Beijing 2008 Olympic Games dand Urban Development Plan - Zhang Lixin, Beijing Municipal Urban Planning Commission 05/08, 2009
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Beijing 2008 Olympic Games andd Urban Development Plan Zhang Lixin, Beijing Municipal Urban Planning Commission 05/08 2009 05/08,
Olympic Ol i City: Ci remarkable k bl achievements hi iin urban b ddevelopment l dduring i the h ten years from 1999 to 2008. Both short-term short term and long- long term needs Both specific and overall perspectives The master plan of Olympic facilities and urban planning of Beijing : closely connected with and reinforced each other The construction of Olympic venues : integral part of urban development.
Background Beijing Municipality Area Municipality area : 16,400 , Sq. q Km,, 61% is mountainous areas. Satellite photo of Beijing municipality area
Background Beijing Municipality Area Population: more than 20 million residents( permanent & mobile) The city cit proper : 1,088 1 088 Sq Sq. Km The overall urban planning of Beijing20042020
Background The Layout of City Proper “Scattered Groups” The city proper: a central built-up area , 10 surrounding di ffringe i groups Green belt: open space between the central area and surrounding groups Control the Growth of the city proper Old city core: 62.5 Sq.Km The Central Axis:25km
A long-term and broad view Site Selection Planning for the Olympic venues Goals For Olympic Games Meet bid requirements and targets Great venues, Great Olympic experience for all users For Post Games Good post-Games post Games legacy used for facilities and space Increate and develop an active multi-functional urban public central area Best integration of the goals for Olympic Games and the long-term development p of the city y
A long-term and broad view Layout of the Venues 31 competition venues Fully use the exiting venues The after-game use:serve the citizens Extending the Central Axis Realize the Green Belt
12 New N Venues V National Stadium National Swimming National Gymnasium Beijing Shooting Center Range Hall Beijing Olympic Laoshan Mountain Shunyi Olympic Rowing- China Agricultural Basketball Center Bike Course Canoeing Park University Gymnasium Beijing University of Beijing University of Beijing University of The Tennis Center Technology Gymnasium Technology Gymnasium Industry Gymnasium
11 Renovated existing Venues Worker’s Stadium Olympic Sports Beijing Shooting Range Fengtai Softball Field Center Gymnasium CTF Beijing Universtiy of Aeronautics Worker’s Gymnasium Yingdong Natatorium and Astronautics Gymnasium Beijing Institute of Laoshan Mountain Bike Olympic Sports Capital Gymnasium Technology Gymnasium Course Center Stadium
8 TTemporary VVenues National Convention Olympic Forest Park Olympic Forest Park Center Fencing Hall Hockey Field Archery Field Wukesong Baseball Field Road Cycling Course Chaoyang Beach Volleyball Field Changping Triathlon Small Wheel Bicycle Race Venue Field
Raleated Olympic facilities The Olympic village The Digital Plaza The National Convention Center---IBC& MPC The Media village
Site Selection for the Olympic Green Olympic Green: at the northern end of the Central Axis Extends the Axis further north to a scenic area Continue of the urban history and identities
Olympic Green Total area : 1,159 ha includes: The forest park:680 ha The central area:315 ha The south part:164 ha
Olympic Games The Summer S mmer Ol Olympic mpic Games:Aug Games A g 8th---Aug 8th A g 24th The Paralympics Games :Sep 6th-----Sep 17th Athletes and delegation members 15,000 28 sports sports,302 302 events judges 2,900 Registered medias over 20,000 Unregistered medias over 10,000 Ol Olympici Family F il 20 000 20,000 Games volunteers 100,000 City volunteers 400,000 IOC President Jacques Rogge : “these were truly exceptional Games.”
Integ gration n Develo D opmentt Platfo orm
D Development: l t Economic Environment Transportation Open Society
Rapid economic development Per capita GDP : jumped from US$909 in 1990 to US$9,000 in 2008 北京人均GDP(美元/ 人) GDP per cap i n Bei j i ng ( usd/ per ) 10000 9000 7654 8000 6323 6000 5548 4966 4216 3726 4000 2914 3262 2585 1714 2004 2309 2000 909 1032 1171 13801188 1520 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Rapid economic development local fiscal revenue : increased from RMB7.4 billion in 1990 to RMB188.2 billion in 2007 北京市地方财政收入(亿元) local fiscal revenue of Beijing municipal government (100million RMB) 1882 1236 1007 830 666 601 508 398 320 266 210 151 74 77 80 84 100 115 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Olympic Development improve the city central area Olympic venues Infrastructures City central renewal Environment cleaning projects 31 venues for competition,45 environment cleaning independent training venues, Road system p j projects
The development of the main functional areas Zhongguancun Science Park CBD Beijing Financial Street The Centre Axis traffic facilities
Newly-built cultural facilities The CCTV New Tower Th N The National i l Centre C for f the h Performing P f i A Arts Museum of China Central Academy of Fine Arts The Beijing Planetarium
Environment Investment for environment protection during 2001-2006: 97 billion RMB. Green Space Th first The fi t Green G Ring Ri Belt B lt off city; it The second green ring belt of city; Nine wedged Green Belts
Environment Green Space The Olympic forest park Chaoyang park The Olympic forest park
Environment Energy : Restructure energy-supply, control air pollution; Renew industry structure, speed up the removal of pollution enterprises, p p , such as Capital Iron & Steel Corp; Use of sustainable new energy and renewable energy : Capital Iron & Steel Corp wind power, solar energy, etc.
Environment Construction of Olympic facilities : Environmental protection is top priority for all the planning and construction t ti off Ol Olympic i facilities f iliti Strict environmental impact assessment Water W t and d energy conserving i d designs i
Environment Water conservation Much better air quality People’s ’ awareness off environmental protection Utilization of rain water Lamp standard Wind power using solar energy Wetland of the forest park
Transportation: International and Inter-city transportation Investment : 90 billion RMB for metro system, system highways and airport airport. Beijing Capital Airport expansion project : three terminals and three runways , annull passenger th throughput h t off 65 million illi person-times ti per year.
Transportation: International and Inter-city transportation Beijing South Station : 30minutes from Beijing toTianjin Inter-city railway plan
Transportation: Metro System Changp. 8 5 Shunyi Airline 1998: 13 14 2 lines,, 42km 4 2008: Datai 10 2 6 lines lines,200km 200km 6 2012: 1 14 lilines,407km 407k 14 7 2015: 10 19 lines,561km 9 Yizhuang Fangsh. Daxing
Open Society How had the design schemes of Olympic Green, Bird Nest, Water Cube been selected? Open Competition to call the wide participation and best professional firms Jury Panel by Leading professionals with strict rules Open to the public and vote Make decision by y Municipal p government g Design Competition for the Olympic Green
Open Society Conceptual Design Competition for the National Stadium The BIAD-designed floating retractable roof of the National Stadium The Bird’s Nest p proposal p by y Herzog g and de Meuron of Switzerland / China Architecture Design and Research Group Proposal p for the National Stadium “Sky y Stadium” by y Satou Planning g Corporation (Japan) /Ingeroses Corporation (Japan) and Architectural Design & Research Institute of Tsinghua University
Open Society An important opportunity for the development of Beijing A rare opportunity for the rest of the world to learn more about China Upgraded infrastructure, improved image, more prosperous One World , One Dream
Legacy Public Transportation Strategy Environment Protection Energy Saving Efficiency Land Use(multi-function public center) Open green space Regeneration of the original industrial area Culture Identity Easy to Live (Happiness) Good Public services ……
Thank you! y
You can also read