2021 Construction Program - PennDOT Engineering District 1 SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
2021 Construction Program PennDOT Engineering District 1 SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES Tom Wolf, Governor Yassmin Gramian, P.E., Secretary of Transportation Brian A. McNulty, P.E., District Executive 1
Engineering District 1 District Office 255 Elm Street P.O. Box 398 Oil City, PA 16301 (814) 678-7085 Business Hours: 8:00 AM — 4:30 PM Monday — Friday County Offices Crawford County Erie County Forest County 18492 Smock Highway 9031 Peach Street 645 Elm Street Meadville, PA 16335 Waterford, PA 16441 Tionesta, PA 16353 Phone: (814) 332-6880 Phone: (814) 871-4411 Phone: (814) 755-3589 Mercer County Venango County Warren County 215 North Maple Street 1460 Pittsburgh Road 20745 US Route 6 Mercer, PA 16137 Franklin, PA 16323 Warren, PA 16365 Phone: (724) 662-5350 Phone: (814) 432-3115 Phone: (814) 723-3500 2
2021 Construction Program Thank you for your interest in the Pennsylvania Department of Transportation, Engineering District 1 Construction Program for 2021. Engineering District 1 is responsible for the state-maintained transportation network in the northwest region of Pennsylvania. This network includes nearly 4,000 miles of roadway and more than 2,000 bridges in the six-county area. This publication is intended to provide a general overview of projects currently under construction and those scheduled to be awarded or begin construction in 2021. The 2021 Construction Book is divided into six sections that represent each county in the district. The projects listed include award dates, expected completion dates, project descriptions, project locations, costs, and maintenance of traffic. The listed estimated cost for a project is for the construction phase only of the project. County maps showing the location of all current and upcoming construction projects are included for reference. For your reference: • Bridge Projects are marked with a star - • Highway Projects are red points or red lines • Local Projects are marked with a diamond - Please keep this book on hand throughout the upcoming construction season. Note: All information is correct as of the distribution date of this booklet; however, all dates and costs are estimated (unless specified as “actual”) and, therefore, are subject to change. 3
2020 Program vs. 2021 Program 2020 Results 2021 Projections $128,000,000 contracted $239,800,000 (est.) 72 Projects 80 Projects 40 Highway 14 Bridge 30 Highway 3 Safety 25 Bridge 15 Local 6 Safety 19 Local 44 Committed projects 9 Carryover projects 19 Potential projects 4
Crawford 2021 Carryover Projects Map ID: C17 C19 C23 Title: SR 1003/Woodcock Creek Tributary Cambridge Truss SR 2031 over Thompson Run SR (Section): 1003/B00 0006/B18 2031/B00 MPMS ID: 93169 57940 78854 Project Type: Bridge Project Bridge Project Bridge Project Contractor: C.H. & D. Enterprises, Inc. Clearwater Construction, Inc. C.H. & D. Enterprises, Inc. Contract cost: $1,647,000 $3,816,000 $621,000 PennDOT Alice Cole Brian Heeter Chad Tarr Contact: Project This project includes the rehabilitation of the This project includes the replacement of the This project includes the rehabilitation of the Description: SR 1003 (Shutz Road) bridge over Woodcock US Route 6 (Main Street) bridge over French SR 2031 (Perry Street) bridge over Thompson Creek Tributary in Woodcock Township, Creek in the Borough of Cambridge Springs, Run in Oil Creek Township, Crawford County. Crawford County. Crawford County. The bridge is 83 feet in length. The bridge is 273 feet in length. The bridge is 203 feet in length. Maintenance of A detour will be required during construction. A detour will be required during construction. A detour will be required during construction. Traffic: Check our website for detailed information: Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. www.511PA.com. Estimated Fall 2021 Fall 2021 Fall 2021 Completion: 7
Crawford 2021 Projects Map ID: C1 C2 C3 Title: South Perry St. Bridge Crawford Group 112 SR 2005 over Conneaut Creek SR (Section): Local bridge project SR 0408, Section 112 SR 2005, Section B00 MPMS ID: 281 32168 74698 Municipalities: Titusville Steuben, Troy, Hydetown Union Project Type: Local Project Resurface Bridge Rehabilitation Estimated cost: $550,000 $948,000 $775,000 PennDOT Stephen Schettler Benjamin Vincent Matthew Antrilli Contact: Project This project includes the removal of the This project includes 4.28 miles of This project includes the rehabilitation of the Description: current bridge over Oil Creek in the City of resurfacing on SR 408 and SR 428 in Troy SR 2005 (Townhall Road) Shaw's Land bridge Titusville. Township, and the Borough of Hydetown. over Conneaut Creek in Union Township, Work involves a binder overlay on SR 428, Crawford County. and mill and overlay on SR 408. This local bridge is 130 feet in length, and is owned by Crawford County. The bridge is 94 feet in length. This is a 409 funded project. This project and costs will be combined with MPMS #115245 Venango Group 511. Maintenance of A short-term detour will be required while a A minimum of one lane of traffic will be A detour will be required during construction. Traffic: crane is set and places the truss. maintained by flaggers. Check our website for detailed information: Access to drives will be maintained. Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. Open for Bid: 06/24/2021 4/08/2021 05/06/2021 Estimated Completion: Winter 2021 Fall 2021 Fall 2021 8
Crawford 2021 Projects Map ID: C4 C5 C6 Title: SR 4009 over Hubert Run PA 408 Thompson St. PA 18: Summerhill to Springboro Rd. SR (Section): SR 4009, Section B01 SR 0408, Section B10 SR 0018, Section 08M MPMS ID: 90152 97051 98720 Municipalities: Hayfield Troy, Hydetown Summerhill, Conneautville Project Type: Bridge Project Bridge Project Resurface Estimated cost: Actual cost: $513,000 $1,800,000 $1,500,000 Contractor: Shingledecker’s Welding, Inc. Not awarded as of publication Not awarded as of publication PennDOT Brian Heeter Mitchell Fabry Matthew Hetrick Contact: Project This project includes the replacement of the This project is the rehabilitation/preservation This project includes 1.36 miles of resurfacing/ Description: SR 4009 (Mosiertown Road) bridge over of the SR 408 (Thompson Street) bridge over restoration (betterment) on SR 18 (Water Hubert Run in Hayfield Township, Crawford Oil Creek in the Borough of Hydetown, Street/Main Street) from the Summerhill County. Crawford County. Township line to Springboro Road in the Borough of Conneautville and Summerhill Township, Crawford County. The bridge is 14 feet in length. The bridge is 192 feet in length. Work involves a mill and overlay, and ADA curb ramps. Maintenance of A detour will be required during construction. A detour will be required during construction. A minimum of one lane of traffic will be Traffic: maintained using flaggers. Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or Access to drives will be maintained. www.511PA.com. www.511PA.com. Open for Bid: 02/19/2021 10/21/2021 08/12/2021 Estimated Completion: Fall 2021 Fall 2022 Summer 2022 9
Crawford 2021 Projects Map ID: C7 C8 C9 Title: Crawford Group 111 US 19: Mercer Co. Line - PA 285 I-79 154-165MM - #12 SR (Section): SR 0098, Section 111 SR 0019, Section 04M SR 0079, Section A28 MPMS ID: 107678 109138 109812 Municipalities Cussewago, Hayfield Greenwood Cussewago, Hayfield Project Type: Restoration Restoration Restoration Estimated Cost: Actual cost: $2,190,647 Actual cost: $1,780,000 $23,800,000 Contractor: Lindy Paving, Inc. Commercial Asphalt Supply, Inc. Not awarded as of publication PennDOT Benjamin Vincent Brian Bowen Chad Tarr Contact: Project This project includes 10.04 miles of This project includes 4.12 miles of restoration This project consists of 23 miles of mill and Description: resurfacing and restoration on SR 98 from SR on US Route 19 from the Mercer County line inlay on Interstate 79 -154MM to 165MM in 198 in Hayfield and Cussewago townships, to SR 285 in Green Township, Crawford Hayfield and Cussewago townships, Crawford Crawford County to the Erie County line. County. County and Washington Township, Erie County. This project and costs will be combined with MPMS #107752 This project will include two bridge rehabilitations. There will be structural work on several other bridges in this project. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. maintained using long-term lane closures and flaggers. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 03/18/2021 03/25/2021 04/08/2021 Estimated Summer 2021 Spring 2022 Fall 2022 Completion: 10
Crawford 2021 Projects Map ID: C10 C11 C12 Title: Pymatuning State Park Spillway Trail Ext. Crawford Group C11 PA 198 Bridge over Conneaut Creek SR (Section): Local Project SR 1019, Section C11 SR 0198, Section B15 MPMS ID: 111430 112901 114405 Municipalities South Shenango Venango Conneautville Project Type: Transportation Enhancement Resurface Bridge Rehabilitation Estimated Cost: $2,416,000 $735,000 $500,000 PennDOT Lyndsie DeVito Benjamin Vincent Mitchell Fabry Contact: Project This project includes repairs to be made to This project includes paving a high-RAP This project consists of a bridge rehabilitation Description: the existing Pymatuning State Park Spillway binder on 4.9 miles of SR 1019 (Plank Road) of PA 198 over Conneaut Creek in the Rail Trail, as well as an extension of the trail in Venango Township, Crawford County. Borough of Conneautville, Crawford County. by nearly 4 miles, and vegetation removal. This work will improve safety for park guests and access to park amenities, such as the Route 6 bike trail and visitor's center. It will also include the re-use of the historic Messerall Truss to connect the trail where the original bridge was removed. Maintenance of This is a pedestrian trail off the roadway. A minimum of one lane of traffic will be A detour will be required during construction. Traffic: maintained using flaggers. No traffic control expected. Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. Open for Bid: 04/08/2021 05/06/2021 04/22/2021 Estimated Summer 2022 Fall 2021 Fall 2021 Completion: 11
Crawford 2021 Projects Map ID: C13 Districtwide Districtwide Title: City of Meadville - LFAR 2021-2022 2021-2022 Districtwide Drilling Contract Districtwide Lighting 2021-2022 SR (Section): Local Project MPMS ID: 115761 115840 115803 Municipalities Meadville Countywide Countywide Project Type: Resurface Restoration Lighting Estimated Cost: $294,000 Actual cost: $914,800 Actual cost: $657,000 Contractor: Not awarded as of publication R. Rindfuss Drilling, L.P. Bronder Technical Services, Inc. PennDOT Christine-Boyer Krantz Christopher Fox Lynn Herrmann Contact: Project This project is to resurface Jefferson Street in Drilling for geotechnical review as needed This project includes the updating and repair Description: the City of Meadville, Crawford County. throughout Crawford, Erie, Forest, Mercer, of lighting along interstates and at major Venango, and Warren counties. intersections across Crawford, Erie, Mercer, This street is locally owned and a Local and Venango counties in 2021 and 2022. Federal Aid Route. Project awarded STP funds from the LFAR. Maintenance of A minimum of one lane of traffic will be Traffic: maintained by temporary signals. Access to drives will be maintained. Open for Bid: 11/04/2021 02/19/2021 02/19/2021 Estimated Summer 2022 Winter 2023 Winter 2022 Completion: 12
Crawford 2021 Projects Map ID: Districtwide Districtwide Title: D1 Interstate Guiderail Upgrade Crawford 2021 AWPM SR (Section): Local Project MPMS ID: 115691 109895 Municipalities Countywide Countywide Project Type: Guiderail upgrades Reflective Pavement Markers Estimated Cost: $6,300,000 Actual cost: $88,206.90 Contractor: Not awarded as of publication WL Markers PennDOT Gregory Maser Lynn Herrmann Contact: Project This project is to upgrade all guiderail on This project includes installing, repairing, and Description: District 1's Interstates to the latest standards. replacing reflective pavement markings on This project will be on Interstates 79, 80, 90, various state routes and municipalities in and 376 in Crawford, Erie, Mercer, and Crawford County. Venango Counties. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained during construction. maintained using flaggers. Daylight traffic control only. Daylight traffic control only. Open for Bid: Potential: 08/26/2021 03/04/2021 Estimated Fall 2021 Completion: 13
Erie 2021 Project Map 15
Erie 2021 Carryover Projects Map ID: E23 E24 E25 Title: Pine Ave/Old French Rd/28th St. Intersection I-90: 0MM to 3.5MM US 6N & PA 99 Intersection Improvements SR (Section): 0008/0S1 0090/A29 3006/03S MPMS ID: 106444 102031 109901 Project Type: Intersection Improvement Reconstruct Intersection Improvement Contractor: Lindy Paving, Inc. Glenn O. Hawbaker, Inc. Joseph McCormick Construction Company, Inc. Contract cost: $1,664,000 $38,000,000 $2,825,200 PennDOT Holly Sidman Nate Nunez Rebecca Olesnanik Contact: Project This project includes improvements to the This project includes the reconstruction and This is an intersection improvement, Description: intersection of SR 8 (Pine Avenue), SR 97 bridge replacements of SR 3012 (Huntley Rd) congestion reduction, and safety (Old French Road) and East 28th Street in bridge along with guiderail updates and improvements project located on US-6N (W. the City of Erie. This project will be a signing updates on Interstate 90 (American Plum and E. Plum Streets) and PA-99N (Erie traditional intersection improvement bringing Veteran’s Memorial Highway) from the Ohio/ St.) in Borough of Edinboro, Erie County. The it up to current safety standards and Pennsylvania line to the maintenance scope of work is to improve the corner radii to improving traffic flow efficiency with crossover east of SR 6N in Springfield the northbound lanes on SR 99 shifting the coordinated signals, increased safety and a Township. traffic on SR 99 east and removing the reduction to congestion. It will also include northbound right turn lane. The eastbound the addition of minor radius improvements to and westbound turn lanes will be realigned to include ADA compliant curb ramps, new be across from each other which will increase pavement, and drainage. the width of the through lanes improving travel. To accommodate pedestrians signals and ADA compliant curb ramps will be placed at all crossings. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using lane closures and maintained using flaggers. flaggers. Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com. www.penndot.gov/District1 or www.511PA.com. www.511PA.com. Estimated Fall 2021 Summer 2021 Summer 2022 Completion: 16
Erie 2021 Carryover Projects Map ID: E26 E27 Title: SR 3010 Bridge/Cussewago Creek West I-90: 3.5MM to 10.5MM Branch SR (Section): 3010/B00 0090-A30/A31 MPMS ID: 97126 102039 Project Type: Bridge Rehabilitation Reconstruct Contractor: Thomas Construction, Inc. Lindy Paving Contract cost: $594,000 $66,133,000 PennDOT Peter Valentino Nate Nunez Contact: Project This project includes the superstructure This project includes the reconstruction of Description: replacement of the SR 3010 (Pageville Road) interstate highway using Superpave Asphalt bridge over Cussewago Creek West Branch mixtures, improvements to drainage, in Elk Creek Township, Erie County. guiderail, cable median barrier, highway lighting, pavement markings, and delineation, as well as bridge rehabilitations and bridge The bridge is 35 feet in length. replacements, or SR 90, Section A30/A31, in Erie County Springfield and Girard Townships. Maintenance of A detour will be required during construction. A minimum of one lane of traffic will be Traffic: maintained using lane closures and flaggers. Check our website for detailed information: www.penndot.gov/District1 or Check our website for detailed information: www.511PA.com. www.penndot.gov/District1 or www.511PA.com. Estimated Fall 2021 Fall 2023 Completion: 17
Erie 2021 Projects Map ID: E1 E2 E3 Title: Niemeyer Road (T-463) Bridge PA 699: Edinboro Rd/I-90 Bridge Beckman Road/I-90 SR (Section): Local Bridge Project 0699/B01 3105/B00 MPMS ID: 1180 47505 82927 Municipalities Washington, Edinboro Hickory Girard Project Type: Rehab/operate historic structure Bridge Replacement Bridge Rehabilitation Estimated Cost: $2,580,000 $4,000,000 Actual cost: $138,000 Contractor: Not awarded as of publication Not awarded as of publication MEKIS Construction Corporation PennDOT Gregory Lindsay Mitchell Fabry Peter Valentino Contact: Project This project includes a covered bridge This project includes the replacement of the This project includes the rehabilitation of the Description: restoration/rehabilitation of the Niemeyer SR 699 (Edinboro Road/Old SR 99) bridge SR 3105 (Beckman Road, Township Road Road (Township Road 463) bridge over over Interstate 90 (American Veteran’s 547) bridge over Interstate 90 (American LeBeouf Creek in Waterford Township. This Memorial Highway) in Summit Township, Erie Veteran’s Memorial Highway) in Girard project was awarded $950,000 from the County. Township, Erie County. National Historic Covered Preservation Program (NHCBP) back in Federal Fiscal Year 2010. This local bridge is 78 feet in length and is The bridge is 271 feet in length. The bridge is 205 feet in length. owned by Waterford Township. Maintenance of A detour will be required during construction. A detour will be required during construction. A detour will be required during construction. Traffic: Check our website for detailed information: Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or www.penndot.gov/District1 or www.511PA.com. www.511PA.com. www.511PA.com. Open for Bid: Potential: 09/16/2021 Potential: 10/21/2021 01/14/2021 Estimated Fall 2022 Fall 2022 Fall 2021 Completion: 18
Erie 2021 Projects Map ID: E4 E5 E6 Title: US 6 over Keppels Run US 20 : Zuck Road to Chestnut Street PA 5: SR 4029 to PA 89 SR (Section): 0006/B07 0020/22M 0005/202 MPMS ID: 88605 99729 99765 Municipalities Corry Millcreek, Erie Lawrence Park, Harborcreek, North East Project Type: Bridge Replacement Resurface Resurface Estimated Cost: $590,000 $5,000,000 Actual cost: $3,946,338 Joseph McCormick Construction Company, Contractor: Not awarded as of publication Not awarded as of publication Inc. PennDOT Eric Kellogg Jeanette Uhl Holly Sidman Contact: Project This project includes the replacement of the This project includes 4.54 miles of resurfacing This project includes 10.55 miles of Description: US Route 6 (Columbus Avenue) bridge over on US Route 20 (Ridge Road) from Zuck resurfacing on PA 5 (12th Street/Lake Road) Keppels Run in the City of Corry, Erie Road to Chestnut Street in the City of Erie in the City of Erie, Lawrence Park, County. and Millcreek Township, Erie County. This Harborcreek, and North East townships. work will include base repair, ADA ramps (12 intersections), sidewalks, drainage, and This project includes 1.34 miles of paving on The bridge is 15 feet in length. guiderail updates along with new pavement PA 89, in the North East Township and the markings. Borough of North East. Maintenance of A detour will be required during construction. A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained by flaggers. maintained by flaggers. Check our website for detailed information: www.penndot.gov/District1 or Access to drives will be maintained. Access to drives will be maintained. www.511PA.com. Open for Bid: 04/08/2021 05/20/2021 02/19/2021 Estimated Summer 2021 Fall 2022 Fall 2021 Completion: 19
Erie 2021 Projects Map ID: E7 E8 E9 Title: Hamot Rd/Oliver Rd Intersection I-90: 35MM to 46MM, Preservation - #11 Erie Group 213 SR (Section): 4008/S01 0090/A36 0098/213 MPMS ID: 102069 106297 107752 Municipalities Millcreek, Erie Harborcreek, Greenfield, Northeast Franklin, Elk Creek, McKean Project Type: Safety Improvement Restoration Resurface Estimated Cost: $4,800,000 Actual cost: $15,122,290 Actual cost: $2,035,722 Contractor: Not awarded as of publication Glenn O. Hawbaker, Inc. Lindy Paving, Inc. PennDOT Michael Hunkele Del Mizban Benjamin Vincent Contact: Project This project includes 0.23 miles of safety/ This project includes Interstate 90 from the This project includes 8.39 miles on SR 98 Description: intersection improvements on Hamot Road Interstate 86 interchange at 35MM to the New from Hawthorn Ridge Road to the Crawford just west of the intersection with SR 4008 York state line at 46MM in Harborcreek, County line in Franklin and Elk Creek (Flower Road/Oliver Road) in Summit Greenfield, and Northeast townships, Erie townships, Erie County. Township, Erie County. Work involves the County. Interstate preservation project mill construction of a roundabout, realignment of and overlay. Oliver Road, milling, binder, wearing course, This project and costs will be combined with subbase, widening, improvements to the MPMS #107678. shoulders, guiderail, and drainage. Maintenance of Detours will be required during construction. A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using lane closures. No closures maintained using flaggers. anticipated during weekends. Access to drives will be maintained. Daylight traffic control only. Access to drives will be maintained. Open for Bid: 04/22/2021 03/25/2021 03/18/2021 Estimated Fall 2022 Summer 2022 Summer 2021 Completion: 20
Erie 2021 Projects Map ID: E10 E11 E12 Title: Zuck Rd: Zimmerly to 26th St. SR 3006 (SR 6N) Bridge over Marsh Run I-79 - 154MM to 165MM - #12 SR (Section): 4015/01M 3006/DF1 0079/A28 MPMS ID: 109147 110156 109812 Municipalities Millcreek Conneaut Springfield, Washington Project Type: Resurface Bridge Replacement Restoration Estimated Cost: $6,200,000 $300,000 $23,800,000 PennDOT Stephen Schettler Matthew Antrilli Chad Tarr Contact: Project This project includes 1.96 miles of resurfacing This is a bridge replacement project on SR This project consists of 23 miles of mill and Description: on SR 4015 (Zuck Road) from SR 4014 to SR 3006 (SR 6N) over Marsh Run in Conneaut inlay (shoulders may be preserved) on 20 in Millcreek Township, Erie County. Township, Erie County. The structure will be Interstate 79 - 154MM to 165MM in Hayfield replaced with a precast box culvert. and Cussewago townships, Crawford County Improvements include milling and overlay of and Washington Township, Erie County. existing bituminous pavement, ADA This bridge is 15.3 feet in length. compliant curb ramps, culvert replacement, drainage improvements, signage, and A portion of the work will be performed by This project will include two bridge pavement markings. PennDOT Erie County maintenance. rehabilitations. There will be structural work on several other bridges in this project. Safety improvements will also be made at various intersections throughout the project limits including new signal equipment, synchronizing signals, widening where needed to allow additional left turn lanes, and ADA improvements. Maintenance of A minimum of one lane of traffic will be A detour will be required during construction. A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using lane closures Check our website for detailed information: Daylight traffic control only. www.penndot.gov/District1 or www.511PA.com. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: Potential: 12/16/2021 05/06/2021 04/08/2021 Estimated Fall 2023 Fall 2021 Fall 2022 Completion: 21
Erie 2021 Projects Map ID: E13 E14 E16 Title: Bayfront Parkway at 6th Street Intersection West 8th St. Corridor Improvements PA 699: Pedestrian Safety Improvements Improvements SR (Section): 4034/S00 Local Project 0699/T34 MPMS ID: 110836 111014 111429 Municipalities Erie Erie Washington, Edinboro Project Type: Intersection Improvement Resurface Transportation Enhancement Estimated Cost: $3,328,000 $3,330,000 $430,000 Contractor: Not awarded as of publication PennDOT Jeanette Uhl Lyndsie DeVito Lyndsie DeVito Contact: Project This project includes proposed improvements This project includes milling and repaving on This bicycle and pedestrian facility project Description: of raised median and landscaping to promote West 8th Street in the City of Erie. includes the installation of a multimodal traffic calming and lower travel speeds, pathway in order to provide enhanced safety pedestrian refuge islands, countdown This project will also remove and replace the along the east side of PA 699 from US 322 pedestrian signals, and possible pedestrian- deteriorated sidewalk, install ADA compliant Erie Street to Walker Drive in the Borough of only phases. curb ramps, and provide traffic signal Edinboro, Erie County. upgrades at the West 8th Street and Lincoln Four intersections will be updated with intersection, including pedestrian signals. advance radar detection, LED signal heads, and phasing will be re-timed and coordinated. This project is on the Bayfront Parkway (SR 4034) between Port Access Road and East 12th Street in the City of Erie. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be This is a pedestrian trail off the roadway. Traffic: maintained using flaggers. maintained using flaggers. No traffic control expected. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 09/30/2021 06/24/2021 Potential: 09/16/2021 Estimated Summer 2022 Winter 2021 Summer 2022 Completion: 22
Erie 2021 Projects Map ID: E17 E18 E19 Title: 12th St. Corridor Signals Summit Township Local Federal Aid Route Soldiers and Sailors Bridge 2020 SR (Section): 0005/09S Local Project 4034/A03 MPMS ID: 111839 112741 115617 Municipalities Erie Summit Erie Project Type: Existing Signal Improvement Resurface Safety Improvement Estimated Cost: $7,000,000 Actual cost: $180,000 $3,000,000 Joseph McCormick Construction Company, Contractor: Not awarded as of publication Not awarded as of publication Inc. PennDOT Stephen Schettler Christine Boyer-Krantz Thomas McClelland Contact: Project This is a signal project located on SR 5 along This project includes the milling and This project is a direct result of the Erie Description: the 12th street corridor in the City of Erie from resurfacing of Cherry Street Extension in Bayfront Parkway study. The bridge will the I-79 to the Bayfront Connector. It will Summit Township, Erie County. provide an at-grade railroad crossing and include signal reconstructions, re-timings, provide access between the Soldiers’ and signal coordination, and pre-emption. Sailors’ Home and a nearby cemetery. The These are Local Federal Aid Routes. project will allow CSX to relocate their rail yard Locations include I-79 off-ramp, Lincoln, from the Central Bayfront area in preparation Greengarden, Weschler, Raspberry, for work. Cascade, Plum, Liberty, Cherry, Chestnut, Myrtle, Sassafras, Peach, State, French, Holland, German, Parade, Wallace, Ash, Reed, and Wayne (22 intersections). Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Minimal traffic impact expected. Traffic: maintained using flaggers. maintained during construction. Access to drives will be maintained. Daylight traffic control only. Daylight traffic control only. Open for Bid: 06/24/2021 01/14/2021 04/08/2021 Estimated Fall 2022 Fall 2022 Spring 2022 Completion: 23
Erie 2021 Projects Map ID: E20 E21 E22 Title: Raspberry Street - LFAR 2021 Waterford Street - LFAR 2021 6th Street - LFAR 2021 SR (Section): Local Project Local Project Local Project MPMS ID: 115648 115649 115650 Municipalities Erie Edinboro Erie Project Type: Resurface Resurface Resurface Estimated Cost: $184,000 $88,787 $250,000 Contractor: Not awarded as of publication Lindy Paving, Inc. Not awarded as of publication PennDOT Lyndsie DeVito Michael Hunkele Lyndsie DeVito Contact: Project This project includes resurfacing Raspberry This project includes resurfacing Waterford This project includes resurfacing of 6th Street Description: Street from 12th Street to 18th Street in the Street from SR 3006 to SR 99 in Borough of from Raspberry Street to Poplar Street in the City of Erie, Erie County. Edinboro, Erie County. City of Erie, Erie County. This road is owned by the City of Erie and is This project is being funded using the Local This route is owned by the City of Erie and is funded through the TIP by the Local Federal Federal Aid Route Program using STP funds. being funded through the TIP using the Local Aid Route Program. Federal Aid Route Program. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers at times. maintained using flaggers at times. maintained using flaggers. Daylight traffic control only. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 04/08/2021 03/11/2021 04/08/2021 Estimated Fall 2021 Fall 2021 Fall 2021 Completion: 24
Erie 2021 Projects Map ID: Districtwide Districtwide Districtwide Title: Districtwide Lighting 2021-2022 Erie 2021 AWPM D1 Interstate Guiderail Upgrade SR (Section): Local Project MPMS ID: 115803 109895 115691 Municipalities Countywide Countywide Countywide Project Type: Lighting Reflective Pavement Markers Guiderail upgrades Estimated Cost: Actual cost: $657,000 Actual cost: $82,609.90 $6,300,000 Contractor: Bronder Technical Services, Inc. WL Markers Not awarded as of publication PennDOT Lynn Herrmann Lynn Herrmann Gregory Maser Contact: Project This project includes the updating and repair This project includes installing, repairing, and This project is to upgrade all guiderail on Description: of lighting along interstates and at major replacing reflective pavement markings on District 1's Interstates to the latest standards. intersections across Crawford, Erie, Mercer, various state routes and municipalities in Erie This project will be on Interstates 79, 80, 90, and Venango counties in 2021 and 2022. County. and 376 in Crawford, Erie, Mercer, and Venango Counties. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. maintained during construction. Daylight traffic control only. Daylight traffic control only. Daylight traffic control only. Open for Bid: 02/19/2021 03/04/2021 Potential: 08/26/2021 Estimated Winter 2022 Fall 2021 Completion: 25
Erie 2021 Projects Map ID: Districtwide Title: 2021-2022 Districtwide Drilling Contract SR (Section): MPMS ID: 115840 Municipalities Countywide Project Type: Restoration Estimated Cost: Actual cost: $914,800 Contractor: R. Rindfuss Drilling, L.P. PennDOT Christopher Fox Contact: Project Drilling for geotechnical review as needed Description: throughout Crawford, Erie, Forest, Mercer, Venango, and Warren counties. Maintenance of Traffic: Open for Bid: 02/19/2021 Estimated Winter 2023 Completion: 26
Forest 2021 Project Map 28
Forest 2021 Projects Map ID: F1 F2 Districtwide Title: Forest County Group 311 PA 66: PA 899 to Forest St. 2021-2022 Districtwide Drilling Contract SR (Section): 0062/311 0066/10M Local Project MPMS ID: 84316 109134 115840 Municipalities Tionesta Jenks Countywide Project Type: Resurface Restoration Restoration Estimated Cost: Actual cost: $996,000 $1,560,000 Actual cost: $914,800 Contractor: IA Construction Corporation Not awarded as of publication R. Rindfuss Drilling, L.P. PennDOT Matthew Blasting Rodney Fasenmyer Christopher Fox Contact: Project This project includes 1.96 miles of resurfacing This project includes 1.26 miles of restoration Drilling for geotechnical review as needed Description: (betterment) on SR 62 (Oil City Road) in (betterment) on SR 66 from the intersection throughout Crawford, Erie, Forest, Mercer, Tionesta Township. Work involves a mill and of SR 899 to the intersection of SR 66 Venango, and Warren counties. Charges are overlay. (Chestnut Street) and East Birch Street in to be transferred to projects/phases utilizing Jenkins Township, Forest County. drilling contract. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers at times. maintained using flaggers. Daylight traffic control only. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 02/19/2021 08/12/2021 02/19/2021 Estimated Summer 2022 Fall 2021 Winter 2023 Completion: 29
Forest 2021 Projects Map ID: Districtwide Title: Northwest 2021 AWPM SR (Section): MPMS ID: 110125 Municipalities Countywide Project Type: Reflective Pavement Markers Estimated Cost: Actual cost: $95,102 Contractor: WL Markers PennDOT Lynn Herrmann Contact: Project This project includes installing, repairing, and Description: replacing reflective pavement markers on various state routes and municipalities in Forest County in 2021. Maintenance of A minimum of one lane of traffic will be Traffic: maintained using flaggers. Daylight traffic control only. Open for Bid: 03/04/2021 Estimated Fall 2021 Completion: 30
Mercer Project Map Mercer Map 32
Mercer 2021 Carryover Projects Map ID: M16 Title: PA 173: Kocher Rd - Main St. SR (Section): 0173/A01 MPMS ID: 109154 Project Type: Resurfacing Contractor: Thomas Construction, Inc. Contract cost: $1,990,000 PennDOT Kenneth Engstrom Contact: Project This project comprises widening and Description: reconstruction of SR 173 from Kocher Drive to East Main Street in the Borough of Grove City. It also includes highway resurfacing, drainage, and signal improvements along SR 173 from West Main Street to Cranberry Road in the Borough of Grove City, Mercer County. Maintenance of A minimum of one lane of traffic will be Traffic: maintained using flaggers. Daylight traffic control only. Access to drives will be maintained. Estimated Summer 2022 Completion: 33
Mercer 2021 Projects Map ID: M1 M3 M4 Title: Ohl Street Bridge Mercer Group 411-2 Mercer Group 411 SR (Section): Local Project 3015/411 0258/411 MPMS ID: 1745 32319 32326 Municipalities Greenville Shenango, Farrell, Hermitage, Wheatland South Pymatuning, Jefferson, Coolspring, East Lackawannock Project Type: Bridge Removal Resurface Resurface Estimated Cost: $600,000 $1,164,000 $2,000,000 PennDOT Gregory Lindsay Benjamin Vincent Benjamin Vincent Contact: Project This project includes the removal of the Ohl This project includes 1.60 miles of resurfacing This project includes 10.55 miles of Description: Street bridge over the Shenango River on SR 3015 (Mercer Avenue) from Wansack resurfacing on SR 258 (Maple Street) to Lake approximately 0.1 miles east of the Rd to SR 418 (Council Street/Mercer Avenue) Road in Coolspring, East Lackawannock, intersection with South 2nd Street in the in Shenango Township and the Borough of Jefferson Township, and Clark and Mercer Borough of Greenville. Wheatland. boroughs. Project will be constructed in Summer Project will be constructed in Summer 2021. Spring Pavement Review will occur 2021. Spring Pavement Review will occur This local bridge is 256 feet in length and is sometime in May 2022. sometime in May 2022. owned by Mercer County. Maintenance of A detour will not be required. A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. Check our website for detailed information: www.penndot.gov/District1 or Daylight traffic control only. Daylight traffic control only. www.511PA.com. A detour for SR 3015 will be required for a portion of the construction. Access to drives will be maintained. Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com. Open for Bid: 07/29/2021 04/22/2021 04/22/2021 Estimated Fall 2021 Summer 2022 Summer 2022 Completion: 34
Mercer 2021 Projects Map ID: M8 M9 M10 Title: SR 1002 Bridge/Otter Creek US 19/Nesh Creek Tributary SR 4017 Bridge/Little Shenango River SR (Section): 1002/B00 0019/B17 4017/B01 MPMS ID: 88484 90032 97324 Municipalities Fairview East Lackawannock Sugar Grove Township Project Type: Bridge Preservation Activities Bridge Replacement Bridge Rehabilitation Estimated Cost: $472,246 $800,000 $1,450,000 Contractor: Shingledecker’s Welding, Inc. Not awarded as of publication Not awarded as of publication PennDOT Jeremiah Amsler Michael Hunkele Mitchell Fabry Contact: Project This project includes the preservation/ This project includes the replacement of the This project includes the restoration/ Description: rehabilitation/replacement of the SR1002 (Mill US Route 19 (Perry Highway) bridge over rehabilitation/replacement of the SR 4017 Street) Fairview Road Bridge over Otter Neshannock Creek Tributary in East (Werner Road) bridge over the Little Creek in Fairview Township, Mercer County. Lackawannock Township, Mercer County. Shenango River in Sugar Grove Township, Mercer County. The bridge is 11 feet in length. The bridge is 209 feet in length. This project and costs will be combined with The bridge is 79 feet in length. MPMS #97097 — 0019/14M. Maintenance of A detour will be required during construction. A temporary bridge will be installed. A detour will be required during construction. Traffic: Access to drives will be maintained. Check our website for detailed information: Check our website for detailed information: www.penndot.gov/District1 or www.penndot.gov/District1 or Check our website for detailed information: www.511PA.com. www.511PA.com. www.penndot.gov/District1 or www.511PA.com. Open for Bid: 03/18/2021 04/22/2021 Potential: 10/21/2021 Estimated Summer 2021 Winter 2021 Summer 2022 Completion: 35
Mercer 2021 Projects Map ID: M11 M12 M13 Title: US 19 Corridor Improvements State St. Pedestrian Improvements Springfield Twp Multimodal Trail Phase 2 SR (Section): 0019/14M 3008/A03 0208/T19 MPMS ID: 97907 109077 111435 Municipalities Springfield, East Lackawannock, Coolspring, Sharon, Hermitage Springfield Mercer Project Type: Restoration Pedestrian Facilities Transportation Enhancement Estimated Cost: $3,250,000 $1,000,000 $575,000 PennDOT Brian Bowen Christine Boyer-Krantz Lyndsie DeVito Contact: Project This Betterment project includes 1.66 miles of This project includes pedestrian Construction of a new multimodal trail Description: resurfacing and safety improvements improvements along SR 3008 (State Street) (bicycles and pedestrians) to improve safety including guiderail upgrades, rumble strips, between Boyd Drive to SR 18. It also includes and enhance connectivity in Springfield radii improvements and signage on US Route intersection improvements that will extend Township along SR 208. This is the second 19 (Perry Highway/Franklin Street) from about 300' north and south along SR 3025 phase of the Springfield Township Multimodal Interstate 80 (Z H Confair Highway) to Quince (Buhl Farm Drive), Mercer County. Trail project. Street in East Lackawannock, Springfield, and Coolspring townships, and the Borough of Mercer, Mercer County. This project and costs will be combined with MPMS #90032 — 0019/B17. Maintenance of A minimum of one lane of traffic will be A temporary bridge will be installed. This is a pedestrian trail off the roadway. Traffic: maintained during construction. Access to drives will be maintained. No traffic control expected. Daylight traffic control only. Open for Bid: 04/22/2021 Potential: 09/16/2021 Potential: 12/09/2021 Estimated Spring 2022 Summer 2022 Fall 2022 Completion: 36
Mercer 2021 Projects Map ID: M14 M15 Title: I-80 Mercer County ITS Addition - TSMO I-80/SR 19 Interchange ITS Addition - TSMO SR (Section): 0080/TS1 0080/TS2 MPMS ID: 114778 114779 Municipalities East Lackawannock, Findley East Lackawannock, Findley, Coolspring Project Type: Corridor Safety Enhancement Corridor Safety Enhancement Estimated Cost: $413,000 $185,000 PennDOT Gregory Maser Gregory Maser Contact: Project This project includes the installation of a This project includes installation of two Description: dynamic message board sign on Interstate 80 dynamic message board signs on SR 19 eastbound around 10MM. The project also north and south bound approaching Interstate includes the installation of two cameras; one 80 and a new CCTV camera at the at the 11MM and one at the 14MM. intersection of Interstate 80 and SR 19. This project is TSMO funded. This project is TSMO funded. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained. maintained. Daylight traffic control only. Daylight traffic control only. Open for Bid: 11/04/2021 11/04/2021 Estimated Winter 2022 Winter 2022 Completion: 37
Mercer 2021 Projects Map ID: Districtwide Districtwide Districtwide Title: Mercer 2021 AWPM 2021-2022 Districtwide Drilling Contract Districtwide Lighting 2021-2022 SR (Section): MPMS ID: 110125 115840 115803 Municipalities Countywide Countywide Countywide Project Type: Reflective Pavement Markers Restoration Lighting Estimated Cost: Actual cost: $56,936 Actual cost: $914,800 Actual cost: $657,000 Contractor: WL Markers R. Rindfuss Drilling, L.P. Bronder Technical Services, Inc. PennDOT Lynn Herrmann Christopher Fox Lynn Herrmann Contact: Project This project includes installing, repairing, and Drilling for geotechnical review as needed This project includes the updating and repair Description: replacing reflective pavement markers on throughout Crawford, Erie, Forest, Mercer, of lighting along interstates and at major various state routes and municipalities in Venango, and Warren counties. intersections across Crawford, Erie, Mercer, Mercer County in 2021. and Venango counties in 2021 and 2022. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. maintained using flaggers. Daylight traffic control only. Daylight traffic control only. Daylight traffic control only. Open for Bid: 03/04/2021 02/19/2021 02/19/2021 Estimated Fall 2021 Spring 2023 Winter 2022 Completion: 38
Mercer 2021 Projects Map ID: Districtwide Title: D1 Interstate Guiderail Upgrade SR (Section): MPMS ID: 115691 Municipalities Countywide Project Type: Guiderail upgrades Estimated Cost: $6,300,000 Contractor: Not awarded as of publication PennDOT Gregory Maser Contact: Project This project is to upgrade all guiderail on Description: District 1's Interstates to the latest standards. This project will be on Interstates 79, 80, 90, and 376 in Crawford, Erie, Mercer, and Venango Counties. Maintenance of A minimum of one lane of traffic will be Traffic: maintained during construction. Daylight traffic control only. Open for Bid: Potential: 08/26/2021 Estimated Completion: 39
Venango Project Map Venango Map 41
Venango 2021 Carryover Projects Map ID: V13 Title: PA 8: Barkeyville to Franklin SR (Section): 0008/A10 MPMS ID: 61354 Project Type: Roadway Project Contractor: Glenn O. Hawbaker, Inc. Contract cost: $32,645,000 PennDOT Ted Wilson Contact: Project This project includes 10.30 miles of Description: restoration on SR 8 (Richard C. Frame Highway) from SR 3003 to SR 3013 in Irwin, Sandy Creek, and Victory townships, Venango County. Work involves pavement restoration, bridge rehabilitation, and safety improvements. Maintenance of A detour will be required during construction. Traffic: Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com. Estimated Spring 2022 Completion: 42
Venango 2021 Projects Map ID: V1 V2 V3 Title: McClelland Ave Bridge Miller Farm (T-635) Bridge PA 8: Polk Cutoff to US 62 SR (Section): Local Project Local Project 0008/10M MPMS ID: 2150 2263 76890 Municipalities Polk Oil Creek Sandy Creek, Franklin Project Type: Bridge Rehabilitation Bridge Rehabilitation Restoration Estimated Cost: $750,000 $915,000 $3,000,000 PennDOT Gregory Lindsay Gregory Lindsay Matthew Hetrick Contact: Project This project includes the restoration/ This project includes the restoration/ This project includes resurfacing/restoration Description: rehabilitation of the McClelland Avenue rehabilitation of the Miller Farm Road (betterment) on SR 8 (Pittsburgh Road) from bridge over Little Sandy Creek in the (Township Road 635) bridge over Oil Creek Polk Cutoff to US Route 62 (Mercer Road) in Borough of Polk, Venango County. in Oil Creek Township. Sandycreek Township and the City of Franklin, Venango County. This local bridge is 74 feet in length and is This local bridge is 154 feet in length and owned by the Borough of Polk. owned by Venango County. Maintenance of A detour will be required during construction. A detour will be required during construction. A minimum of one lane of traffic will be Traffic: maintained using flaggers. A temporary road is being constructed with a Check our website for detailed information: detour directing motorists to the temporary www.penndot.gov/District1 or Daylight traffic control only. road. www.511PA.com. Access to drives will be maintained. Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com. Open for Bid: 04/22/2021 09/30/2021 11/04/2021 Estimated Fall 2022 Fall 2022 Summer 2022 Completion: 43
Venango 2021 Projects Map ID: V4 V7 V8 Title: Fisherman's Cove (T-370) Bridge Allegheny Blvd. Multimodal Trail Project PA 428: PA 8 to Cherrytree Rd SR (Section): 7220/L00 0062/S00 0428/02M & 1015/02M MPMS ID: 78465 98571 109151 Municipalities Victory Franklin, Sugarcreek Oil City, Cornplanter, Oakland, Sugarcreek Project Type: Bridge Rehabilitation Pedestrian Facilities Resurfacing Estimated Cost: $800,000 $3,225,000 $3,851,000 Contractor: Not awarded as of publication Not awarded as of publication Not awarded as of publication PennDOT Gregory Lindsay Lyndsie DeVito Matthew Hetrick Contact: Project This project includes the superstructure This project includes 2.84 miles of safety This project contains 5.79 miles of resurfacing Description: replacement of the Fisherman's Cove Road improvements on US Route 62 (Washington on SR 428 and SR 1015 located in Oil City, (Township Road 370) bridge over Victory Run Crossing/Allegheny Boulevard) from Liberty Cornplanter Township, Oakland Township, approximately 1 mile east of Old Route 8 in Street to Front Street in the City of Franklin and Borough of Sugarcreek, Venango County. Victory Township, Venango County. and Borough of Sugarcreek, Venango County. Work involves adding pedestrian This local bridge is 85 feet in length and is facilities. owned by Victory Township. Maintenance of A temporary bridge will be constructed during A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: rehabilitation. maintained using flaggers. maintained using flaggers. Check our website for detailed information: Daylight traffic control only. Daylight traffic control only. www.penndot.gov/District1 or www.511PA.com. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 11/04/2021 12/16/2021 12/16/2021 Estimated Fall 2022 Fall 2022 Winter 2022 Completion: 44
Venango 2021 Projects Map ID: V9 V10 V11 Title: I-80 27MM to 34MM - #8 Franklin Ped Streetscape Safety Project PA 36: Pleasantville to PA 27 SR (Section): 0080/A11 & 8002/A11 0062/T21 0036/M01 MPMS ID: 109821 111433 114036 Municipalities Barkeyville, Clintonville, Irwin, Clinton Franklin Pleasantville Project Type: Mill and Resurface Transportation Enhancement Resurface Estimated Cost: Actual cost: $8,860,680 $970,000 Actual cost: $329,800 Contractor: Glenn O. Hawbaker, Inc. Not awarded as of publication Commercial Asphalt Supply, Inc. PennDOT Blaise Bucha Lyndsie DeVito Ronald Johnson Contact: Project SMA overlay on I-80 (Z H Confair Highway) This project is a bicycle and pedestrian safety This project includes 0.57 miles of resurfacing Description: from the Mercer/Venango line at 27.6MM to improvement located on Liberty Street (US including ADA ramps and curbs in the exit 35 at 34.5MM in Barkeyville and 62/322 & SR 8) between 12th Street and an Clintonville boroughs, and Irwin and Clinton area just west of 13th street in the central Borough of Pleasantville along PA 36 from the townships, Venango County. business district of Franklin. borough/township line to PA 27 in Venango County. Work will include repairing/replacement of deteriorated concrete pavement, placement of new decorative streetlights, and placement of new mast arms. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using lane closures. maintained using flaggers. maintained by temporary signals. Daylight traffic control only. Daylight traffic control only. Access to drives will be maintained. All ramps will remain accessible. Access to drives will be maintained. Open for Bid: 01/14/2021 08/26/2021 03/25/2021 Estimated Fall 2021 Fall 2021 Summer 2021 Completion: 45
Venango 2021 Projects Map ID: V12 Title: Venango Group 511 SR (Section): 0428/511 MPMS ID: 115245 Municipalities Plum Project Type: Resurface Estimated Cost: $1,434,000 Contractor: Not awarded as of publication PennDOT Benjamin Vincent Contact: Project This project includes the resurfacing of 4.66 Description: miles of SR 428 from Buxton Road to the Crawford County line in Venango County. This project is 409 funded. This project and costs will be combined with MPMS #32168 Crawford Group 112. Maintenance of A minimum of one lane of traffic will be Traffic: maintained during construction. Daylight traffic control only. Access to drives will be maintained. Open for Bid: 04/08/2021 Estimated Fall 2021 Completion: 46
Venango 2021 Projects Map ID: Districtwide Districtwide Districtwide Title: Northwest 2021 AWPM 2021-2022 Districtwide Drilling Contract Districtwide Lighting 2021-2022 SR (Section): MPMS ID: 110477 115840 115803 Municipalities Countywide Countywide Countywide Project Type: Reflective Pavement Markers Restoration Lighting Estimated Cost: Actual cost: $95,102 Actual cost: $914,800 Actual cost: $657,000 Contractor: WL Markers R. Rindfuss Drilling, L.P. Bronder Technical Services, Inc. PennDOT Lynn Herrmann Christopher Fox Lynn Herrmann Contact: Project This project includes installing, repairing, and Drilling for geotechnical review as needed This project includes the updating and repair Description: replacing reflective pavement markers on throughout Crawford, Erie, Forest, Mercer, of lighting along interstates and at major various state routes and municipalities in Venango, and Warren counties. Charges are intersections across Crawford, Erie, Mercer, Venango County in 2021. to be transferred to projects/phases utilizing and Venango counties in 2021 and 2022. drilling contract. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained by temporary signals. maintained by temporary signals. maintained by temporary signals. Access to drives will be maintained. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 03/04/2021 02/19/2021 02/19/2021 Estimated Fall 2021 Winter 2023 Winter 2022 Completion: 47
Venango 2021 Projects Map ID: Districtwide Title: D1 Interstate Guiderail Upgrade SR (Section): MPMS ID: 115691 Municipalities Countywide Project Type: Guiderail upgrades Estimated Cost: $6,300,000 Contractor: Not awarded as of publication PennDOT Gregory Maser Contact: Project This project is to upgrade all guiderail on Description: District 1's Interstates to the latest standards. This project will be on Interstates 79, 80, 90, and 376 in Crawford, Erie, Mercer, and Venango Counties. Maintenance of A minimum of one lane of traffic will be Traffic: maintained during construction. Daylight traffic control only. Open for Bid: Potential: 08/26/2021 Estimated Completion: 48
Warren Project Map Warren Map 50
Warren 2021 Projects Map ID: W3 W4 W5 Title: Warren County Group 611 Pennsylvania Ave/Market St. Intersection City of Warren - LFAR 2021-2022 SR (Section): 0426/611 1017/A00 Local Project MPMS ID: 100525 100323 115760 Municipalities Columbus, Spring Creek Warren Warren Project Type: Resurface Intersection Improvement Resurface Estimated Cost: $2,760,000 $3,500,000 $926,000 Contractor: Not awarded as of publication Not awarded as of publication Not awarded as of publication PennDOT Benjamin Vincent Christine Boyer-Krantz Christine Boyer-Krantz Contact: Project This project includes 5.72 miles of resurfacing This project includes a single lane This project includes the resurfacing of West Description: and widening on SR 426 from Old Route 77 roundabout at the intersection of SR 6 Fifth Avenue and Madison Avenue in the City to the Erie County line in Columbus and (Pennsylvania Avenue) and SR 1017 (Market of Warren, Warren County. Spring Creek townships. Street) in the City of Warren, Warren County. This are locally owned Local Federal Aid Routes. Project being awarded Federal STP funds. Maintenance of A minimum of one lane of traffic will be Detours will be required during construction. A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained using flaggers. Check our website for detailed information: Daylight traffic control only. www.penndot.gov/District1 or Daylight traffic control only. www.511PA.com. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 05/20/2021 Potential: 12/16/2021 Potential: 11/04/2021 Estimated Fall 2021 Spring 2023 Fall 2022 Completion: 51
Warren 2021 Projects Map ID: Districtwide Districtwide Title: 2021-2022 Districtwide Drilling Contract Northwest 2021 AWPM SR (Section): MPMS ID: 115840 110477 Municipalities Countywide Countywide Project Type: Restoration Reflective Pavement Markers Estimated Cost: Actual cost: $914,800 Actual cost: $95,102 Contractor: R. Rindfuss Drilling, L.P. WL Markers PennDOT Christopher Fox Lynn Herrmann Contact: Project Drilling for geotechnical review as needed This project includes installing, repairing, and Description: throughout Crawford, Erie, Forest, Mercer, replacing reflective pavement markers on Venango, and Warren counties. various state routes and municipalities in Warren County in 2021. Maintenance of A minimum of one lane of traffic will be A minimum of one lane of traffic will be Traffic: maintained using flaggers. maintained by temporary signals. Daylight traffic control only. Access to drives will be maintained. Access to drives will be maintained. Open for Bid: 02/19/2021 03/04/2021 Estimated Spring 2023 Fall 2021 Completion: 52
You can also read