Strategic Plan 2015-2019 - MAF International
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
MYK LOURS C: 100 M: 57 Y: 0 K: 40 C: 5 M: 100 Y: 71 K: 22 C: 0 M: 1 Y: 0 K: 51 MAF International Strategic Plan 2015-2019
CONTENTS Our Strategic Journey....................................... 4 1 Executive summary........................................... 7 2 Reflections on the existing strategic plan............ 9 3 Important internal trends................................ 13 4 Long-term trends.......................................... 19 5 The starting point.......................................... 23 6 Moving forward (strategic priorities)................ 25 7 Implementation (strategic objectives).............. 29 8 Critical success factors................................. 33 9 Financial implications..................................... 37 10 Risks............................................................ 41 11 Final conclusions.......................................... 43 2 MAF Strategic Plan 2015 - 2019
“A MAF flight can make the difference between a healthy newborn with a living, loving mom and an infant who is orphaned. Many literally owe their lives to a MAF programme” Beth Elson, Health Alliance International MAF Strategic Plan 2015 - 2019 3
Our Strategic This has been possible because we have a faithful God whom we are committed to serve and seek in prayer. Every three minutes And because we are united one of our aircraft takes off or lands in purpose and in vision bringing help, hope and healing to those in need all over the world ies sionar l So uth mis Globa dustry av iation in Stab le n isolatio p o ck ets of but cture ers in frastru disast Impro ved to n atural e spons sed re Increa We are a Current western-based recruitment base organisation is not big enough (funds and staff) We are a ’do it ourselves’ type of ministry Our partnership strategy is not strong Good focus We are not on quality and safety very agile, but what about risk-adverse and slow efficiency? to change 4 MAF Strategic Plan 2015 - 2019
Journey Our current strategy has taken us far… RESOURCE IMPROVED DEVELOPMENT INTERNAL ORGANISATION PARTNERSHIP NEW MINISTRY FOCUS MODELS But we can go even further… We must chart our course around the current trends and navigate through challenging conditions What could MAF look like in 20 years? FROM DOING Together in TO ENABLING Christ we will be BECOMING A MORE strategically AGILE ORGANISATION positioned to BECOMING TRULY transform INTERNATIONAL more lives MAF Strategic Plan 2015 - 2019 5
He is before all things, and in him all things hold together Colossians 1:17 6 MAF Strategic Plan 2015 - 2019
1 EXECUTIVE SUMMARY This strategic plan builds on the previous plan and as such Rolling out the approved HR strategy with a key focus represents more changes in emphasis rather than major on recruitment and reward and the Asia development changes of direction. It briefly looks at what was achieved strategy will form integral parts of the new strategy and are during the past few years and identifies both successes as considered critical success factors. In addition we plan for well as key areas where the existing strategy fell short. This, a greater emphasis on improving financial management in in combination with a careful analysis of long-term trends, such a way that operational income and expenses will return forms the basis of the new strategic plan. to a more healthy balance, and with all of our resources focused on making a difference in places of highest need. That said, with the new plan we are introducing three new key themes which will run like a thread through the plan and As we look forward and plan we acknowledge our which will tie together the different strategic initiatives. These dependency on the Lord and we commit ourselves to three themes are: prayer recognising that He is before all things and in Him all things hold together (Colossians 1:17). • From doing to enabling • Becoming more international • Increasing agility FROM DOING BECOMING TRULY BECOMING A MORE TO ENABLING INTERNATIONAL AGILE ORGANISATION WE ARE STRATEGICALLY POSITIONED TO TRANSFORM MORE LIVES MAF Strategic Plan 2015 - 2019 7
“We hope and pray that our good Lord will continue to guide us and MAF until all those remaining steps are met with success and joy” Villagers of Lailenpi Myanmar looking forward to MAF commencing operations 8 MAF Strategic Plan 2015 - 2019
2 REFLECTIONS ON THE EXISTING STRATEGIC PLAN The 2011-2015 strategic plan introduced four Financial support (in terms of grants and SWAP funding) strategic priorities: was given to Australia, Finland, and Norway to accelerate their growth • Resource development Lastly, much effort was put into Asia development and MAF • Internal organisational improvement was (re-)established in Malaysia, Singapore, Philippines and India. To date, two Asian International Staff members have • Partnership focus been accepted into MAF and there are several more in the pipeline. In mid-2014 MAF International Board approved the • New ministry and new ministry models Asia development plan for further investment in Singapore, Philippines and India, as well as the recruitment of an Indian 2.1 Resource development national to work alongside the International Development We identified lack of sufficient financial resources and, even Director in Asian development. more so, lack of sufficient human resources as issues which needed to be addressed in order for MAF to be able 2.2 Improving the internal organisation to respond to both existing and future needs. With this in Firstly, we recognised that a lot of work had to be done mind we focused on three key areas: 1) developing a new for MAF International (operations) to start functioning HR strategy; 2) developing some of the smaller Resourcing as one organisation. Secondly, the information flow Groups; and 3) investing in Asia development. Good between Resourcing Groups and operations in terms of progress was made in each of these areas. stories, pictures, project proposals and reporting needed improvement. With that in mind we focused on the A comprehensive HR strategy was developed and following areas: 1) creation of a single leadership team; 2) approved, and implementation is underway. Special restructuring all support departments so that they would attention was given to recruitment and I am pleased to say have a global instead of a regional focus; and 3) creation of that we are gaining real momentum, with a net growth in an internal communications department. number of International Staff forecast for 2015 after three years of decline. However, whereas recent developments After the appointment of a single CEO, a new Executive have been encouraging, a further step change will be Leadership Team was put together. As time has progressed required to adequately address our future needs. that team has bonded well and has started to work increasingly more strategically. Regular financial (EON) support from MAF groups other than MAF UK grew by an average of 6.6% per year, while All support departments have undergone a complete MAF UK increased their contribution by an average of 9.6% restructure whereby most roles have now become global annually. In other words, our dependency on MAF UK rather than regional. As a result they have started to work increased rather than decreased in the past four years. That much more as virtual teams with team members based in said, MAF Australia, Netherlands, Norway, Sweden and Ashford and Cairns as well as in the field. In addition, a new Finland managed to increase their contributions significantly. department for Quality, Safety and Security was created. MAF Strategic Plan 2015 - 2019 9
A new internal communications department was created Collaboration with MAF-US and MAF Canada intensified to improve the information flow between operations and in the last couple of years with several joint projects now Resourcing Groups and to improve overall communications on the go, including Wingman (IT), Myanmar and disaster within MAF International. The feedback received suggests response. Moreover, both groups are seconding more that this has been a worthwhile development. International Staff to our programmes. Typically while going through a merger process the focus 2.4 New ministry (models) is on aligning systems, procedures, standards and culture. Our fourth and last strategic priority area included 1) seeking MAF is no different in that respect. However, as new to open up new programmes, 2) introducing cheaper-to- systems and procedures are being formalised there are operate aircraft type(s), and 3) introducing different operating concerns that MAF as a whole has become less flexible and models. more bureaucratic. As we move forward this concern needs to be addressed. After considerable delay due to the Ebola outbreak, we have now moved into Liberia and aim to be operational 2.3 Partnership focus before the end of 2015. We also completed our registration Our third strategic priority area focused attention on in Myanmar, and indications are that we may become the importance of partnerships, as it is mostly through operational sooner than originally anticipated. partnerships that we are able to achieve our vision of seeing isolated people being transformed in Christ’s name. The The C182SMA was successfully introduced into key priorities in this area were 1) seeking to develop more Madagascar and Chad and a third one is scheduled to strategic partnerships both at headquarters level and in the become operational in South Sudan this year. Due to its low field; 2) more engagement with networks from the Global operating costs the aircraft has allowed us to fly a customer South; and 3) ongoing close collaboration with MAF-US and group for whom we had become too expensive. On the MAF Canada. downside, the dispatch reliability of the aircraft relating to engine problems is a real concern. Several successful partnerships have been forged at programme level including partnerships with local Lastly, there was some progress in terms of different governments. However, to further develop these operating models. We are trying the consultancy partnerships internationally proved to be more challenging. approach with a flying club in Nigeria, have transferred our Fortunately we have good access and collaboration with maintenance operation in Tanzania to local ownership, and like-minded partners through networks such as EU-CORD we charter aircraft in South Africa instead of operating our and Integral. Such networks are particularly valuable during own. Moreover we are encouraging the introduction of disaster response. Limited progress was made with regard technology services into more programmes. to engaging with networks from the Global South, but contact was made with the Micah Network. As we move forward we may need to rethink how to progress in this area. 10 MAF Strategic Plan 2015 - 2019
RESOURCE DEVELOPMENT Asia development Financially is starting to gain strong momentum BUT High dependency Resourcing Groups on MAF UK Recruitment is are growing their Growth in recruitment starting to grow is not enough to income address the need IMPROVE INTERNAL ORGANISATION Global organisation is well established Improved internal communications & info sharing ELT & Board have real strategic focus BUT Heightened security management & increased training streamlining and formalising internal processes can feel Better fleet and engine management cumbersome and bureaucratic Improved safety PARTNERSHIP FOCUS Some successes: ➔ Rural Airstrip Agency | PNG ➔ ‘Let’s fix it’ initiative | Bangladesh ➔ Mercy Ships | Madagascar ➔ eMi | Uganda BUT It is difficult to put strategic global EU-CORD | INTEGRAL partnerships into meaningful action Local partnerships enable us to achieve our vision NEW MINISTRY MODELS Increased focus on training ➔ TC Mareeba ➔ MATC ➔ Engineering Apprenticeship Programme BUT Myanmar It takes us a long time to set up something new Liberia C182SMA MAF Strategic Plan 2015 - 2019 11
Programme Manager Emil Kundig and Pilot Arjan Paas, two of the founder members of the MAF lifeline in Liberia 12 MAF Strategic Plan 2015 - 2019
3 IMPORTANT INTERNAL TRENDS 3.1 Operations However, it will be important to monitor this very closely Draft Strategic plan 2015-2019 Operational activity (measured in hours flown) has reduced year and take the necessary action if, for whatever reason, that on year since 2011, with the most significant drop happening growth does not materialise. in 2014. The primary reason for this has been the shortage of RTANT staff, INTERNAL particularly TRENDS impacting the three programmes where the Driven by our desire to allocate resources where they ations demand for our service is the highest: Arnhem Land, PNG have the greatest ministry impact, we have realigned our and South Sudan. Other factors include delays in starting up operation in several places. Most notably the following activity (measured in hours flown) has reduced year on year since 2011, with the most the Liberia programme, reduced flying in Uganda following the changes were implemented: rop happening in 2014. The primary reason for this has been the shortage of staff, revocation of our permission to fly internationally, lack of staff in mpacting the three programmes where the demand for our service is the highest: Mongolia, the closure of the flying programme in South Africa • ClosureArnhem of own flight operations in South Africa nd South and Sudan. Other factors include delays in starting up the re-directing of existing resources (people and aircraft) the Liberia programme, g in Uganda following the revocation of ourapermission • Restructure to fly internationally, lack of staffand significant reduction of footprint in Tanzania from programmes that experienced decline in demand the closure ofAfrica) (East the flying taking programme in South and longer than anticipated Africa not and alwaysthe re-directing of existing • South Sudan becoming an independent programme eople and aircraft) from programmes that experienced a decline resulting in people going to the places of highest need due to in demand (East Africa) than anticipated and not issues around alwaysamong schooling resulting in things. other peopleMoreover, the places•of highest going to with Restructure needand refocus of the Kenya programme ever increasing s around schooling among requirements from Moreover, other things. regulators and the ever with effortsincreasing requirements • Opening Liberia and Myanmar as new programmes ors and the efforts we ourselves put into increasing theof quality we ourselves put into increasing the quality and safety our and safety of our operations, he operational the operational availability of pilots availability has reduced. of pilots has reduced. • Focus on re-staffing the PNG programme As far as flight operations are concerned we have identified Hours Flown the following priorities: 35000 30000 • Get Liberia and Myanmar fully operational 25000 • Complete the strategic re-focus of the Kenya programme 20000 15000 • urther develop and increase activity in the South Sudan F 10000 programme 5000 0 • ebuild and restructure the PNG programme in line with R 2011 2012 2013 2014 2015 its strategic plan (forecast) • e-staff the Arnhem Land programme and clarify its dual R urs flown isWhereas not a good measure (ministry + training) strategy hours flown isofnot ministry a goodimpact, measure it of is aministry good measure of activity and it ern that aimpact, declineitinis operational a good measureactivity has coincided of activity and it is awith real a significant• investment on Review potential long(er)-term involvement in Nepal side. However, with a much better recruitment plan in concern that a decline in operational activity has coincidedplace and a greater focus on recent earthquake following the ieve we arewithturning a corner a significant and weon investment should see activity the support grow significantly in this next side. However, od, thus bringing back better with a much the necessary balance. recruitment plan in place and a greater • Further expand operational activity in West Africa focus on training I believe we are turning a corner and we will be important shouldto monitor see activitythis growvery closely and significantly takenext in this necessary action•if, for the strategic Review need for MAF operation in Bougainville whatever growth does not materialise. period, thus bringing back the necessary balance. r desire to allocate resources where they have the greatest ministry impact, we have r operation in several places. Most notably the following changes were implemented: MAF Strategic Plan 2015 - 2019 13
3.2 Staffing levels Notes: As can be seen in the table below, the total number of International Staff dipped in 2013 and 2014, but is set to • he figures focus on staff in programme only and T recover in 2015. However, due to visa issues some of this exclude those International Staff working in Cairns, recovery may not happen until 2016. Ashford or Mareeba; • ‘Other’ refers to International Staff coming from countries Programme 2011 2012 2013 2014 2015 where there is no MAF Resourcing Group; Arnhem Land 34 30 28 28 32 Bangladesh 4 3 2 2 4 • he ‘duplicate’ line has been included as some T Chad 4 3 4 5 4 International Staff are counted under 2 Resourcing CRMF (PNG) 2 2 3 2 3 Groups. This is the case where husband and wife (and Liberia 2 their financial support) come from 2 different countries. Kenya 22 24 19 11 9 3.3 Support costs (regional offices) South Sudan n/a n/a n/a 8 11 During the initial part of this strategic period we invested Madagascar 4 4 5 5 5 significantly in the support side of the organisation. This Mongolia 2 2 1 1 2 was necessary for successful integration, the boosting of Myanmar 0 capacity in specific areas of need and for investment in some new strategic initiatives. Over the past four years we PNG 32 34 31 28 35 have successfully globalised the different departments, South Africa 2 2 0 0 0 created a new ELT, added an internal communications Tanzania 14 16 17 5 6 department (at the request of the Resourcing Groups), Timor-Leste 1 1 2 2 2 increased our recruitment capacity, and created the role of Uganda 14 13 13 21 19 an International Development Director to focus on increasing TOTAL 135 134 125 118 134 our presence in Asia. Although some ongoing adjustments are being made, the structure overall is well established and When we analyse our 2015 projected number of International is geared towards being able to handle greater programme Staff by Resourcing Groups the following figures emerges: activity. The latter is needed to restore balance between support and programme costs. Sending Group F’cast 2015 MAF Australia 31 MAF Canada 17 MAF Denmark 0 MAF Finland 3 MAF France 1 MAF Germany 4 MAF Italy 1 MAF Netherlands 11 MAF New Zealand 13 MAF Norway 1 MAF South Africa 3 MAF Sweden 2 MAF Switzerland 11 MAF UK 23 MAF US 4 Other 13 Less: duplicates -4 TOTAL 134 14 MAF Strategic Plan 2015 - 2019
In reviewing the trend forward, Figure 2 demonstrates that we should be able to achieve an Acceptable rate over the next few years. If we continue with the improvements in the Safety and Quality culture, then MAFI should be able to achieve the target rate by 2018. Flight Accident Rate - MAF I (8 year rolling rate) 6.00 4.98 5.00 4.61 4.60 4.33 4.37 4.42 3.50 3.71 4.00 2.86 3.00 2.59 2.69 2.77 1.96 2.01 2.00 1.54 1.00 0.00 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Per 100,000 hours Target Acceptable 3.4Africa 2.1.2 SafetyRegion During this next five years the major priorities in terms of fleet In terms of safety this strategic period did not start very well, management include: Over the last year no flight accidents were recorded for this region. This has resulted in an with two accidents in PNG within a short period of time. A accident rate of 0.00 per 100,000 flight hours over an 8 year rolling rate as shown in the figure safety enhancement plan was introduced and safety and below. • Major overhaul and upgrade of second Twin Otter quality management systems was further aligned between the two regions. These efforts and an increased focus on • Agree on fleet plan for PNG with the aim of reducing the AR Accident rates per 100,000 flight hour (8 year rolling rate) Figure 3in PNG to two safety and quality appear to have paid off, with all safety number of types operated 7 trends moving in the right direction. The introduction of a new reporting system, Mantis, has certainly helped to • Further phasing out of our C206 fleet 6 improve our reporting culture, and5.24credit5.29 goes to all staff for buying into the 4.83 system.5.04 • Completion of Caravan avionics upgrade 5 4.13 4.24 4.28 4.25 4.00 If the current 3.92 trend continues, we are likely to meet our • Rationalising our fleet of training aircraft in Mareeba 4 target of fewer than two accidents per 100,000 hours within the time-frame of this strategic plan. For this to happen, • Improve dispatch reliability of C182SMA 3 ongoing effort and attention need to be given to promote 2.18 2.15 2.14 2 safety within the organisation. As far as quality is concerned, 3.6 Training we are aiming to improve the way we measure the cost In response to the ongoing shortage of staff we have put 1.07 1.09 1 associated with (lack of) quality. greater emphasis on training. We invested in MATC in the Netherlands, moved flight training from Coldstream to 0.00 0 3.5 Fleet Mareeba, and are in advanced conversation with Prairie, During 1999 the past2001 2000 five years 2002 we managed 2003 both 2006 2004 2005 to rationalise 2007 2008 2009 Canada. 2010 Through 2011 2012 an improved 2013 2014curriculum we are seeking and upgrade our fleet andAccidents now operate Acc/100k a fleet of 60 hours aircraft. Target to reduce the Acceptable minimum requirements for pilots to join MAF The PC12 was phased out and good progress was also and are working very closely with the Resourcing Groups to made with phasing out our Cessna C206s with now none reduce the time it takes for pilots to go to the field. This is the first time in MAFI history that such a rate remaining in PNG. Further modifications were carried out on has been achieved and illustrates the hard work that has gone on behind the scenes by both the GA8 to improve its reliability and its STOL performance.staff and management Following the at struggles all levels.at ACMA with regard to their One of our three Twin Otters successfully underwent a engineering training programme, we have moved to an major overhaul. Lastly, progress has been made with the apprenticeship model which is now being implemented in avionics upgrade of our Caravans and four have now been Mareeba. completed. SMS Annual We are Report waiting for the necessary permission - 2014 Page 2 of 10 to upgrade a further two Caravans in 2015. Confirmed Both initiatives are in effect examples of vertical integration, future aircraft needs include a C208 for Liberia and a C208 whereby we are seeking to engage at an earlier stage with Amphibious for Bangladesh. Furthermore we expect to the those who have a desire and calling to serve God through need for an aircraft in Myanmar. MAF with the aim of improving the future pipeline of pilots and engineers. MAF Strategic Plan 2015 - 2019 15
3.7 Finances Below you’ll find the overview of the actual income and costs from 2010 to 2014 compared to the operating budget as presented in the last strategic plan: 2011 2012 2013 2014 SUMMARY Budget Actual Diff Budget Actual Diff Budget Actual Diff Budget Actual Diff $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 INCOME Africa Operations 6,733 6,735 2 7,452 7,501 49 7,676 7,802 126 7,906 5,431 -2,475 Asia Pacific Operations 13,393 14,562 1,169 13,911 15,501 1,590 14,488 11,511 -2,977 15,259 9,111 -6,148 Members (Eons) 8,132 9,127 995 9,076 9,785 709 9,303 9,384 81 9,541 11,176 1,635 Members (Staff Support) 1,762 1,903 141 1,859 2,186 327 1,963 2,135 172 2,075 2,434 359 Net Benefit Asian Fund Raising 0 0 0 0 0 0 25 0 -25 140 0 -140 Institutional Funding increase 0 0 0 0 0 0 100 0 -100 200 0 -200 Sub-total 30,020 32,327 2,307 32,298 34,973 2,675 33,555 30,832 -2,723 35,121 28,152 -6,969 EXPENSES Africa Programmes 7,991 8,379 -388 9,183 9,314 -131 9,459 9,706 -247 9,742 8,910 832 Asia Pacific Programmes 15,742 16,520 -778 16,474 18,933 -2,459 16,968 14,289 2,679 17,477 12,452 5,025 Support offices 5,630 5,693 -63 6,046 5,733 313 6,840 5,945 895 7,046 6,504 542 Transfers to/from designated funds -10 0 -10 -200 84 -284 -200 714 -914 -100 236 -336 Additional staff 0 0 395 0 395 404 0 404 413 0 413 New initiatives 25 0 25 200 0 200 200 0 200 300 0 300 Sub-total 29,378 30,592 -1,214 32,098 34,064 -1,966 33,671 30,654 3,017 34,878 28,102 6,776 Result 642 1,735 1,093 200 909 709 -116 178 294 243 50 -193 Annual perc increase in income 20% 8% -12% -9% Annual perc increase in expenses 16% 11% -10% -8% Tot number of International Staff 135 134 125 118 Tot flying hours 30,031 28,890 26,143 21,258 A number of conclusions can be drawn from this: • sia development has not yet resulted in funding A income, but has resulted in recruitment of new • rogramme income is significantly down in 2013 P International Staff. and dramatically down in 2014 in line with the lower hours as a result of lower staffing levels. Consequently • In spite of investments made at regional level (i.e. programme expenses have also been down. support offices), overall costs were significantly below budget. • esourcing Group income has been consistently above R budget, but most notably in 2014. This is the reason why we did not end up with a deficit in 2014. 16 MAF Strategic Plan 2015 - 2019
As always we separate our operational budget from our capital budget. Concerning the latter the comparison between budget and actual was as follows: 2012 2013 2014 Total SUMMARY Budget Actual Budget Actual Budget Actual Budget Actual $`000 $`000 $`000 $`000 $`000 $`000 $`000 $`000 Aircraft 2,200 784 980 5,800 800 538 3,980 7,122 Aircraft upgrades 400 - 600 187 600 991 1,600 1,178 Property 500 821 500 427 500 1,190 1,500 2,438 Vehicles & equipment 440 570 440 309 440 347 1,320 1,226 TOTAL 5,552 2,175 2,520 6,723 2,340 3,066 8,400 11,964 This includes: • urchase of four houses in South Sudan, a house P + annex in Arnhem Land, Mareeba Training Centre • he purchase of two Cessna Caravans, a C182SMA, T building, and part of the costs of the Kajjansi office and five GA8s (now known as Project Croc) Thanks to the hard work of our Resourcing Groups and the • our avionics upgrades and the refurbishment of one F generous donations of our supporters the actual capital Twin Otter project income far exceeded the budgeted income. SUMMARY OF INTERNAL TRENDS Operations • Hours flown down year on year since 2011 • Staff shortages especially in programmes where service demand high • Change programme implemented to realign operations to maximise ministry impact • Globalisation of support functions • Enhanced safety and quality processes Fleet • Rationalisation and upgrade of fleet over last 5 years • Greater emphasis on training to grow our own pilots and engineers including new facility at Mareeba Finances • Programme income down but Resourcing Groups income consistently above budget • Generous donations and supporter base has enable significant capital investment including acquiring 8 aircraft MAF Strategic Plan 2015 - 2019 17
“This is a miracle that has happened. When I received the call from you guys, this was like this is a game changer for us. We haven’t been able to reach so many communities because of the roads, the weather conditions, many days of driving or hiking and this is changing everything. Thanks to you guys we will be able to reach communities that haven’t been reached yet with medicine, clean water, clothes, food supplies so this is amazing. Thank you so much. Today everything changed – we met MAF!” Diego Traverso – Operation Blessing – Nepal 2015 Disaster Response 18 MAF Strategic Plan 2015 - 2019
4 LONG-TERM TRENDS 4.1 Introduction Fourthly, the need for MAF services in relief and disaster Any new strategy not only builds on the strength of the situations remains high. The ongoing high demands for existing strategy whilst addressing its weaknesses; it also our service in South Sudan, the East Africa famine relief needs to take into account the long-term trends that impact intervention, and our involvement in the Nepal earthquake MAF in both a positive and negative way. Significant time disaster response are good examples of that. We have was spent identifying these trends. been working very closely with MAF-US in this area and have successfully set up a joint structure. The speed with 4.2 Trends related to needs which we have been able to respond to the earthquake in Research1 suggests that poverty on the whole is on the Nepal has been encouraging and demonstrates that the decline. However, there are still over 1 billion people living in joint approach is working. As we look forward we anticipate extreme poverty. Moreover there remain many people and that our involvement in similar situations is likely to increase people groups that have limited or no access to the Gospel, rather than decrease. and the need for nurturing existing churches in remote areas remains high. Fifthly, as we look forward we anticipate that there will be greater need for MAF services in so-called closed countries, Secondly, in many (but not all) of the countries were we i.e. in countries where Christianity is a minority faith. This will operate the infrastructure is improving, but pockets of have an impact on the way we train and equip missionaries isolation remain. Effectively this means that in the long run to serve effectively in those countries; for example putting more of our programmes are likely to become smaller and greater emphasis on the need for personal witness and more focussed on specific isolated areas within a country. discipleship. Thirdly, with the ongoing world-wide population increase, Lastly, we see opportunities for MAF to get involved in urbanisation continues to be a major trend. However, consultancy-type work whereby some of the knowledge we research2 suggests that the number of people living in rural have gained over many years can be shared with others, areas is likely to remain fairly stable. such as local operators and aviation authorities. This would create other opportunities for witness. 1 World Bank, Remarkable declines in global poverty, but major challenges remain, April 17, 2013 2 United Nations, World Urbanization Prospects, (revised) 2014, esa. un.org/unpd/wup/Highlights/WUP2014-Highlights.pdf MAF Strategic Plan 2015 - 2019 19
4.3 Trends related to our 4.4 Trends related to our resources external environment Most of our resources come from Western countries We operate in a highly regulated and conservative industry (Europe, Australia and New Zealand, and North-America) where changes tend to be incremental and slow. The slow and we are thankful for the many faithful and committed development of a diesel alternative to our piston engines is a supporters we have in those countries. At the same time we good example of this. Although there are several companies know that our donor base is ageing and that the Church in working on this development, we still seem to be several years the West is in decline. Although these may not impact us off a suitable solution for our fleet of piston aircraft. At the same in the short to medium term, we anticipate that in the long time we are operating in an ever faster changing world with term financial support from our existing supporter base will pressure on us to be increasingly more flexible and to continue decline. This can be counterbalanced by increasing our reducing costs. There is an inherent tension between these presence in Western countries where MAF has been under- two worlds which we are grappling with day by day. represented so far and by focusing more on Asia and the Global South where the Church is growing, in some places One of the challenges we are facing is that we are seeing even quite dramatically. needs changing in countries where we operate, but we are relatively slow in our ability to move aircraft and people. As It is for this reason that we appointed an International we look forward there is a need for us to be able to respond Development Director to focus on Asia development, and it more quickly to changing needs. Likewise, whereas we is encouraging to see that this is now gaining momentum. continue to focus on a long-term commitment to serve the With regard to recruitment in particular, we believe there needs of the isolated peoples in the countries where we is great potential and we anticipate that Asian and Global operate, we anticipate that in future the length of time we South missionaries will become an important part of MAF’s will serve in some countries will reduce. This means that in missionary force. some of the new places where we plan to start operating, we should start with an exit strategy in mind. Other trends to be mindful of are the generation gap and different attitudes of younger missionaries (Gen Y) starting Lastly, many missions have moved from doing to enabling to join MAF, as well as concerns around obtaining visas and whereby much of the work has been handed over to the work permits. The latter was already identified in the previous Church and/or local partners. This has not only changed strategic plan as an area of concern and we can only expect the need for our service and whom we serve, but also begs this to become more difficult in the years to come. the question whether and how this might apply to MAF. Our main focus has continued to be on ‘doing’ and as a result Lastly, donor transparency and a need to be able clearly we have largely remained a Western mission in our outlook to demonstrate impact are ongoing trends and we need to and in the way we work. Of course the fact that we are a make sure that our information systems are robust enough highly technical ministry is an important factor in that. to meet those demands. 20 MAF Strategic Plan 2015 - 2019
TRENDS: NEED Poverty overall is on the decrease, but urgent needs remain Increased needs in response to natural disasters Improved infrastructure, but pockets of isolation Highest need for MAF likely to be in so-called ‘closed countries’ Ministry opportunities to share our aviation knowledge in different ways TRENDS: THE EXTERNAL ENVIRONMENT A relatively stable and only slowly-changing aviation industry Decreasing maintenance costs and aircraft downtime Shorter and more clearly defined programme cycles Need to become quicker and more agile in responding to changing needs Missions moving from ‘doing’ to ‘enabling’ – mutuality and partnership TRENDS: OUR RESOURCES Declining church in the West, but growing church in the South and East Global South has become part of the mission force Changing expectations of younger missionaries Increasing difficulties with placing International Staff Increased scrutiny from supporters/donors and need to demonstrate impact MAF Strategic Plan 2015 - 2019 21
MAF’s unique ministry is to use aircraft and technology to physically and spiritually transform the lives of those living in isolated areas 22 MAF Strategic Plan 2015 - 2019
5 THE STARTING POINT 5.1 Our identity in Christ Throughout the years this unique mandate has been worded As we reflect on 70 years of history we are encouraged that in different ways in mission, vision and purpose statements, the desire and calling that moved our founders to create but its core essence hasn’t changed. As we move forward Mission Aviation Fellowship and use aircraft (and technology) we believe that this unique mandate should remain. to transform the lives of those living in isolated areas still lie at the very heart of the organisation. While we continue 5.3 Aviation as core competency to experience change in terms of where we operate, how Our aviation ministry has been and will continue to be our we operate and the types of services we offer, the Great core ministry. Nonetheless, we have recognised that other Commandment and the Great Commission and a desire to technology solutions further increases our transformational follow Jesus and to make Him known remain the principle impact. It is for this reason that several years ago ‘and motivation for why we do what we do. technology’ was added to our purpose statement. Where we implement technology services we seek these services For this reason it is vital that we continue to seek Him in all to be complementary to our core aviation ministry and to we do and prayer is therefore such an important part of our serve the same vision of transforming the lives of people ministry. We expect Him to direct us as an organisation, living in isolated areas. recognising that we are involved in a spiritual battle. 5.2 Transformation of remote communities MAF’s unique ministry is to use aircraft and technology to physically and spiritually transform the lives of those living in isolated areas. MAF is unique in that it is a technical mission, but also because of its focus on reaching isolated areas. AFFIRM OUR CORE IDENTITY IN CHRIST TRANSFORMATION OF REMOTE COMMUNITIES TO REMAIN AT THE CORE OF OUR VISION AND STRATEGY AVIATION TO REMAIN OUR CORE COMPETENCY MAF Strategic Plan 2015 - 2019 23
Our staff are our greatest asset and one of the biggest challenges we have faced in recent years is recruiting enough suitably qualified people to enable us to do all the crucial work our partners and customers need. Recruitment and training remain key priorities for the organisation 24 MAF Strategic Plan 2015 - 2019
6 MOVING FORWARD (STRATEGIC PRIORITIES) 6.1 Introduction Our strategic plan has been developed through detailed SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, which is summarised in the table below: S Our identity in Christ Commitment to prayer W Shortage of staff Cost of operation (efficiency) United in purpose, vision and values Slow changing Financial strength Inability to respond quickly Global presence Western based and Western led Excellence (including safety) O T Visas / work permits Global South / Asia development Security Strategic partnerships Declining Church in the West Sharing our aviation knowledge in different ways Ageing donor base Need for MAF in countries where we Generational issues are currently not present Donor expectations Placing staff in remote locations Through our new strategic priorities we will be seeking rural airstrip agency (RAA) in PNG is a good example of local to build on our strengths and seize opportunities whilst capacity building and we will be seeking to identify capacity addressing some of the weaknesses and safeguarding building projects in other countries as well. against threats. Through analysis and discussion three major themes were identified: 1) from doing to enabling; 2) We will look out for opportunities for our staff to be involved becoming more international; and 3) increasing our agility. in consultancy type ministry where we share our knowledge and expertise with others. This and the fact that we are 6.2 From doing to enabling likely to be doing more ministry in so-called closed countries Enabling others has always been at the heart of our mean that we need to better equip and enable our staff to ministry and will continue to be in the years to come. be effective in discipleship. However, we aim to become more intentional in terms of local and international partnerships in order to increase our Lastly we see a need to train and enable more of our local transformational impact. Moreover we want to put a greater staff to take on senior roles. Not only is this a positive emphasis on local capacity building and supporting local development is itself, it also addresses the concerns we initiatives. The way that MAF was involved in setting up the have in terms of work permits and visas. MAF Strategic Plan 2015 - 2019 25
6.3 Becoming more international 6.4 Increasing agility Becoming more international means that we continue In an ever faster changing world and with the increased our strategy of Asia development and we expect more need to respond to natural and man-made disasters, there people from Asia to join MAF as missionaries in the years is a need for MAF to be able to respond quickly. Moreover, to come. Moreover we would like to see more of our local we need to address the internal perception that MAF has staff become missionaries with MAF as well. For this we become more bureaucratic and slow to change as a result will need to create new pathways for recruitment and think of the integration process. We should therefore explore ways through issues such as support raising. Likewise, the staff to improve the mobility of our staff and our assets (aircraft) so survey once again highlighted the perception of a glass that we are better able to respond to changing partner needs ceiling for local staff where senior roles are concerned. in the places where we work. Likewise, we should aim to As we find ways for local staff to join as missionaries, this further shorten the time it takes for International Staff to get to issue needs to be addressed as well and is likely to include the field. Finally we see national regulators increasingly taking a leadership development programme. Lastly, to become a prescriptive approach, thus reducing our flexibility. As MAF more international we need to increase diversity at every we need to find the right balance between a prescriptive and level within the organisation and we recognise that this will principle-based approach in the way we write our standards only happen if we are intentional about this. and policies to optimise our flexibility within the constraints in which we operate. WHAT COULD MAF LOOK LIKE... FROM DOING TO ENABLING BECOMING A MORE AGILE ORGANISATION BECOMING TRULY INTERNATIONAL 26 MAF Strategic Plan 2015 - 2019
We have been sharing our aviation expertise in a partnership with the Timor-Leste government where MAF has provided in-country flight experience to Timorese pilots as well as flight training at our Australian flight school in Mareeba MAF Strategic Plan 2015 - 2019 27
“This is the second time I have flown with MAF and I think it is a reminder that MAF just keeps on taking the presence of Christ into some of the most difficult places on earth” The Most Reverend Justin Welby, Archbishop of Canterbury 28 MAF Strategic Plan 2015 - 2019
7 IMPLEMENTATION (STRATEGIC OBJECTIVES) 7.1 From doing to enabling In order to move from doing to enabling We are going to make this work by… we are going to focus on… 1. D eveloping strategic international •B ecoming more intentional in working with partners that will enable and local partnerships holistic transition to happen •E nsuring that all our activities are focused on achieving maximum transformational impact •R eviewing and updating our ministry effectiveness tool to improve the way we measure ministry impact • Being more actively involved in strategic alliances and networks •P utting greater emphasis on identifying and working with key local partners in our programmes 2. F acilitating local capacity building • Identifying specific projects within existing programmes that would and supporting local initiatives build local capacity • Actively offering our service and expertise externally 3. E ncouraging and equipping staff •A ctively seeking and distributing resources to encourage and equip for effective discipleship staff in this area •C ontinuing to promote prayer within the organisation and allowing opportunities for retreats • Identifying suitable training courses, particularly for staff working in spiritually hard places • Developing and implementing a staff well-being strategy 4. E mphasising training and development •D eveloping and implementing a pathway for national staff with of national staff potential to become MAF pilots • Further developing our maintenance apprenticeship programme • Increasing our in-house training resources and integrating this with our performance management system MAF Strategic Plan 2015 - 2019 29
7.2 Becoming more international In order to become more international We are going to make this work by… we are going to focus on… 1. Accelerating Asia development • Implementing the approved Asia development strategic plan • Earmarking sufficient financial resources to implement the strategy •H aving the Asia Development Executive (working alongside the International Development Director) fully operational 2. E ncouraging national staff to become •D eveloping a support structure model specifically geared towards missionaries with MAF Global South missionaries • Creating opportunities for national staff to work in other programmes 3. Leadership development • Developing a management mentorship programme •B ecoming more structured in the way we develop and mentor those with potential for future leadership 4. Increasing diversity at every level within • Appointing at least one trustee from a Global South background the organisation • Actively seeking to increase diversity at the senior management level 30 MAF Strategic Plan 2015 - 2019
7.3 Increasing our agility In order to increase our agility We are going to make this work by… we are going to focus on… 1. Improving the mobility of people and •F urther simplifying and standardising our aircraft fleet and flight aircraft to become more responsive to training changing partners needs •D eveloping creative solutions for some of the major stumbling blocks that prevent staff from moving (e.g. schooling) •F urther developing our disaster response capability in close collaboration with MAF-US • Implementing our recruitment strategy •C ontinuing to critically review our programmes on a regular basis 2. Increasing operational effectiveness in terms of their ministry effectiveness and implementing changes and efficiency accordingly • Developing KPIs that help us to monitor operational efficiency • Improving stock and inventory management •P utting greater emphasis on operational efficiency within our QMS and as we review new standards and policies •R eviewing effectiveness and efficiency of a centralised versus a de-centralised approach •C arrying out a feasibility study of going to a single HQ (as opposed to two regional offices) •C ontinuing to invest in MAF’s specialised flight training 3. Shortening recruitment time programmes (i.e. Mareeba TC, MATC, Prairie) • Improving forward manpower planning •W orking with the Resourcing Groups to make improvements to our support raising system 4. B alancing prescriptive and • Include this in the review process as we develop and set principle-based approach standards and policies •R eview whether the right balance is achieved between devolved decision making and centralised services MAF Strategic Plan 2015 - 2019 31
“I know that MAF is not just a charter airline, but a true partnership in sharing the love and hope of our saviour Jesus” Gillian Parker, Reaching The Light Mongolia 32 MAF Strategic Plan 2015 - 2019
8 CRITICAL SUCCESS FACTORS 8.1 Prayer • In close collaboration with MAF-US welcoming more Unless the Lord builds the house, the builders labour in staff from the USA vain (Psalm 127:1). As a mission we want and need to be guided by God. That’s why prayer is such an integral • Improving our capacity to recruit and process staff from part of what we do and why organisationally we put such countries where there is no MAF group great emphasis on this through things like morning prayers, pre-flight prayer, international days of prayer, weekly • Improve our manpower forward planning PrayerPoints, and programme retreats. As we move forward, in addition to the above, we intend to put greater emphasis • Implementing our reward strategy, which is aimed on the spiritual well-being and growth of our staff3 for at getting greater parity among International Staff effective discipleship. and which may, subject to ongoing discussion and consensus, see us move away from a 100% support 8.2 Recruitment level target. The latter is likely to mean an increase in the Recruitment is an integral part of the strategy and elements number of people willing/able to join MAF. can be found under each of the three themes. However, as there is such a close correlation between overall An indicative projection of staffing levels per programme can ministry activity and number of International Staff it is worth be found on the next page. separating this out. The success of our recruitment strategy is a key critical success factor, whereby acknowledging that 8.3 Programme effectiveness & efficiency it is the Lord who calls people into ministry. Key elements of With increased donor expectations on us to demonstrate our recruitment strategy include: ministry impact, it is key that we ensure that our resources are used in places of highest need and in the most efficient way. • ontinuing to work very closely with the Resourcing C Key activities to make ongoing improvements in this area are: Groups and encouraging them to actively find new staff • eviewing and ‘upgrading’ our ministry effectiveness R • elcoming staff from Asia into MAF. In the Asia W tool and using this tool to review our programme ministry Development Strategy we project that by 2019 we will plans have 13 International Staff from Asia (India, Philippines, Singapore, and Malaysia) working in our programmes. • eveloping KPIs that help to us to monitor and improve D ministry efficiency • ecruitment and development of national staff into R missionary roles • nsuring that our management information systems are E fit for purpose and are meeting donor requirements 3 See paper ‘Prioritising prayer in MAF’ for more details on this MAF Strategic Plan 2015 - 2019 33
Forecasted total number of International Staff in programme: 2011 2012 2013 2014 2015 2016 2017 2018 2019 Programme Actual Actual Actual Actual F’cast F’cast F’cast F’cast F’cast Arnhem Land 34 30 28 28 32 34 36 38 40 Bangladesh 4 3 2 2 4 4 5 5 5 Chad 4 3 4 5 4 4 5 5 5 CRMF (PNG) 2 2 3 2 3 3 4 4 4 Liberia n/a n/a n/a n/a 2 3 4 4 4 Kenya 22 24 19 11 9 8 8 8 8 South Sudan n/a n/a n/a 8 11 14 16 20 22 Madagascar 4 4 5 5 5 6 6 6 6 Mongolia 2 2 1 1 2 2 3 3 3 Myanmar 0 0 0 0 0 1 2 2 3 PNG 32 34 31 28 35 37 40 42 45 South Africa 2 2 0 0 n/a n/a n/a n/a n/a Tanzania 14 16 17 5 6 6 5 5 5 Timor-Leste 1 1 2 2 2 3 3 3 3 Uganda 14 13 13 21 19 18 17 16 15 West-Africa n/a n/a n/a n/a n/a n/a n/a 1 1 Bougainville n/a n/a n/a n/a n/a n/a n/a 1 1 TOTAL 135 134 125 118 134 143 154 163 170 It is assumed that 170 International Staff represents a full complement of staff and that we will have achieved this target no later than 2019. With attrition rate hovering around 14%, we will need to recruit between 30 to 35 new International Staff members each year. This is considered to be an ambitious but achievable target. Furthermore, we will also review what measures could be taken to decrease our attrition rate at the same time. 34 MAF Strategic Plan 2015 - 2019
“We’ve been blessed more than we could have ever imagined. We’ve experienced God’s strength and comfort as we’ve moved our little family halfway across the world. And we’ve found joy amidst the hardships and disappointments of this missionary life” Chris and Karyn Ball – Pilot family based in South Sudan MAF Strategic Plan 2015 - 2019 35
“I’m not trying to make our operation more efficient to earn more money for a faceless corporation; my team and I are trying to make our flying programme more efficient to allow more people to take MAF flights so that remote bush communities will have a better lifeline to the outside world, women will not die needlessly in childbirth and people will be able to read the Bible in their heart language. Nowhere else can you get that level of job satisfaction from sitting behind a desk” Siobhain Dales, Ground Operations Manager, MAF in Papua New Guinea 36 MAF Strategic Plan 2015 - 2019
9 FINANCIAL IMPLICATIONS 9.1 Operational budget forecast 2014 2015 2016 2017 2018 2019 SUMMARY Actual Forecast Budget Budget Budget Budget $'000 $'000 $'000 $'000 $'000 $'000 INCOME Africa Operations 5,431 6,524 7,000 7,500 7,800 8,000 Asia Pacific Operations 9,111 8,732 11,000 12,000 13,000 14,000 Members (Eons) 11,176 10,725 11,000 11,250 11,500 11,750 Members (Staff Support) 2,434 2,294 2,400 2,500 2,600 2,700 Asia development - fundraising 0 0 35 45 100 130 New technology services (incl consultancy) 0 0 25 25 50 50 Sub-total 28,152 28,275 31,460 33,320 35,050 36,630 EXPENSES Africa Programmes 8,910 8,384 9,000 9,500 9,800 10,000 Asia Pacific Programmes 12,452 12,204 14,000 14,750 15,500 16,500 Support offices 6,504 7,271 7,200 7,400 7,600 7,800 Transfers to/from designated funds 236 110 Asia development 0 240 260 160 160 120 Seed-funding member groups 0 300 250 250 250 250 New technology services (incl consultancy) 0 100 200 300 400 Sub-total 28,102 28,509 30,810 32,260 33,610 35,070 Result 50 -234 650 1,060 1,440 1,560 Notes to the financial forecast: 3. Income and expenses for Asia development to be in accordance with the approved strategic plan for Asia 1. W e aim for the deficit between operational income and development. This plan assumed EON funding would expenses for the Africa region to settle at $2m annually rise to $130k in 2019 and a further $580k would be by having staff in the right place and through greater raised for capital projects; efficiency. 4. W e will continue to reserve $250k annually for 2. W e aim for the deficit between operational income and Resourcing Group development. expenses for the Asia Pacific region to reduce from $3.5m in 2015 to $2.5m in 2019 through having more 5. W e will allow support office costs to increase with staff in AL and PNG and through greater efficiency; inflation only. MAF Strategic Plan 2015 - 2019 37
6. T he costs of new technology services and consultancy This includes: type projects is expected to rise to $400k by 2019, 1. A Cessna Caravan for Liberia (2016) and one for but with only limited service income expected to be Bangladesh (2017). Both are already approved projects; received for these services. 2. T he purchase and development of land in South Sudan 7. R esourcing Group EON contributions from the bigger (2015-2017); groups are forecasted to level out, but smaller groups continue to increase. It is recognised that this may be a 3. Completion of the Kajjansi office (2015); conservative assumption. 4. B uilding additional houses on our compound in Kenya The strategic plan aims for us to make an operational (2016/2017); surplus of around $1.5m annually by 2019. This will be done primarily through increase programme ministry 5. Refurbishment/rebuild of 2 maisonettes in Chad (2016) (resulting from having more staff) and bringing back a healthier balance between operational activities and 6. P urchase of a house (from the Nazarenes) in PNG expenses (including support office costs). (2015) The forecasted surplus can/will be used in the 7. A Cessna Caravan for Myanmar (2018) and one (their following possible ways: second one) Caravan for Arnhem Land (2019). Both are not approved projects at this stage; • ngoing investment in fleet renewal and other critical O capital items (e.g. hangars, housing, etc.) where these 8. Hangar in Juba, South Sudan (2017); are not funded with restricted funding; 9. Two Cessna Caravan avionics upgrades per year; • Increased topping-up of International Staff as we move away from a 100% target; 10. Refurbishment of one more Twin Otter (2016); • llow for more highly-subsidised flying to take place for A 11. Implement solar energy project across most high-impact flying and/or allow for more consultancy programmes (2016 – 2019) type projects which don’t increase programme activity (in terms of hours flown), but would be considered high- impact ministry. 9.2 Capital budget The following capital investments are planned: 2014 2015 2016 2017 2018 2019 TOTAL SUMMARY Actual Forecast Budget Budget Budget Budget Budget $'000 $'000 $'000 $'000 $'000 $'000 $'000 Aircraft 538 300 2,000 2,500 2,000 2,000 8,800 Aircraft upgrades 991 350 1,350 350 350 350 2,750 Property 1,190 2,000 750 1,000 500 500 4,750 Vehicles & equipment 347 400 400 400 400 400 2,000 TOTAL 3,066 3,050 4,500 4,250 3,250 3,250 18,300 38 MAF Strategic Plan 2015 - 2019