SUPPLEMENTARY INFORMATION FOR OUTLINE PLANNING PERMISSION - Scott Tallon Walker Architects
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
“St Andrew’s Healthcare is the UK’s leading mental healthcare charity. Its reputation for excellence is founded on a 170-year heritage as a charity dedicated to learning about mental health and helping people on their way to recovery.” Introduction St. Andrew’s Healthcare is the UK’s leading charitable provider of NHS care. Its reputation The intention is to build these additional facilities in a number of phases. When complete for excellence is founded on a 170-year heritage as a charity dedicated to learning about the number of bed spaces would be increased from 128 to 250. The buildings will be mental health and helping people on their way to recovery. sensitively located across the site and incorporate new landscape areas, tree planting and car parking. The scheme will also include the redevelopment of two existing buildings St. Andrew’s supports people with mental illness, developmental disabilities, autistic to improve the facilities available on site spectrum disorders, brain injuries and neurodegenerative conditions such as dementia and Huntington’s. The exhibition boards show the existing site, proposed development areas and an illustrative layout drawing showing the how the site may be developed in the future. The Charity is focused on providing the highest standards of care to as many people as possible improving the quality and range of services available now and in the future. Flood Control As part of the site lies within the flood plain, St. Andrew’s has ensured that their scheme St. Andrew’s Birmingham has been designed to avoid any adverse impact on the risk of flooding to the local St. Andrew’s Birmingham is based at the Charity’s purpose-built healthcare development residential area. The scheme will actually provide a positive benefit to the local community on Dogpool Lane. This facility received planning permission from Birmingham City Council by reducing the existing risk of flooding to residential properties. This will be achieved in 2006 and has been fully operational since 2008. St. Andrew’s Birmingham provides 285 through an increase in land levels across the site, the creation of a new wetland habitat on jobs and has successfully provided care for many people during this time. site (in part to offset the relocation of the existing on site pond) and minor flood defence work along parts of the River Rea corridor. This will help channel any future flood events The Proposals into open parkland along the River Rea rather than towards the residential properties as St. Andrew’s Healthcare will shortly be seeking outline planning permission to allow the has previously happened. principle of further development (which we are calling Phase 2) on ‘previously developed’ land under their ownership which is currently vacant. The site is to the north east of their Investigative work on flood risk has been carried out by St. Andrew’s flood advisor existing buildings and internal access road. It is currently grassed over following its previous throughout 2011 and 2012. This work has involved close engagement with the clearance as part of the derelict Ten Acres site. Environment Agency and the Council’s drainage and flood risk manager. Both of these organisations are supportive of the flood risk measures proposed and we are confident The proposed development is needed to provide additional bed spaces at St. Andrew’s that the proposal will create a better situation for the local area by reducing the current Birmingham providing enhanced healthcare services to meet local needs. risk of flooding. The planning application will be submitted in outline format, seeking permission for St. Andrew’s flood advisor is on-hand at the exhibition today and can answer any questions a maximum amount of floor space within the fixed development areas shown on the you may have on how the proposed flood mitigation scheme will work. ‘Parameters Plan’ exhibition board. Whilst this will set the maximum amount and height of development, St. Andrew’s will still need to apply to the Council for approval of the final design and position of future buildings within the development zones ST. ANDREW’S HEALTHCARE - INTRODUCTION www.stwarchitects.com
TE N A C R E S C E N TR E FOR MER KI DDERMI NSTER CARPETS BUI LDI NG ST. ANDREW’S HEALTHCARE - SITE VIEW (ILLUSTRATING SITE LOCATION AND EXISTING BUILDINGS ) www.stwarchitects.com
ROAD MANILLA E LAN OAD O L G PO DO RE R FLOOD RE DEFENCE SHO WOR K S NT CE PER TY CI R Y N DA O U B T E SI A E R R E IV R ST. ANDREW’S HEALTHCARE - AERIAL VIEW www.stwarchitects.com
d Main Site Entrance Line of existing structures Proposed Emergency l a Roa SITE AREA: Road. to be demolished. & Fire Tender Access. Manil L an e 10.164 Acres/ 4.11 Ha D o gp o ol EXISTING + NEW BUILDINGS: NEW BUILDING PARAMETERS: GEA Maximum Floor Space: CLASS C2 - BUILDINGS 5, 7, 8 & 9 26,993²/ 290,550ft² (approx.) Min. Number of Buildings: 1 Max. Number of Buildings: 4 GEA Min. of Buildings: 3,480m²/ 37,460ft² GEA Max of Buildings: 14,800m²/ 159,310ft² Min. Building Length: 77.5m B1 Max. Building Length: 80.7m Min. Building Width: 12.5m Max. Building Width: 25.5m EXISTING BUILDINGS: CLASS C2/ D1 - BUILDINGS 1, 2, 3 & 4 Min. Building Height: 4.25m Max. Building Height: 12.5m GEA of Buildings: NEW BUILDING PARAMETERS: 7,778m²/ 83,722ft² (approx.) Max. Parapet Height: 13.0m CLASS C2/ D1 - BUILDINGS 6 & 10 B2 Perimeter landscaping Min. Number of Buildings: 1 to Floodplain Max. Number of Buildings: 2 alleviation zone [Refer FLOODPLAIN to BWB drawings for GEA Min. of Buildings: Line of existing details]. 935m²/ 10,010ft² structures to be GEA Max. of Buildings: B3 demolished. 3,480m²/ 37,460ft² Min. Building Length: 30.0m Max. Building Length: 80.7m Line of existing Buildings 2 & 5 to be Min. Building Width: 15.6m demolished. Max. Building Width: 25.5m Min. Building Height: 9.6m Max. Building Height: 12.5m B4 Max. Parapet Height: 13.0m Existing Healthcare Buildings to be retained. KEY NEW BUILDING ZONE(S)* NOTES: CAR PARK/ LANDSCAPING/ SERVICE * Areas not covered by buildings will contain: AREA/ ROADS - Car Parking; PERIMETER LANDSCAPING - Landscaping; - Surface Water Attenuation; EXISTING HEALTHCARE STRUCTURES - Energy Centre(s). OF PHASE 1 10 Cromwell Place London SW7 2JN T. +44 (0)20 789 4949 F. +44 (0)20 7225 1005 ST. ANDREW’S HEALTHCARE - PARAMETERS PLAN E-mail. london@stwarchitects.com www.stwarchitects.com www.stwarchitects.com
NEXT STEPS St. Andrew’s Healthcare will submit the outline planning application to Birmingham City Council in July. It is expected that the application will be determined by October 2012. If successful securing outline planning permission, the charity can confidently begin the detailed planning process for the first phase of the development. The scheme will not only provide much needed new 3 healthcare facilities for the region, it will also provide further employment and wider spin-off benefits for the local area and the City of Birmingham. Before the plans are submitted, St. Andrew’s wants to know what you think. To have your say, please fill in the feedback form, then post in the box provided. If you need any more information or have any questions, please ask a member of staff. 1 2 5 4 LEGEND 1 - CAR PARK 2 - INTERNAL ACCESS ROAD 3 - EMERGENCY ACCESS ONLY 4 - PROPOSED WETLAND HABITAT 5 - FLOOD DEFENCE WORK See separate board SECURE PERIMETER SITE BOUNDARY ST. ANDREW’S HEALTHCARE - MASTER PLAN ILLUSTRATING OVERALL INDICATIVE SITE PROPOSAL www.stwarchitects.com
NOTES KEY ISSUES & REVISIONS Client Project Title Drawing Title Rev Date Details of issue / revision Drw Rev ST ANDREW'S HEALTH ST ANDREW'S, STIRCHLEY FLOOD DEFENCE CARE CONCEPT Birmingham | 0121 233 3322 Leeds | 0113 233 8000 London | 020 7234 9122 ST. ANDREW’S HEALTHCARE - INDICATIVE FLOOD DEFENCE CONCEPT ADJACENT TO THE RIVER REA Manchester | 0161 233 4260 Scale 1:500 Drawn R. Green Drawing Status Drawing No. Revision www.stwarchitects.com Nottingham | 0115 924 1100 www.bwbconsulting.com Size A1 Reviewed S. Nelmes PRELIMINARY BMW/505/SK17 P1 c Copyright BWB Consulting Ltd
10 Acres Bldg B1 EXISTING FLOODPLAIN B2 DEMOLISH Enclosure Existing TRETTIFORD entrance BLDG B3 B5 B4 St Andrews Healthcare, Birmingham Phase 1 Phasing Plan Demolish existing Trettiford Building
10 Acres Bldg B1 EXISTING FLOODPLAIN ER M ET RI PE RE B2 CU SE ND Enclosure TE Existing EX entrance B3 CONSTRUCT NEW BLDG 6 B5 B4 St Andrews Healthcare, Birmingham Phase 2 Phasing Plan Construct new Building B6, extend secure perimeter
10 Acres Bldg B1 EXISTING FLOODPLAIN B2 Enclosure Existing entrance B3 NEW BLDG 6 B5 B4 Decant patients from Therapies to New Bldg 6 St Andrews Healthcare, Birmingham Phase 3 Phasing Plan Decant existing building 5 to new Building 6
10 Acres Bldg B1 EXISTING FLOODPLAIN B2 Enclosure Existing entrance B3 B6 B4 St Andrews Healthcare, Birmingham Phase 4 Phasing Plan Demolish existing Building 5
10 Acres Bldg B1 CONSTRUCT NEW ROUNDABOUT EXISTING FLOODPLAIN B2 Enclosure Existing entrance B3 B6 CONSTRUCT PART BLDG 5 B4 St Andrews Healthcare, Birmingham Phase 5 Phasing Plan Construct first part of new Building B5, replacement Therapies. Construct new entrance road & roundabout
10 Acres Bldg B1 EXISTING FLOODPLAIN CONSTRUCT NEW TEMPORARY ENTRANCE B2 DEMOLISH PART EXTG B3 BLDG 2 (THERAPIES) B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 6 Phasing Plan Demolish part of existing Building 5, create new temporary entrance
10 Acres Bldg B1 EXISTING FLOODPLAIN CONSTRUCT 2STOREY WORKBRIDGE BUILDING RECONFIGURE CARPARK B2 CONSTRUCT B3 B5 Pt2 (Gym) B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 7 Phasing Plan Construct remainder new Building 5, function: Gym & support. Construct Wirkbridge Building , reconfigure carpark
10 Acres Bldg EX TE ND SE CU CONSTRUCT PLATEAU FOR SET DOWN R NEW BLDG 8 B1 E POINT PE (Temp carparking) RI M ET ER CONSTRUCT B10 ENTRANCE & CONSTRUCT LINK CORRIDOR NEW BLDG 7 B2 B5 Pt2 B3 B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 8 Phasing Plan Construct new Building 7 and plateau under building 8 for temp carparking construct new entrance portal & link corridor
10 Acres Bldg CONSTRUCT PLATEAU FOR NEW BLDG 9 (Temp carparking) SET DOWN B1 POINT CONSTRUCT NEW BLDG 8 NEW ENTRANCE B10 Close up B2 temporary entrance B5 Pt2 B3 B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 9 Phasing Plan Construct new Building 8 and plateau under building 9 for temp carparking
DEMOLISH EXTG 10ACRES BLDG 56No. temp carparking spaces B1 B10 B2 B5 Pt2 B3 B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 10 Phasing Plan Demolish existing 10 Acre Building
EMERGENCY ENTRANCE CONSTRUCT NEW CONSTRUCT NEW ACCESS CARPARK ROAD CONSTRUCT 50No. carparking NEW BLDG 9 spaces SET DOWN B1 POINT B8 ENTRANCE B10 Secure 2STOREY entrance WORKBRIDGE portal BUILDING B7 Expanded 50No. Kitchen carparking spaces B2 Stores B5 Pt2 B3 B6 B5 Pt1 (Therapies) B4 St Andrews Healthcare, Birmingham Phase 11 Phasing Plan Construct new capark on 10 Acre site, construct new access road from NE corner, construct new Building 9
PROPOSED ELEVATION
PROPOSED ELEVATION
PROPOSED ELEVATIONS
ARTIST’S IMPRESSION OF THE NEW SCHEME FROM DOG POOL LANE
ARTIST’S IMPRESSION OF THE NEW SCHEME FROM THE SITE
St. Andrew’s Healthcare, Birmingham Example Images for Building Fabric
Curraheen Hospital, Hospice & Elderly Care Facility, Co. Cork, Ireland Scott Tallon Walker Architects
Jesuit Community Care Home, Dublin 6, Ireland Scott Tallon Walker Architects
Mitchelstown Medical Campus, Co. Cork, Ireland Scott Tallon Walker Architects
St. Vincent’s University Hospital, Psychiatry Building, Dublin, Ireland Scott Tallon Walker Architects
Design Proposal for National Forensic Hospital in Conjunction with MAAP Architects Scott Tallon Walker Architects