01                           AUTOMATED METRO

                             A MASS TRANSIT SOLUTION
                             TAILORED TO THE REQUIREMENTS
                             OF SMART CITIES

                             Over half of humanity now lives in towns         automated systems, continues to innovate
                             and cities. The urban population is growing      and remains on the cutting edge of these
                             very quickly (50% in 2020; 70% by 2050)*.        technologies. The group achieves this by
                             Cities will consequently have to deal with       working closely with leading industries to

  RATP Group                 exponential mobility needs.                      create increasingly high-performance and
                                                                              safer systems.
   automated                 The mass transit sector, the RATP Group
                             core business, is accordingly in full expan-     RATP Group is the locus for extensive
 metro systems               sion and remains the backbone of every           experience in fully automated metro sys-
    key figures              effective transport system in today's            tems acknowledged worldwide, concentra-
                                                                              ted in the operation of Paris Line 14 and
                             growing mega-cities.
         1.8 billion                                                          OrlyVal and the successful automation of
           passengers per    Automated metro systems epitomise                Paris Line 1 without major interruption
          year, soon to be   the smart solution for mass transit. They        to operations. RATP Group is also moder-
         supplemented by     address a number of needs: large transport       nising and extending Paris Line 14 and
   passengers on networks    capacity, safety, adaptability and regularity.   automating Line 4. Thanks to the success
      in Doha and Riyadh
                             Automated metro systems provide passen-          of its new lines and line conversions, RATP
         ……………………
                             gers with a high level of service and cut        Group is one of the few operators in the
                     22      down on wait times on platforms (thanks          world to field the engineering, operation
      fully-automated and    to higher frequencies and greater commer-        and maintenance skills required for this
     semi-automated lines
                             cial speeds than in other metro system),         kind of project. Automation projects for
         ……………………
                             while maintaining high regularity. They          current lines are extremely complex, in
             250 km          are a reliable means of transportation that      particular given the need to maintain ser-
        of automated and     requires cutting-edge expertise.                 vice during works.
    semi-automated lines
    currently in operation
         ……………………            The global market for automated metro            Automated metro systems are a major
                             systems has strong growth potential (multi-      asset in developing Group presence in
             460 km          plying by a factor of three by 2025) for both    France (notably in the Grand Paris Express
     of lines by 2024 with
                             new lines and converting existing ones both      project) and internationally.
    both Paris and Algiers
     networks extensions     in France (the Grand Paris Express project
                                                                              *Arthur D.Little, The future of urban mobility 2.0, 2014
      as well as Doha and    includes the creation of 200 km of driverless
     Riyad new networks.     lines) and internationally.

                             Thanks to its integrated know-how in engi-
                             neering, operations and maintenance,
                             RATP Group, the fifth largest public trans-
                             port group in the world and a pioneer in

                                                                                                                   RATP GROUP — 3
RATP Group, the world leader in automated metro systems
02                                RATP Group, an historic
                                  leader in automating
                                  metro systems

                                  A SERIES OF WORLD FIRSTS:
                                           70 years’ experience automating metro
                                           and regional train lines

 1952                1979              1991                  1998                2010                   2012                  2018

                                                                                                                               ra
 Experiment          90% of Paris      Operation of          Paris Line 14       Operation of           Conversion of         The RER A regio-
 with automated      metro lines       OrlyVal, automa-      enters service      São Paulo Line 4*,     Line 1 – the oldest   nal train service
 driving             have automated    ted metro line        as the first        the first automa-      and most heavily      is the first high-   100% automated and semi-automated metro networks
                     driving           connecting with
                                       the airport
                                                             high-capacity
                                                             automated metro
                                                                                 ted line in Latin
                                                                                 America
                                                                                                        used metro line
                                                                                                        in Paris – without
                                                                                                                              capacity rail line
                                                                                                                              to be equipped
                                                                                                                                                   operated by RATP Group
                                                             line in the world                          significant traffic   with automated
                                                                                * RATP Group           interruption          steering.
                                                                                                                                                                                      PARIS, France
                                                                                 ceased providing
                                                                                 technical
                                                                                          assistance
                                                                                                                                                                         1.5 billion passengers yearly
                                                                                 for the Sào São
                                                                                 Paulo Line 4 at the                                                                         3 fully-automated lines:
                                                                                 end of 2014                                                                  Line 1 – 181 million passengers per year                                         SEOUL, South Korea
                                                                                                                                                              Line 14 – 83 million passengers per year
                                                                                                                                                               OrlyVal – 3 million passengers per year                                 154 million passengers yearly
                                                                                                                                                                 11 semi-automated lines with driver                               1 semi-automated line with driver

       Four levels of automation

 CONTROLLED                       SEMI-AUTOMATED                       AUTOMATED DRIVING                      FULLY-AUTOMATED
 MANUAL DRIVING                   CONTROL WITH DRIVER                  WITH ON-BOARD STAFF                    DRIVING
 The driver manages all aspects   The train is operated using          An operative (not a driver) is         No staff aboard.
 of driving the train manually.   automated controls. The driver is    on board to open and close             The control system manages
 G0A1                             in charge of opening and closing     doors and handle incidents.            all operations, supervised
                                                                                                                                                                                                                                         MUMBAI, India
                                  doors, authorises the start-up of    G0A3                                   remotely by a control centre.
                                  the train, monitors the tracks and                                          G0A4
                                                                                                                                                                                   ALGIERS, Algeria                                      142 million passengers yearly
                                  handles unexpected situations.
                                                                                                                                                                                                                                         1 semi-automated line with driver
                                  G0A2
                                                                                                                                                                        30 million passengers yearly
                                                                                                                                                                   1 semi-automated line with driver                           DOHA, Qatar
                                                                                                                                                                                                                               3 fully-automated lines

                                                                                                                                                                                                     RIYADH, Saudi Arabia

                                                                                                                                                                                                     2 fully-automated lines

 4 — RATP GROUP                                                                                                                                                                                                                                                        GROUPE RATP — 5
RATP Group, the world leader in automated metro systems
according to need. Over 98% of passengers       > ORGANISATION:
                                                                                                                                          questioned in a 2016 survey stated that         Management of drivers’ careers after auto-

                                                                                                                      Key                 they were satisfied with the service provi-
                                                                                                                                          ded on Line 14.
                                                                                                                                                                                          mation
                                                                                                                                                                                          During the automation process for Line 1,
                                                                                                                   figures                                                                continuous labour dialogue was ensured
                                                                                                               .……………………
                                                                                                                                          Furthermore, Line 14 has been Quality-          based on volunteering and respect for dri-
                                                                                                               Over 98%                   Safety-Environment (QSE) certified since        vers’ choices. A majority agreement was sig-
                                                                                                                    of passengers
                                                                                                                                          2011. The line also won EFQM R4E (Reco-         ned with unions enabling Line 1 drivers to
                                                                                                                    satisfied with
                                                                                                                                          gnized for Excellence) certification in 2017,   join another line to continue in their current
                                                                                                                       the service
                                                                                                                      provided on         an international recognition of the excel-      careers or remain on the line in one of the
                                                                                                                           Line 14        lence of operation, commitment by opera-        new, more qualified professions arising from
                                                                                                                               (Source:   ting teams on a day-to-day basis and of the     the automation process.
                                                                                                                  perception survey for
                                                                                                               Ile-de-France-Mobilités    maturity of its management system.
                                                                                                                              in 2016).
                                                                                                                                                                                            São Paulo Line 4 in Brazil,
                                                                                                                                            Paris metro Line 1, the first                 the first automated metro line
                                                                                                                                          hundred-year-old, high-capacity                 in Latin America (2010)
                                                                                                                                          metro line to be automated
                                                                                                                                          without operation interruption                  The state of São Paulo awarded the
                                                                                                                                          (2012)                                          construction and operation contract in two
                                                                                                                                                                                          phases as part of a public-private partner-
                                                                                                                                          A unique project anywhere in the world,         ship (PPP) in 2010 for the first driverless
                                                                                                                                          Line 1 was fully automated in 2012 without      metro line in Latin America to the ViaQua-
                                                                                                                                          major service interruption. The line, which     tro consortium of which RATP Group was
                                                                                                                                          carries over 180 million passengers yearly,     a member. The Group contributed its full
                  A RATP GROUP, A PIONEER                                                                                                 has subsequently been operating in fully        expertise to implementing and operating
                                                                                                                                          automated mode without drivers (and with        the line’s automated systems.
                 IN AUTOMATING METRO LINES                                                                                                platform screen door).
                                                                                                                                                                                          * RATP Group ceased providing technical assistance for
                                                                                                                                          The conversion of a hundred-year-old
                 Four major firsts in commissioning
                                                                                                                                                                                           the São Paulo Line 4 at the end of 2014.
                                                                                                                                          metro line into a fully automated one - wit-
                                                                                                                                          hout major traffic interruption throughout
                 fully automated lines                                                                                                    the project - was a significant challenge on
                                                                                                                                          multiple levels:

                   OrlyVal, first airport connection              Paris metro Line 14, the first                                           > TECHNICAL:
                 in France via automated metro                  high-capacity automated metro                                             Integration of automation systems on a line
                 (1991)                                         line in the world (1998)                                                  in service line routes are normally defined
                                                                                                                                          according to the constraints of automation
                 Flexibility is the key concept behind this     Twenty years ago in 1998, the Paris metro                                 systems. For Line 1, RATP Group adapted
                 line, which carries three million passen-      Line 14 was the first high-capacity, fully-                               automation system operation to the physi-
                 gers per year, connecting Paris and Orly       automated line to enter service.                                          cal constraints of a line already in use
                 international airport. The line adapts to
                 the rest of the rail network by scheduling     Line 14 now carries 83 million passengers                                 > SAFETY:
                 train departures in line with train arrivals   per year with a wait time of 85 seconds                                   Combined phase of operation with
                 from Paris.                                    in peak times, an unprecedented per-                                      simultaneous running of trains with and
                                                                formance anywhere in the world for a                                      without drivers
                 Multiple modernisation programs were           broad-gauge automated line. Line 14 has
                 implemented in 2017 on the OrlyVal ser-        transported over a billion passengers since
                 vice. Since then, the number of passen-        its commissioning in 1998.
                 gers on the line has risen by 21%. The
                 OrlyVal service was also certified EFQM        An innovative, high-performance system
                 C2E (Committed to Excellence) in 2017          The quality of service made available to
                 and gained ISO 9001, version 2015 cer-         passengers on Line 14 is based on its train
                 tification in 2018 for its high level of       automation and operation system. The sys-
                 service and quality of management.             tem can inject or remove trains in real time

6 — RATP GROUP                                                                                                                                                                                                                RATP GROUP — 7
RATP Group, the world leader in automated metro systems
Examples of semi-automated
                     lines across the world
                     In addition to its ability to operate fully automated, very high capacity lines (a rele-
                     vant solution for very heavy traffic services such as Lines 1, 4 and 14 on the Paris
                     network), RATP Group has developed unparalleled expertise in driving automation
                     for large-scale projects such as the deployment of the OCTYS driving system on
                     several lines on the Paris metro network. Lines 3, 5 and 13 have been modernised
                     accordingly and lines 6, 9 and 11 are currently being equipped. The system shortens
                     the interval between trains with complete safety.

                             OCTYS
                       Open Control of Train Interchangeable Integrated System developed by RATP
                       Group, is a key component of the metro modernisation program (semi-automa-
                       ted with driver) that uses solutions developed by each industrial group indiffe-
                       rently, thereby ensuring system interoperability. It guarantees enhanced safety
                                                                                                                SEOUL, SOUTH KOREA
                       thanks to continuous speed control and reduces the interval between two trains           • Only line in Seoul that is privately operated
                       (90 seconds), thereby enhancing the transport offering.                                  • 154 million passengers yearly
                                                                                                                • 3-5 minutes’ interval between trains
                                                                                                                • 100% punctuality rate
                                                                                                                • 27 km
    On an international scale RATP Group currently                                                              • 25 stations
    operates three semi-automated lines:                                                                        • Commissioned and operating since June 2009

                                                                                                                                                                  ALGIERS, ALGERIA
                                                                                                                                                                  • 30 million passengers yearly
                                                                                                                                                                  • 98% customer satisfaction rate
                                                                                                                                                                  • 3-4 minutes’ interval between trains
                                                                                                                                                                  • 12 km – the four current line extensions
                                                                                                                                                                  will extend the network across 40 km by 2020.
                                                                                                                                                                  • 10 stations
                                                                                                                                                                  • Commissioned and operating since November 2011

                                                   MUMBAI, INDIA
                                                   • 1st line in India to have a foreign operator
                                                   • 1st metro in the city
                                                   • 142 million passengers yearly
                                                   • 99% punctuality rate
                                                   • 3 minutes’ interval between trains at peak times
                                                   • 12 km line
                                                   • 12 stations
                                                   • Commissioned and operating since June 2014

8 — RATP GROUP                                                                                                                                                                                       RATP GROUP — 9
RATP Group, the world leader in automated metro systems
GRAND PARIS EXPRESS:
                                                                                                                            A MAJOR STAKE FOR RATP GROUP
                                                                                                                            The completely automated and extended lines 4 and 14 will
                                                                                                                            form the backbone of tomorrow’s automated metro network
                                                                                                                            for the Paris region. With its 70 years’ experience in automating
                                                                                                                            metro systems, RATP Group is strongly committed to taking part
                                                                                                                            in bids for the future lines 15,16, 17 and 18.

                              B RATP GROUP CONSOLIDATES ITS
                             LEADING POSITION IN FRANCE AND
                             THE MIDDLE EAST
                             RATP Group continues to make its               Line 14: the backbone of the future
                             know-how available to cities to address        Grand Paris Express network.
                             modernisation issues for current lines         Line 14 will be the backbone of the future
                             and create automated metro systems             Grand Paris Express network and will
                             meeting the most stringent internatio-         continue to set the standard in continuous
                             nal standards.                                 modernisation. Extensions to the north
                                                                            and south will triple its length without
                                                                            undermining performance (one train every
                                  In Paris, FRANCE                          85 seconds now and 80 seconds by 2024).
                                                                            New eight-carriage trains will be phased in
                               Renewal of automation and                    to replace the current six-carriage trains to                                   In Doha, QATAR
                             train operation systems for                    absorb the million passengers daily using
                             metro Line 14                                  the line.                                                                On 7 December 2017 Qatar Rail, the natio-            The Green line will connect Al Mansoura
                                                                                                                                                     nal public transport operator in Qatar,            to the east with Al Riffa to the west and will
                             As the first step in the automated metro        Comprehensive automation                                                awarded the operating and maintenance              feature 11 stations.
                             service for Grand Paris Express, the Line 14   of Line 4                                                                contract for the automated metro in Qatar
                             extension will connect Saint-Denis Pleyel                                                                               capital Doha (population of over 2 million)           The Gold line will provide access to Kha-
                             station (after a preliminary section enters    With approx. 156 million passengers yearly,                              to RKH Qitarat. This is a joint venture            lifa International Stadium, which was com-
                             service for Mairie de Saint Ouen in the        Line 4 is the second most heavily used on                                established by the consortium of RATP              pleted in 2016.

         Line 14             summer of 2020) northwards with Orly air-
                             port south of Paris by 2024. The program
                                                                            the Paris network after Line 1. Automating
                                                                            Line 4 will ensure very clear improvements
                                                                                                                                                     Dev (RATP Group subsidiary) with Keolis
                                                                                                                                                     (49%) and the Qatar company Hamad                  The first part of the network, which will
         by 2024             also includes modernisation of the opera-      in passenger service, real-time adaptability                             Group (51%).                                       for the most part be underground, should
                             ting system and renewal of rolling stock.      of the transport offering and regularity.                                                                                   be functional by the end of 2018; 640 000
       21 stations                                                                                                                                   As the leading public transport network on         daily passengers are expected by 2021.
        with 27 km of line
        ……………………             27 km in length, Line 14 will feature 21       Comprehensive automation of Line 4 will                                  rails in Qatar, the project is a priority vector
          1 million          stations and will be equipped with a new       be completed by 2022 without major ser-                                  for development and growth for the Qatar
       passengers per day    train control system called CBTC (Com-         vice interruption. Line 4 will then become                               government.                                                  In Riyadh,
        ……………………             munication Based Train Control System),        the second high-capacity line in the world                                                                                          SAUDI ARABIA
          72 trains          an automated system that operates using        to be automated without major operation                                  The Doha metro will be fully automated
      with eight carriages   continuous communication between the           interruption.                                                            and driverless along its 75 km of lines and        On September 18, 2018, RATP Group, via
        ……………………
                             vehicle and operatives steering traffic, to                                                                             37 stations. It will operate using CBTC            CApital Metro COmpany (CAMCO) – the
       80 seconds            ensure fully automated operation.              The line is also being extended at the same                              (Communications Based Train Control)               joint venture between RATP Dev and
           between trains
        during peak times                                                   time towards Bagneux, south of Paris                                     technology and will initially comprise three       SAPTCO (Saudi Public Transport Com-
                             Commissioning is scheduled to begin in         (1.7 km).                                                                lines:                                             pany) –, has been awarded the flagship
                             2024. Patronage is estimated at a million                                                                                                                                  Riyadh Metro Operations & Maintenance
                             passengers per day by then, making Line 14                                                                                The Red line will connect the interna-           (O&M) contract for Lines 1 and 2 by
                             the most heavily used on the Paris network.                                                                             tional airport to Lusail in just 36 minutes        Arriyadh Development Authority (ADA).
                                                                                                                                                     and will be interconnected with the metro
                                                                                                                                                     network.

10 — RATP GROUP                                                                                                                                                                                                                      RATP GROUP — 11
RATP Group, the world leader in automated metro systems
The first metro line - Line 1 or the Blue line
                          on the Al-Olaya - Al-Batha corridor - covers
                          39 km and serves 25 stations. The second
                          line - Line 2 or the Red line - runs along
                          King Abdullah Road over a distance of 25
                          km and serves 15 stations.

                          The O&M contract has been devised based
                          on worldwide best practices, and against
                                                                           the complete transit system, including
                                                                           Trains, Signalling, Telecommunication,
                                                                           Power Supply, Passenger Information,
                                                                           among others.

                                                                           The Riyadh Metro is part of the King Abdu-
                                                                           laziz Project for Riyadh Public Transport
                                                                           (KAPRTP), which consists of an integra-
                                                                           ted metro and bus network, to meet the
                                                                                                                         03   Metro line modernisation and
                                                                                                                              automation: unique know-how
                                                                                                                              found only in RATP Group
                          global KPIs in urban metro operation             future demands of the Riyadh community.
                          and maintenance, namely in the areas             The metro network is the backbone of the
                          of Passenger Services, Facilities Manage-        public transit system of the Saudi capital,        The main challenge facing transport operators and/or authorities wishing to
                          ment, Transit System, Health & Safetyand         with six lines covering a total length of          enhance the performance of their metro systems lies in the ability to integrate
                          security, as well as Local Content.              176 km and 85 metro stations; the metro            all new automation systems (developed by rail industries) and ensuring continued
                                                                           network will cover most of the densely             operation over time.
                          The joint-venture between RATP Dev, sub-         populated areas, public facilities, as well
                          sidiary of RATP Group, and SAPTCO will           as the educational, commercial and medi-           RATP Group can face these challenges and has already ensured permanent per-
                          provide a comprehensive range of O&M             cal institutions. It will also connect King        formance improvement in the lines it operates thanks to its expertise covering
                          services, including Metro Operation,             Khalid International Airport and King              operation, maintenance and engineering.
                          Security, Passenger Assistance, Facility         Abdullah Financial District, in addition to
                          Management, Maintenance of Buildings             main universities, the downtown area and
                          (stations, Park & Rides, depots etc..) and       the Public Transport Centre.                        Support throughout the auto-                 Integrating systems designed by
                                                                                                                              mation project sequence                      different industrial groups

                                                                                                                              RATP Group supports transport authori-       RATP Group works closely and at all times

   RATP Group makes its innovative abilities                                                                                  ties throughout the automation project,
                                                                                                                              from designing networks, construction,
                                                                                                                                                                           with leading industrial groups to imple-
                                                                                                                                                                           ment systems to achieve ever-higher per-
   and expertise available to cities to offer                                                                                 commissioning and right up to operation,     formance and safety levels. Thanks to this

   tailored solutions:                                                                                                        maintenance and managing services in
                                                                                                                              public areas.
                                                                                                                                                                           experience, RATP Group works with most
                                                                                                                                                                           of the industrial operators on the market.
     ommissioning automated lines
    C                                                           utomation of current lines
                                                               A
    (Line 14 in Paris, three lines in Doha by                  (Lines 1 and 4 in Paris by 2022)                                Integrated maintenance for                   Guaranteeing rail safety
    2021, two lines in Riyadh)                                                                                                new and increasingly complex
                                                                odernisation of current lines (Paris
                                                               M                                                              systems                                      Thanks to experience developed through
    Extension and modernisation of                            Lines 3, 5 and 13 - already completed-                                                                      major projects in France and internatio-
    automated lines (Line 14 in Paris)                         and Lines 6, 9 and 11 in progress).                            RATP Group has a thorough working            nally, integrated engineering in RATP
                                                                                                                              knowledge of all levels of maintenance       Group has developed expertise in vali-
                                                                                                                              for rolling stock and infrastructure with    dating the safety of rail security systems
                                                                                                                              extensive experience in both old equip-      operations.
                                                                                                                              ment (over 40 years of age) and the latest
                                                                                                                              generation of facilities.                    Platform screen door on some lines also
                                                                                                                                                                           serve as a barrier between the platform
                                                                                                                              The Group's know-how means that it can       and the track, making travel even safer.
                                                                                                                              oversee contracts to acquire new rolling
                                                                                                                              stock and transfer equipment. The Group
                                                                                                                              controls interfaces between systems and
                                                                                                                              rolling stock throughout its life cycle.

                                                                                                                              RATP Group’s know-how also covers its abi-
                                                                                                                              lity to design and produce renovation and
                                                                                                                              maintenance operations for legacy trains
                                                                                                                              and infrastructures, thereby increasing
                                                                                                                              their service life at optimal cost.

12 — RATP GROUP                                                                                                                                                                                      RATP GROUP — 13
RATP Group, the world leader in automated metro systems
Optimising energy consump-                      The ability to manage labour
                              tion on automated lines                         transitions through staff mobili-
                                                                              sation and training
                              RATP Group has implemented economy
                              modes on Lines 1 and 14. These are used         Labour dialogue is maintained throughout
                              to reduce energy consumption by optimi-         the automation project to find the best
                              sing the acceleration and braking phases.       organisational balance ensuring optimal
                              RATP Group is the first to have imple-          passenger service. Automation gives rise
                              mented these systems.                           to new and more qualified jobs for which
                                                                              drivers, once trained, can apply.
                              RATP Group also obtained ISO 50001              The new positions, which are more focused
                              -Energy Management certification for all        on customer service, are a career develop-
                              its operations in its historic network in the   ment opportunity for staff members and
                              Paris region, a world first for a multi-modal   offer multiple advantages for passengers,
                              transport operator.                             such as guaranteeing greater safety, a
                                                                              more flexible transport offering tailored to
                                                                              demand and optimised customer service.

                                                                              The transition was successfully imple-
                                                                              mented when line was automated and is
                                                                              currently in progress with the project to
                                                                              automate Line 4.

  RATP Group automated metro:
  a safe and clean mode of travel
  with a high level of service
A HIGH LEVEL OF                          PLATFORM SCREEN DOOR                      ENERGY SAVINGS
SERVICE THANKS TO:                       FOR OPTIMISED SERVICE

 Adaptation of the transport offe-      Platform screen door ensure control       Automated shuttle services can be
 ring in real time                       and fluidity in passenger movements       scheduled in economy mode to help
  Reduced intervals between trains      and make platform areas safe.             recover energy by optimising the acce-
 Enhanced safety and regularity                                                    leration and braking phases.
   Staff in the field for passenger     By facilitating respect for train immo-
    service                              bility times, platform screen door
    Speedy intervention when required   help ensure traffic regularity. They
     thanks to continuous supervision.   also ensure optimal service quality on
                                         automated lines with high patronage.