The New generation NCS operator - January 2020 - OKEA
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
OKEA – an independent E&P company on the NCS Production HQ Development (Trondheim) Draugen (44.56% WI, op.) 19,200 boepd Gjøa Operations NCS ONLY PRODUCTION1 (12% WI) (Kristiansund) Ivar Aasen (0.554% WI) USD 11.1/boe 88 mmboe Grevling / Storskrymten 2P+2C (35% / 60% WI, op.) OPEX1 Yme (15% WI) (1) 2019 year to date (Q1-Q3), offtake cost and insurance not included. Converted at the official Norges Bank USD-NOK exchange rate 2
5 licenses awarded in APA 2019 – strengthen OKEAs position in core areas Draugen/Mistral area Grevling Area PL1003 B Licence Block(s) Operator OKEA share PL1060 6407/8,9 Equinor Energy AS 40% PL1034 15/12 Chrysaor Norge AS 40% PL093 F 6407/9 OKEA ASA 44.56% PL1060 PL1003 B 6406/3,6 OKEA ASA 60% PL973 B PL973 B 15/12 Chrysaor Norge AS 30% PL1034 PL093 F 3
OKEA is a responsible and value focused E&P company Safe and responsible Continuously improving Value driven M&A Financial flexibility and operations operations robustness $ A NCS focused E&P Improvement and Target value Prudent financial company digitalization enhancing growth strategy “The OKEA way” is a safe and responsible approach to all we do 4
Safe and responsible operations Proven operational capabilities on Draugen • No incidents or leakages in 2019 • Strong production in 2019, 5% above target • Average 90.8% reliability last 3 years, 94% in 2019 • Unique knowledge of Draugen upside potential • Positive production outlook to 2040 • Several maintain integrity projects executed • Operating cost reduced by more than 200 MNOK (1) Draugen 100% 5
Improvement and digitalization Improving Draugen operational efficiency • Optimised decision processes have reduced lead time • Mapping of governing documents, removing redundancy • Software applications down by 33% • Using industry standards for development projects • Revised roles and responsibilities • Revitalising earlier stranded projects • New digital platform in cooperation with ABB and HP 6
Draugen drilling 2019 No major accidents Fast and effective operation (finish the well in less Drilling than 7 days) targets and • Infill Ø drilled in 5.38 dry hole days results • Skumnisse drilled in 7,17 days Rate of penetration (ROP): • 100 M/HR IN 12 ¼’’ SECTION: 200-300 M/HR • 200 M/HR IN 8 ½’’ SECTION: 410 M/HR (peak) Fit for purpose 2-strings well design OKEA way with performance midset Success criteria Involvment of OKEA key personell Good rig in Deapsea Nordkapp Excellent mud, cement and drilling tools 7
OKEA is committed to operate safely and responsibly Safety Environment Safe and sustainable business with zero harm to people Energy efficient production with focus on reducing environmental footprint or assets • Serious incident frequency (SIF) for Draugen on “0” for 2019 (as for 2018 and 2017) Draugen – Targeting lower emissions Despite the “nature” working against late life producers – OKEA aim to improve ‒ Liquid fuel will be replaced with gas in 2020 ‒ Environmental strategy & management plan implemented ‒ New environmental projects initiated in 2019 ‒ Lifetime extension ‒ Draugen as area hub Gjøa – Industry leading low emission asset ‒ Gas supplier to UK – substituting coal ‒ Electrified with power from shore, reducing direct emissions Ivar Aasen – Power from shore sanctioned ‒ Sanctioned investment to electrify in 2022 with renewable power from shore 8
Value driven M&A Target the right deals • Target value enhancing M&A on NCS • Emphasising portfolio fit to enable synergies • The right deals more important than timing • Desire operatorships ‒ producing assets and developments up to 100 mmboe • Funding through operating cash flow and owner support • Proven industry leading onboarding process of new assets 9
Financial flexibility and robustness Strong financial performance Production (kboepd) EBITDA1 (NOKm) Cash position2 (NOKm) Q3 2019 Q3 2019 Q3 2019 Previous Previous Previous 2 # of Draugen liftings 1 1 1 799 594 22,4 19,5 20,0 18,1 1 329 413 404 586 133 395 0.4 42 57 Q3 2018 Q4 2018 Q1 2019 Q2 2019 Q3 2019 Q3 2018 Q4 2018 Q1 2019 Q2 2019 Q3 2019 Q3 2018 Q4 2018 Q1 2019 Q2 2019 Q3 2019 120MUSD bond issue in Q4 2019 gives financial flexibility going forward (1) APM: EBITDA is defined as earnings before interest, taxes, depreciation, depletion, amortisation and impairments. Net debt is defined as interest bearing debt less cash & cash equivalents 10 (2) Excluding restricted cash
Outlook High level of activity in coming years Q4’19 Q1’20 Q2’20 Q3’20 Q4’20 Q1’21 Q2’21 Target further debottlenecking and cost reductions Draugen Appraisal well BOK/BOV1 Hasselmus Hasselmus FID Progressing redevelopment of Gjøa P1 towards first oil late 2020 Gjøa P1 production start Gjøa Progress and de-risk Yme towards first oil mid 2020 1st oil Yme Yme IOR well programme – two wells per year 2020-21 Ivar Aasen Progress Utsira High Area power grid project – Power from shore from 2022 Gjøa Hamlet prospect planned well in 2020 E&A and other prospects BOK/BOV1 Grevling/Storskrymten Mistral North appraisal and PL973 exploration drilling Pursue further M&A – both bolt-on acquisitions and larger transformational deals Business development APA 2019 APA 2020 APA 2020 awards applications awards Note: Indicative timeline. Milestones may be subject to approval by the Ministry of Petroleum and Energy and licence decisions 11 (1) BOK = Concretisation decision, BOV = Decision to continue, BOG = Decision to implement
OKEA investment highlights • NCS-focused E&P company with strong cash flow from ca. 20 000 boed in net production Safe and responsible • A responsible operator focusing on safety and lowest possible environmental footprint operations on NCS • Proven value creation in 2019 as operator of the Draugen field • Improvement programme utilize innovative tools to increase operational efficiency Operational improvement & • A step-wise approach to digitalization of operation on the operated Draugen field digtialization • Actively targeting value enhancing growth through M&A, across production and developments up to 100 million boe Value driven M&A growth • Experienced operational organization suited for new operatorships and capturing synergies • Financial flexibility through new bond issue (RBL can replace OKEA 03 if OKEA decides – Prudent financial preapproved of bond holders) strategy 12
okea.no Ståle Myhre VP IR 13
You can also read