ALTURA LITHIUM
NEW SIGNIFICANT SUPPLY TO THE
BATTERY MARKET IN 2018

JUN E 2 01 8

INVESTOR UPDATE

                      R ESO URC ES DRI V I NG SU PPLY TO THE BATTERY R EVOLUTION 1
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

DISCLAIMER
This presentation has been prepared by Altura Mining Limited (“Altura” or the “Company”). It should not be considered as an invitation or offer to
subscribe for or purchase any securities in the Company or as an inducement to make an invitation or offer with respect to those securities. No
agreement to subscribe for securities in the Company will be entered into on the basis of this presentation.

This presentation is provided on the basis that none of Altura nor its respective officers, shareholders, related bodies corporate, partners, affiliates,
employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or
completeness of the material contained in the presentation and nothing contained in the presentation is, or may be relied upon as, a promise,
representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law.

The presentation contains forward looking information and prospective financial material which is predictive in nature and may be affected by inaccurate
assumptions or by known or unknown risks and uncertainties, and may differ materially from results ultimately achieved. All references to future
production, production targets and resource targets and infrastructure access are subject to the completion of all necessary feasibility studies, permitting,
construction, financing arrangements and infrastructure-related agreements. Where such a reference is made, it should be read subject to this paragraph
and in conjunction with further information about the Mineral Resources, Ore Reserves and Exploration Results, as well as the Competent Persons'
Statements.

All persons should consider seeking appropriate professional advice in reviewing the presentation and all other information with respect to the Company
and evaluating the business, financial performance and operations of the Company. Neither the provision of the presentation nor any information
contained in the presentation or subsequently communicated to any person in connection with the presentation is, or should be taken as, constituting the
giving of investment advice to any person.

                                                                                                 Charging forward with Lithium
                                                                                                                                                                       2
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

     CONTENTS
                                                        1   Introduction
                                                        2   Project Overview
                                                        3   Corporate
                                                        4   Project Update
                                                        5   Financial Analysis
                                                        6   Offtake
                                                        7   Regional Exploration
                                                        8   Lithium Market Fundamentals
                                                        9   Summary
                                                            Appendices

Ideally located in the gateway to North Asian Markets
                                                                                                     3
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

Section 1
INTRODUCTION

                                 4
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

ALTURA INVESTMENT HIGHLIGHTS
                                Low risk, low cost, low capex and long life, with excellent
 1     World Class Project
                                 metallurgy
                                Existing port and road infrastructure, with proximity to end
 2     Tier One Jurisdiction
                                 users in Asia
                                Less than 2 months to first spodumene sales in a strong
 3    Near Term Production
                                 market
                                Capital spent and offtake contracted, with Stage 2 DFS
 4      Stage 1 Derisked
                                 completed in April 2018
                                Driven by the EV “mega trend” and clean energy storage
 5   Positive Market Outlook
                                 demand
                                Based on forecasts from Stage 1 production and from the
 6     Attractive Valuation
                                 Stage 2 DFS
                                More than 16,000 hectares of highly prospective tenements
 7     Exploration Upside
                                 with targets identified

 8   Highly Experienced Team    Strong project development credentials

                                                                                                                  5
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

INTRODUCTION
Feeding the lithium supply chain in H2 2018
                                                                                         Project Location
•   ASX-listed company Altura Mining Limited (“Altura” ASX:AJM) owns 100% of the
    Pilgangoora Lithium Project (the “Project”)
•   The Project is located in the Pilbara region of north west Western Australia, an
    established mining region that is well serviced by existing infrastructure                                     Port Hedland
                                                                                                                                            Pardoo
•   Stage 1 of the Project is currently in commissioning stages, and is expected to                 Karratha
                                                                                                                                     Pilgangoora
    produce approximately 220,000 tpa of spodumene concentrate SC6 (circa 30,000
                                                                                                                                         Marble Bar
    tpa LCE)*                                                                              Onslow
                                                                                                     Pannawonica
•   Stage 2 of the Project (DFS complete) involves a doubling of production to                                   Wittenoom
                                                                                                                                           Nullagine

    approximately 440,000 tpa spodumene concentrate SC6 (circa 60,000 tpa LCE)
                                                                                                                    Tom
    with expected commissioning in Q1 2020*                                                                         Price
                                                                                                    Paraburdoo
•   Combined Stage 1&2 NPV (@10% discount rate) of A$835m based on Stage 2 DFS                                                           Newman

    assumptions and pricing on 34.2Mt ore reserve estimate*
•   Concentrate will be transported ~130kms by existing road infrastructure for export
    via an existing multi-user berth in Port Hedland
                                                                                                                             Perth
•   A minimum of 200,000 tpa is contracted until 31 December 2022, with 100,000
    tpa to each partner (Lionergy and J&R Optimum) on market-based terms with a
    pricing floor and cap for 3 years

* Refer to ASX Announcements 26 September 2016, 24 October 2017 and 30 April 2018                                                                             6
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

Section 2
PROJECT OVERVIEW

                                     7
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

PROJECT SNAPSHOT
Altura’s Pilgangoora project is fully permitted from mine to port with first shipment planned for Q3
2018

Description                             Units      Stage 1   Stage 1&2(1)   PRODUCTION PROFILE

Run Rate Production                  SC6 kt p.a.    220          440

Mine Life (on Reserves)                 Years        23          13

Development Capex                       A$m         151         119(2)

LOM Sustaining Capex (Real)             A$m          31          31

LOM C1 Cost (Real)                      A$/t        356          324

LOM Total Cash Cost (Real)              A$/t        428          400

Ore Mined (Reserves)                     Mt         34.2        34.2

LOM Grade                              % Li2O      1.04%        1.04%

Waste                                    Mt         106.2       106.2

(1) Refer to ASX Announcement 30 April 2018
(2) Excludes Stage 1 Capex
                                                                                                                   8
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

Section 3
CORPORATE

                              9
ALTURA LITHIUM NEW SIGNIFICANT SUPPLY TO THE BATTERY MARKET IN 2018 INVESTOR UPDATE - Altura Mining
Highly Confidential

COMPANY OVERVIEW
                                                                                      12 MONTH SHARE PRICE PERFORMANCE

                                                                   Share Price (A$)                                        Volume (m)

                                                                         0.60                                                 40.0
  Capital Structure (22nd June 2018)              AUD

  Shares on Issue                                 1,819.9m                                                                    35.0
                                                                         0.50
  Share Price                                     $0.315
                                                                                                                              30.0
  Market Capitalisation                           $573m                  0.40
                                                                                                                              25.0
  Cash(1)                                         $63m
                                                                         0.30                                                 20.0
  Debt(1)                                         $144m

  Enterprise Value                                $654m                                                                       15.0
                                                                         0.20
(1) As per 26 April 2018 Quarterly Announcement
                                                                                                                              10.0
  Major Shareholders                              In Company (%)
                                                                         0.10
                                                                                                                              5.0
  Furui Holdings Limited (Shaanxi J&R)            16.81%

  Allan Buckler (Shazo Holdings Pty Ltd)          10.71%                 0.00                                                 0.0

  Terry Smith                                     10.15%

  Directors(2)                                    16.02%

  Top 20                                          62.3%

(2) Excludes J&R shareholding

                                                                                                                                          10
Highly Confidential

CORPORATE HISTORY
                                                                                                                                                          13-Nov-17
                                                                                                                                                    Stage 2 scoping study
Share Price (A$)                                                                                                                                         results show
                                                                                                                                                                                                       Volume (m)
                                                                                                                                                       production plant            22-May-18
                                                26-Apr-16                     8-Nov-16                                                                                            Process plant
     0.60                                                                                                   9-May-17
                                                                                                                                                      duplication is best
                                                                                                                                                                               Commissioning – first
                                                                                                                                                                                                         80.0
                                             Binding off-take            Subscription and co-                                                         expansion option
                                            agreement signed             operation agreement           Contracts for plant                                                         ore crushed
                                            with Lionergy for            signed with Optimum               construction,
                                           100ktpa spodumene                 Nano raising               transport, logistics            24-Oct-17
                                                                                                       and power awarded
                                                                                                                                                                                                         70.0
                                               concentrate                     A$41.6m                                              Increase in Reserve
     0.50                                                                                                 at Pilgangoora            and Resource base
                                                                                                                                   supporting a 22 year
                         11-Apr-16                                                                                                 mine life under Stage
                    Pilgangoora stage 1                                                                                                    1 DFS
                                                                                                                                                                                                         60.0
                      feasibility study                        26-Sep-16
     0.40          released highlighting                  Pilgangoora stage 1                                                10-Jul-17
                   NPV of A$382m and                          DFS released                    27-Feb-17
                     12+ year mine life
                                                                                                                          Binding off-take                                                               50.0
                                                          highlighting NPV of            Pilgangoora project             agreement signed
                                                           A$411m and a 13                management plan               with Optimum Nano
                                                             year mine life                approved by WA                   for 100ktpa
                                                                                        Government and on-                  Spodumene
     0.30                                                                                                                                                                                                40.0
                                                                                        site works commence                 Concentrate

                                                                                                                                                                                 30-Apr-18               30.0
     0.20                                                                                                                                                                    Stage 2 Definitive
                                                                                                                                                                              Feasibility Study
                                                                                                                                                                            Released highlighting
                                                                                                                                                                            NPV of A$835m and            20.0
                                                                                                                                                          28-Jul-17          13+ year mine life
                                                                                                                                                     Senior secured loan     (includes Stage 1)
     0.10                                                                                                                                             notes issue raises
                                                                                                                                                      US$110m to fund                                    10.0
                                                                                                                                                      construction and
                                                                                                                                                      commissioning at
                                                                                                                                                         Pilgangoora
     0.00                                                                                                                                                                                                0.0

                                                                                                                                                                                                                        11
Highly Confidential

    BOARD & MANAGEMENT

                        BOARD
                        James Brown                               Paul Mantell                                Zhao Tong
                        Managing Director                         Executive Director, CFO                     Non-Executive Director
Board and               Mr Brown is a Mining Engineer with        Mr Mantell is a qualified accountant and    Mr Zhao Tong brings over 25 years
                        extensive mining experience and           has in excess of 30 years in corporate      experience in the international trade of
Management with a       operational development. Mr Brown has     experience in the mining and associated     metals and minerals. Mr Tong has been
                        been Managing Director of Altura since    industries. This included 28 years at New   the director of the Lithium Division of
                        September 2010, and previously was        Hope Corporation, with the last 12 years    J&R Optimum, an offtake partner of
history of successful   the Company’s General Manager.            as the Company’s Chief Financial Officer.   Altura since October 2016
                        Previous to his role at Altura Mr Brown

developments, strong    spent 22 years at New Hope
                        Corporation (ASX:NHC)

operations and robust   BT Kuan                                   Allan Buckler                               Dan O’Neill
                        Non-Executive Director                    Non-Executive Director                      Non-Executive Director
dividend returns        Mr Kuan has been a director of Altura     Mr Buckler holds over 40 years              As an exploration geologist and founding
                        since November 2007 and brings a          experience in the mining industry which     director of current lithium producer
                        wealth of experience in logistics,        includes being a former Director and        Orocobre Limited (ASX:ORE), Mr O’Neill
                        specifically the development and          Chief Operations Officer at New Hope        brings over 30 years’ experience in
                        management of bulk handling and           Corporation. Mr Buckler has been            international mining across Australasia,
                        terminal operations. Mr Kuan is a         directly responsible for the                Africa, Asia and North America. Mr
                        qualified mechanical engineer             commercialisation of several projects       O’Neill has served as a director of Altura
                                                                  which begun from resource identification    since December 2008
                                                                  all the way through to production

                                                                                                                                                           12
Highly Confidential

BOARD & MANAGEMENT

MANAGEMENT
Chris Evans                                                     Marc Rowley                                                      Graham Austin
Chief Operating Officer                                         General Manager Development                                      Maintenance Superintendent
Mr Evans is an experienced civil engineer and project           Mr Rowley is a seasoned management professional covering         Mr Austin holds over 30 years experience on all fixed plant
manager. Mr Evans has project management and                    all phases of project lifecycles spanning from scoping studies   equipment and has been involved with greenfield and
construction experience in Australia, South east Asia and the   through to commissioning and handover.                           brownfield projects throughout Africa, Asia and Australia.
UK.                                                             With 15 years working in WA for a number of tier 1               Mr Austin has held various Maintenance Superintendent
Prior to commencing as COO at Altura, Mr Evans was Project      engineering consultants, Mr Rowley holds experience in           positions in the gold, copper and nickel mining processes
Manager for the Mt Webber mine development in the               both small scale scoping studies and Definitive Engineering      Mr Austin begun his career in Zimbabwe, before moving to
Pilbara region of Western Australia for Atlas Iron, and         Studies on projects with a value over $1b. Mr Rowley has         Botswana where he worked for various mining
delivered on an aggressive timetable for the project            assumed the position of Project Director to take the Stage 1     organisations, then moving to Singapore taking up a position
                                                                study through to implementation and commissioning.               of Service Engineer with National Oilwell

Phil Robinson                                                   Walter Madel                                                     Brady Jenkins
Registered Manager                                              Processing Manager                                               Processing Superintendent
Mr Robinson brings to Altura a solid background in Mining       Mr Madel is a metallurgist and a mineral process                 Mr Jenkins is a Metallurgist with over twenty years
and Processing operations, working on a number of               engineering and design professional, with 17 years of            experience in the Australian mining industry. He has
greenfield mining developments such as Atlas Abydos Mine        practical processing engineering experience in a wide variety    extensive processing experience in a wide range of
and Arrium’s Southern Iron Project, with experience also        of minerals and metals on projects in Australia and              commodities including nickel, gold, mineral sands, coal and
working on a number of business transformation projects         internationally, and also holds 10 years of experience in        iron ore.
such as Cockatoo Island Redevelopment, Woodie                   mineral plant operations.                                        In recent years Mr Jenkins has focused primarily on
Manganese Mine development, and Arrium’s redevelopment          Mr Madel played a key role in the design of the processing       operational readiness, commissioning and ramp up of large
of its Whyalla group of Mines.                                  plant and supporting infrastructure from conceptual and          scale processing operations with tier 1 mining companies.
Mr Robinson is an experienced Mining Operations and             study stage through to detail design of the Pilgangoora          Mr Jenkins has assumed the role of Commissioning
Construction Manager with over 20 years experience.             project.                                                         Manager for the Pilgangoora project.
                                                                                                                                                                                                13
Highly Confidential

Section 4
PROJECT UPDATE

                                  14
Highly Confidential

PROJECT UPDATE
Rapid progress – Greenfield site to production
            March 2017                           June 2018

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                     15
Highly Confidential

PROJECT UPDATE
 Pilgangoora Stage 1 delivering to timetable and budget
                                                                               Development Capex Profile (A$m)
 Operations and Maintenance Readiness – Progress
                                                                                        $18                                                           $180
 •   Power station energised

                                                                             Millions

                                                                                                                                                             Millions
                                                                                        $16                                                           $160
 •   Reverse Osmosis (RO) plant commissioned
                                                                                        $14                                                           $140
 •   8 mega litre raw water dam on line to supply water to process plant
                                                                                        $12                                                           $120
 •   High Pressure Grinding Rolls (HPGR) and Dense Media Separation
                                                                                        $10                                                           $100
     (DMS) systems complete
                                                                                         $8                                                           $80
 •   On site laboratory operational and testing first samples
                                                                                         $6                                                           $60
 •   Commissioning and performance testing of the Crushing Circuit
     complete                                                                            $4                                                           $40

 •   Product storage shed in Port Hedland constructed and ready to receive               $2                                                           $20
     spodumene concentrate for shipment
                                                                                         $0                                                           $0
 •   All key processing plant staff recruited – owner operator model
 •   Steel fabrication complete                                                               Planned   Actual   Cummulative Planned   Cummulative Actual

 •   Electrical installation works completed
 •   100% of conveyors are in place

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                                                   16
Highly Confidential

COMMISSIONING PROGRESS
Commissioning process progressing to plan

CHARGING FORWARD WITH LITHIUM | ASX : AJM                    17
Highly Confidential

Section 5
FINANCIAL ANALYSIS

                                      18
Highly Confidential

COMPARABLES ANALYSIS
    Forecast 2020 Run Rate Production (ktpa LCE)                                                                   Capital Intensity (US$’000 / t Li2O)
                                                                                                                                                                                                                             59
            112

                                                                                                                                                                                                              46
                                                                                                                                                                                                  42
                                                                                                                                                                                    37
                        65
                                                                                                                                                                    27

                               33         30         28
                                                                23        21                                                                          11
                                                                                     18                                                8
                                                                                                13                      6
                                                                                                             8

            PLS     AJM       NMX        GXY        ORE       TAW        KDR        BCN        LAC          NMT        KDR            AJM            PLS           ORE              GXY         LAC         NMX             BCN
                                                                                                                    (Earl Grey)     (Stage 1)      (Stage 1)      (Ph. 2)          (SdV)      (Olaroz)     (Whab.)        (Sonora)
    Source: company disclosure. Galaxy production includes only Mt Cattlin (200ktpa SC6). Pilbara and Altura        Source: Company disclosures.
    include Stage 2 expansions.

    EV / 2020 Run Rate Production (US$’000/t LCE)                                                                  EV / CY 2020E EBITDA
                                                                                                                                                                                                                          18.2x

                                                                                                     31.5                                                                                                 15.7x

                                                                            27.5       27.6
                                                                26.3

                                                                                                                  EV / CY 2020E EBITDA
                                                                                                                  Adjusted for                                              7.9x           8.3x
                                                    13.6                                                          Stage 2 Volumes
                                        12.1
                             11.1
                  9.8
      8.8                                                                                                                                                  4.3x
                                                                                                                       2.7x              2.8x

     AJM          PLS        NMX        TAW         NMT         ORE        KDR         GXY           LAC               AJM              TAW                PLS              KDR            GXY            LAC              ORE
      Source: Company disclosure. Galaxy multiple does not include Sal de Vida or James Bay                          Source: Bloomberg broker consensus. Altura EBITDA assumes mid-point of guidance on previous page (A$139m) adjusted
                                                                                                                     for Stage 2 expansion. Cash and debt per latest reported adjusted for any capital raisings post balance date (ORE, TAW).
                                                                                                                     Share price at close 27 April 2018.
.                                                                                                                                                                                                                                               19
Highly Confidential

VALUE UPSIDE

•   Stage 2 DFS delivers NPV of A$835m (@10% discount                            Metric                  Units   Stage 2 DFS Case*
    rate) as at 1 July 2018*
•   Material project upside potential through exploration                        Pricing Scenario                                DFS Pricing
    targets extending asset life on the underexplored
    16,000 hectare tenement package (only 600 hectares                           Asset Life              Years                         13
    explored to date)
•   Stage 2 DFS based on 34.2Mt Ore Reserve estimate                             NPV (10% discount)      A$m                          835
    (excludes latest Ore Reserve estimate upgrade of
    41.1Mt)*                                                                     Ore Mined                kt                         34,214

•   Opportunity for mine life extension via evaluation of                        Spodumene Concentrate
                                                                                                          kt                         4,755
    tenement package                                                             Produced

                                                                                 LOM EBITDA              A$m                         2,473

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcements      LITHIUM
                              26 September    | ASX
                                           2016,     : AJM
                                                 30 April 2018 and 28 May 2018                                                                  20
Highly Confidential

Section 6
OFFTAKE

                             21
Highly Confidential

OFFTAKE PARTNERS
Offtake agreements for a minimum of 200ktpa from Stage 1 for five years

                                                                       Lionergy
          • 100% owned subsidiary of Shenzhen-listed         • 20+ years in Chinese lithium industry with
            Shaanxi J&R Optimum Energy                         excellent reputations and connections
          • Controls significant % Chinese battery market    • Exploration, mine development, concentrate
          • Producer of lithium power battery systems for      sales and distribution
            EV, large EV and static storage                  • Li2C03 and LiOH manufacturing and sales,
          • Customers include Dongfeng Motors, Sunlong         lithium metal & cathode manufacturing for
            Bus, Dayun Group, FAW Group, Haw Tai Motors        Li-ion batteries
          • Producing +100,000 battery sets in 2017          • Purpose built Li2C03 and LiOH conversion
          • 2017 production of 5.6GW of batteries, ranking     plant substantially under construction in
            No.3 in China                                      Ulanqab, Inner Mongolia
          • Currently undergoing re-structuring to form      • Stage 1 capacity 120ktpa SC6 concentrate
            larger New Energy entity covering raw material   • Stage 2 capacity 240ktpa SC6 concentrate
            integration

                                                              Charging forward with Lithium
                                                                                                                         22
Highly Confidential

SUMMARY OFFTAKE TERMS
Minimum of 200,000 tpa of production contracted for five years, with floor and cap pricing for 3 years
 Term                                                                                  Stage 1 - 220ktpa SC6 (circa 30ktpa LCE)
 •   Five years from first shipment to occur after the mining commencement
     date                                                                                                               H2 2018 Lionergy
                                                                                         Lionergy
 Prices                                                                                                                 Conversion Plant
                                                                                        Min 100ktpa
 •   Prices to be mutually agreed annually by the Parties, having regard to:                                            120ktpa (Stage 1)
      •   Spodumene indices (if available)
      •   Published company prices                                                          J&R                                  H2 2019 Lionergy
      •   Weighted average price of comparable lithium products shipped from             Optimum                                 Conversion Plant
          Australian projects                                                           Min 100ktpa                              240ktpa (Stage 2)
      •   Movements in lithium carbonate prices
 •   Price floor of US$550/t and cap of US$950/t for the first 3 years                 Stage 2 - 440ktpa SC6 (circa 60ktpa LCE)
 •   Price adjustment formulas in place if Li2O content is above or below 5.5%
     Li2O                                                                                Lionergy /                                H2 2019 Lionergy
                                                                                            J&R                                    Conversion Plant
 Volumes                                                                                                                           240ktpa (Stage 2)
                                                                                        Min 200ktpa
 •   Minimum annual contracted volume of 100,000 tonnes for each offtake for
     a period of five years (200,000 tonnes minimum in total)
                                                                                        New Offtake                                                 H1 2020
 •   Until the fifth anniversary of the first shipment, if Altura produces in excess                                                               New Supply*
                                                                                         Available*
     of the confirmed annual quantity, then J&R agrees to buy and Altura agrees
                                                                                        Min 200ktpa                                              200ktpa (Stage 2)
     to sell that additional product on the same terms as this offtake
                                                                                               Charging forward with Lithium
                                                                                              * New offtake subject to J&R Optimum rights until 31 December 2022
                                                                                                                                                                             23
Highly Confidential

Section 7
REGIONAL
EXPLORATION

                               24
Highly Confidential

EXPLORATION TARGETS
Defined high-impact prospects identified within Altura’s tenement package

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                    25
Highly Confidential

NEAR FIELD EXPLORATION POTENTIAL
Infill drilling opportunities immediately adjacent to production operations offer low-risk reserve upside
•    The resource infill drilling and geological model reinterpretation work carried out in
     2017 has identified the following potential exploration targets within the M45/1230
     and M45/1231 tenements:

    1.   ‘Southern Ridge Deposit Area’ – located in the southeast corner of the
         M45/1231 tenement. This area requires infill drilling to improve geological
         understanding and grade definition. Area drilled in early 2018.
    2.   ‘H Pit Area’ – located at the southern end of the mining start-up area. A majority
         of this area has not previously been drilled due to access restrictions caused by
         the steep slopes. Current mining will reduce the ‘H Pit’ to the 211mRL, which
         will create a large flat area for drilling.

    3.   ‘Stage 1 South Area’ – a high grade shoot located at the southern end of the
         Stage 1 mining area was identified during the recent drilling program. Further
         infill drilling is recommended in this area.
    4.   ‘Remainder of Planned Open Pit’ – the recent drilling also identified the need for
         closely spaced (20m x 20m grid) drilling in the remainder of the main deposit to
         improve geological understanding and grade definition which will minimise risk
         prior to future mining activities.
•    Altura holds five external exploration tenements including the E45/2287 tenement.
     Detailed geological mapping carried out on this tenement in April 2017, identified a
     target area near the ‘Monster Deposit’ which is located on the neighbouring
     tenement held by Pilbara Minerals Ltd. Based upon the results of three exploration
     holes drilled in this area in October 2016 and the mapping data collected this year,
     further exploration potential exists in this target area.*

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcement      LITHIUM
                             14 December 2017| ASX : AJM                                                           26
Highly Confidential

RECENT RESULTS – SOUTHERN RIDGE
Strong results from Southern Ridge drilling program supports resource conversion
 •         Numerous shallow and high-grade intersections recorded from a total of 4,654m of RC drilling in 44 holes*
 •         Impressive results for depth, grade and thickness

 Hole ID         Mineralised Intersections                                                  Hole ID     Mineralised Intersections

                 4m @ 0.50% Li2O from 3-7m                                                  P18RC0024   22m @ 1.68% Li2O from 12-34m    including 10m @ 1.76% Li2O from 12m
 P18RC0003
                 9m @ 2.43% Li2O from 13-22m     including 6m @ 2.88% Li2O f rom 15-21m                 3m @ 1.34% Li2O from 18-21m
                                                                                            P18RC0025
 P18RC0004       21m @ 1.22% Li2O from 37-58m    including 8m @ 1.55% Li2O f rom 49-57m                 16m @ 1.46% Li2O from 28-44m    including 9m @ 2.00% Li2O from 30m

                                                                                                                                        including 10m @ 2.13% Li2O from 23m
                 41m @ 1.20% Li2O from 60-101m   including 6m @ 1.44% Li2O f rom 63-69m     P18RC0029   43m @ 1.65% Li2O from 21-64m
 P18RC0006                                                                                                                              including 15m @ 2.14% Li2O from 47m

                                                 including 13m @ 1.93% Li2O from 88-103m                18m @ 1.40% Li2O from 51-69m    including 5m @ 2.68% Li2O from 51m

                 17m @ 1.00% Li2O from 55-72m    including 9m @ 1.34% Li2O f rom 56-65m                 6m @ 0.79% Li2O from 77-83m
 P18RC0007                                                                                  P18RC0031
                 7m @ 1.12% Li2O from 75-82m                                                            5m @ 1.03% Li2O from 94-99m

                                                 including 13m @ 1.66% Li2O from 92-105m                6m @ 1.94% Li2O from 113-119m   including 3m @ 3.48% Li2O from 113m
                 59m @ 1.34% Li2O from 77-136m
 P18RC0008                                       including 17m @ 1.71% Li2O from 117-134m               12m @ 1.55% Li2O from 85-97m    including 4m @ 2.19% Li2O from 85m
                                                                                            P18RC0032
                 19m @ 2.05% Li2O from 144-163m including 10m @ 2.52% Li2O from 148-158m                16m @ 1.30% Li2O from 101-117m including 7m @ 1.83% Li2O from 104m

                 21m @ 2.19% Li2O from 2-23m     including 12m @ 2.65% Li2O from 8m                     4m @ 2.10% Li2O from 60-64m

 P18RC0018       2m @ 1.37% Li2O from 43-45m                                                P18RC0033   16m @ 1.15% Li2O from 104-120m including 6m @ 1.48% Li2O from 104m

                 7m @ 1.69% Li2O from 51-58m                                                            2m @ 1.02% Li2O from 128-130m

 P18RC0019       20m @ 1.29% Li2O from 0-20m     including 10m @ 1.60% Li2O from 1m                     27m @ 1.62% Li2O from 90-117m   including 8m @ 2.24% Li2O from 93m
                                                                                            P18RC0034
                 7m @ 1.10% Li2O from 15-22m                                                            25m @ 1.44% Li2O from 142-167m including 15m @ 1.73% Li2O from 143m

                 5m @ 1.29% Li2O from 32-37m                                                            7m @ 1.00% Li2O from 131-138m
 P18RC0021
                 2m @ 1.04% Li2O from 57-59m                                                P18RC0035   5m @ 0.79% Li2O from 139-144m

                 7m @ 0.92% Li2O from 61-68m     including 3m @ 1.58% Li2O f rom 65m                    23m @ 1.14% Li2O from 148-171m including 5m @ 1.61% Li2O from 150m

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcements     LITHIUM
                              13 March        | ASX
                                       2018, 10       : AJM
                                                April 2018 and 28 May 2018                                                                                                                     27
Highly Confidential

 UTARA PROSPECT
 High impact prospect located adjacent to Stage 1 and 2 facilities
 •      The Utara Prospect is located near the Monster Deposit, which is within a neighbouring
        tenement held by Pilbara Minerals Ltd. Fractionated, spodumene-bearing pegmatite
        intrusions were observed and mapped within a section of the E45/2287 tenement. This
        section of the tenement overlaps into the main pegmatite field known to host Altura’s
        Pilgangoora Lithium Project (6.5km to the south) that is currently being developed
 •      The mapping work identified three separate occurrences of spodumene-bearing pegmatite.
        One of these has already been drilled, and the other two are untested. Three drill holes
        were previously drilled by Altura in October 2016 and two of these holes intersected
        spodumene-bearing pegmatites*
 •      Exploration reverse circulation or RC drilling on a 50m by 50m staggered grid is planned for
        the Utara Prospect in 2018. Holes averaging 50-100m deep and drilled perpendicular to the
        interpreted pegmatite strike orientations (angled at 60o declination) are planned for this
        prospect. These holes will be geologically logged and the pegmatite intersections will be
        sampled and assayed. Pending the RC drilling results a series of twinned diamond core
        holes will be drilled in this prospect to confirm pegmatite dyke thickness and mineralisation

Hole ID                   Hole Type           Easting        Northing          RL              Dip      Azimuth     Hole Depth   Depth Form   Interval Length   Li2O%       Comments

                                                                                                                                                                           Incl. 3m @ 1.88
PNRC001                      RC             698796.91      7675057.35        195.72           -60        315           58           13             11           1.07
                                                                                                                                                                          Li2O% from 19m

                                                                                                                                    44              3           1.18
PNRC002                      RC             698856.69      7675123.26        189.00           -60        315           76                                                        -
                                                                                                                                    61              2           1.15

                                                                                                                                                                           Pegmatite not
PNRC003                      RC             698888.05      7675089.43        189.26           -60        315          106            -              -            -
                                                                                                                                                                            intersected

                                                                                                                  Charging forward with Lithium
     * Refer to ASX Announcements 14 December 2017                                                                                                                                           28
Highly Confidential

Section 8
LITHIUM MARKET
FUNDAMENTALS

                                  29
Highly Confidential

DEMAND OUTLOOK
Worldwide lithium compounds and metals consumption is expected to achieve an 18% CAGR between
2017 and 2022
                                                                        Global Lithium Compounds and Metals Demand, 2012-2022 (kt LCE)

 •   Between 2012 and 2017, global lithium demand increased                                                                                                            CAGR: 18%

     from 134kt LCE to 229kt LCE, at a CAGR of 11%. CRU                                          600

                                                                       Lithium Demand (kt LCE)
                                                                                                                                                                                                  526
     forecasts that the rate of growth will accelerate to 18%                                                             CAGR: 11%
                                                                                                                                                                                         463
                                                                                                                                                                                 408
     during 2017-2022, with global lithium demand more than                                      400                                                                  351
                                                                                                                                                           296
     doubling to 526kt LCE                                                                                                       188        209   229
                                                                                                                   153    170
                                                                                                 200    134

 •   93% of the total demand growth will be from battery                                           0
     applications and electric vehicles (EVs) alone will account for                                   2012A 2013A 2014A 2015A 2016A 2017A 2018E 2019E 2020E 2021E 2022E
                                                                                                        EVs                             Glass & Ceramics                    Other industrial applications
     80% of the total demand growth. By 2022, lithium                                                   Other eTransportation           Portable electronics                Lubricating Grease
     consumption in EVs will reach 54% of total lithium                                                 Energy storage devices

     consumption compared to just 3% in 2012
                                                                        Global Lithium Compounds and Metals Demand by End Use

                                                                                                                     9% 1%                                                  4% 3%
 •   Lithium demand from industrial applications and portable                                                                     22%                                7%
     electronics is expected to increase at a relatively slow, but                                            12%
                                                                                                                                                                 8%
     steady, CAGR of 2.8% and 4.8% respectively between 2017                                                             2017A                                                 2022E           54%
                                                                                                                                                               10%
     and 2022                                                                                                 8%

                                                                                                                                      28%
                                                                                                                   20%                                           14%
 Source: CRU estimates from Gangfeng IPO Documentation

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                                                                                                   30
Highly Confidential

DEMAND OUTLOOK
 Market continues to misjudge and revise demand estimates upwards as true extent of EV mega trend
 becomes apparent
   Deutsche Bank LCE Demand Forecast                                                                                        Broker Consensus Pricing Outlook
                                                                                                                               LCE Price US$/t                                                               SC6 Price US$/t
        Year               2016 Forecast                   2017 Forecast                     % Increase                        15000                                                                                  1000

                                                                                                                               13000                                                                                  800

                                                                                                                               11000                                                                                  600
       2016                        209                             214                              2
                                                                                                                                9000                                                                                  400

                                                                                                                                7000                                                                                  200
       2020                        359                             453                             26
                                                                                                                                5000                                                                                  0
                                                                                                                                          2017    2018    2019     2020    2021    2022      2023     2024     2025

       2025                        534                             778                             46                                                    Broker LCE Forecast        Broker SC6 Forecast

                                                                                                                            Broker Global Demand and Supply Outlook
                                                                                                                               LCE kt

                                                                                                                                1000

   In 2017 Deutsche Bank revised its Global LCE                                                                                  800

                                                                                                                                 600
   demand forecast in 2025 up 46% from its 2016                                                                                  400

   forecast                                                                                                                      200

                                                                                                                                   0
                                                                                                                                          2017   2018    2019     2020    2021    2022      2023    2024     2025

                                                                                                                                        Broker Consensus Demand   Broker Consensus Supply    Broker Global Surplus

  Source: Broker estimates from SC6 Citi, Bell Potter, Morgan Stanley, Macquarie, Canaccord, Hartleys, Bailieu Holst, CRU
  Source: Broker Estimates for LCE UBS, Bell Potter, Deutsche Banke, Citi, Bailieu Holst, Canaccord, Cormark Securities,
CHARGING          FORWARD WITH LITHIUM | ASX : AJM
  BMO, Roskill, JPM, Eith Capital, Numis, Macquarie, MorganlStanley Hartleys                                                                                                                                                   31
Highly Confidential

LITHIUM SUPPLY
The lithium market is predominantly served by 3 main countries – Australia, Chile and Argentina

 The lithium market is predominantly served by 3 main                Resources by Country, 2017
 countries being Australia, Chile and Argentina. Australia is
 characterised by mined lithium and the Chile and Argentina by                    Chile                                                                                   7,500,000
                                                                                 China                                       3,200,000
 brines. China has both brines and mined lithium
                                                                              Australia                              2,700,000

 Two-thirds of the world’s lithium reserves are found in Chile                Argentina                        2,000,000
                                                                               Portugal       60,000
 (the world’s largest lithium producer), Bolivia and Argentina, in
                                                                                 Brazil       48,000
 what is known as the ‘Lithium Triangle’. Bolivia has a number of       United States         35,000
 large lithium salar deposits that have high Mg:Li ratios, making            Zimbabwe         23,000
 processing and lithium extraction uneconomic. Australia                                  0                       3,000,000                           6,000,000                    9,000,000
 currently has a dominant spodumene presence globally                                                                      Reserves in metric tons

 About half of current lithium production stems from Western         Global Lithium Supply by Country (kt LCE)
 Australian open pit mines extracting spodumene, and then            Country                  2018E    2019E        2020E           2021E        2022E            2023E   2024E        2025E
 concentrating the ore via beneficiation (dense media
                                                                     Chile                      94      107          119             131             137           137     137          137
 separation, flotation, etc.). The end spodumene concentrate is
 then sold to converters (essentially in China) to further upgrade   Australia                 159      252          315             336             346           345     345          342

 the raw concentrate to carbonate and hydroxide end lithium          Argentina                  37      38            59              83             106           136     153          173
 applications (7.5-8 tonnes of acceptable spodumene                  China                      37      42            45              47             48            50       50           55
 concentrate is typically required for one tonne of lithium
                                                                     US & Mexico                 6       6             6               6             16            21       29           36
 carbonate or hydroxide)
                                                                     Others                     13      17            26              31             46            51       66           71

                                                                     Total (kt LCE)            346      461          570             633             698           739     779          814

                                                                     % Growth                  35%     22%           17%             11%             11%           7%      5%           4%
 Source: Company Reports, Industry Reports, Deutsche Bank

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                                                                                          32
Highly Confidential

Section 9
SUMMARY

                             33
Highly Confidential

ALTURA INVESTMENT PROPOSITION

 1   Near-term Production    Feeding the lithium supply chain from H2 2018

 2     Offtake Secured       Stage 1 offtake fully secured until 2022

 3    Expansion Potential    Robust Stage 2 DFS completed to double production

      Exploration Upside     Southern Ridge delivering exploration success, Utara drilling
 4                            planned

      Value Proposition      Low risk, low cost, long life and attractive valuation based on
 5                            forecast production

                                                                                                               34
Highly Confidential

APPENDICES

                              35
Highly Confidential

PROJECT LOCATION AND INFRASTRUCTURE
Pilgangoora is located close to established transport and export infrastructure
                                                                         •   Altura’s Pilgangoora mine is located
                                                                             approximately 130km by road from Port
                                                                             Hedland in Western Australia’s north west

                                                                         •   Permanent camp (acquired from Roy Hill) is
                                                                             located 20 minutes west from Altura’s mine
                                                                             site near the intersection of the Great
                                                                             Northern Highway and Wodgina Access
                                                                             Road

                                                                         •   Well served by transport infrastructure –
                                                                             connected to Port Hedland by the Great
                                                                             Northern Highway, NW Coastal Highway
                                                                             and Wodgina Access Road

                                                                         •   Port Hedland International Airport offers
                                                                             daily connections to Perth, and connections
                                                                             to other key Australian capital cities

                                                                         •   Onsite power infrastructure to comprise
                                                                             dual fuel-capable diesel and gas generators
                                                                             for both stages provided by KPS under a
                                                                             BOO contract

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                     36
Highly Confidential

PORT – EASTERN OPERATIONS
•   QUBE has been contracted to handle transport, storage and export logistics for
    Altura. QUBE will export produced spodumene concentrate through the Eastern
    Operations facilities at Port Hedland
•   The Eastern Operations facilities have historically been used to export copper
    concentrate from the Telfer, Nifty and DeGrussa operations
•   In April 2018 the DEWR approved the application by the Pilbara Ports Authority
    to export up to 610,000 tonnes of spodumene concentrate annually
•   Total approved throughput from the Eastern Operations are limited to 1.17Mtpa
    (560,000 tonnes of Cu concentrate and 610,000 tonnes of spodumene
    concentrate)
•   Qube owns or operates the majority of load out and storage infrastructure at the
    Eastern Operations. Spodumene will be stored at Qube’s new storage shed in
    Wedgefield (~15km from port)

    Equipment                                     Owner                Operator

    5x Conveyors
                                                                                       Eastern Operations
    (Map: BC01, BC02, BC02A, CV12, CV21)

    12 x Conveyors (inc. 2 x mobile)
    (Map: BC03, CV01 through CV10, MC01, MC02)

    MAFI Truck, Crane, Rotabox attachment
                                                                                                                   ~15km

    Metals X Cu Shed

    Newcrest Cu Sheds                                                                  Wedgefield Storage

    Wedgefield Storage (off site)

                                                                                                                             37
Highly Confidential

CONTRACTORS AND WORKFORCE
Manning expected to peak at 364 during Stage 1 construction and 480 during Stage 2 construction. Steady state circa 250

                    Mining Services                                  Construction & Processing                                   Logistics and Transport                                                Power

•   Five year agreement to provide mining, drilling and                                                                •   QUBE has been contracted to provide logistics and        •   Kalgoorlie Power Systems (KPS), a subsidiary
    blasting services                                                                                                      transport services for Pilgangoora                           of Pacific Energy will build, own and operate
                                                                                                                                                                                        an 11MW power station on site
•   Mobilisation commenced in March 2017                                                                               •   The scope of the work for the contract includes:
                                                              •   Altura has elected to build, own and operate the
                                                                                                                                                                                    •   Contract commenced 1 December 2017 and
•   Workforce expected to be 43 people in June 2018               processing infrastructure at Pilgangoora.                •   Loading product at Pilgangoora Mine Stockyard.
                                                                                                                                                                                        runs for an initial 5 year period
    (Stage 1) and up to 93 people for Stage 2                                                                                  Product Transport in side tipping road trains to
                                                              •   18 mining, 59 processing, 34 maintenance and 5           •
                                                                                                                                                                                    •   Diesel generators which can be converted to
Key Activities & Services                                         mine admin staff estimated to be employed by                 Port Hedland.
                                                                                                                                                                                        dual fuel to use gas
•   Construction of mining infrastructure including the TSF       Altura during stage 2 steady state operations            •   Construction and operation of a product
    and ROM Area                                              •   Civmec was contracted for all concrete, civil, SMP           storage shed in Port Hedland.
•   Mine haul roads                                               and EC&I works for the full construction of the          •   Transport to port and ship loading using the
                                                                                                                                                                                                  Camp Services
                                                                  processing plant                                             patented RotaboxTM system.
•   Drill & Blast
                                                              •   DRA completed plant design                           •   Truck fleet size expected to be 3 during Stage 1 and
•   Load and haul production mining of ore and
    overburden                                                •   Falck to provide medical and emergency services (2       5 following Stage 2 expansion
                                                                  persons on-site)
•   Up to 60 staff on site during construction                                                                                                                                      •   Swift Networks contracted for an initial 12
                                                              •   NPJV , a JV between the Njamal Peoples                                                                                month period to provide telecommunications
Fleet Details (construction)                                      Benevolent Trust and Pilbara Resource Group                             Exploration                                   and entertainment at camp
•   3 x D10 Dozers, 4 x CAT 785 Dump Trucks, 6 x 777              contracted to provide 6-15 persons during                                                                         •   Cater Care to supply catering services to the
    Dump Trucks, 1 x 85t Excavator, 1 x 14H Grader, 2 x           construction phase                                                                                                    camp
    Articulated Dump Trucks, 2 x Drill Rigs onsite            •   Terra Firma (subsidiary of The GO2 People)                                                                        •   Security contractor to provide 1 person for
Fleet Details (operations)                                        provided construction services for Mining                                                                             security services on-site
                                                                  Operations Centre, which is currently fully
•   Two excavator units (EX2500 and EX1200);                                                                           •   Exploration drilling services provided by MT Magnet
                                                                  operational and occupied by Altura and NRW
                                                                                                                           Drilling, specialising in diamond core and RC drilling
•   Up to 6 CAT 785 haul trucks with 2 CAT777 trucks for          workforce                                                                                                                   Laboratory Services
    ancillary work                                                                                                     •   Four permanent Altura staff dedicated to
                                                                                                                           exploration
•   EX1200 used as backup when more movement
    capacity is needed                                                                                                                                                              •   Contract awarded to Intertek and nearing
                                                                                                                                                                                        completion of construction
                                                                                                                                                                                    •   6 people operating Lab from June 2018

                                                                                                                                                                                                                                        38
Highly Confidential

PROJECT RESERVES AND RESOURCES
Material and well-defined reserve position. 81% resource to reserve conversion achieved.

                                                                                                                               May 2018 Upgrade
                                                        Altura Pilgangoora Ore Reserve Estimate (May 2018)

                                                                                            Tonnes                    Li2O
                                                                                                                               The increased estimate has added a minimum two
                                                        JORC Category       Cut-off Li2O%            Li2O%   Fe2O3
                                                                                             (Mt)                    Tonnes    years life to the project and will be incorporated into
                                                                                                                               the Stage 2 expansion that was the subject of a recent
                                                        Proved                 0.43%         8.3     1.14%    2.13   94,000
                                                                                                                               robust Definitive Feasibility Study (see ASX release 30
                                                                                                                               April 2018).
                                                        Probable               0.43%         32.8    1.03%    1.90   338,000
                                                                                                                               The revised estimate, which followed the completion of
                                                        Total                  0.43%         41.1    1.05%    1.95   432,000
                                                                                                                               a drill program in the Southern Ridge Deposit area, has
                                                                                                                               also increased overall confidence in the project
                                                                                                                               inventory by classification
                                                                                                                               “The resource and reserve upgrade was extremely
                                                        Altura Pilgangoora Mineral Resource Estimate (May 2018)                positive and in line with Altura’s strategy of
                                                                                                                               systematically increasing the resource inventory.”
                                                                                            Tonnes                    Li2O
                                                        JORC Category       Cut-off Li2O%
                                                                                             (Mt)
                                                                                                     Li2O%   Fe2O3
                                                                                                                     Tonnes
                                                                                                                               “The exploration and development team have delivered
                                                                                                                               some outstanding results that will not only add
                                                        Measured               0.40%         8.7     1.12%   2.14    97,000    confidence to the existing operation but underpin the
                                                                                                                               planned Stage 2 expansion to 440,000 tonnes per
                                                        Indicated              0.40%         38.0    1.00%   1.93    380,000   annum production.”
                                                                                                                               The material change in the Mineral Resource estimate
                                                        Measured &
                                                        Indicated
                                                                               0.40%         46.7    1.02%   1.97    477,000   is a result of the infill and confirmatory drilling
                                                                                                                               improving the geological interpretation of the deposit
                                                        Inferred               0.40%         3.8     0.92%   1.96    35,000    and significantly reducing the risk associated with the
                                                                                                                               categorisation of Measured and Indicated Resources.
                                                        Total
                                                                               0.40%         50.5    1.01%   1.96    512,000   This improved confidence has resulted in a conversion
                                                        (Meas, Ind & Inf)
                                                                                                                               of 81% of the Mineral Resources to Ore Reserves.

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcement      LITHIUM
                             28 May 2018  | ASX : AJM                                                                                                                                    39
Highly Confidential

SITE LAYOUT OVERVIEW
Several infrastructure items have already been sized for a Stage 2 expansion.
 •   Layout of mine support infrastructure has been developed using the general               Site Layout – Stage 2 Final Design
     topography of the site and the location of the processing facility to allow ease of
     access between facilities
 •   The main access road brings external traffic into the mine and provides access to the
     mine operations centre, laboratory, power plant (for fuel deliveries), workshop and
     product haulage
 •   Separate site roads will be used for heavy vehicles and light vehicles
 Key Non Processing Facilities
 •   Mine Operations Centre: constructed and currently in use, and appropriately sized
     for Stage 2 operations. MOC includes offices, meeting rooms, reception, kitchenette
     facilities, storage and other items
 •   Water Treatment: potable water supplied by a water treatment facility located at the
     Stage 1 and Stage 2 plants. Waste water is treated via a leach-drain system to the
     NW of the Stage 2 plant
 •   Power Plant: Stage 2 will include a duplication of the Stage 1 power facilities (see
     Slide 46 for further details)
 •   Communications: fibre optic connection to accommodation camp, with a microwave
     transmitter connecting to site. This is the basis for phone and data connections. Site
     wide communications are UHF 2-way radio and 2-way digital
 •   Accommodation Camp: Operational with occupancy of c. 365 persons
 Key Changes for Stage 2 Required
 •   Waste dump and TSF expanded due to extra capacity required – requires movement
     of explosives magazine and entrance road

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                                           40
Highly Confidential

MINING OVERVIEW
                                                                                                            Final Pit Design
 Method Summary
 • Mining is undertaken using conventional bulk mining methods, utilising hydraulic excavators, dump
   trucks and drill and blast, coupled to a ROM stockpile. Ore is trucked directly from the blasted faces
   to the ROM stockpile and fed to the primary crusher using a Front-End Loader (FEL).
 Operating Overview
 • Stage 1 will see the mining operation on 12 hr shifts working a permanent day shift operation. This
   will minimise any dilution as well as reduce the amount of manning needed for the mining operation.
   With the expansion to Stage 2 additional movement will be required and will result in a night shift
   being added to the roster.
 Processing Through-put
 • The Stage 1 and Stage 2 process plants are designed for a 1.54 Mtpa each giving a total throughput
   capacity of 3.08Mtpa to produce 440,000tpa of Spodumene concentrate at 6% Li2O *. The maximum
   planned total material movement, including waste, stockpile reclaim and direct delivery of ore to the
   ROM ore pad is 15.4 Mtpa. The mining operation will continue for approximately 13 years (excluding
   life extension)
 Overburden
 • The organic topsoil component of the overburden will be removed, segregated and stockpiled
   separately at designated areas or at a distance to ultimate pit edges for easy rehabilitation of the
   final WRD slopes.

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcement      LITHIUM
                             30 April 2018 | ASX : AJM                                                                                          41
Highly Confidential

MINING PLAN - OVERVIEW
 •       Mining plan involves seven stages, with total ore mined of           Mining Equipment Selected – Owned by NRW
         34.2Mt and waste of 106.2Mt (strip ratio 3.1x)
                                                                               Unit                                Make             Number             Replacement
 •       Overall mine production rate indicate that one 250t excavator
                                                                               Primary Loading Unit            Hitachi EX2500          1                 Jan 2021
         will be sufficient to ensure target production is met. A 130t
                                                                               Backup & Support Excavator      Hitachi EX1200          1                    n.a.
         payload truck size is selected to match primary loading
         equipment                                                             Primary Dump truck                CAT 785C              6                 Jun 2022

 •       Support fleet will consist of track dozers, graders, hydraulic        Secondary Dump Truck               CAT 777              2                    n.a.

         excavators and water truck                                            Water truck                       WT8WH-H               1                    n.a.

 •       Workforce numbers are expected to increase from 43 in Stage 1         Grader                          Caterpillar 16-X        1                 Jan 2021

         to 94 in Stage 2 (NRW contract workforce estimate)                    Track Dozer                        CAT D10              1                 Jan 2021

                                                                               Blast hole drill rig         Atlas Copco ROC T-45       2                    n.a.

Physicals by Mine Plan Stage                                                   Front end loader                   CAT 988              1                    n.a.

  Stage
                  Total Ore     Li2O        Waste     Total Rock      Strip                                                        NRW Mining Workforce
                    (Mt)         (%)         (Mt)        (Mt)        (W:O)
                                                                                                                                   Stage 1 vs Stage 2
  Hill               0.2        1.14         1.4         1.6          7.0x                                                                                     94

  Stage 1            2.9        1.14         7.5         10.4         2.6x

  Stage 2            2.5        0.99         5.2         7.7          2.1x

  Stage 3            2.5        1.18         6.7         9.2          2.7x                                                                  43

  Stage 4           17.7        1.04         52.4        70.1         3.0x

  Stage 5            7.5        0.98         31.6        39.0         4.2x

  Stage 6            1.0        0.97         1.4         2.4          1.4x
                                                                                                                                           Jun-18            Jan-22
  Total Tonnes      34.2        1.04        106.2       140.4         3.1x                                                           Salary Staff        Excavator Operators
                                                                                                                                     Truck Operators     Dozer Operators
                                                                                                                                     Other Operators     Maintenance
                                                                                                                                     Drill & Blast
CHARGING
 * Refer to ASXFORWARD     WITH
                Announcements      LITHIUM
                              30 April 2018 | ASX : AJM                                                                                                                        42
Highly Confidential

PROCESSING PLANT LAYOUT (Stage 1&2)
Duplication of Stage 1 plant provides a low-risk and cost-effective expansion option

                                                              The process design is as per Stage1 and is summarised as
                                                               Two stage modular crushing and dry screening
                                                                  circuit;
                                                               HPGR tertiary crushing to produce a -6mm crushed
                                                                  product size;
                                                               Dense Media Separation (DMS) on the coarse 6 x
                                                                  1mm fraction producing a coarse spodumene
                                                                  product;
                                                               Mica removal prior to processing using up-current
                                                                  classification technology;
                                                               Milling and flotation circuit to produce an on-grade
                                                                  fine spodumene product; and
                                                               Magnetic separation to remove contamination from
                                                                  the coarse and fine concentrate.

                                                                                                                                 43
Highly Confidential

PROCESS FLOWSHEET
                                                         Key Components
                                                         •   Modular Crushing Plant
                                                         •   Mica Removal & Feed Preparation
                                                         •   Primary and Secondary DMS
                                                         •   Milling and Flotation
                                                         •   Tailings Storage Facility (TSF)

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcement      LITHIUM
                             30 April 2018 | ASX : AJM                                                          44
Highly Confidential

METALLURGY – CARBONATE CONVERSION
Excellent results from conversion testing, with lithium carbonate purity exceeding key benchmarks

 Conventional Spodumene Processing Flowsheet                                                       Prim ary LC
                                                                                                                  Refined LC     Refined LC     FMC Battery       Chinese
                                                                                       Elem ent                  (Low Purity)   (High Purity)     Grade         Battery Grade

      EXTRACTION           PURIFICATION           PRIMARY LC         LC REFINING                      ppm           ppm            ppm             ppm              ppm
                                                                                         Al              3             2             2               10               2
                                                                                         As              2            2              2                -               -
                                                                                          B              2             2             2                -               -
                                                                                         Ca             94             2             2              400              25
                          Purification (Stage                                            Cr              2             2             2                -               -
      Decrepitation                             Ion Exchange (RIP)   Bicarbonation
                                 One)
                                                                                         Cs              3             2             2                -               -
                                                                                         Cu              5             5             5               5                2
                                                                                         Fe              8             2             2               5                2
                                                                                          K             25            11            10               5               10
                                                                                         Li          184,271       209,091        231,060             -               -
                                                   Evaporation
           Bake                                                      Ion Exchange        Mg             16            2              2                -              10
                                                 (Concentration)
                                                                                         Mn             25            25            25                -               5
                                                                                         Mo              2            2              2                -               -
                          Purification (Stage
                                                                                         Na           1,023          175            88              500              20
                                 Two)
                                                                                         Ni              5             5             5               6                -
                                                 Primary Li2CO3      Refined Li2CO3       P             28            13            16                -               -
           Leach                                                                         Pb              2             2             2               1                5
                                                  Precipitation       Precipitation
                                                                                         Rb             25             2             2                -               -
                              Softening
   Evap.                                                                                  S            804            12            12              334              10
                                                                                         Si             12            12            12                -              40
                                                                                         Sr             25             2             2                -               -
                                                                                         Zn             25            25            25               5                -
                                                                                         Cl             25            54            25              100              20
                                                                                         Fe             80            54            40                -               -
                                                                                      Li2CO3 (%)      99.59         99.84          99.97           99.50            >99.9

CHARGING
 * Refer to ASXFORWARD     WITH
                Announcement       LITHIUM
                             16 January 2018 | ASX : AJM                                                                                                                        45
Highly Confidential

ACCOMMODATION
Well located, equipped and serviced accommodation camp
•   The accommodation consists of 365 rooms, with cleared space for a
    further 176 rooms if future expansion is required. All central
    infrastructure at the village is sized for a room capacity of 500 personnel.

•   Central facilities contained within the village include:
     •   Dining room & Kitchen
     •   Wet Mess & Beer Garden
     •   Recreation room
     •   Sports Court
     •   Golf driving Nets & Putting facility
     •   Administration centre
     •   First Aid facility
     •   Maintenance facility

•   The village is strategically located on the Great Northern Highway and on
    the Western side of the Turner River meaning that it will not be cut off
    from a supply or evacuation point of view during the cyclone season.
    Altura sees a significant strategic advantage in having its accommodation
    village remote from the Mine site, on the Western side of the Turner
    River and within easy reach of Port Hedland

                                                                                   Charging forward with Lithium
                                                                                                                                    46
Highly Confidential

POWER PLANT
BOO contract with an experienced regional power operator
•   KPS were selected as the preferred supplier for the power station   Power Plant Demand and Designation
    for Stage 1. The power station has been constructed and a
                                                                                                             Transformer                           Operating
    contract is in place                                                  MCC    Designation
                                                                                                                Rating
                                                                                                                            Connected Load
                                                                                                                                                     Load
•   Power generators will have dual fuel capability pending                                                     kVA         kW         kVA            kVA
    availability of gas supply
                                                                                 Primary Crushing and
                                                                           1                                   1,600       1,161      1,351           683
•   It is envisaged that KPS will supply the same for Stage 2 and on             Screening
    the same cost basis                                                          Crushed Ore Storage, HPGR
•   The Stage 2 power plant will mirror that from Stage 1, and will        2     Crushing, Secondary and       2,000       1,803      2,066          1,164
                                                                                 Tertiary Screening
    consist of:
      •   9 x 850kW diesel generators contained within a steel             3     Flotation and Primary DMS     1,600       1,150      1,392           927
          fabricated engine hall;
      •   2 x 850kW diesel generators standby/spare for                    4     Ball Mill                      n.a.       1,400      1,700          1,366
          redundancy
                                                                                 Milling Classification,
      •   2 x 110kl diesel storage tanks supplying a day tank;             5                                   2,000       1,699      1,951          1,175
                                                                                 Flotation and Reagents
      •   Oil and station fuel tankage within a bunded area; and                 Coarse Product & Fines
                                                                           6                                   1,600       1,084      1,266           742
      •   Electrical distribution via 11kV switchgear, with control              Handling
          systems to be housed in a separate air conditioned
                                                                           7     Plant Services                1,600       1,100      1,308           632
          segregated switch room
•   Supporting electricals have been designed based on power supply      TOTAL                                             9,397      11,034         6,689
    of 11kV from the power plant

                                                                                             Charging forward with Lithium
                                                                                                                                                                47
Highly Confidential

TRANSPORT
QUBE has been engaged to handle all transport and logistics
                                                   MINE SITE TO STORAGE OVERVIEW                        STORAGE TO PORT
 Key Logistics Overview
                                                                                    Stage 1   Stage 2                                       Stage 1 & 2
 •   Spodumene concentrate will be hauled from     Round Trip (km)           km      254       254      Shipment Size (t)            t        35,000
     the mine site to the storage facility near
                                                   Annual Tonnes              t     215,000   430,000   Distance (km)               km         32.0
     Wedgefield by double combination road
                                                   Volume Per Month           t     17,917    35,833    Cycle Time (hrs)            hrs         1.0
     trains
                                                   Payload (t)                t       67        67      Delivery Window (hrs)       hrs        21.3
 •   Distance from mine site to storage is 127km   Fuel Efficiency            %     98.0%     98.0%     Trips Per Day               no.        20.0

                                                   Actual Load (t)            t      66.0      66.0     Tonnes per Trip              t         77.3
 •   Stage one storage consists of 3 cells
     providing 30,000t of capacity, with Stage 2   Daily Demand               t      638.0    1,276.0   Fill Efficiency             %           0.9

     expected to require at least 5 cells with     Daily Trips Required      no.      10        19      Actual Load                  t         71.9
     50,000t total capacity                        Trips Per Month           no.     272       543      Trips per Shipment          no.        487.0

                                                   Capability                                           Number of Trucks Required   no.         6.0
 •   Product is loaded into Qube Rotaboxes for
                                                   Delivery Window (hrs)     hrs     21.3      21.3     Time to Load Vessel (hrs)   hrs        104.2
     transport from the storage facility to port
     using triple combination road trains          Trip Time (hrs)           hrs      4.1       4.1
                                                                                                        QUBE ROTABOX SYSTEM
                                                   Trips per Day per Truck   no.      4.0       4.0
 •   Exports via number 2 berth at Port Hedland    Average Days Per Month    days     28        28

                                                   Fleet Size (Demand)       no.      2.4       4.8
                                                   Fleet Size (Actual)       no.      3.0       5.0

                                                   Redundancy                 %      19%        3%

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                                                                                  48
Highly Confidential

PORT HEDLAND AIRPORT
Established international airport with connections to key Australian capital cities.
Port Hedland International Airport is a modern and well-serviced          Key Carriers                            Key Routes
airport that provides a welcoming gateway to the Pilbara and the
North West of Australia and a direct link to the world’s largest bulk
tonnage export port.

With up to 50 commercial flights per week offering direct services to
Bali (Sat), Brisbane (Tue) and Perth (daily). The Airport welcomes
approximately 350,000 passengers annually.

Port Hedland International Airport is also home to International
Freight services, Charter and flight training facilities, a dedicated
Heliport facility and the region’s Royal Flying Doctor Service.
                                                                               Charter flights only
Port Hedland International Airport has two runways and an
interconnecting taxiway. The main runway (Runway 14/32) is 2500m
long and 45 m wide. It is used for regular passenger transport and is
suitable for aircraft up to 100,000kgs (MTOW). The second runway
(Runway 18/36) is only for general aviation aircraft limited to 5,700kg
(MTOW). It is 1,000m long and 18m wide.

                                                                                           Charging forward with Lithium
                                                                                                                                                49
Highly Confidential

COMPETENT PERSONS STATEMENT

The information in this report that relates to Exploration Results and the Mineral Resource for the Pilgangoora lithium deposit is based on information compiled
by Mr Stephen Barber. Mr Barber is a Member of the Australasian Institute of Mining and Metallurgy. Mr Barber is the Senior Resource Geologist at Altura
Mining Limited and has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity of mineral resource estimation
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr Barber consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

The information in this report that relates to the Ore Reserve for the Pilgangoora lithium deposit is based on information compiled by Mr Quinton de Klerk. Mr de
Klerk is a Fellow of the Australasian Institute for Mining and Metallurgy. Mr de Klerk is a Director and Principal Consultant of Cube Consulting Propriety Limited
and has sufficient experience that is relevant to the activity of ore reserve estimation to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr de Klerk consents to the inclusion in the report of the matters
based on this information in the form and context in which it appears.

The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcements on 26
September 2016, 14 December 2017, 13 March 2018, 10 April 2018, 30 April 2018 and 28 May 2018.

CHARGING FORWARD WITH LITHIUM | ASX : AJM                                                           Charging forward with Lithium
                                                                                                                                                                            50
Highly Confidential

CHARGING AHEAD
WITH ALTURA LITHIUM

                      ASX:AJM