Statement of Qualifications - Lynn Engineering

Page created by Maria Stanley
 
CONTINUE READING
Statement of Qualifications - Lynn Engineering
Statement of
                                     Qualifications
                                    WE THINK BIG. TO WORK BIG. TO GIVE BIG.

                                               LYNNENGINEERING

       BAY CITY | EDNA | PORT LAVACA | ROCKPORT | CORPUS CHRISTI | GRAPEVINE

Sample Engineering DBA John D Mercer and Associates: Texas Registered Engineering Firm F-324
                Lynn Engineering: Texas Registered Engineering Firm F-11605
Statement of Qualifications - Lynn Engineering
INTRODUCTORY LETTER                                                                     INTRODUCTORY LETTER

        1221 AVENUE F | BAY CITY, TEXAS 77414 | 979.245.8900 | LYNN-ENGINEERING.COM                  118 E. MAIN STREET | EDNA, TEXAS 77957 | 361.782.7121 | JDMERCER.COM

            Ref: STATEMENT OF QUALIFICATIONS
                 Professional Engineer Consulting Services

                                                                                             We believe our firm is uniquely positioned to meet the needs of any project from
      The combined teams of LYNN ENGINEERING and JOHN D. MERCER                            inception to completion. With our combined experience over multiple civil and
    & ASSOCIATES are pleased to present this Statement of Qualifications for               structural engineering disciplines, we are confident in our ability to provide you
    architectural and engineering services in the state of Texas.                          with a project that meets your specific requirements while also being cost effective,
                                                                                           efficiently constructed, and easily maintained after completion.
      LYNN ENGINEERING is a civil and structural engineering firm, founded in
    2009 with offices located in Bay City, Edna, Port Lavaca, Rockport, and Corpus           Our approach of designing the project for not only the needs of the client, but also
    Christi. The firm was founded with the intent of providing professional design and     from the perspective of the contractor, allows for transparent bids, less change orders,
    consulting services for private and public projects on the Texas Gulf Coast. For       and shorter construction times. We also maintain great working relationships with
    more than 10 years, the firm has successfully completed projects through the use of    professionals from other engineering disciplines to provide additional services if your
    sound professional judgment, applicable principles of engineering and use of current   project requires.
    technology.
                                                                                             Enclosed you will find our list of professionals and completed projects that prove
      What makes LYNN ENGINEERING unique in this space is our inclusion of a               our commitment to our clients, projects, and communities served. We are confident
    full-time architectural staff. For many years, KEN SHANKS & ASSOCIATES of              that we can meet the challenges ahead and stand ready to partner with you in
    El Campo, Texas contracted with LYNN ENGINEERING to provide architectural              delivering an effective solution.
    services. Recently, Mr. Shanks joined LYNN ENGINEERING in a full-time
    capacity and serves as our architect on staff.                                          Thank you for taking the time to learn about our firm.

     On January 1, 2019, the assets of JOHN D. MERCER & ASSOCIATES, INC.                    Should you have any questions relative to our response to the City’s Request for
    were purchased by LYNN ENGINEERING and the firm now operates under the                 Qualifications for Engineering Consulting Services, contact us at (979) 245-8900 or
    dba John D. Mercer & Associates.                                                       email info@lynngroup.com.

      JOHN D. MERCER AND ASSOCIATES is a consulting engineering firm                       Signed,
    founded in 1980 with more than 40 years experience providing professional design
    services to governmental agencies, and communities along the Central Gulf Coast
    and South Central portions of Texas.                                                   Stuart A. Lynn P.E.           John D. Mercer, P.E.           N. Mitchell Carrillo P.E.

2   STATEMENT OF QUALIFICATIONS                                                                                                                                                       3
Statement of Qualifications - Lynn Engineering
What it looks like
                                                                                                                   01.          SELECTION OF ENGINEER / STUDY & REPORT

                                                                                                                   Following selection of an engineering firm by a client, the project should proceed
                                                                                                                   approximately as follows:

                                                                                                                           •   Client/Firm meeting to define needs and desired results
                                    TABLEOFCONTENTS                                                                        •   Contract negotiation
                                                                                                                           •   Study and report phase
                                                                                                                           •   Client/Engineer review and revision of report
          Introductory Letter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2
          Project Approach and Proposed Methodology . . . . . . . . . 6                                            If the work effort is only a Study & Report, completion of the work will be final
          Proposed Project Staff  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  10              acceptance of the report by the client.
          Qualifications of Firm  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  16
          Quality of Client Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22               02.          ENGINEERING THROUGH PROJECT CONSTRUCTION
          References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
                                                                                                                   If the Study & Report is the initial engineering phase of the work effort, intended
                                               ATTACHMENTS                                                         to culminate in a project of construction, the following would also be tasked in the
                                                                                                                   engineer’s contract:
          Relevant Architectural Project Experience  . . . . . . . . . . . . 26
          RFP 2020-10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28             •   Preliminary design phase
                                                                                                                           •   City/Engineer review, revision and approval of preliminary design
                                                                                                                               documents
                                                                                                                           •   Final design phase
                                                                                                                           •   City/Engineer review, revision and approval of final design documents
                                                                                                                           •   Obtain reviewing agency approval
                                                                                                                           •   Bidding phase
                                                                                                                           •   Construction of project
                                                                                                                           •   Project close-out

4   STATEMENT OF QUALIFICATIONS                                                                                                                                                                           5
Statement of Qualifications - Lynn Engineering
Project Approach
                                                                                                                                                                                                                        Here’s
                                                                                                                             3. FINAL DESIGN                                        >>

        – – – – PROP OSED ME THOD OLO GY                                                                                     •   Based on the client’s acceptance of the Preliminary
                                                                                                                                 Design and the resulting Design Premise or criteria,

                                                                                                                                                                                                                        how it
                                                                                                                                 prepare the Final Design, Plans, and Specifications.
                                                                                                                             •   Submit the Final Design, Plans, and Specifications to
        THE FIRM’S GOAL IS TO BE THE CONSULTANT THAT ESTABLISHES LONG-TERM                                                       the proper reviewing authorities.

                                                                                                                                                                                                                        works.
        RELATIONSHIPS WITH CLIENTS BY PERFORMING A HIGHLY COMPETENT SERVICE                                                  •   Prepare and review with the client, legal counsel,
        WITH INTEGRITY AND CONCERN FOR THE CLIENT AS WELL AS THE GENERAL                                                         and other advisors all contract related documents,
                                                                                                                                 forms, and conditions.
        PUBLIC. WE PRIDE OURSELVES ON OUR ABILITY TO DESIGN FOR EASE OF                                                      •   Present and review all Designs, Plans, Specifications,
        OPERATION AND MAINTENANCE AND ALWAYS STRIVE TO KEEP IN MIND THE                                                          and applicable Code Compliance requirements with
                                                                                                                                 the client, their advisors, and / or their third-party
        DESIRES AND CAPABILITIES OF THE CLIENT.                                                                                  review representative.

                     STUDY                                                        PRELIMINARY                                                        FINAL                                                       BIDDING AND
                   AND REPORT                                                        DESIGN                                                         DESIGN                                                       NEGOTIATION

1. STUDY AND REPORT                                       >>   2. PRELIMINARY DESIGN                                   >>    4. BIDDING AND NEGOTIATION                             >>

•   Consult with the client to define its needs, review        •   Prepare preliminary design documents consisting           •   Compile completed and approved construction plans,         •   Advise the client as to the qualification of the bidders
    existing available data, and establish required                of, but not limited to, a Design Premise which                specifications, and applicable contract documents for          and make recommendations on the award of the
    additional data.                                               includes final design criteria, preliminary design            distribution to prospective bidders.                           contract as well as any pertinent stipulations.
                                                                   drawings, outlines of specifications, and a detailed
•   Provide an analysis or overview of the client's needs.                                                                   •   Assist the client, as established in phase one, with the   •   Assist the client in securing and executing
                                                                   written description of the project including its goals
                                                                                                                                 distribution of bid packages and respective advertising        contracts based on the bid award and resulting
•   Provide general economic analysis of the client's              and projections.
                                                                                                                                 for bids.                                                      recommendations.
    requirements as an allocation for expenditures,
                                                               •   Advise the client of additional data required, services
    comparison of existing cost estimates, and/or a                                                                          •   Conduct the “Pre-Bid” conference and prepare               •   Issue respective “Notice to Proceed.”
                                                                   which need to be accomplished, or final criteria
    statement of "not-to-exceed" values.                                                                                         applicable minutes of the meeting.
                                                                   definitions which have to be established.
•   Prepare a report and/or a design premise containing                                                                      •   Conduct “Bid Opening” and prepare applicable
                                                               •   Prepare a revised opinion of probable project costs
    the engineer's recommendations and opinions.                                                                                 meeting minutes and bid comparisons.
                                                                   for the client.
•   Meet with the client to review the established
                                                               •   Review all facets of the Preliminary Design with the
    data and to solidify a project description relative
                                                                   client and modify the Design Premise for its final
    to its magnitude, complexity, responsibilities, and
                                                                   form.
    tentative schedules.

    6      STATEMENT OF QUALIFICATIONS                                                                                                                                                                                                               7
Statement of Qualifications - Lynn Engineering
5. FIELD TESTING AND INSPECTIONS                               >>

•       Conduct pre-construction conferences keeping
        applicable minutes and provide appropriate direction
                                                                            direction, in all matters pertaining to the contractor
                                                                            and consult with or advise the client in all matters
                                                                                                                                                      PROJECT APPROACH
        or guidance.                                                        relative to the contract and project matters.
                                                                                                                                          The best approach begins with an experienced and proven Engineer-in-
•       Conduct inspection of the construction or project           •       Review and take appropriate action to contractor’s
        site at appropriate or predetermined intervals (by                  submittals, construction or shop drawings, or requests        Charge who is committed to customer satisfaction by providing responsive
        a professional engineer or qualified staff member)                  for payment.
        to determine project progress and applicable                                                                                      and practical project solutions. The Engineer-in-Charge will be responsible
                                                                    •       Conduct required inspections to determine the
        compliance with intent of design and contract                                                                                     for the overall project administration and management including
                                                                            completion of all work in accordance with the contract
        documents.
                                                                            and applicable codes.
•       Provide sufficient interim inspections by qualified
                                                                                                                                          thorough coordination with the client’s key decision-makers to ensure
                                                                    •       Conduct a final inspection and certify completion
        personnel to assure the quality of materials and
                                                                            of all project work and support documentation in              the client’s needs are kept at the forefront of the work effort.
        workmanship.
                                                                            accordance with the contract and applicable codes.
•       Act as the client’s representative, per the client’s
                                                                                                                                          The Project Manager, if different from the Engineer-in-Charge, is
                                                                                                                                          responsible for the “in-house” project coordination. This includes
                                                                                                                                          communication between the technical engineering experts, the engineers-
                                                                                                                                          in-training, and the CADD technicians and also includes assigning project
                                                                                                                                          tasks, preparation of monthly status reports, managing the project schedule,
                                                                                                                                          controlling project costs, ensuring project documentation is being maintained
                                                                                                                                          and being the main client contact for most project issues.

                                                                                                                                          A successful project depends upon the technical abilities, project management
                  FIELD TESTING                                                              OTHER SPECIAL
                 AND INSPECTIONS                                                               SERVICES                                   skills, and commitment of the project team members. Our philosophy is to
                                                                                                                                          commit key team members to an active role in every project from start to
                                                                                                                                          finish.

                                                                        6. OTHER SPECIAL SERVICES                                    >>
                                                                                                                                          The initial role of the client is to define a problem or problems that need
                                                                                                                                          to be solved. A problem may be a lack of information that makes it difficult
                                                                        •   Accomplish and complete site, property, or
                                                                                                                                          for the client to make short-term decisions and/or do long-term planning. It
                                                                            equipment surveys, if required.
                                                                                                                                          may be that there is an obvious problem with the client’s infrastructure.

                       TWO
                                                                        •   Provide soil and materials testing. (Through a third-
                                                                            party subcontractor)
                                                                        •   Provide the client with project progress updates at
                                                                                                                                          For a municipal entity there is often the need, or a statutory requirement,
                                                                            appropriate intervals.
                     NUMBER OF FIRMS                                                                                                      that a licensed professional engineer be involved in the process to resolve
                                                                        •   Work with project administrator as necessary to
            The merging of Lynn Engineering                                 provide for timely project completion and close-out.          the problem. If such is the case, the municipal entity must follow statutory
             and John D. Mercer & Associates                            •   Prepare a certificate of construction completion and
                                                                                                                                          guidelines in selecting and procuring the services of an engineering firm who
            has provided access to additional                               lien certificate.
               engineering experience and                               •   Provide “third-party” inspection and/or project               will assist the client in defining what the needs are and what the desired
                   technical expertise.                                     management services.                                          results should be.

    8         STATEMENT OF QUALIFICATIONS                                                                                                                                                                                 9
Statement of Qualifications - Lynn Engineering
PROJECTSTAFF
                                                                                                         Mr. Carrillo oversees the operations in the firm’s
                                                                                                        Bay City, Port Lavaca, Rockport, Corpus Christi and
                                     The firm works and performs its duties under the                   Grapevine offices.
                                    guidance of Mr. Stuart A. Lynn, PE.
                                                                                                          Experience: Mr. Carrillo specializes in structural
                                      Experience: Mr. Lynn has more than nineteen (19)                  engineering and has experience designing projects
                                    years of civil, structural and windstorm engineering                that utilize timber, steel, and concrete. Mr. Carrillo also
                                    experience. He is responsible for approximately twenty              manages the operations of Lynn Engineering’s sister
                                    (20) employees. His career includes design for private              company, Lynn Steel Buildings. As a result, Mr. Carrillo
                                    and public residential, commercial, and infrastructure              has a vast knowledge in the design, detailing and
                                    development projects. Mr. Lynn has overseen projects on             construction of pre-engineered metal buildings. Mr.
                                    the Texas Coast from Padre Island to Galveston, TX.                 Carrillo has overseen projects on the Texas Coast from
                                                                                                        Padre Island to Galveston, TX.
                                     Qualifications: BS Civil Engineering, University of
                                    Houston; Professional Engineer in Texas                              Qualifications: BS Civil Engineering, Lamar University;      N. Mitchell
     Stuart A.
                                                                                                        Professional Engineer in Texas
                                                                                                                                                                      Carrillo, PE
                                    Lynn Engineering is a windstorm, structural and                      Professional Organizations: American Society of Civil
     Lynn, PE                       civil engineering firm specializing in private and
                                                                                                        Engineers
                                                                                                                                                                      PROFESSIONAL ENGINEER

     PROFESSIONAL ENGINEER
                                    public residential, commercial and infrastructure
                                    development projects on the Texas Gulf Coast.                                                       Mr. Mercer is the founder of John D. Mercer
                                                                                                                                       & Associates, and since the Lynn Engineering
                                                                                                                                       acquisition, maintains the duties of managing the
 Formerly known as Lynn & Associates, Lynn            coastal bend – to our team. This acquisition                                     operations of its Edna office.
 Engineering was founded by Stuart A. Lynn, P.E.      allowed our firm to become more dynamic by
 in 2008. In the early years, Lynn & Associates’      providing more services to a larger clientele.                                     Experience: Mr. Mercer has more than thirty-nine (39)
 primary focus was to assist residential                                                                                               years of civil and environmental engineering experience.
                                                      On January 1, 2019, Lynn & Associates became                                     He is responsible for approximately six (6) employees.
 contractors and homeowners throughout                Lynn Engineering as the firm adjusted
 Matagorda, Calhoun and Brazoria counties                                                                                              His career includes both design and construction
                                                      its branding for consistency with its sister                                     of municipal water and wastewater facilities. This
 with their Texas Department of Insurance (TDI)       companies in LynnGroup.
 windstorm certifications.                                                                                                             combination of experience provides for an approach
                                                      On January 1, 2020 Lynn Engineering acquired                                     to design that is not easily found in other consulting or
 In 2011, Lynn & Associates acquired Eichstadt &      Hickman Consulting Engineers – a professional                                    design firms.
 Associates located in Rockport, Texas. This new
 office in Rockport effectively doubled our staff
                                                      engineering firm specializing in private land
                                                      development projects for residential and
                                                                                                        John D. Mercer,                  Mr. Mercer is Engineer-in-Charge of projects in
 and service area.                                    commercial markets – in McKinney, Texas. HCE      PE, RPLS                       Galveston, Jamaica Beach, Santa Fe, Richwood, Tiki
                                                                                                                                       Island, Freeport and Surfside Beach.
 Two years later, in 2013, Lynn & Associates          has more than 30 years of experience working
                                                                                                        PROFESSIONAL ENGINEER
 acquired Sample Engineering of Corpus Christi,       with the counties and municipalities in the                                       Qualifications: BS Civil Engineering, Lamar University;
 Texas. This allowed us to provide windstorm          DFW area.                                                                        Professional Engineer in Texas; Registered Professional
 inspections and certifications for the coastal       These resources and experience allow Lynn                                        Land Surveyor in Texas, NACE Coating Inspector Level 1.
 residents and contractors from Brazoria County       Engineering to quickly and efficiently complete
 to Kleberg County.                                                                                                                     Professional Organizations: National Society of
                                                      large-scale residential developments in a
                                                                                                                                       Professional Engineers/Texas Society of Professional
 At the close of 2018, we added John D. Mercer &      fraction of the time of our competitors. Our
                                                                                                                                       Engineers; Texas Society of Professional Surveyors;
 Associates – a full-service civil engineering firm   team maintains excellent working relationships
                                                                                                                                       American Water Works Association; Texas Municipal
 with more than 40 years of experience servicing      with public officials, subconsultants and
                                                                                                                                       League; American Concrete Institute; American Society
 the municipalities and counties of the Texas         contractors in the areas we serve.
                                                                                                                                       of Civil Engineers; NACE International.

10      STATEMENT OF QUALIFICATIONS                                                                                                                                                                11
Statement of Qualifications - Lynn Engineering
Experience: Mr. Sheblak has more than thirty-
                                   five (35) years of experience in design of municipal         Experience: Mr. Hickman is an experienced
                                   improvements and related systems in the Gulf Coast         professional with a 35-plus year history of leadership and
                                   Area of Texas. He serves as principle-in-charge and        working in the Civil Engineering industry. He is skilled
                                   project engineer for our Edna office by performing civil   in AutoCAD, drainage, site development, construction
                                   design, project inspections, project documentation and     management and Entitlements. Mr. Hickman is a
                                   the supervision of technical personnel. He is a native     strong business development professional with a
                                   of Edna, Texas. Mr. Sheblak is Engineer-in-Charge of       Master of Business Administration (M.B.A.) focused in
                                   projects in Columbus, Seadrift, Cuero, Shiner, West        Business Administration and Management from Averett
                                   Columbia, and Oyster Creek.                                University. For more than twenty-five (25) years he
                                                                                              managed his own boutique engineering firm, Hickman
                                    Qualifications: BSChE, Texas A&M University;              Consulting Engineers, in McKinney, TX before joining the
                                   Professional Engineer in Texas; Certified OSSF Site        LynnGroup in early 2020.
     David W.                      Evaluator
                                                                                                Qualifications: BS Civil and Structural Engineering,       Mark Hickman,
     Sheblak, PE                    Professional Organizations: National Society of
                                   Professional Engineers/Texas Society of Professional
                                                                                              Texas A&M University; Master of Business Administration
                                                                                              (MBA), Averett University
                                                                                                                                                           PE, MBA
     PROFESSIONAL ENGINEER         Engineers; Texas Society of Professional Surveyors.                                                                     PROFESSIONAL ENGINEER

       Experience: Mr. Kramer has more than twenty-one                                                                        Experience: Ken Shanks joined the Lynn Engineering
     (21) years of experience in the design and construction                                                                team in September 2020. Prior to that, he had been the
     of Municipal, Private and Industrial Projects across                                                                   principal architect of his firm Ken Shanks & Associates,
     southeast Texas. His career includes the design and                                                                    LLC since June 1999. For more than thirty (30) years,
     construction of numerous land development projects,                                                                    Ken has worked in the Houston metro area with both
     field engineer and project manager for the $8 Billion                                                                  commercial and residential architecture.
     Motiva Crude Oil Expansion Project in Port Arthur, Texas
     and the Construction Manager for a Civil Construction                                                                   Prior to starting his own firm, Ken worked with the
     Company. The combination of both design and                                                                           teams at BROWNE PENLAND MCGREGOR STEPHENS
     construction experience gives Mr. Kramer a unique and                                                                 ARCHITECTS, INC. and SUSTAITA ASSOCIATES, INC., both
     valuable perception in the design of new projects.                                                                    of Houston.

       Mr. Kramer is a design engineer on projects in Wallis,                                                                 He has been a licensed architect in the State of Texas
                                                                                                                            since 1990 and has been a Registered Accessibility
     Jamaica Beach and Port O’Connor.
                                                                  Brian M.                    Ken                           Specialist with the State of Texas in the past. Ken is
      Qualifications: BS Civil Engineering, Lamar University;
     Professional Engineer in Texas.                              Kramer, PE                  Shanks, AIA                   well-versed in Americans with Disabilities Act (ADA)
                                                                                                                            requirements for handicap accessibility.
                                                                  PROFESSIONAL ENGINEER       ARCHITECT
      Professional Organizations: American Society of                                                                       Qualifications: B.E.D. Environmental Design, Texas
     Civil Engineers (ASCE); National Society of Professional                                                              A&M University; A.A.S. Drafting & Design Technology,
     Engineers/Texas Society of Professional Engineers.                                                                    Wharton County Junior College

12      STATEMENT OF QUALIFICATIONS                                                                                                                                                    13
Statement of Qualifications - Lynn Engineering
MAJORSUBCONSULTANTS
     ELECTRICAL & CONTROLS:                                                                     MECHANICAL, ELECTRICAL & PLUMBING ENGINEERING,
     Sherrel A. Mercer, PE                                                                      PROJECT MANAGEMENT, AND COMMISSIONING SOLUTIONS:
     Sherrel A. Mercer, PE, is well known in       Mr. Mercer normally is found in the          Sutton Eldridge Engineering, LLC
     the central Gulf Coast area of Texas for      office of Mercer Controls at 804 Apollo
                                                                                                Sutton Eldridge Engineering, LLC is a           SEE provides engineering design services
     his expertise in the design and repair of     Drive in Edna. The Controls company
                                                                                                Mechanical, Electrical, and Plumbing (MEP)      of HVAC, Plumbing, Electrical Distribution,
     the electrical and controls components        manufactures and services motor control
                                                                                                design firm in Plano, Texas dedicated           Critical Power Systems, Site Lighting,
     found in municipal water and wastewater       panels and associated hardware. Mercer
                                                                                                to providing excellence in all aspects of       Energy Modeling and MEP Commissioning.
     systems. His experience includes              Controls began in 1992 as a division of
                                                                                                engineering services – delivering projects
     design and construction of control            Mercer Construction Company and
                                                                                                in an efficient, comprehensive, and             Their staff has the knowledge and
     installation and design, construction, and    became a separate corporate entity in
                                                                                                economical manner.                              experience to assist our clients in the
     programming of SCADA facilities.              2004. Mr. Mercer serves as its president,
                                                                                                                                                following areas:
                                                   where he provides corporate and
                                                                                                Their goal is to form long-term
     Mr. Mercer, PE, operates S. A. Mercer, PE,    technical management as well design of
                                                                                                relationships with each client by                   •   HVAC Systems
     Inc. to provide electrical, controls and      motor control panels and SCADA systems.
                                                                                                implementing appropriate design solutions           •   Energy Systems
     SCADA design for specific municipal           He also continues to serve as Technical
                                                                                                that are responsive to time and budget..            •   Energy Modeling
     projects. Mr. Mercer has more than            Director of Mercer Construction Company,
                                                                                                                                                    •   Cost Analysis
     forty (40) years of experience associated     909 North Colorado in Edna, having
                                                                                                SEE holds Professional Engineering                  •   Emergency Power Systems
     with construction of municipal utility        previously served as Chairman of the
                                                                                                registrations in more than seventeen                •   Electrical Power Distribution
     infrastructure. He has an extremely           Board (2000-2006), President (1984-2000)
                                                                                                (17) states and has significant design              •   Lighting Systems
     strong record of performance throughout       and Executive Vice-President (1971-1984).
                                                                                                experience in engineering design, contract          •   Building Automation
     his career in working with worst-case
                                                                                                administration and commissioning in                 •   Critical Power Systems
     design constraints, emergency operation       Mr. Mercer’s long experience in design and
                                                                                                multiple commercial projects – delivering           •   Master Planning
     of water and wastewater systems, and          manufacture of control products leads to
                                                                                                projects in an efficient, comprehensive,            •   LEED Design
     component longevity requirements. He is       designs that are both cost effective and
                                                                                                and economical manner.                              •   Commissioning
     also experienced in forensic analysis and     dependable. His insight and experience
                                                                                                                                                    •   Facility Assessment
     lightning mitigation.                         have resulted in the development
                                                                                                SEE is capable of providing engineering             •   Contract Administration
                                                   of quality standards for design, with
                                                                                                services utilizing the latest tools including       •   Value Engineering.
                                                   attention to component choices, assembly
                                                                                                AutoCAD and REVIT.
                                                   techniques, and functional reliability
                                                   that insure a high level of customer
                                                   satisfaction.
         SURVEYING:
         Ganem & Kelly Surveying, Inc.
         Ganem & Kelly Surveying, Inc. was        innovative equipment and software.
         established in 1989 by George A.         They provide boundary surveys,
         Ganem, Jr. RPLS and Gary J. Kelly,       topographic surveys, as-built surveys,
         RPLS and currently has forty-            route surveys and construction
         two (42) employees with offices          staking for various industrial facilities,
         in Point Comfort, Victoria and           pipeline companies, construction
         Edna, Texas. Thier personnel have        companies and engineering
         diverse backgrounds, extensive           companies.                                                     CIVIL                 STRUCTURAL                CONSTRUCTION
         surveying knowledge and use                                                                      ENGINEERING DESIGN        ENGINEERING DESIGN          ADMINISTRATION

14       STATEMENT OF QUALIFICATIONS                                                                                                                                                          15
Statement of Qualifications - Lynn Engineering
About Us

        LYNNENGINEERING                                                                                        John D. Mercer & Associates is a full-service
                                                                                                               civil engineering firm with more than 40 years
                                                                                                               of experience servicing the municipalities and
               Lynn Engineering is a windstorm, structural and civil engineering                               counties of the Texas Coastal Bend.
               firm specializing in private and public residential, commercial
                                                                                                             The firm was founded in 1980 to provide                Having specialized in providing engineering
               and infrastructure development projects on the Texas Gulf Coast.                              engineering services to smaller cities and water       services to smaller communities and water
 WHO WE ARE                                        >>                                                        districts within approximately 125 miles of Edna,      districts, the firm employees understand the
                                                                                                             Texas. The current list of clients includes nearly     importance of being responsive to the inquiries
Formerly known as Lynn & Associates, Lynn               Texas Coastal Bend – to our team. This acquisition   fifty (50) public entities for which work has been     and needs of our clients.
Engineering was founded by Stuart A. Lynn, P.E.         allowed our firm to become more dynamic by           performed in the past five (5) years. (See page 19.)
                                                                                                                                                             Following Hurricane Ike, the firm provided
in 2008. In the early years, Lynn & Associates’         providing more services to a larger clientele.       In January 2019, the assets of the firm were    engineering services under a contract with
primary focus was to assist residential contractors     On January 1, 2019, Lynn & Associates became         purchased by Stuart A. Lynn, P.E. and the       the Texas General Land Office on forty-nine
and homeowners throughout Matagorda,                    Lynn Engineering as the firm adjusted                firm now exists as Sample Engineering, Inc.,    (49) separate construction projects for twelve
Calhoun and Brazoria counties with their Texas          its branding for consistency with its sister         dba John D. Mercer & Associates. Day-to-day     (12) separate public entities. All of the projects
Department of Insurance (TDI) windstorm                 companies in LynnGroup.                              management of the engineering performed by had a maximum professional fee and a
certifications.                                                                                              the firm remains with John D. Mercer, P.E.      maximum construction budget that could
                                                        On January 1, 2020 Lynn Engineering acquired                                                         not be exceeded and a required schedule for
In 2011, Lynn & Associates acquired Eichstadt &         Hickman Consulting Engineers – a professional        The merging of the two firms has provided
Associates located in Rockport, Texas. This new         engineering firm specializing in private land        access to additional engineering and technical completion. All projects were completed within
office in Rockport effectively doubled our staff                                                             personnel as may be needed to increase          the required budgets and schedules.
                                                        development projects for residential and
and service area.                                       commercial markets – in McKinney, Texas. HCE         productivity on engineering projects.           The ability of the firm to efficiently design and
Two years later, in 2013, Lynn & Associates             has more than thirty (30) years of experience        The firm is licensed as Firm No. 324 to perform manage multiple projects effectively within
acquired Sample Engineering of Corpus Christi,          working with the counties and municipalities in      engineering in the State of Texas as Sample     required budgets and schedules is thereby
Texas. This allowed us to provide windstorm             the DFW area.                                        Engineering, dba John D. Mercer & Associates.   confirmed.
inspections and certifications for the coastal          These resources and experience allow                 The professional engineers in the firm take            The responsibility for maintenance of product
residents and contractors from Brazoria County          Lynn Engineering to quickly and efficiently          pride in designing projects that are cost              quality lies with John D. Mercer, P.E., who has
to Kleberg County.                                      complete large-scale residential developments        effective and maintenance friendly. Their              more than forty (40) years of experience being
At the close of 2018, we added John D. Mercer &         in a fraction of the time of our competitors. Our    experience is extensive in water supply, storage       in responsible charge of engineering projects
Associates – a full-service civil engineering firm      team maintains excellent working relationships       and distribution, and in wastewater collection,        since the founding of the firm in 1980.
with more than forty (40) years of experience           with public officials, subconsultants and            transportation and treatment, and in streets           The firm has no history of litigation within the
servicing the municipalities and counties of the        contractors in the areas we serve.                   and drainage.                                          past five (5) years.

16     STATEMENT OF QUALIFICATIONS                                                                                                                                                                                     17
Statement of Qualifications - Lynn Engineering
The registered professional engineers of our firms, Lynn
                                                                                          Engineering and John D. Mercer & Associates, strive to
                                                                                          ensure that every client is properly represented at all
                                                                                          times by competent, professional personnel.
                                                                                          Our professional engineers have a combined total of
                                                                                          more than 150 years of responsible charge experience in
                                                                                          design and engineering.

     John D. Mercer & Associates has the
     experience and expertise to provide
     professional engineering services in         The affiliate offices of Lynn
     most of the disciplines needed by            Engineering have expertise in the
     municipalities.                              following areas:

     Our expertise extends to the following:       • Concrete and Piling Foundation      ARCHITECTURE:
                                                     Design
                                                   • Wood, Steel, and Concrete
                                                                                         Lynn Engineering is not your average engineering firm, as
      • Water Supply – Wells
      • Water Storage – Ground and Elevated          Structural Design                   we employ a full-time architecture staff. Our clients benefit
        Tanks                                      • Pre-Engineered Steel Buildings      from a one-stop shop from planning to design and on to
      • Hydro-pneumatic Tanks                      • Windstorm Design and                construction. Our seamless workflow produces distinguished,
      • Water Plants – Pumps, Piping,                Permitting
                                                   • Residential Building Planning
                                                                                         elegant and modern designs that are as practical as they are
        Disinfection, and Controls
      • Reverse Osmosis Treatment                    and Design                          visually appealing.
      • Waste Water Collection Systems –           • Commercial Building Planning
                                                     and Design                          Our qualified team is experienced in both commercial and residential
        New and Rehabilitations
                                                   • Residential and Commercial          developments. We have successfully designed, planned and
      • Lift Stations – New and Rehabilitations
      • Waste Water Treatment Plants – New,          Subdivision Planning and Design     managed the construction process for many homes and commercial
        Expansions, and Rehabilitations            • RV Camp Sites                       buildings. All resulting in distinguished, elegant and modern designs
      • Waste Water Treatment Plant                                                      that are as practical as they are visually appealing.
        Permitting – New, Amendments, and         Lynn Engineering has become a
        Renewals                                  primary provider in the Central Gulf    We cover everything, from needs assessment and site analysis; to
      • Streets – New and Rehabilitation          Coast for windstorm design and            design and construction management. Our team has a proven
      • On-Site Sewer Systems – Design and        permitting. Their reputation for             track record for developing customized strategies through
        Permitting                                structural design is expanding and
                                                  their structural design services are
                                                                                                  our active collaboration with clients. We take great pride
      • Storm Drainage Pipes, Ditches, and
                                                  being requested more often. Their                  in the project we undertake and remain dedicated to
        Detention/Retention
      • Engineering Studies and Plans             growth in clientele and reputation                     maintaining the highest of standards in the industry.
      • Utility System Mapping                    testifies to their engineering and
      • Bond Applications and Reports             technical capability.
      • On-site Construction Observation

18       STATEMENT OF QUALIFICATIONS                                                                                                                             19
Firm Experience                                                                                                                OUR UNIQUE APPROACH
                                                                                                            Our approach of designing the project for not only the needs of the client,
                                                                                                            but also from the perspective of the contractor, allows for transparent bids,
                                                                                                                        less change orders, and shorter construction times.

– ROADWAY PROJECT                  – DRAINAGE PROJECTS              – WASTE WATER PROJECTS

City of Goliad – Fannin            City of Lake Jackson –           City of Palacios - WWTP
Street Reconstruction              Willow-Blossom Drainage          Mechanical Bar Screen

                                                                                                        CONT.
Project included repair or         Improvements Project             Project included installation
reconstruction of 5,200 LF         included increasing the          of a mechanical bar screen on
of city street with associated     existing capacity of a           the gravity flow influent line
drainage improvements. Total       neighborhood drainage            into the main plant lift station

                                                                                                        EXPERIENCE
Contract: $660,000. Project        by upsizing box culverts         together with installation
was completed April 2020.          and concrete lining ditches      of variable speed drives on
                                   in back yard easements.          the tri-plex pump lift station.
– WATER PROJECTS                   Construction Budget              Project cost was $1,025,000.
                                   $610,000. Completion of          Construction complete in
Port O’Connor                      Project in May 2020.             December 2019.
Improvement District –                                                                                             EXPERIENCE WITH JURISDICTION AUTHORITIES
TWDB Bond Project includes         City of Lake Jackson –           Jackson County WCID No. 1
five (5) new wells, a ground       Yaupon Ditch Drainage            – CDBG Sewer Rehabilitation                    The professional engineers in the firm have presented
storage tank and reverse           Improvements Project             Project was for rehabilitation                 project plans and specifications for review and approval to:
osmosis treatment form 1,200       included concrete lining         of approximately 5,000 LF of
gallons per minute of treated      approximately 1,300 LF           sewer mains by pipe-bursting                     •   Local Communities and Utility Districts
water. Construction budget         of major outfall ditch and       and replacement of sewer                         •   Texas Commission on Environmental Quality
is $4,556,000. Project is in       upsizing three (3) street        service lines. Construction                      •   Texas Water Development Board
design with construction           crossings with multi-box         cost was $238,300.                               •   Texas General Land Office
completion scheduled for           culverts. Total budget           Construction completed                           •   Texas Department of Agriculture
January 2022.                      approximately $1,200,000.        March 2020.                                      •   US Department of Agriculture, Rural Development
                                   Project is under construction,
City of Goliad – Ward Street       completion to be determined.     – SURVEYING PROJECT
Water Plant Project includes                                                                           FUNDING FOR PROJECTS THE                         PERMITS FOR CONSTRUCTION OF
a new 600 gallon per minute                                         Port O’Connor                      FIRM HAS DESIGNED HAS BEEN                       PROJECTS HAVE BEEN OBTAINED
well, a 200,000-gallon welded                                       Improvement District –             OBTAINED FROM:                                   FROM:
steel ground storage tank,                                          TWDB Bond prepared plats
disinfection facilities, booster                                    and legal descriptions for          •     Local Funds/Open Market Bonds                •   Texas Department of
pumps and an emergency                                              lease tracts for two (2) wells,     •     Texas Water Development Board                    Transportation
generator. Construction                                             three (3) sanitary control          •     Texas General Land Office                    •   USA Corp of Engineers
budget is $950,000. The                                             easements around the wells          •     Texas Department of Agriculture              •   Railroads
well is nearing completion                                          and two (2) utility easements       •     US Department of Agriculture,
and design of the storage                                           for water line construction.              Rural Development
tank and booster pump                                               Completed April 2020.               •     Texas Department of Emergency
is complete with bidding                                                                                      Management
scheduled for June 2021.                                                                                •     Federal Emergency
                                                                                                              Management Agency

 20      STATEMENT OF QUALIFICATIONS                                                                                                                                                        21
Quality                             QUALITY ASSURANCE PROGRAM

                                             OF CLIENT SERVICES                           The firm has a current work force capable over a twelve (12) month
                                                                                          period of designing projects having a combined $10 million - $20
                                                                                          million construction cost. An expansion of the number of employees
                                                                                          is always considered on an as needed basis.
                                        THE FIRM IS COMMITTED TO
                                        BEING RESPONSIVE TO THE                           All engineering design performed by the firm is subject to the
                                        NEEDS OF ALL OUR CLIENTS.                         review of other engineers in the firm. Close attention is given to
                                                                                          constructibility, cost of maintenance and the specific desires of the
                                                                                          project owner. Timelines of completion relative to specific deadlines
                       Having limited change orders on a project is generally the
                       direct result of having a thoroughly designed project on           is given emphasis in work scheduling and utilization of employees.
                       which the engineer has made quality of the design product
                       a priority. There are fewer “unforeseen” conditions and less
                                                                                          ADDITIONAL INFORMATION
                       chance of the project needing changes in design when
                       particular attention is placed on the details of the design.
                       When attention is paid to completeness of design, potential        The firm emphasizes a team approach to accomplish completion
                       bidders see less risk in the cost of construction and the client   of engineering design. The project owner’s staff members are
                       is given a better and more competitive bid resulting in an
                       overall reduced project cost.                                      essential components of the team as are project stakeholders
                                                                                          when appropriate.

     The quality of the service that is provided to our clients is shown by the large
     number of repeat clients who utilize our services. The firm has been performing      From project concept planning through securing funding to
     engineering services for several clients for over fifteen (15) years. For example:   completion of design and construction, team members are
                                                                                          encouraged to have input to the total project work effort where
             •   The City of Columbus since 1987
             •   The City of Shiner since 1991                                            specific input ability is appropriate and/or needed to facilitate the
             •   The City of Oyster Creek since 1990                                      total project. Beginning with the earliest efforts to define a project,
             •   The City of Palacios since 2000                                          including meetings with the project owners, the public and
             •   The Village of Surfside Beach since 1998
                                                                                          specific stakeholder groups or other entities, the engineers strive to
             •   The City of Seadrift since 2004
             •   Wharton County WCID No. 1 since 1994                                     represent the owner’s best interest as project schedules, budgets
             •   Jackson County WCID No. 2 since 1986                                     and financing options are evaluated.

22      STATEMENT OF QUALIFICATIONS                                                                                                                                 23
References

                                                                                                                                            RECENTCLIENTS
     City of Columbus                     City of Palacios                          City of Shiner

          City of Columbus                     City of Palacios                           City of Shiner
              PO Box 87                          PO Box 845                                PO Box 308
       Columbus, Texas 78934                Palacios, Texas 77465                     Shiner, Texas 77984
       Attn: Donald Warschak,               Attn: David Kocurek,                       Attn: Natalie Fric,
             City Manager                       City Manager                             City Secretary
        Phone: (979) 762-2366               Phone: (361) 972-3605                   Phone: (361) 594-3362
                 Email:                             Email:                                    Email:
     drw89@columbustexas.net             dkocurek@cityofpalacios.org              Natalie.fric@shinertexas.gov

                                                          Galveston County
                        City of Goliad
                                                            WCID No. 8

                             City of Goliad                Galveston County WCID No. 8
                      PO Box 939 | 152 W. End St.                    PO Box 337
                          Goliad, Texas 77963                  Santa Fe, Texas 77510
                          Attn: Kandi Hubert                   Attn: James Newman
                             City Secretary                           Manager
                         Phone: (361) 645-3454                Phone: (409) 925-0941
                                 Email:                                Email:

                                                                                                                                                               entity clients for whom we
                                                                                                                                                               This map showcases a list
                                                                                                                                                               and location of the public
                      citysecretary@goliadtx.net               wcid8@comcast.net

                                                                                                                                                               have worked in the past
                                                                                                                                                               five (5) years.
                                                                                                                                                                                                       P.O. Box337
                                                                                               Customer Deposit Information                                                                          12148 15th St.
                                                                                                                                                                                                Santa Fe, TX 77510
                                                                                                    WATER DEPOSITS ARE REFUNDABLE UPON CLOSURE
                                                                                                         OF ACCOUNT AND THE FINAL BILL PAID.
                                                                                                                                                                                                (409) 925-2821

                                                                                               At your request, your final bill may be paid from your water deposit and the reminder sent to you.

                                                              TYPE OF SERVICE: q WATER                q SEWER            OD               SERVICE START DATE:                              /         /
                                                              Previous Address:
24   STATEMENT OF QUALIFICATIONS                                                                                                                                                                                      25
ATTACHMENTS                                                                                           ATTACHMENTS

                                                                                                          Beeville I.S.D. - Beeville, TX                    The Capital Grille - Minneapolis, MN
Relevant Architectural Project Experience                                                                 New Gymnasium / Concession area for               Construction cost: $ 8.0 million
                                                                                                          A.C. Jones High School
INDUSTRIAL FACILITIES:                                  Cuero Community Hospital - Cuero, TX              Construction cost: $ 1.2 million                  The Capital Grille - Charlotte, NC
  Colorado Bend 1 Power – Wharton, TX                   O.B. / GYN. Center                                                                                  Construction cost: $ 7.5 million
  Office additions/manufacturing facility               Construction cost: $ 2.5 million                  Louise I.S.D. - Louise, TX
  Construction costs: $1.5 million                                                                        Several campus renovations                        Quadalajara Restaurant - Houston, TX
                                                        Cuero Community Hospital - Cuero, TX              and new buildings                                 Construction cost: $ 1.75 million
     Nan-Ya Plastics Corp. – Wharton, TX                Respiratory / Physical Therapy Unit               Construction cost: $ 2.1 million
     Office renovations/manufacturing facility          Construction cost: $ 1.75 million                                                                   Schulze’s Family Restaurant - Rosenberg, TX
     Construction costs: 2.5 million                                                                      Northside Education Center - El Campo, TX         Construction cost: $ 750,000
                                                        Cuero Community Hospital - Cuero, TX              Renovation to existing two story building
AMPHITHEATERS:                                          Senior Citizen’s Care Wing                        Construction cost: $ 400,000                      Ice Cream Parlor - Astroworld - Houston, TX
 Camden Amphitheater - Camden, NJ                       Construction cost: $ 1.25 million                                                                   Construction cost: $ 250,000
 Multi-use facility with year-round                                                                     OFFICE BUILDINGS:
 occupancy. Seating capacity of 25,000.                 Detar Hospital - Victoria, TX                    Introgen Therapeutics, Inc. - Houston, TX        RETAIL CENTERS:
 Construction cost: $ 35 million.                       Doctor’s Suite Additions                         30,000 square foot two story office facility		    Fairway Plaza Shopping Center -
                                                        Construction cost: $ 750,000                     Construction cost: $ 8.0 million                  Pasadena, TX
     Teatro Aire Libre Amphitheater -                                                                                                                      275,000 square foot shopping center
     Monterrey, Mexico                                  South Texas Medical Clinic - Needville, TX        Calhoun Interprizes Inc. - Houston, TX           Construction cost: $ 15.0 million
     Open air facility.                                 Doctor’s Clinic                                   20,000 square foot office facility
     Seating capacity of 25,000.                        Construction cost: $ 950,000                      Construction cost: $ 935,000                      Looney Tunes U.S.A. - Astroworld -
     Construction cost: $ 22 million US.                                                                                                                    Houston, TX
                                                      SCHOOLS:                                            Cal-Maine Foods Inc. - Gonzales, TX               10,000 square foot shopping center
     West Palm Beach Amphitheater -                     Beeville I.S.D. - Beeville, Texas                 30,000 sf office / production facility            Construction cost: $ 1.5 million
     West Palm Beach, Florida                           Additions to high school & junior high school     Construction cost: $ 750,000
     Open air facility. Seating capacity of 18,000.     Construction cost: $ 4.5 million                                                                    Colorado Center - Smithville, TX
     Construction cost: $ 12 million.                                                                   CITY PROJECTS:                                      25,000 square foot shopping center
                                                        Halletsville I.S.D. - Halletsville, Texas         El Campo Volunteer Fire Department -              Construction cost: $ 750,000
     Sandstone Amphitheater -                           Library / Gymnasium Additions                     El Campo, TX
     Kansas City, MO                                    Construction cost: $ 3.35 million                 Training facility w/ burn building and office     Richmond Loop South - Houston, TX
     Open air facility. Seating capacity of 18,000.                                                       support buildings - 30 acre development           12,000 square foot shopping center
     Construction cost: $ 8 million.                    Beeville I.S.D. - Beeville, Texas                 Construction cost: $ 1.2 million                  Construction cost: $ 400,000
                                                        A.C. Jones High School Gymnasium
     The Cynthia Woods - Mitchell Pavilion -            Construction cost: $ 2.4 million                CHURCHES:                                         LEASE SPACE/INTERIOR DESIGN:
     The Woodlands, Texas                                                                                Parkway Baptist Church - Victoria, TX              Lalon Beauty Institute - Houston, TX
     Renovation to the reserved seating areas /         Wharton Co. Junior College                       Construction cost: $ 2.2 million                   3,500 square foot
     A.D.A. study.                                      (LaDieu Technology Center) - Wharton, TX                                                            Construction cost: $ 320,000
     Construction cost: $ 200,000                       45,000 square foot multi-use                      St. Mary’s Catholic Church - San Antonio, TX
                                                        technology facility                               Construction cost: $ 1.2 million                  United Savings Inc. - Houston, TX
MEDICAL:                                                Construction cost: $ 2.2 million                                                                    4,000 square foot
 Introgen Therapeutics, Inc. - Houston, TX              Rice I.S.D. - Eagle Lake, TX                      Holy Family Catholic Church – Wharton, TX         Construction cost: $ 455,000
 Genetic Cancer Research Facility                       Additional classroom wings                        Construction costs: $2.8 million
 Construction Cost: $ 16.5 million                      Construction cost: $ 1.5 million                                                                    Commerce State Bank - Houston, TX
                                                                                                          St. Jerome Catholic Church – Houston, TX          2,500 square foot
     Detar Hospital - Victoria, TX                      Beeville I.S.D. - Beeville, TX                    Construction costs: $4.5 million                  Construction cost: $ 325,000
     Physical Therapy Unit                              Renovation of A.C. Jones High School
     Construction cost: $ 3.1 million                   Construction cost: $ 1.4 million                RESTAURANTS:                                      LIBRARIES:
                                                                                                         The Capital Grille - Houston, TX                   Wharton County Library - El Campo, TX
                                                                                                         Construction cost: $ 8.5 million                   14,000 square foot
                                                                                                                                                            Construction cost: $ 850,000

26       STATEMENT OF QUALIFICATIONS                                                                                                                                                                      27
let's start
the project.
Bay City Office
1221 Ave F
Bay City, TX 77414
979-245-8900
                             LYNN-ENGINEERING.COM
                     FACEBOOK.COM/LYNNENGINEERING
Edna Office
118 E Main St
Edna, TX. 77957
361-782-7121
You can also read