components of Phase 1A and 1B of the Lesotho Highlands Water Project, consisting of Katse and Mohale Dams, Matsoku Weir and connecting conveyance and transfer tunnels delivering water into Liebenbergsvlei River, a tributary of the Vaal River, which feeds Vaal Dam. C1-4 Grootdraai Sub-system The main component of this sub-system is Grootdraai Dam, which also forms the hub of the water supply system for the Vaal River Eastern Sub-system. Grootdraai Dam regulates a significant portion of the Upper Vaal River catchment’s runoff, and receives transfer water from the Heyshope and Zaaihoek sub-systems. The main water users that are supplied from the sub-system include Thutuka Power Station, Sasol 2 and Sasol 3, as well as irrigation and several small urban users. C1-5 Heyshope Sub-system Heyshope Dam lies on the Assegaai River, which is a tributary of the Usutu River. Only minor water requirements are supplied directly from the water resources of the Heyshope Sub-system. The main function of the sub-system is to augment the water supply in the Grootdraai and Usutu sub-systems. APPENDIX C : VAAL PILOT STUDY October 2006
C1-2 C1-6 Zaaihoek Sub-system The Zaaihoek Dam regulates the runoff of the Slang River, which is a tributary of the Buffalo River and forms part of the catchment of the Thukela River. The main function of Zaaihoek Dam is to supply the water requirements of Majuba Power Station and to support Grootdraai Dam as a secondary priority. C1-7 Usutu Sub-system The Usutu Subsystem consists of Morgenstond, Jericho and Westoe Dams (combined capacity of 222 million m3) as well as the Churchill Diversion Weir. These are all linked through gravity and rising conveyance systems feeding Jericho Dam to supply water to several Power Stations and augment the water supply in the Komati Sub-system. An additional rising main pipeline has increased the transfer capacity from Morgenstond to Jericho Dams. C1-8 Komati Sub-system This sub-system contains two major dams namely Nooitgedacht and Vygeboom, located on the Komati River, which provides most of the regulating storage (161 million m3) of the Komati Sub- system, with support from the diversion structures on the Gladdespruit and Gemsbokhoek Rivers. Most of the water requirements is from power stations and is supplied through pumping. A significant volume of water is used by forestry developments (afforestation) occurring mainly in the catchment of Vygeboom Dam. This is estimated at 24 million m3/annum or 24% of the Mean Annual Runoff of that particular incremental catchment. C1-9 Witbank and Middelburg Sub-systems Witbank Dam regulates the runoff from a highly developed catchment, which contains various coal mining operations as well as minor irrigation and agricultural activities. The function of the dam is to support the urban water requirements of the Emalahleni Local Municipality. Obligatory releases are also required to support Loskop Dam. Inter-basin transfer to this sub-system is possible from the Grootdraai Sub-system by means of releases from Trichardtsfontein Dam. These releases are conveyed via the river channel into Witbank Dam. This transferred water can also be supplied to Duvha Power Station from Witbank Dam through the Naaupoort Pump Station. The sulphate concentration of the water in Witbank Dam, resulting primarily from the coal mining operations in the catchment, is a constraint on the volume of water that can be used from this source to supply the Duvha Power Station. Middelburg Dam is the main water resource infrastructure component within the sub-system and has the function of supplying Middelburg Local Municipality. There are also obligatory releases for Loskop Dam. A pipeline constructed in 1998 transfers water from Witbank Dam to Middelburg Dam, effectively giving the users in this sub-system access to water from the Witbank, Grootdraai, Heyshope and Zaaihoek sub-systems. APPENDIX C : VAAL PILOT STUDY October 2006
ANNEXURE C2 : OPERATION OF THE SUB-SYSTEMS
C2-1 For orientation purposes, refer to Figure B2-1 which shows the schematic layout of the Integrated Vaal River System. The operation of the sub-systems is described hereafter. C2-1 Lower Vaal Sub-system The Lower Vaal Sub-system has limited local water resources and most of the water requirements in the sub-system are supplied through releases from Bloemhof Dam. Vaalharts Weir, located downstream of Bloemhof Dam, serves as a control structure to divert water into a canal system that feeds the Vaalharts Irrigation Scheme. Water is also discharged into the Vaal River, mainly for irrigation and some urban water users. The predominant water use in the sub-system is irrigated agriculture. Of the urban and industrial water requirements, the water supply to Kimberley is the most significant. Due to the relatively long river reach downstream of Bloemhof Dam and Vaalharts Weir, significant quantities of consumptive evaporative losses and non-consumptive operating losses are associated with releases in the river system. C2-2 Bloemhof Sub-system The description of the operation of the Bloemhof Sub-system is provided according to the main storage structures and abstractions, ordered from the most downstream to the most upstream. Bloemhof Dam is the most downstream regulating storage structure in the sub-system. It serves as the primary water source to supply the water requirements in the Lower Vaal Sub-system. Releases from the dam are made in accordance with a daily schedule of water requirements that is updated on a weekly basis. Since the water requirements supplied from Bloemhof Dam are more than the supply capability (incremental yield) of the dam, releases are made from Vaal Dam (via Vaal Barrage) once the water level in Bloemhof Dam reaches it’s minimum operating level. Sub-catchments within the Bloemhof Sub-system contain various dams and water abstractions all impacting on the supply capability of the dam. There are no release obligations from these sub- catchments, with the result that only spills from the dams and unutilised runoff flows into Bloemhof Dam. Releases from Bloemhof Dam are driven by the water requirements of the Vaalharts Irrigation Canal System. Water released from Bloemhof Dam for irrigation is fed into the canal system at the downstream Vaalharts Weir. Notable abstractions in the river reach between Vaal Barrage and Bloemhof Dam include Midvaal Water, Sedibeng Water and abstractions for irrigation. These abstractions are supported with releases from Vaal Barrage (supported also by Vaal Dam). The releases from Vaal Barrage are driven by either these downstream water requirements or through excess water in the Vaal Barrage (spills) as a result of the dilution operating rule. The dilution operating rule has the purpose of maintaining the Total Dissolved Solids (TDS) concentration of the water in the Vaal Barrage at a specified level by means of freshening releases from Vaal Dam. This is necessary due to the high salinity (TDS) content of the underground mine water that is pumped out of the gold mines into the river system, and from surface runoff from the highly urbanised areas in the incremental catchment of the Vaal Barrage. APPENDIX C : VAAL PILOT STUDY October 2006
C2-2 Other alternative blending and dilution operating rules are also considered during the Annual Operating Analysis. These are evaluated with respect to the long-term assurance of supply and the TDS concentration of the water supplied to all the users. The operation of Vaal Dam is driven mainly by the downstream releases and the water abstracted by Rand Water. Releases from Sterkfontein Dam are usually only made if Vaal Dam’s storage is depleted to the minimum operating level, or if Sterkfontein Dam is full and there is still water available in Woodstock Dam for transfer via the Thukela Vaal Transfer Scheme, as further explained hereafter. The operation of the Thukela-Vaal Transfer Scheme is such that water is released from Woodstock Dam to Driel Barrage from where it is pumped and conveyed to the lower level of the Drakensberg Pump Storage Scheme. From here it is further pumped into Sterkfontein Dam located at the higher elevation on the escarpment. The normal operating rule, with the objective of maximising yield in the system, is to continue the transfer until Vaal and Bloemhof Dams are full. However, during wet hydrological conditions when the dam levels are relatively high or in the case where excess supply capability in the system is present, the transfer volume is reduced to save pumping costs. These deviations are only implemented if it is proven, through scenario analysis, that the long term assurance of supply will not be jeopardised. Transfers from the Senqu Sub-system (Lesotho Highlands Water Project) are governed by the Treaty agreements between South Africa and Lesotho. This agreement stipulates a schedule of annual volumes that have to be transferred which increase over time until the so-called “Nominal Annual Yield” of the Lesotho Highlands Water Project is reached. C2-3 Senqu Sub-system The elevation of the components of the sub-system that are located in the Lesotho Highlands makes it possible to gravity feed water through tunnels from Matsoku Weir and Mohale Dam into Katse Dam, from where it is further transferred to South Africa via a delivery tunnel, discharging water into Liebenbergsvlei River a tributary of the Vaal River upstream of Vaal Dam. Compensation releases to maintain the ecological functions of the downstream rivers are made from all three structures. The operating rule of the releases ensures variability in the downstream flow by allowing for maintenance flow freshets during wet hydrological conditions and base flow released during drought conditions. The aim is to mimic the natural cycles and thereby maintain the ecological triggers that would have occurred under natural conditions. C2-4 Grootdraai Sub-system Water is pumped via pipelines and canals from Grootdraai Dam to supply Sasol 2 and Sasol 3 and to transfer water to the Olifants (Witbank Dam) sub-system. The transfers are discharged into Trichardtsfontein Dam in the upper reaches of Trichardtspruit. From here water is released to Witbank Dam via Rietfontein Weir, and pumped to Middelburg Dam if required. Sasol’s primary source of supply is Grootdraai Dam, which in turn receives water from Heyshope and Zaaihoek Dams. Water for Kendal, Kriel and Matla Power Stations is partly supplied from Rietfontein Weir that is supported from Grootdraai Dam. Duvha Power Station can be supplied from Grootdraai Dam via Trichardtsfontein Dam, Rietspruit Weir and Witbank Dam. The volume of water that can be utilised through this transfer option is limited due to the high sulphate concentrations of the APPENDIX C : VAAL PILOT STUDY October 2006
C2-3 water in Witbank Dam. This support option is only utilised if the Komati, Usutu and Heyshope sub- systems can not fully supply the water requirements in the Komati sub-system. C2-5 Heyshope Sub-system This sub-system transfers water from Heyshope Dam on the Assegaai River to the upper reaches of the Vaal River and/or to the upper reaches of the Ngwempisi River which is part of the Usutu Sub-system. Water transferred to the Vaal River flows into Grootdraai Dam and water transferred to the Usutu sub-system flows into Morgenstond Dam. The primary function of the Heyshope Sub-system is to support the Grootdraai Dam. The normal rule of transfer to the Vaal River is applied when Grootdraai Dam is drawn down to below 90% of its storage capacity. This rule level is however relaxed during wet hydrological conditions when the remainder of the Vaal River Eastern Sub-system dams are full. In so doing, pumping costs are reduced. This deviation is only implemented if it is shown that the assurance of supply is not jeopardised over the long term. The transfer of water to the Usutu Sub-system is driven by the short term yield vs. demand balance and buffer storage is maintained in Heyshope Dam where the transfer to Grootdraai Dam ceases until Grootdraai Dam is depleted. The function of the buffer storage is to ensure that water is available in Heyshope Dam for transfer to the Usutu Sub-system when required during drought conditions. Compensation releases are made from Heyshope Dam mainly to supply the downstream town of Piet Retief and rural water requirements. C2-6 Zaaihoek Sub-system Water is pumped from Zaaihoek Dam in the Slang River (a tributary of the Buffalo River) to Volksrust and Majuba Power Station. This power station's only source of water is the Zaaihoek Sub-system. Releases are made from the Majuba pipeline into the Schulpspruit, a tributary of the Vaal River, from where water can flow into Grootdraai Dam. Zaaihoek Dam is Majuba’s only source of water supply and the volume of transfer to Grootdraai Dam is therefore carefully controlled and limited to ensure the long term assurance of supply to Majuba Power Station. This rule implies that the transfers to Grootdraai Dam decrease over time to accommodate the increasing water requirements of Majuba Power Station. C2-7 Usutu Sub-system Inter-reservoir operating rules determine the inter-reservoir transfers and draw down sequence of the Usutu Dams (Morgenstond, Westoe and Jericho). Water is transferred from the Usutu (Jericho Dam) to the Komati Sub-system (Nooitgedacht Dam) in support of the Power Stations situated in the Komati and Olifants rivers catchments (Komati, Arnot, Hendrina and Duvha). Camden Power Station can only be supplied from the Usutu Sub-system (Jericho Dam) which in turn can be supported from Heyshope Dam. Although Kendal, Kriel and Matla Power Stations are primarily supplied from the Usutu, transfers from Grootdraai Dam can also support these Power Stations. The supply source of these power stations is determined by the short-term yield vs. demand balance of the Usutu Sub-system which incorporates the need for support to the Komati Sub-system. In essence the supply load of these power stations is shifted to Grootdraai Dam during drought conditions to make water available for transfer to the Komati Sub-system. C2-8 Komati Sub-system The two major dams in this sub-system are the Vygeboom and Nooitgedacht Dams. The operation of these two dams is such that the priority of supply to the power stations is from Vygeboom Dam while the remainder of the demand is supplemented from Nooitgedacht Dam. APPENDIX C : VAAL PILOT STUDY October 2006
C2-4 This implies that the downstream dam (Vygeboom) is emptied first, with the purpose of limiting spills from the sub-system, and to capture as much runoff as possible from the dam’s incremental catchment. Gladespruit Weir diverts water from the Gladespruit River into Vygeboom Dam and water is abstracted from the Komati River at Gemsbokhoek and feed to the Bosloop Pump Station, from where it is transferred to the power stations. The primary route of support to the Komati Sub-system is from the Usutu Sub-system and the volume of transfer is determined by the short-term yield vs. demand balance. Transfer is also possible from the Grootdraai Sub-system (via Witbank Dam) to supplement Duvha Power Station’s demand during severe drought events. The volume that can be supplied through this option is, however, limited due to the high sulphate concentration of the water in Witbank Dam. C2-9 Witbank and Middelburg Sub-systems These two sub-systems are operated to supply their respective water requirements as well as to make obligatory releases to Loskop Dam in compliance with Court Orders that were promulgated when the dams were constructed. A rising main (pipeline) provides the flexibility to transfer water from Witbank to Middelburg Dams and, in the context of the larger Vaal River Eastern Sub- system, make it possible to transfer water from Grootdraai Dam to the Middelburg Sub-system. C2-10 Vaal River Eastern Sub-system The Komati, Usutu, Heyshope, Zaaihoek, Grootdraai, Witbank and Middelburg Sub-systems are collectively known as the Vaal River Eastern Sub-system (VRES). Given the sub-system operating rule summaries provided in the previous sections, the assumptions and operating rules that are proposed for the VRESAP pipeline from Vaal Dam to Secunda are presented in this section. These operating rules originate from scenario analyses that were undertaken during planning studies, with the objective of maintaining the assurance of supply to the users in the Vaal River Eastern Sub-system, while allowing reduced pumping through the proposed pipeline during wet hydrological periods. • Water supply definition: The total water requirement of Matla Power Station was modelled to be supplied from Grootdraai Dam during the first three years of the analysis (i.e. until the proposed pipeline from Vaal Dam is implemented). This was necessary to maintain a balance in the storage levels of the sub-systems, given the relatively low storage levels in the dams as observed on 1 May 2003 (the starting date for the analyses). During the remainder of the analysis period, which extended to 2030, Kendal, Matla and Kriel Power Stations were operated to receive water (as first priority) from Usutu and Heyshope sub-systems. Under conditions where the water requirements exceed the short-term yield capability of these two sub-systems the shortfall is allocated to the Grootdraai Sub-system by supplying a portion of the demand from Grootdraai Dam. • Morgenstond-Jericho transfer: The additional pipeline (active from 1 July 2004) and new pump station (active from 1 November 2004) were incorporated in the system configuration. • Heyshope-Morgenstond transfer: Alternative reserve storages in Heyshope Dam were adopted for different periods of the analysis. The purpose of the reserve storage is to reduce the transfer from Heyshope to Grootdraai in order to have water available for transfer to the Usutu sub-system during drought periods. APPENDIX C : VAAL PILOT STUDY October 2006