CONTRACT DRAWINGS ROME WATERFRONT VILLAGE - JAMES ST. PROJECT SITE OVERLOOK INDEX TO DRAWINGS TITLE SHEET G-001 GENERAL NOTES, LEGEND & ABBREVIATIONS C-101 OVERALL SITE PLAN C-302 CROSS SECTIONS C-502 EROSION & SEDIMENT CONTROL DETAILS C-502A DETAILS C-512 PEDESTRIAN HANDRAIL DETAIL E-101 SIGHT LIGHTING PLAN E-501 LIGHTING DETAILS & SECTIONS E-502 ONE-LINE DIAGRAM, DETAILS AND SCHEDULES L-100 LIGHTING PLAN L-200 PLANTING PLAN L-300 MATERIALS & AMENITIES DETAILS L-301 PLANTING DETAILS S-001 GENERAL NOTES, DESIGN CRITERIA, SYMBOLS & ABBREVIATIONS S-101 JAMES STREET OVERLOOK BULKHEAD INSTALLATION S-301 BULKHEAD INSTALLATION SECTIONS AND DETAILS S-302 DETAILS AND SECTIONS CITY OF ROME ONEIDA COUNTY, NY AUGUST 2021 JACQUELINE M. IZZO CITY OF ROME - MAYOR MATTHEW J. ANDREWS CITY OF ROME - DEPUTY DIRECTOR O'BRIEN & GERE ENGINEERS, INC. THIS DOCUMENT WAS PREPARED WITH FUNDING PROVIDED BY THE NEW YORK STATE DEPARTMENT OF STATE UNDER TITLE 11 OF THE ENVIRONMENTAL PROTECTION FUND
SAVED:4/20/21 8:45 AM GENERAL NOTES: ENVIRONMENTAL PROTECTION NOTES: DEMOLITION NOTES ABBREVIATIONS: 1. THE PLANS HAVE BEEN DEVELOPED BASED ON THE RAVI ENGINEERING & LAND SURVEYING, P.C. 1. THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS TO THE SATISFACTION OF THE ENGINEER TO PREVENT 1. CONTRACTOR SHALL VISIT THE SITE TO OBSERVE ALL EXISTING SITE CONDITIONS PRIOR TO SUBMITTING AC-FT ACRE FEET "BOUNDARY SURVEY" OF ROME WATERFRONT IN THE CITY OF ROME, ONEIDA COUNTY NEW YORK, DATED OR REDUCE TO A MINIMUM ANY DAMAGE TO ANY WATERWAY FROM POLLUTION BY DEBRIS, SEDIMENT, OR BID DOCUMENTS. ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS JANUARY 30, 2018. OTHER FOREIGN MATERIAL, OR FROM THE MANIPULATION OF EQUIPMENT AND/OR MATERIALS IN OR NEAR AVE AVENUE THE WATERWAY. THE CONTRACTOR SHALL NOT RETURN ANY WATER WHICH HAS BEEN USED FOR WASH BLVD BOULEVARD 2. PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL VERIFY AND STAKE THE LOCATIONS OF ALL 2. HORIZONTAL DATUM USED NAD83 NEW YORK STATE PLAN CENTRAL, US FOOT. ALL ELEVATIONS IN PURPOSES OR SIMILAR OPERATIONS DIRECTLY TO A DITCH OR DIRECTLY TO A WATERWAY, WHICH COULD UNDERGROUND UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE A LOCATING BM BENCHMARK NAVD88. CAUSE THAT WATER TO BECOME POLLUTED WITH SAND, SILT, CEMENT, OIL OR OTHER IMPURITIES. SERVICE TO VERIFY UNDERGROUND UTILITY LOCATIONS. CKT CIRCUIT 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE THEMSELVES WITH THE SITE AND ALL EXISTING CONDITIONS SURROUNDING IT AND THEREON. 2. DEWATERING WILL BE REQUIRED FOR THIS PROJECT. THE CONTRACTOR MUST OBTAIN THE REQUIRED PERMITS FROM THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION IF WELL POINTS 3. CONTRACTOR SHALL VERIFY THE FOLLOWING: FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA, ℄ CENTERLINE ARE TO BE USED AND/OR VOLUME WITHDRAWN IS GREATER THAN OR EQUAL TO AN AVERAGE OF 100,000 CATALOGUE NUMBERS, AND SIMILAR DATA. CMP CORRUGATED METAL PIPE 4. THE UNDERGROUND STRUCTURES AND UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM GALLONS PER DAY IN ANY CONSECUTIVE THIRTY-DAY CONSECUTIVE PERIOD. CM CENTIMETER AVAILABLE SURVEYS AND RECORD MAPS. THE UNDERGROUND STRUCTURES AND UTILITIES SHOWN ON 4. CONTRACTOR SHALL OBTAIN AND COMPLY WITH ALL NECESSARY APPROVALS, PERMITS, INSPECTIONS AND CONC CONCRETE THIS MAP ARE NOT CERTIFIED TO THE ACCURACY OF THEIR LOCATION OR COMPLETENESS. IT IS THE 3. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO PREVENT THE ENTRANCE OF FRESH CONCRETE INTO CERTIFICATIONS PRIOR TO AND DURING THE COURSE OF CONSTRUCTION. CU FT CUBIC FEET CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION AND EXTEND OF ALL UNDERGROUND THE WATERS OF NEW YORK STATE. EQUIPMENT, TOOLS, AND TRUCKS USED IN THE PROJECT SHALL BE D DOWNSTREAM STRUCTURES AND UTILITIES PRIOR TO ANY EXCAVATION OR CONSTRUCTION ACTIVITIES TAKE PLACE. CLEANED IN SUCH A MANNER AS TO PREVENT WASH WATER FROM ENTERING THE WATERWAY. WET 5. CONTRACTOR IS RESPONSIBLE TO REPAIR OR REPLACE ALL ITEMS DAMAGED OUTSIDE OF CONSTRUCTION DBH DIAMETER AT BREAST HEIGHT CONCRETE IS HIGHLY TOXIC TO FISH. LIMITS, OR ANY ITEMS DISTURBED ON THE SITE WHICH ARE NOT PART OF THE IDENTIFIED WORK OF THIS 5. THE CONTRACTOR SHALL NOTIFY DIG SAFELY NEW YORK (800-962-7962) FOR A UTILITY STAKE-OUT THREE DIA DIAMETER CONTRACT. CONTRACTOR SHALL PROVIDE PROPER SIGNS, BARRICADES, FENCES, TO PROTECT THE WORK, E EAST (3) WORKING DAYS PRIOR TO ANY EXCAVATION, DRILLING OR BLASTING. 4. SPILLAGE OF OIL AND HAZARDOUS SUBSTANCES IS PROHIBITED BY SECTION 311 OF THE CLEAN WATER ACT PROPERTY, EQUIPMENT AND PERSONS FROM DAMAGE DURING ALL PHASES OF CONSTRUCTION. EG FOR EXAMPLE OF 1977. MEASURES INCLUDING PROPER MAINTENANCE OF CONSTRUCTION EQUIPMENT, DESIGNATING 6. THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE STATE, MUNICIPAL, AND PRIVATE AUTHORITIES OF FUEL/HAZARDOUS SUBSTANCE HANDLING AREAS TO ALLOW SPILLS TO BE CONTAINED BEFORE REACHING ELEV. ELEVATION UTILITIES A MINIMUM OF THREE (3) WORKING DAYS PRIOR TO COMMENCEMENT OF WORK. THE WATERWAY, INSTRUCTING PERSONNEL ON PROPER HANDLING AND DISPOSAL OF PETROLEUM 6. PROTECT ALL VEGETATION TO REMAIN DURING ALL PHASES OF CONSTRUCTION. DO NOT DRIVE VEHICLES, EX. EXISTING PRODUCTS, AND OTHER REQUIRED PROCEDURES SHALL BE IMPLEMENTED. IF A SPILL OF OIL/HAZARDOUS STORE EQUIPMENT, SPILL LIQUIDS OR STORE CHEMICALS BELOW THE CANOPIES OF EXISTING VEGETATION FT. FEET 7. THE CONTRACTOR SHALL PROVIDE LABOR, FACILITIES, AND CONTROLS TO MAINTAIN INGRESS AND SUBSTANCES ENTERS THE WATERWAY, IMMEDIATE NOTIFICATION OF THE NYSDEC BY CALLING 1-800-457-7362, TO REMAIN. CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ALL VEGETATION AND ROOTS OUTSIDE THE GA. GUAGE EGRESS FOR VEHICLE AND PEDESTRIAN TRAFFIC TO ALL PREMISES WITHIN THE WORK LIMITS. THE NATIONAL RESPONSE CENTER AT 1-800-424-8802, AND THE CANAL AUTHORITY SENIOR DISPATCHER AT CONSTRUCTION LIMIT LINE AND WITHIN TREE PROTECTION AREAS GALV GALVANIZED (866) 691-8282. AN ADEQUATE SUPPLY OF CONTAINMENT AND ABSORBTION MATERIALS SHALL BE MAINTAINED GFI GROUND FAULT CIRCUIT INTERRUPTER 8. CONTRACTOR TO REMOVE AND PROPERLY DISPOSE OF ALL MATERIAL NOT REUSED IN PROJECT OFF-SITE, FOR RAPID DEPLOYMENT. 7. CONTRACTOR SHALL STRIP, STORE, AND REUSE ALL TOPSOIL FROM AREAS TO BE PAVED OR REGARDED. IN CONFORMANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. GI. GREEN INFRASTRUCTURE PROVIDE SEDIMENT CONTROL FENCE AROUND BASE OF TOPSOIL STOCKPILE. 5. THE WORK IN THIS CONTRACT COMPLIES WITH U.S. ARMY CORPS OF ENGINEERS (USACE) INDIVIDUAL PERMIT HDPE HIGH DENSITY POLYETHYLENE PIPE 9. THE CONTRACTOR SHALL PROVIDE RECORD DRAWINGS OF ALL WORK PERFORMED WHICH SHALL ALSO (IP). THE REQUIRED NOTIFICATION HAS BEEN MADE TO THE USACE. A NYSDEC WATER QUALITY HRS HOURS 8. IN AREAS WHERE PLANT MATERIAL IS PROPOSED ON AREAS OF EXISTING PAVEMENT, EXCAVATE EXISTING INCLUDE THE LOCATION, BY STATION, OF ALL APPURTENANCES INSTALLED, REFERENCED FROM THE CERTIFICATION (WQC) HAS BEEN ISSUED FOR USACE IP'S. THE CONTRACTOR SHALL COMPLY WITH ALL SOIL TO A DEPTH OF 30" AND REPLACE WITH APPROVED TOPSOIL, COORDINATE WITH PLANTING PLAN. INV. INVERT BEGINNING STATION. ALL COSTS TO BE INCLUDED IN BID ITEMS. THE OWNER RESERVES THE RIGHT TO REQUIREMENTS OF THE IP INCLUDING APPLICABLE REGIONAL CONDITIONS, AND THE ASSOCIATED WQC. LB POUND WITHHOLD THE PROJECT RETAINAGE UNTIL THE OWNER IS SATISFIED WITH THE RECORD DRAWINGS LOD. LEVEL OF DISTURBANCE SUBMITTAL IN THE SPECIFIED FORMAT. 9. ALL EXISTING MATERIAL TO BE SALVAGED SHALL BE VERIFIED BY LANDSCAPE ARCHITECT AND REMOVED AND STORED BY CONTRACTOR IN A LOCATION COORDINATED WITH OWNER. CONTRACTOR SHALL LTG LIGHTING 10. CONTRACTOR WILL BE PROVIDED ELECTRONIC CAD FILE WITH WHICH TO OBTAIN LAYOUT INFORMATION COMPENSATE OWNER FOR ANY DAMAGE TO SALVAGED MATERIALS THAT OCCURS DURING REMOVAL, MAX. MAXIMUM CANAL OPERATION NOTES: STORAGE OR REINSTALLATION. FOR PROPOSED WORK FEATURES. MIN. MINIMUM A 100 FT WIDE NAVIGATION CHANNEL WITH A 14 FT. DEPTH SHALL BE MAINTAINED AT ALL TIMES DURING THE N NORTH NAVIGATION SEASON WHICH COMMENCES ABOUT MAY 1ST AND ENDS ABOUT NOVEMBER 15TH. 10. ALL EXISTING UTILITIES TO REMAIN, UNLESS OTHERWISE NOTED. NA NOT AVAILABLE NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988 BULKHEAD NOTES: THE CONTRACTOR SHALL NOT PERFORM ANY WORK DURING THE NAVIGATION SEASON WHICH AFFECTS THE 11. ALL WORK IN THE PUBLIC R.O.W SHALL BE COORDINATED AND APPROVED BY LOCAL, COUNTY AND STATE NIC NOT IN CONTRACT OPERATION OF THE CANAL WITHOUT PRIOR APPROVAL OF THE CANAL CORPORATION. ANY APPROVED WORK AUTHORITIES AND SHALL BE STAGED TO ALLOW REGULAR UNINTERRUPTED TRAFFIC FLOW TO THE EXTENT NM NIAGARA MOHAWK 1. THE CONTRACTOR SHALL FURNISH ALL LABOR, TOOLS, EQUIPMENT AND MATERIALS TO DEMOLISH AND SHALL BE CONDUCTED IN ACCORDANCE WITH THE GENERAL RULES AND REGULATIONS OF THE U.S. COAST POSSIBLE. ALL DAILY TRAFFIC AND EMERGENCY VEHICLE TRAFFIC IN THE VICINITY OF THE SITE SHALL NOT NO. NUMBER CONSTRUCT THE NEW BULKHEAD STRUCTURE, STORM DRAINAGE AND NECESSARY ADDITIONAL WORK AS GUARD AND THE CANAL CORPORATION. BE IMPEDED. NTS NOT TO SCALE DEPICTED ON THE PLANS, WITHIN THE TECHNICAL SPECIFICATIONS AND SPECIFIED HEREIN NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION IF THE CONTRACTOR ELECTS TO PERFORM THE STONE FILL AT THE S. JAMES STREET BRIDGE DURING 12. WHEN PRACTICAL ALL SAW-CUTS INTO EXISTING CONCRETE SHALL OCCUR AT EXISTING CONSTRUCTION OR O.C. ON CENTER 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIELD VERIFICATION OF ALL LOCATIONS, DIMENSIONS NAVIGATION SEASON, THE FOLLOWING RESTRICTIONS SHALL APPLY: EXPANSION JOINTS. AND ELEVATIONS OF THE NEW WORK. DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER O.D. OUTER DIAMETER IMMEDIATELY. TO CONFIRM CONTRACT COMPLIANCE, THE CONTRACTOR SHALL SUBMIT FOR THE RECORD 1. THE CONTRACTOR'S OPERATION SHALL HAVE A MAXIMUM ENCROACHMENT IN THE CHANNEL (AS DEFINED OHW ORDINARY HIGH WATER 13. AT PRE-CONSTRUCTION MEETING, CONTRACTOR TO COORDINATE WITH LANDSCAPE ARCHITECT ANY PLANT PC POINT OF CURVATURE PRIOR TO FIELD CONSTRUCTION THEIR SURVEY CONTROL POINTS AND BASELINES, AND BENCHMARK IN THE NOTE ABOVE) OF 15 FEET. THE CONTRACTOR SHALL SUBMIT THEIR WORK PLAN AND EQUIPMENT MATERIAL TO BE SAVED AND/OR REPLANTED. ELEVATIONS. LOCATION TO THE DIVISION CANAL ENGINEER FOR APPROVAL. PI POINT OF INTERSECTION 2. DANGER BUOYS SHALL BE PLACED AROUND THE TURBIDITY CURTAIN TO THE SATISFACTION OF THE PSI POUNDS PER SQUARE INCH 3. AT LEAST 10 WORKING DAYS PRIOR TO THE STARTING OF ANY WORK, THE CONTRACTOR SHALL SUBMIT DIVISION CANAL ENGINEER. THE COST OF THE BUOYS SHALL BE INCLUDED IN THE UNIT PRICE FOR THE 14. COORDINATE WITH LANDSCAPE ARCHITECT FOR LOCATION OF EXCESS CUT MATERIAL PLACEMENT. PT POINT OF TANGENCY FOR THE ENGINEER TO REVIEW THE CONTRACTORS PROPOSED METHODS FOR THE CONTROL OF WATER TURBIDITY CURTAIN. PVC POLYVINYL CHLORIDE PROGRAM. THE COST FOR THE CONTROL OF WATER PROGRAM SHALL BE INCLUDED IN THE UNIT PRICE BID 3. MPT SIGNS SHALL BE PROVIDED ON THE CANAL AT NO ADDITIONAL COST TO THE AUTHORITY/CANAL RCP REINFORCED CONCRETE PIPE FOR THE SHEET PILING ITEM AND SHALL INCLUDE ALL DEWATERING RELATED ACTIVITIES (DISCHARGE CORPORATION. THE MPT SHALL INCLUDE SIGNS LIMITING THE SPEED LIMIT THROUGH THE WORK AREA TO RCPT RECEPTACLE PERMITS, LABOR, MATERIAL, EQUIPMENT, INSTALLATION, MAINTENANCE, POWER REQUIREMENTS AND 5 MPH. THE MPT PLAN SHALL BE SUBMITTED TO THE DIVISION CANAL ENGINEER FOR APPROVAL. RD ROAD CONNECTIONS, DISMANTLEMENT, ETC.) AND BE OF SUFFICIENT SIZE TO ACCOMMODATE THE WATER CONDITIONS REGARDLESS OF SOURCE. HISTORICAL WATER LEVEL RECORDS ARE AVAILABLE FOR REVIEW BY THE CONTRACTOR AT THE DIVISION REBAR REINFORCING BAR CANAL ENGINEER'S OFFICE. THE CONTRACTOR SHALL HAVE NO CLAIM AGAINST THE NYSCC FOR FLOWS NOT LEGEND SCH SCHEDULE 4. IN THE EVENT NATURAL FLOODING CAUSES THE WATER TO OVERTOP THE MAXIMUM SHEETING HEIGHT AS REGULATED BY THE NYSCC. SF SQUARE FEET ESTABLISHED IN THE CONTRACT DOCUMENTS, ADDITIONAL COMPENSATION WILL BE ALLOWED TO EXISTING SICPP SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE REIMBURSE THE CONTRACTOR FOR THEIR VERIFIABLE DIRECT COSTS ASSOCIATED WITH THE SITE ORDINARY HIGH WATER SPECS SPECIFICATIONS RESTORATION TO PRE-EVENT CONDITIONS THE NYS BARGE CANAL MAINTAINS THE WATER LEVEL 418.5 FT., NAVD83 YEAR ROUND. THERE ARE NO STA. STATION CONTROL POINT PROVISIONS TO LOWER THE WATER BELOW THIS ELEVATION. TBD TO BE DETERMINED 5. THE CONTRACTOR SHALL MAINTAIN FLOW IN THE EXISTING STORM SEWERS AT ALL TIMES. COST FOR BENCHMARK PROPERTY LINE TEL TELEPHONE BYPASS PUMPING TO MAINTAIN EX. FLOWS TO BE INCLUDED IN THE PRICE BID FOR STORM SEWER MAJOR CONTOUR THK THICK REPLACEMENT OR OTHER REHABILITATION WORK. MINOR CONTOUR TYP TYPICAL 6. EXISTING STORM SEWERS AFFECTED BY THIS PROJECT SHALL BE REPAIRED/REPLACED IN-KIND PLANTING/LANDSCAPING NOTES U UPSTREAM EDGE OF PAVEMENT MATCHING EXISTING SLOPE AND/OR ELEVATIONS. W/ WITH EDGE OF GRAVEL 1. ALL PLANTS ARE TO MEET THE MINIMUM STANDARDS OF THE AMERICAN ASSOCIATION OF NURSERYMAN. WL WATER LINE CENTERLINE 7. COST TO EXCAVATE AND REMOVE PIPING TO BE INCLUDED IN THE PRICE BID PER LINEAL FOOT OF PIPE WP WEATHER PROOF TREELINE REMOVAL OR INSTALLATIONS. 2. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO AVOID DAMAGE TO ANY VEGETATION TO REMAIN. WV WATER VALVE SHORELINE OF CREEK WWF WELDED WIRE FABRIC 8. ANY ADDITIONAL LABOR, MATERIALS, APPURTENANCES, ETC. NEEDED TO RECONSTRUCT THE SIDES, OVERHEAD UTILITY LINE INVERTS AND BOTTOMS OF EXISTING AND NEW MANHOLES, CATCH BASINS AND EXISTING PIPES TO 3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND FIELD VERIFYING THE LOCATION OF ALL UTILITIES OVERHEAD ELECTRIC ACCOMMODATE THE NEW BULKHEAD WALL ARE TO BE INCLUDED IN THE PRICE BID FOR NEW PIPES. AND AVOIDING ALL UTILITIES TO REMAIN DURING THE CONSTRUCTION PROCESS. HIGHWAY BOUNDARY GAS LINE SECTION DESIGNATION 9. ALL FILL INCORPORATED INTO THE WORK SHALL BE CLEAN, UNCONTAMINATED GRANULAR MATERIAL OF 4. PLANTS SHALL BE DELIVERED ONLY WHEN THEY CAN BE INSTALLED IN A REASONABLE TIMEFRAME. ALL PROPERTY BOUNDARY THE GRADATION SPECIFIED. PLANTS ARE SUBJECTED TO INSPECTION AT DELIVERY BY THE LANDSCAPE ARCHITECT. FENCE LINE I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_G-001 GENERAL NOTES.DWG BRUSH LINE 10.NO WORK SHALL BE CONSIDERED ACCEPTED AS FINAL UNTIL THE STRUCTURES, UTILITIES AND SYSTEM 5. ALL PLANTING BEDS AND AREAS OF GROUND COVER SHALL BE MULCHED TO A DEPTH OF 4". BOX BEAM GUIDERAIL 1 HAS PASSED ACCEPTANCE TESTS AND SATISFACTORY VISUAL INSPECTION BY THE ENGINEER/CITY. SECTION 1, SHEET C-302 C-302 6. SEE SHEET PLANTING PLAN FOR PLANTING SOIL SPECIFICATION. UTILITY POLE W/ GUY WIRE 7. PLANTS SHALL BE THE SIZE (HEIGHT, DIAMETER, OR CALIPER) AND TYPE NOTED ON THE PLANTING TREES EROSION CONTROL NOTES: SCHEDULE. 1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES AS SOIL BORING LOCATIONS SHOWN ON THE PLANS AND AS REQUIRED TO PREVENT EROSION AND SEDIMENT MIGRATION FROM THE 8. THE LOCATION OF ALL PLANTING TO BE VERIFIED BY LANDSCAPE ARCHITECT. DETAIL DESIGNATION SITE IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION PLAN (SWPP) PREPARED FOR PROPOSED THE PROJECT AND THE MOST CURRENT VERSION OF THE NEW YORK STANDARDS AND SPECIFICATIONS 9. THE CONTRACTOR SHALL GUARANTEE ALL PLANTED MATERIALS HEALTH, AS DETERMINED BY THE FOR EROSION AND SEDIMENT CONTROL. LANDSCAPE ARCHITECT, FOR A MINIMUM OF ONE (1) YEAR TIME. ELECTRIC LINE A ORDINARY HIGH WATER DETAIL A, SHEET C-502 10. THE CONTRACTOR SHALL MAINTAIN ALL WORK INCLUDING WATERING AND PROTECTION FROM TRAFFIC WATER MAIN C-502 UNTIL FINAL ACCEPTANCE OF THE PROJECT. SILT FENCE TURBIDITY CURTAIN ARCHAEOLOGICAL NOTES CANAL CROSSING ROADWAY 11. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ALL ITEMS DAMAGED OUTSIDE PROPOSED HANDRAIL 1. MORTON ARCHEOLOGY CONDUCTED A PHASE IA/1B CULTURAL RESOURCE SURVEY AT THE SITE IN CONSTRUCTION LIMITS OR DISTURBED ON SITE WHICH ARE NOT PART OF THE IDENTIFIED WORK OF THIS DECEMBER 2017. CONTRACT. RIP RAP CULVERT OUTLET 2. CRITICAL RESOURCES ARE AS FOLLOWS: NATIONAL LANDMARK BARGE CANAL HISTORIC DISTRICT AND 12. ALL PLANTS AND SEED MIXTURES SHALL BE NATIVE SPECIES. NO INVASIVE SPECIES SHALL BE PERMITTED. NATIONAL REGISTER ELIGIBLE OLD ERIE CANAL. BOTH RESOURCES ARE PROTECTED UNDER THE NATIONAL HISTORIC PRESERVATION ACT. STABILIZED CONSTRUCTION ENTRANCE 3. UNDER CONDITIONS OF THE EFFECT DETERMINATION FROM STATE HISTORIC PRESERVATION OFFICE (SHPO), RECEIVED JANUARY 22, 2018, ALL CHANGES TO THE PLANS OR CONSTRUCTION METHODOLOGY WILL REQUIRE FURTHER COORDINATION WITH SHPO. LIGHT POLE 4. DURING CONSTRUCTION AN ARCHEOLOGIST MAY NEED TO BE PRESENT DURING EXCAVATION AT KEY LOCATIONS WITHIN THE PROJECT LIMITS THAT WERE UNABLE TO BE SURVEYED DURING THE PHASE 1A/B. PROPOSED PLANTING IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE GENERAL NOTES, LEGEND & S. GANNON CHECKED BY 280.67211 DATE ABBREVIATIONS G-001 ADDRESS DRAWING LOCATION 1 8/5/2021 ISSUED FOR BID SBG M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR R. HASTINGS NO. DATE REVISION INT.
SAVED:8/4/21 2:10 PM D C-50 2 BA SE LIN E T EE S TR ES JAM T H AL ASP 44 445 43 0 0 435 43 0 440 42 5 435 429 435 430 430 42 0 5 43 3 43 42 0 425 A 425 C-512 421 C C-502 1 S-301 1 C-502A 2 C-302 A C-502 NYS BARGE CANAL 1 C-302 I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_C-101.DWG NOTE: REMOVE EXISTING ASPHALT SURFACE COURSE FROM THE TRAIL IN AREAS REQUIRED FOR NEW WORK AND DISPOSE OF MATERIAL OFF-SITE. LEGEND PROPOSED CONCRETE WALK SEE DETAIL 2 SHEET L-300 PLAN NORTH SITE PLAN 1"=20'-0" 20' 0 20' IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. ALL ELEVATIONS IN NAVD88 CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE SITE PLAN S. GANNON CHECKED BY 280.67211 DATE ADDRESS DRAWING LOCATION C-101 1 8/5/2021 ISSUED FOR BID SBG M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR NO. INT. R. HASTINGS DATE REVISION
SAVED:4/30/21 2:07 PM EXISTING BRIDGE 450.0 EXISTING GROUND WING WALL 450.0 ~446' 445.0 CONCRETE TRAIL 10' WIDE 440.0 PROPOSED 440.0 OVERLOOK 9' WIDE 435.0 RAILING DETAIL A, C-512 ELEVATION 430.0 430.0 425.0 PROPOSED OHW ELEV RETAINING WALL 418.5' 428' (1' WIDE) 420.0 420.0 415.0 410.0 410.0 405.0 405.0 -20 0 20 40 60 80 100 120 140 160 180 OFFSET 0+19.29 SECTION 1 SCALE: HORIZ. 1"=20' 20' 0 20' VERT. 1"=10' 10' 0 10' PROPOSED PLANTING BED 6' WIDE PROPOSED OVERLOOK - 10' EXISTING GROUND WIDE 445.0 CONCRETE TRAIL 10' WIDE 440.0 440.0 435.0 RAILING DETAIL A, C-512 ELEVATION 430.0 430.0 425.0 PROPOSED OHW ELEV RETAINING WALL 418.5' 428' (1' WIDE) I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_C-302.DWG 420.0 420.0 FINISHED GRADE 415.0 410.0 410.0 -40 -20 0 20 40 60 80 100 120 140 OFFSET 0+79.65 SECTION 2 SCALE: HORIZ. 1"=20' 20' 0 20' VERT. 1"=10' 10' 0 10' IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. ALL ELEVATIONS IN NAVD88 CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE CROSS SECTIONS S. GANNON CHECKED BY 280.67211 DATE ADDRESS DRAWING LOCATION C-302 1 8/5/2021 ISSUED FOR BID SBG M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR R. HASTINGS NO. DATE REVISION INT.
SAVED:4/30/21 2:09 PM WOVEN WIRE FENCING (REINFORCED SILT FENCE) 50' (MIN.) 36" MIN. FENCE POST 10'-0" MAX. 10' SEDIMENT CONTROL FABRIC ATTACHED USING "HOG RINGS" OR WOVEN WIRE MESH PLASTIC TIES EXISTING (REINFORCED SILT FENCE) 12' MIN. 24' 14 1/2 GA. MIN. W/ 6" MESH PAVEMENT SPACING MAX. EXISTING GROUND 10' 20" MIN. FILTER CLOTH COVER PLAN VIEW COMPACTED SOIL BACKFILL NOTES: UNDISTURBED EXISTING GROUND 1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. FLOW 2. LENGTH - AS REQUIRED, BUT NOT LESS THAN 50 FEET 3. THICKNESS - NOT LESS THAN 6". COMPACTED 6" MIN. SOIL 18" MIN. 4. WIDTH 24' MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE EGRESS OCCURS. BACKFILL TOE-IN FABRIC 5. FILTER FABRIC (MIRAFI 140N OR EQUAL) - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 6" MIN. TO GROUND 6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARDS CONSTRUCTION ENTRANCES SHALL BE EMBED FILTER CLOTH MIN. PIPED ACROSS THE ENTRANCE. IF PIPING IS NOT POSSIBLE, A MOUNTABLE BERM 3' WIDE (MIN.) WITH 5:1 SLOPES WOODEN FENCE POST (TYP.) 6" INTO GROUND (REINFORCED SILT FENCE USE WILL BE PERMITTED. "LUGGED-U" OR "T" STEEL) 7. MAINTENANCE - THE ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC OP DRESSING WITH 1. SILT FENCE SHALL BE PLACED WHERE SHOWN ON THE EROSION AND SEDIMENT SECTION DETAIL ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP CONTROL PLANS AND AS DESCRIBED IN THE PROJECT SWPPP OR AS ORDERED BY SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE THE ENGINEER. REMOVED IMMEDIATELY. 2. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES POSTS : STEEL EITHER T OR U TYPE 8. WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. OR STAPLES. OR 2" HARDWOOD WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO ADJACENT SEDIMENT BASINS. 3. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES FENCE : WOVEN WIRE 14.5 GAUGE 6" SPACED EVERY 24" AT TOP AND MID SECTION. MAX. MESH OPENING 9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED IN ACCORDANCE WITH THE PROJECT STORM WATER POLLUTION PREVENTION PLAN. 4. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE FILTER CLOTH : OVER-LAPPED BY SIX INCHES AND FOLDED. MINIMUM TENSILE 10. CONTRACTOR SHALL FIELD LOCATE AS REQUIRED WITH APPROVAL BY THE OWNER'S REPRESENTATIVE. STRENGTH OF 120 LBS. 5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN (ASTM D-16826) "BULGES" DEVELOP IN THE SILT FENCE. 6. FENCE TO BE ALIGNED ALONG CONTOUR AS CLOSELY AS POSSIBLE. PREFABRICATED UNIT : MIRAFI ENVIROFENCE, STABILIZED CONSTRUCTION ENTRANCE DETAIL 7. FENCE SHALL BE DOUBLED WHERE SHOWN. (DSF) OR APPROVED EQUAL D NOT TO SCALE STANDARD SYMBOL SF SF 10'-0" SILT FENCE DETAIL (TYP.) A NOT TO SCALE R 21" 6" 21" TOP OF CAP L1 GALVANIZED END SECTION A CONCRETE CAP ON BULKHEAD ELEVATION STORM OUTLET C-503 6" W1 W2 I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_G-502 ECS DETAILS.DWG 8" 2" SCH. 40 PIPE RAILING EXTEND RIP-RAP TO TOP OF PIPE 2" SCH. 40 PIPE PLAN POST VIEW SECTION TOP TEE D1 2 1/2" SCH. 40 PIPE 6" SELECT GRANULAR 2" SCH. 80 PIPE MATERIAL; NYSDOT ITEM NO. 620.08; BEDDING MATERIAL 3 1 1/2" SCH. 40 PIPE 1 CENTER RAIL 6" 1' 1 PIPE DIMENSION NOTES: VARIES (L1) 3 SIZE W1 W2 L1 D1 MIDDLE CROSS 8" 2' 8' 11' 2' 1. RAILING SHALL BE OF ALL WELDED STEEL CONSTRUCTION. 18" 4.5' 25' 25' 3' SECTION A 2" SCH. 40 PIPE 24" 6' 34' 25' 3' 2. WELDS SHALL BE GROUND SMOOTH. POST C-503 *IF D1 = 2' USE NYSDOT MEDIUM STONE 3. PRIME AND PAINT WITH 2 COATS *IF D1 = 3' USE NYSDOT HEAVY STONE 6" DIA. x 1/2" THK. RIP-RAP APRON DETAIL BLACK EPOXY FINISH. BASE PLATE C NOT TO SCALE 4. INSTALL RAILING ALONG TOP OF CAP FROM BASELINE STA. 0+00 TO 6+38. 3 - 5/8" DIA. x 6" EXPANSION TURBIDITY CURTAIN DETAIL ANCHORS B NOT TO SCALE POST BASE RAILING DETAIL E NOT TO SCALE IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE DETAILS S. GANNON CHECKED BY 280.67211 DATE ADDRESS DRAWING LOCATION C-502 1 8/5/2021 ISSUED FOR BID SBG M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR NO. INT. R. HASTINGS DATE REVISION
SAVED:8/4/21 9:54 PM 6"min Spacing is 1' to 3' and random Cuttings must penetrate bedding stone or geotextile if used. Cuttings must extend to lowest water of the year. 24" thickness Medium Stone NYSDOT Item 6" thickness 620.04 Bedding Stone BULKHEAD WALL NYSDOT Item 620.08 2 JOINT PLANTING C-502A NOT TO SCALE LIVE STAKE Optional sealant Remove side branches. Sharpen end. paint STEP 1 Obtain willow or willow type adventitiously rootable stock. Material should be from an area with similar soil, climate, ORDINARY HIGH and location relative to the stream. The material shall be at least two years old and free of disease, rot, or insect WATER EL. 418.5 infestation. Material shall be harvested while dormant and soaked (1 to 14 days) before installation. 24" MEDIUM STONE, NYSDOT ITEM 620.04 CANAL BOTTOM Note: A waterjet (hydrodrill) may be used to create the pilot hole in 6" BEDDING STONE, silt, loam, and some clay soils. It NYSDOT ITEM 620.08 does not work well in large gravels 2 ft and cobbles. 2 ft min min STEP 2 Create a pilot hole that is perpendicular to the ground surface and deep enough to reach the lowest water table of the year. The hole shall be 2 3 to 3 4 the length of the live pole. 6"min. I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_C-502A.DWG Note: If pilot hole is made with a water jet (hydro drill), backfilling with water soil slurry may not be necessary. DETAIL NOTES: STEP 3 1. REFER TO PLAN SHEET FOR SIDE SLOPES AND FINISHED ELEVATIONS. Tamp live poles into hole. Top of cutting shall be above competing vegetation. Back fill hole with water and soil mix to achieve good soil to stem contact. Space stakes in a 1 to 3 foot random pattern. 2. INSTALL LIVE STAKES IN STONE FILL ON RIVER BANK AS SHOWN ON DETAIL. 3. ALL ELEVATIONS REFER TO NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88). 3 LIVE STAKES C-502A 1 TYPICAL BANK SECTION NOT TO SCALE C-502A NOT TO SCALE IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE DETAILS S. GANNON CHECKED BY 280.67211 DATE ADDRESS DRAWING LOCATION C-502A 1 8/5/2021 ISSUED FOR BID M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR NO. INT. R. HASTINGS DATE REVISION
SAVED:4/30/21 3:34 PM I:\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211_C-512 PEDESTRIAN HANDRAIL DETAIL.DWG PEDESTRIAN HANDRAIL DETAIL A NOT TO SCALE IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME P. ROMANO DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE PEDESTRIAN HANDRAIL DETAIL S. GANNON CHECKED BY 280.67211 DATE ADDRESS DRAWING LOCATION C-512 1 8/5/2021 ISSUED FOR BID SBG M. PARRISH 5/11/2021 DRAWN BY ROME, NY 0 3/30/2018 ISSUED FOR OWNER APPROVAL PDR NO. INT. R. HASTINGS DATE REVISION
SAVED:8/5/21 8:37 AM HEET L-403 S MATCH LINE ET STRE ES JAM POLE SEE LIGHTING E-502 FIXTURE SCHEDULE 1 CYCLONE BOLLARD FIXTURE CBM1210C L-100 SCALE: NOT TO SCALE LIGHT FIXTURE POLE BASES TO MATCH CYCLONE BOLLARD FIXTURE BASE (CBM121OC) Maintain Slope Vegetati on Mainta in Slop Vegeta e tion Maint POLE SEE LIGHTING ain Veget Slope ation E-502 FIXTURE SCHEDULE 1 BOLLARD CBM1210C L-100 NYS BARGE CANAL Z:\01_PROJECT _FILES\326-21-994 RAMBOLL ST. JAMES OVERLOOK\03_CAD\326-994_LIGHTING PLAN 08-04-2021.DWG PLAN NORTH LEGEND LIGHT POST W/DECORATIVE BASE FOR POST-TOP FIXTURE LIGHTING PLAN 1"=20'-0" 20' 0 20' LIGHT POST W/ DECORATIVE BASE FOR ARM MOUNTED FIXTURE BOLLARD FIXTURE 04/30/2021 IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. ALL ELEVATIONS IN NAVD88 LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION P. Loyola CITY OF ROME RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. JAMES STREET OVERLOOK LIGHTING PLAN & DETAILS DESIGNED BY FILE NO. 8/04/2021 ISSUED FOR BID P. Loyola CHECKED BY DATE ADDRESS DRAWING LOCATION L-100 R1 4/30/2021 ISSUED FOR BID P. Loyola 4/30/2021 R0 3/30/2018 ISSUED FOR OWNER APPROVAL DRAWN BY ROME, NY NO. DATE INT. S. Miller REVISION
SAVED:8/5/21 8:39 AM HEET L-403 S MATCH LINE ET STRE ES JAM DECIDUOUS TREE 3 PLANTING L-301 EVERGREEN TREE 6 1 PLANTING L-301 Q1 14 NATIVE TURF SLOPE JPS SEED MIX 3 PO 2 SHRUB PLANTING L-301 NYS BARGE CANAL Maintain Slope Vegetati on Mainta in Slop Vegeta e 10 tion EP 14 Maint ALL OTHER DISTURBED AREAS PV ain Veget Slope ation PLANT WITH TURF SEED MIX. 9 10 1 SEE SPECIFICATIONS. PAH JVG 3 Q2 1 NS LT LANDSCAPE 4 RESTORATION L-301 NYS BARGE CANAL Z:\01_PROJECT _FILES\326-21-994 RAMBOLL ST. JAMES OVERLOOK\03_CAD\326-814_PLANTING PLAN 2021-07-26.DWG LEGEND PLAN NORTH PROPOSED SHRUBS AND PROPOSED MEDIUM TREE GROUND COVER PROPOSED LAWN PROPOSED SMALL TREE PLANTING PLAN 1"=20'-0" 20' 0 20' 1 PROPOSED LARGE TREE PROPOSED TREE LABLE A1 04/30/2021 IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. ALL ELEVATIONS IN NAVD88 LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION P. Loyola CITY OF ROME RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. JAMES STREET OVERLOOK PLANTING PLAN DESIGNED BY FILE NO. 8/04/2021 ISSUED FOR BID P. Loyola CHECKED BY DATE ADDRESS DRAWING LOCATION L-200 R1 4/30/2021 ISSUED FOR BID P. Loyola 4/30/2021 R0 3/30/2018 ISSUED FOR OWNER APPROVAL DRAWN BY ROME, NY NO. DATE INT. S. Miller REVISION
SAVED:8/5/21 8:44 AM TACK COAT BETWEEN ASPHALT SURFACES 1 1/2" TOP COURSE (NYSDOT TYPE 7) 2 1/2" BINDER COURSE (NYSDOT TYPE 3) * ALL DIMENSIONS ARE IN INCHES * 26" 8" SUBBASE (NYSDOT TYPE 2) FRONT WELDS ARE POLISHED UNTIL THEY DISAPPEAR, FORMING A CONTINUOUS SURFACE 31-1/4" STEEL SLATS ARE FORMED FROM SEAT 17" COMPACTED SUBGRADE 1/4" x 1-1/2" SOLID STEEL BARS HEIGHT 24-3/8" FINISHED END UNIT IS MADE FROM 1/2" x 2" SOLID STEEL BAR 1 ASPHALT PAVEMENT DETAIL - FULL DEPTH L-300 SCALE: NOT TO SCALE CLEARANCE FOR 1/2" ANCHOR BOLTS 72-1/2" 1/2" WIDE COMPRESSIBLE EXPANSION JOINT 1-5/16" TUBULAR STEEL USED FOR ADDITIONAL SUPPORT FILLER WITH JOINT SEALANT AND ELASTOMERIC POOL CAULKING, GRAY. PROVIDE SAMPLE TO OWNER. 3/8" x 1" SOLID STEEL BARS ARE WELDED UNDERNEATH TOOLED CONTROL JOINT, 1.25" DEEP x FOR ADDITIONAL SUPPORT 1/4" WIDE, TOOLED EDGES 1/2" RADIUS SOFT BRISTLE BROOM FINISH FINISHED END UNITS JOIN TO SEAL ALL CONCRETE SURFACES PERPENDICULAR TO SIDE SEATING SECTION WITH FASTENERS WITH A HEAVY DUTY OIL 70-1/2" CENTER-TO-CENTER RESISTANT CONCRETE SEALER CONCRETE PAVEMENT AVAILABLE OPTIONS POWDER COATING LENGTHS #3 GRADE REBAR @ 18" O.C. EACH WAY 10 STANDARD COLORS, 2 OPTIONAL METALLIC COLORS, STANDARD 4' CUSTOM COLORS (INCLUDING THE RAL RANGE) STANDARD 6' (AS SHOWN) INTERMEDIATE & CENTER ARMRESTS STANDARD 8' COMPACTED AGGREGATE 4', 6', & 8' AVAILABLE WITH OPTIONAL SOLID STEEL ARMRESTS 6" SUBBASE MATERIAL, NYSDOT NOTES: TYPE 2 1. DRAWINGS NOT TO SCALE. DO NOT SCALE DRAWINGS. 2. ALL FABRICATED METAL COMPONENTS ARE STEEL SHOTBLASTED, ETCHED, PHOSPHATIZED, PREHEATED, AND ELECTROSTATICALLY POWDER-COATED WITH T.G.I.C. POLYESTER POWDER COATINGS. PRODUCTS ARE FULLY CLEANED AND PRETREATED, PREHEATED AND 6" COATED WHILE HOT TO FILL CREVICES AND BUILD COATING FILM. COATED PARTS ARE THEN FULLY CURED TO COATING MANUFACTURER'S COMPACTED SUBGRADE SPECIFICATIONS. THE THICKNESS OF THE RESULTING FINISH AVERAGES 8-10 MILS (200-250 MICRONS). 3. IT IS NOT RECOMMENDED TO LOCATE ANCHOR BOLTS UNTIL BENCH IS IN PLACE. THIS VICTOR STANLEY, INC. PRODUCT MUST BE PERMANENTLY AFFIXED TO THE GROUND. CONSULT YOUR LOCAL CODES FOR REGULATIONS. 4. ANCHOR BOLTS NOT PROVIDED BY VICTOR STANLEY, INC. 5. FOR HIGH SALT ABUSIVE CLIMATES, HOT-DIP GALVANIZING BEFORE POWDER COATING IS AVAILABLE. HOT-DIP GALVANIZING IS PERFORMED FOR VICTOR STANLEY, INC. BY AN EXPERIENCED QUALIFIED FIRM TO WHICH PRODUCTS ARE SHIPPED FOR GALVANIZING. HOT-DIP GALVANIZING INCLUDES AN AGGRESSIVE PRE-TREATMENT AND IMMERSION IN A TANK OF CHARGED LIQUID ZINC AT OR AROUND 860°F (460°C). THE RESULTING SURFACE IS RESISTANT TO RUST BUT HAS SOME UNEVENNESS RESULTING FROM THE BONDING OF THE ZINC TO THE STEEL SURFACE. AS A RESULT, THE POWDER-COATING SURFACE FINISH OVER THAT GALVANIZED SURFACE MAY EXHIBIT BUMPS, UNEVENNESS, AND MAY NOT BE NOTES AS SMOOTH AS THE STANDARD FINISH; THIS UNEVEN AND INCONSISTENT FINISH IS NORMAL FOR GALVANIZING. CONTACT MANUFACTURER FOR DETAILS. 6. ALL SPECIFICATIONS ARE SUBJECT TO CHANGE. CONTACT MANUFACTURER FOR DETAILS. 7. THIS PRODUCT IS SHIPPED PARITALLY UNASSEMBLED. 1. EXPANSION JOINTS TO OCCUR MAX. 20' O.C. & AT ALL CURBS, WALLS, EDGE OF BLUESTONE PAVERS, & WHERE SHOWN ON PLANS AND OTHER DETAILS. ALL STEEL CONTOURED BENCH 2. SCORE JOINTS TO BE 5' O.C. OR AS SHOWN ON PLANS & OTHER DETAILS OR TO MATCH EXISTING CONDITIONS. SHOWN: STANDARD 6-FOOT LENGTH CONTROL JOINTS SHALL ALSO OCCUR AROUND ENTIRE PERIMETER OF CONCRETE PAVEMENT WHERE NOT DIRECTLY ABUTTING LAWN OR PLANTING BEDS. 3. ALL EDGES TO BE FINISHED WITH A 14" RADIUS. Z:\01_PROJECT _FILES\326-21-994 RAMBOLL ST. JAMES OVERLOOK\03_CAD\326-994_L300 L301 L500 L600 L700_ CLA DETAILS 4-30-2021.DWG 4. THE CONCRETE USED SHALL BE 4000 PSI PORTLAND CEMENT, AIR-ENTRAINED, CLASS "D" CONCRETE WITH AN AIR CONTENT OF 5%, MIN., TO 7%, MAX., AND A SLUMP OF TWO INCHES, MIN., TO THREE INCHES MAX. 3 VICTOR STANLEY BENCH RB-28 OR APPROVED EQUAL L-300 SCALE: NOT TO SCALE 2 6" CONCRETE SIDEWALK L-300 SCALE: NOT TO SCALE 04/30/2021 IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION P. Loyola CITY OF ROME RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. JAMES STREET OVERLOOK MATERIAL & AMENITIES L-300 DESIGNED BY FILE NO. 8/04/2021 ISSUED FOR BID P. Loyola CHECKED BY DATE DETAILS ADDRESS DRAWING LOCATION R1 4/30/2021 ISSUED FOR BID P. Loyola 4/30/2021 R0 3/30/2018 ISSUED FOR OWNER APPROVAL DRAWN BY ROME, NY NO. DATE INT. S. Miller REVISION
SAVED:8/5/21 8:42 AM PROPOSED TREE PLANTS TO BE INSTALLED AT SPACING IDENTIFIED ON PLANS 2" SHREDDED HARDWOOD MULCH NOTE: CONTRACTOR TO INSTALLED PRIOR TO PLANTING BOTTOM OF TRUNK FLARE SHALL REMOVE ALL BURLAP & ROPES FROM TOP HALF COORDINATE WITH OF ROOTBALL. REMOVE WIRE BASKET ENTIRELY, BE SET 2" ABOVE FINISHED GRADE LANDSCAPE ARCHITECT IF PRESENT. REMOVE NON-BIODEGRADABLE EXISTING TREES TO REMAIN BURLAP ENTIRELY, IF PRESENT. FOLLOWING INITIAL 6" DEEP BED OF PLANTING SUBSOIL TO BE STAK-OUT OF PLAYGARDEN FORM 6" HIGH X 12" WIDE SAUCER SOIL MIXTURE BROKEN WITH OF TOPSOIL AT EDGE OF PIT A PICK AXE PLANTING SOIL MIX, PER SPECS CL 12" NOTE: LOCATE FENCE AS 1. GROUND COVER SHOULD BE POT OR CONTAINER GROWN. INDICATED ON PLAN VARIES COVER TOPSOIL WITH MULCH, 3" SETTLED 5 GROUNDCOVER PLANTING DEPTH, 8' DIAMETER AREA PAID UNDER 4.16 BA. L-301 SCALE: NOT TO SCALE 4' ORANGE PLASTIC SNOW FENCE EXCAVATE SIDES OF PITS AT AN ANGLE & BREAK UNDISTURBED SOIL. PLACE ROOT BALL ON UNEXCAVATED UP SURFACE OF PIT TO FORM ROUGH FACE 2X ROOTBALL OR TAMPED SOIL TAMP SOIL AROUND ROOTBALL FIRMLY DIAMETER WITH FOOT PRESSURE SO THAT ROOTBALL DOES NOT SHIFT. STEEL FENCE POST AT 6' O.C. 3X ROOTBALL DIAMETER 8" MIN. 3" DIAMETER X 8' CEDAR OR PRESSURE TREATED STAKE 2 GARDEN HOSE FRICTION GUARD DECIDUOUS TREE PLANTING OPPOSITE. 3 L-301 SCALE: NOT TO SCALE 12 GAUGE GALVANIZED WIRE 12 GAUGE GALVANIZED WIRE- 3 TREE PROTECTION 1 EQUALLY SPACED W/ SURVEYORS L-301 SCALE: NOT TO SCALE FLAGGING TAPE. GROUND LINE TO BE THE SAME AS AT THE NURSERY. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE 4" HARDWOOD MULCH - BURLAP AND WIRE CAGE FROM TOP EXTEND OVER BERM 1/3 OF ROOTBALL. REMOVE ALL SYNTHETIC MATERIALS. CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM FLOOD WITH WATER TWICE IN FIRST BACKFILL WITH PLANTING 24HRS. REMOVE ALL TWINE & STRAPS. GROUND LINE TO BE SAME SOIL MIXTURE IN 9" LAYERS. CUT AND REMOVE BURLAP AND AS AT THE NURSERY WATER EACH LAYER UNTIL 2" x 4" x 3'- 0" CEDAR OR REWIRE CAGE FROM TOP 13 OF SETTLED. DO NOT TAMP. PRESSURE TREATED ANCHOR. ROOTBALL. REMOVE ALL 3" SHREDDED HARDWOOD SYNTHETIC MATERIALS. MULCH- EXTEND OVER BERM BREAK SUBSOIL WITH A PICK " -6 MOUND TOPSOIL HYDROSEED AND MULCH IMPORTED TOPSOIL 2' CONSTRUCT EARTH SAUCER 1/2 TO 1 INCH WITH 4" HIGH BERM HIGHER THAN ADJACENT GRADE 2X ROOT BALL DIA. FOR SETTLEMENT 4" NOTES: BREAK SUB-SOIL 1. SPRAY WITH ANTIDESSICANT IN ACCORDANCE WITH MFG.'S RECOMMENDATIONS. WITH A PICK BACKFILL WITH PLANTING SOIL ADJUST SUBGRADE TO ALLOW FOR 2. TREES LESS THAN 3" CALIPER SHALL BE STAKED. MIXTURE IN 9" LAYERS. WATER EACH TOPSOIL THICKNESS 3. TREES GREATER THAN 3" CALIPER AND UP SHALL BE GUYED AND ANCHORED. LAYER UNTIL SETTLED. DO NOT 4. IF PROVIDED, STAKES SHALL BE REMOVED AT THE END OF THE FIRST GROWING SEASON AFTER PLANTING. TAMP. 6" MIN. 4 LANDSCAPE RESTORATION Z:\01_PROJECT _FILES\326-21-994 RAMBOLL ST. JAMES OVERLOOK\03_CAD\326-994_L300 L301 L500 L600 L700_ CLA DETAILS 4-30-2021.DWG L-301 SCALE: NOT TO SCALE EVERGREEN TREE PLANTING NOTE: 6 SPRAY WITH ANTIDESSICANT IN ACCORDANCE WITH MFG.'S RECOMMENDATIONS L-301 SCALE: NOT TO SCALE IF FOLIAGE IS PRESENT. 2 SHRUB PLANTING L-301 SCALE: NOT TO SCALE LANDSCAPE NOTES: 1. PLANTING BALL - ON B&B MATERIAL, BURLAP AND WIRE BASKET OR OTHER CONTAINER SHALL BE REMOVED FROM THE UPPER HALF OF THE ROOT BALL AND DISPOSED OF. 2. HEIGHT OF THE PLANTING SAUCER SHALL BE 3''. 3. MULCH SHALL BE A MAXIMUM OF 3'' DEEP AND TAPERED DOWN TO LEAVE THE ROOT FLARE EXPOSED. WHEN PLANTING ON SLOPES, DOWNHILL SIDE MUST BE STABILIZED APPROPRIATELY OR SEEDING ON DOWNHILL SIDE MAY BE SPECIFIED. 4. MATERIALS FOR PROTECTION OF PLANTS SHALL BE A COMMERCIALLY AVAILABLE PRODUCT OR SYSTEM FOR SUPPORTING OF TREES. 5. ALL TAGS, LABELS, ETC. SHALL BE REMOVED FROM THE PLANTS. 6. THE ROOT FLARE SHALL BE VISIBLE AND LEVEL WITH SURROUNDING SOIL. IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION P. Loyola CITY OF ROME RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. JAMES STREET OVERLOOK PLANTING L-301 DESIGNED BY FILE NO. 8/04/2021 ISSUED FOR BID P. Loyola CHECKED BY DATE DETAILS ADDRESS DRAWING LOCATION 4/30/2021 ISSUED FOR BID P. Loyola 4/30/2021 3/30/2018 ISSUED FOR OWNER APPROVAL DRAWN BY ROME, NY NO. DATE INT. S. Miller REVISION
SAVED:5/11/21 10:10 AM PT : 3+ E ELIN AS 29. NB OAD IO 98 CT R U PC: 2+67.74 TR CK CO NS MU LEGEND 3+00 425 415 EXISTING MAJOR CONTOUR 0 43 2+00 EXISTING MINOR CONTOUR AIL L TR 420 PROPOSED MAJOR CONTOUR 1+00 C ANA X IS TING PROPOSED MINOR CONTOUR ASELINE E CTION B CONSTRU 0+00 E ELECTRIC LINE 25 TIE- '-0" W WATER SUPPLY LINE BAC PI STA:2+99.11 K NORTHING: 1168862.41 LIGHT POLE ET EASTING: 1118201.86 RE 1 S- ST 30 1 NORMAL POOL ES W.S. EL. 418.5 NZ 19 SHEET PILE TIE-BACK M ANCHOR WALL (BURIED- SEE JA SECTION 1 ON SHEET S-301) 5 41 PROPOSED R. CULVERT 0 43 =1 OUTLET 07 '- 0" T/ CONC. CAP EL. 428.0' (TYP.) 440 NZ 19 SHEET PILE BULKHEAD AB BRI 5 UT DG 44 WITH REINFORCED CONCRETE M E L BULKHEAD CAP (SEE SECTION 1 EN T NG WAL ON SHEET S-301) C . WI CON "± '-0 435 152 FLOATING DOCK ASSEMBLY = TH (BY OTHERS) NG LE \\RAMUNYFILE01.RAMBOLL.RAMBOLL-GROUP.GLOBAL.NETWORK\PROJECTS\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211-001.DWG C AR 430 BRIDGE ABUTMENT REMAINS NORTH PARTIAL PLAN - JAMES STREET OVERLOOK BULKHEAD 1"=20'-0" 20' 0 20' 440 440 152'-0"± EXIST. GRADE EPOXY COATED RAILING (SEE DETAIL ON SHEET C-504) 430 430 T/ WALL EL. 428.0' FINAL GRADE 420 420 ELEVATION ELEVATION REINF. CONC. CAP CONTROL JOINTS NZ 19 SHEET PILE (SEE DETAIL ON (SPA. @ 30'-0" TYP.) BULKHEAD (30' LONG) SHEET S-302) 410 410 400 400 B/ SHEET PILE WALL EL. 397.0' 390 390 PROFILE - JAMES STREET OVERLOOK BULKHEAD 1"=20'-0" HORIZ. 20' 0 20' 1"=10'-0" VERT. 10' 0 10' IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME R. BOWERS DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE JAMES STREET OVERLOOK DDW CHECKED BY 280.67211 DATE BULKHEAD INSTALLATION S-101 ADDRESS DRAWING LOCATION 1 5/11/2021 ISSUED FOR BID RRB JMQ 5/11/2021 DRAWN BY ROME, NY JAMES STREET OVERLOOK 0 3/30/2018 ISSUED FOR OWNER APPROVAL RRB NO. INT. MK DATE REVISION
SAVED:5/10/21 5:22 PM 36'-0"± LIMITS OF EXCAVATION 25'-0" 25'-0" TIEBACK (TYP.) TIE-BACK (TYP.) 3/4" Ø GALVANIZED A BOLT INSTALLED IN B S-301 "OVERCLAW" SIDE S-301 ORIGINAL GROUND 20'-0" WALKWAY 3'-0" SURFACE ELEVATION (TYP.) CONCRETE CAP. (FOR TURNBUCKLE REINF. DETAILS SEE (TYP.) BULKHEAD DETAIL ON SHEET S-302) REPLACE WITH 1'-0" SUITABLE EXCAVATED MATERIAL 2% SLOPE C15x33.9 T.O. CONC. BULKHEAD CAP 9'-2 1/4" EL. 428.0' (VARIES-SEE PLAN VIEWS) (TYP.) T.O. SHEET PILE EL. 427.0' (VARIES) 5'-3"± SELECT FILL (VARIES) 3'-0" SPLICE PLATE 6'-0" TYPE D OR F NZ 19 SHEET (TYP.) 1"Ø THREADED NZ 19 SHEET PILE BULKHEAD BAR (TYP.) PILE ANCHOR TIE ROD EL. 424.0' WALL 8'-0" LIMIT OF ORIGINAL GROUND 30'-0" EXCAVATION SURFACE ELEVATION NZ 19 SHEET PILE LIMIT OF C15x33.9 8'-0" LONG ANCHOR EXCAVATION N.W.L. EL. 418.5' (TYP.) WALL (TYP.) 1'-0" NZ 19 SHEET PILE 30'-0" LONG (HARBOR SIDE) BULKHEAD (TYP.) (SEE SHEET PILE NOTES) PARTIAL PLAN - TYPICAL BULKHEAD/ANCHOR WALL CONNECTION 1/4"=1'-0" 4' 2' 0 2' 4' 3/8"x12"x12" STEEL PLATE 1'-0" "B" - STEEL PIPE B.O. SHEET PILE WALL SLEEVE EL. 397.0 (VARIES-DRIVE PILES FULL LENGTH) 3/4" Ø GALV. BOLT INSTALLED IN "OVERCLAW" SIDE (TYP.) \\RAMUNYFILE01.RAMBOLL.RAMBOLL-GROUP.GLOBAL.NETWORK\PROJECTS\ROME-C.280\67211.WATERFRONT-VILL\DOCS\DWG\SHEETS\JAMES ST OVERLOOK 2021\67211-006.DWG BULKHEAD MOUNTING PLATE 1 TYPICAL BULKHEAD/ANCHOR WALL SECTION S-101 1/4"=1'-0" 4' 2' 0 2' 4' NZ 19 SHEET WATER SIDE PILE BULKHEAD C15x33.9 WALL (TYP.) 1'-0" SQ. "A" "C" - LINK CONCRETE CAP. (FOR 3'-0" 8'-0"± DIA. SEAL SIZE REINF. DETAILS SEE 1"Ø 3 BULKHEAD DETAIL ON THREADED 16 SHEET S-302) BAR (TYP.) ORIGINAL GROUND FLOATING DOCK 1'-0" 3/8"x12"x12" SURFACE ELEVATION ASSEMBLY (BY STEEL PLATE OTHERS) T.O. CONC. BULKHEAD CAP 8" EL. 421.0' (SEE SHEET S-105) T.O. SHEET PILE EL. 420.0' 1"Ø C15x33.9 "B" - STEEL PIPE 2'-0" N.W.L. EL. 418.5' (TYP.) NZ 19 SHEET THREADED WALL SLEEVE NZ 19 SHEET PILE ANCHOR BAR (TYP.) PILE BULKHEAD WALL "B" DIA. CUT SQUARE OPNG. IN SHEET PILE FOR PIPE SLEEVE NZ 19 SHEET PILE 25'-0" LONG (HARBOR SIDE) BULKHEAD (TYP.) BULKHEAD SMALL DIA. (SEE SHEET PILE NOTES) C PIPE PENETRATION DETAIL - 1/2"=1'-0" 2' 1' 0 1' 2' 25'-0" A BULKHEAD DETAIL B ANCHOR WALL DETAIL S-301 1/2"=1'-0" 2' 1' 0 1' 2' S-301 1/2"=1'-0" 2' 1' 0 1' 2' LINK SEAL SIZING TABLE PIPE SIZE ACTUAL SIZE PIPE WALL SLEEVE LINK SEAL LINKS PER (NOM.) - "A" (INCHES) (NOM.) - "B" SIZE - "C" SEAL SHEET PILE NOTES: 1 1.315 2.5 LS-200- 5 1. WALL HEIGHT WILL VARY ALONG PLAN ALIGNMENT. MAXIMUM SHEET PILE WALL HEIGHT 1 1/2 1.900 3 LS-200- 7 ABOVE MUDLINE SHALL NOT EXCEED 12.0 FEET. 2 2.375 3.5 LS-200- 8 FUTURE DREDGING ADJACENT TO BULKHEAD SHALL BE LIMITED TO THAT DEPTH WHICH 3 3.500 6 LS-360- 7 B.O. SHEET PILE RESULTS IN MAXIMUM WALL HEIGHT STATED 4 4.500 6 LS-300- 10 EL. 395.0 (VARIES-DRIVE PILES FULL LENGTH) ABOVE. 6 6.625 10 LS-475- 10 2. SHEET PILES SHALL BE DRIVEN FULL LENGTH TO 8 8.625 12 LS-475- 12 PLAN TOP OF PILE ELEVATION, REGARDLESS OF 10 10.750 14 LS-425- 10 2 TYPICAL BULKHEAD CANTILEVER WALL SECTION FINAL SHEET PILE TIP ELEVATION. 12 12.750 16 LS-425- 12 S-105 1/4"=1'-0" 4' 2' 0 2' 4' 3. SHOP COAT STEEL SHEETS ON CANAL SIDE WITH COAL TAR EPOXY FROM EL. 420.5' TO EL. 416.5'. 4. PLACE NO MORE THAN 4 FEET OF BACKFILL BEHIND SHEET PILE WALL UNTIL ANCHOR IT IS A VIOLATION OF LAW FOR ANY PERSON, THIS DRAWING WAS PREPARED AT THE SCALE INDICATED. INACCURACIES IN THE STATED SCALE MAY BE INTRODUCED CONNECTIONS ARE COMPLETE. UNLESS ACTING UNDER THE DIRECTION OF A WHEN DRAWINGS ARE REPRODUCED BY ANY MEANS. USE THE GRAPHIC SCALE BAR TO DETERMINE THE ACTUAL SIZE. LICENSED ENGINEER, TO ALTER THIS DOCUMENT. DRAWING IS NOT SCALABLE IF NO SCALE BAR IS PRESENT. CLIENT DESIGNER / PROFESSIONAL ENGINEER RESPONSIBLE PROJECT SHEET DESCRIPTION CITY OF ROME R. BOWERS DESIGNED BY FILE NO. RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. ROME WATERFRONT VILLAGE BULKHEAD INSTALLATION DDW CHECKED BY 280.67211 DATE SECTIONS & DETAILS S-301 ADDRESS DRAWING LOCATION 1 5/11/2021 ISSUED FOR BID RRB JMQ 5/11/2021 DRAWN BY ROME, NY JAMES STREET OVERLOOK 0 3/30/2018 ISSUED FOR OWNER APPROVAL RRB NO. INT. MK DATE REVISION