Presentation S2R and AWP2018 Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017
A PUBLIC-PRIVATE PARTNERSHIP R&I PLATFORM FOR RAILWAY WORKING TOGETHER TO DRIVE INNOVATION BY 2024 #Shift2Rail
the S2R MAAP* • is a collaborative long-term investment planning document, which now also contains an Executive View (Part A) providing the S2R vision and Capabilities. • translates strategic R&I priorities for the Railway sector – as per S2R Master Plan - into concrete R&I activities, milestones and deliverables • contains the description of R&I activities worth an estimated value of about EUR 777 million • is a living document (ongoing “maintenance” for Part B) • enables the preparation of result-oriented Annual Work Plans and Calls for Proposals • grants awarded for the actions(Projects) should aim to implement part(s) of the MAAP * multi-annual action plan #Shift2Rail
Innovation Capabilities Capability 1_Automated train operation Capability 12_Rapid and Capability 2_Mobility as a reliable R&I delivery service Capability Capability 3_Logistics on 11_Environmental and demand social sustainability Capability 10_Stations Capability 4_More value and “smart” city mobility from data Capability 9_Intelligent Capability 5_Optimum trains use of enrgy Capability 8_Guaranteed Capability 6_Service asset health and timed to the second availability Capability 7_Low cost railway #Shift2Rail
Automated Train Operation 1A_ Automated (passengers and freight) trains run closer together with increased flexibility 1B_ Passenger and freight train preparation processes Trains are able are automated to operate 1C_ Vehicles split and join on themselves and the move. New operational run closer approaches (e.g., virtual together coupling, convoying, reduced headway, communication connections between trains/units) are employed 1D_ Self-propelled automated / autonomous single units guide themselves through the system #Shift2Rail
ATO through… Building Blocks Passengers and Freight ATO On-board Train Integrity Cyber security Traffic Management #Shift2Rail
S2R PROGRAMME: INTEGRATED CONSISTENT DELIVERY ORIENTED R&I FOR INNOVATION CAPABILITIES #Shift2Rail
From TRL0 to TRL6/7 #Shift2Rail
IP1 (225 Mio EUR) #Shift2Rail
Example of a Technology Demonstrator Final Demos of TD 1.2 TCMS : Interaction with other TDs and Research Area Specific Specification Demonstrator Focus of activity IPs: Techn. objective Activities Market TRL Ra di o techn., Metro 6/7 Incorpora te wi rel es s technol ogi es to the tra i n communi ca tion network s ol utions Wi rel es s TCMS a rchi tecture (i .e. tra i n ba ckbone, cons i s t network a nd tra i n to ground communi ca tion). a nd protocol s Regi ona l 6/7 Train Control & Provi de a tra i n-wi de communi ca tion network for ful l TCMS s upport i ncl udi ng the Archi tecture, Metro 6/7 Monit. System Dri ve-by-da ta repl a cement of tra i n l i nes , connecting s a fety functions up to SIL4 (i ncl . protocol s Regi ona l 5 s i gna l l i ng). Speci fi ca tion, Metro 6/7 New a rchi tectura l concept ba s ed on s tanda rd fra mework & a ppl i ca tion profi l es , Functiona l di s tri bution a rchi tecture di s tri buted computing to a l l ow execution of compl i a nt functions on end devi ces a rchi tecture a nd i nterfa ce 5 di s tri buted a l ong the vehi cl e meeting di fferent s a fety & i ntegri ty requi rements Regi ona l defi ni tion 6/7 Support the Functiona l Open Coupl i ng Technol ogy Standa rdi s ed s i mul a tion fra mework i n whi ch a l l s ubs ys tems of the tra i n wi l l be Vi rtua l Pl a ci ng on the defi ni tion, Generi c 6/7 s i mul a ted, a l l owi ng remote a nd di s tri buted tes ting i ncl udi ng ha rdwa re i n-the- Ma rket protocol s a nd l oop through heterogeneous communi ca tion networks . procedures • Planning (budget estimated at 48,8M€): 14 #Shift2Rail
IP2 (195 Mio EUR) #Shift2Rail
IP3 (153 Mio EUR) #Shift2Rail
IP4 (86 Mio EUR) #Shift2Rail
IP5 (83 Mio EUR) Maximizing service quality, productivity, • High load efficiency resource utilization and network • Low energy • Increased flexibility capacity consumption through train Pan-European rail freight as key enabler • Low noise emissions coupling/ sharing for automated driving systems • Fully integrated • Increased train logistical chain length for growth Automated train • Increased intermodal on European competitiveness corridors composition and • New services for new • Competitive operation markets strength Asset Control tower & customer communication Logistics capable Future Longer coupled trains wagon with distributed power Boosting productivity/ punctuality Condition monitoring Competitive cost structures for predictive LCC cost and Stimulating maintenance sustainable rail customers benefit freight growth Cost-efficiency in in Europe Smart eco-efficient maintenance propulsion technologies Driver assistance, hybridization and operations and advanced propulsion Based on smart freight assets 18 technologies Significantly reducing energy Maximizing consumption and emissions reliability #Shift2Rail
CCA (35 Mio EUR) #Shift2Rail
WHAT’S GOING ON R&I BEYOND 2020 STANDARDS’ ROADMAP DEMOS PLANS R&I 2018 AND S2R MID BEYOND MAAP TERM STRATEGIC EVALUATION Around 50 REVIEW PROJECTS ONGOING #Shift2Rail
#Shift2Rail
#Shift2Rail
TD2.1: Adaptable communications for all railways (quality of service, interfaces 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, Mistral AWP 2018: CFM, OC planned activities TD2.2: Railway network capacity increase (ATO up to GoA4 – UTO) 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, ASTRail planned activities TD2.3 Moving Block 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, ASTRail AWP2018: CFM, OC planned activities TD2.4: Fail-Safe Train Positioning (including satellite technology) 2015 2016 2017 2018 2019 2020 2021 … Ongoing act: X2RAIL-2; ASTRail AWP2018: OC planned activities #Shift2Rail
TD2.5: On-board Train Integrity 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2RAIL-2; ETALON planned activities TD2.6: Zero on-site testing (control command in lab demonstrators) 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, Vite AWP 2018: CFM, OC planned activities TD2.7: Formal methods and standardisation for smart signalling 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2RAIL-2; ASTRail planned activities TD2.8: Virtually – Coupled Train Sets (VCTS) 2015 2016 2017 2018 2019 2020 2021 … AWP2018: CFM, OC #Shift2Rail
TD2.9: Traffic management evolution 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2RAIL-2 planned activities TD2.10: Smart radio-connected all-in-all wayside objects 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, ETALON planned activities TD2.11: Cyber Security 2015 2016 2017 2018 2019 2020 2021 … Ongoing act.: X2Rail1, Cyrail AWP2018: CFM, OC planned activities #Shift2Rail
TD3.1 Enhanced Switch & Crossing System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Track AWP 2018: CFM planned activities TD3.2 Next Generation Switch & Crossing System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, S-CODE AWP 2018: CFM planned activities TD3.3 Optimised Track System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Track AWP 2018: CFM planned activities TD3.4 Next Generation Track System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail AWP 2018: CFM planned activities #Shift2Rail
TD3.5 Proactive Bridge and Tunnel Assessment, Repair and Upgrade 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Track AWP 2018: OC & CFM planned activities TD3.6 Dynamic Railway Information Management System (DRIMS) 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Smart, IN2DREAMS planned activities TD3.7 Railway Integrated Measuring and Monitoring System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Smart, MOMIT AWP 2018: OC planned activities TD3.8 Intelligent Asset Management Strategies (IAMS) 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Smart planned activities #Shift2Rail
TD3.9 Smart Power Supply 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Stempo planned activities TD3.10 Smart Metering for Railway Distributed Energy Resource Management System 2015 2016 2017 2018 2019 2020 2021 … ongoing activities: In2Rail, In2Stempo, In2Dreams TD3.11 Future Stations 2015 2016 2017 2018 2019 2020 2021 … AWP 2017: IN2STEMPO, FAIR STATIONS #Shift2Rail
TD 4.1 Interoperability Framework 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE AWP 2018 Open Call 1 Planned activities TD4.2 Travel Shopping 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, Co-Active, COHESIVE AWP 2018 Call For Members Planned activities TD4.3 Booking and Ticketing 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, Co-Active, COHESIVE AWP 2018 Call For Members Planned activities TD4.4 Trip Tracker 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, Attracktive, My-TRAC AWP 2018 Call For Members Planned activities #Shift2Rail
TD4.5 Travel Companion 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, Attracktive, My-TRAC AWP 2018 Call For Members Planned activities TD4.6 Business Analytics 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE Planned activities ITD4.7 Integrated Technical Demonstrator 2015 2016 2017 2018 2019 2020 2021 2022 Ongoing act. IT2RAIL, COHESIVE AWP 2018 Open Call 2 #Shift2Rail
TD 5.0 – Business analytics and implementation strategies 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: SMART-RAIL, FR8RAIL, INNOWAG, FR8HUB TD5.1 Freight electrification, brakes and telematics 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: FR8RAIL, INNOWAG AWP2018: CFM planned activities TD5.2 Access and Operation 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: ARCC, SMART, OPTIYARD AWP2018: CFM planned activities TD5.3 Wagon design 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: FR8RAIL, INNOWAG, FR8HUB AWP2018: CFM planned activities #Shift2Rail
TD 5.4 Novel Terminal, Hubs, Marshalling Yards, Sidings 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: FR8HUB planned activities TD 5.5 New Freight Propulsion Concepts 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: FFL4E, DYNAFREIGHT, FR8HUB AWP2018: CFM & OC planned activities TD 5.6 Autonomous train operation 2015 2016 2017 2018 2019 2020 2021 … ongoing projects: ARCC, SMART AWP2018: CFM planned activities #Shift2Rail
WA1 Long-term needs and socio-economic research & SPD's 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: ROLL2RAIL, IMPACT1, NEAR2050, IMPACT2 planned activities WA2 KPI method and integrated assessment 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: ROLL2RAIL, IMPACT1, tender KPIs, IMPACT2 WA3 Safety, Standardisation, Maintanance, Materials, Virtual Certification 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: PLASA, GoSAFE RAIL, IMPACT2, SMaRTE AWP 2018: CFM planned activities #Shift2Rail
WA4 Smart Planning, I2M 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: IN2RAIL, PLASA, GoSAFE RAIL, IMPACT2 AWP 2018: CFM planned activities WA5 Energy and sustainability 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: FINE1, OPEUS, DESTINATE planned activities WA6 Human Capital 2015 2016 2017 2018 2019 2020 2021 2022 … ongoing act.: IMPACT2, SMaRTE, tender HC #Shift2Rail
AWP 2018 #Shift2Rail
AWP 2018 Million of EUR Total Members Open to non- only Members Value of the Call for Proposals R&I 155.2 134.1 21.1 S2R Maximum Co-funding 78.7 59.6 19.1 In-Kind Contribution 76.5 74.5 2 No of topics 18 7 11 Value of Call for tender R&I 2.3 0 2.3 No of topics 4 0 4 #Shift2Rail
AWP 2018 S2R Programme specificities How to read the topics acronyms Action Type and Topic Topic name expected Technical Maximum S2R co- (*) indicative Complementarity number – IP Readiness Level funding (*) figures in EUR (TRL) S2R-OC-IPX- Paradigm shifts - S2R-CFM-IP1-02-2018 RIA, up to TRL 2 2,200,000 - S2R-CFM-IP2-01-2018 01-2018 for railway - S2R-CFM-IP3-01-2018 Number IP1 IP2 IP3 IP4 IP5 CCA IPX CFM topic 2 1 1 1 1 1 0 Scope: OC topic 1 3 1 2 1 0 3 […] the proposed research should address all the Linked tender 2 1 1 following work-streams topic described below […] #Shift2Rail
Technology Readiness Levels definition #Shift2Rail
AWP 2018 – CFM Type of action and Topic Topic name Maximum In-kind expected Value of the number - S2R co- contribution Technical actions (*) IP (*) indicative figures in EUR funding (*) (*) Readiness Level (TRL) Development of technology S2R-CFM- demonstrators for the next RIA , TRL 5 IP1-01- generation of traction systems 28,534,203 12,680,600 15,853,603 to 6 2018 and adhesion management systems S2R-CFM- Implementing new IP1-02- RIA, TRL 5 10,576,058 4,700,000 5,876,058 technologies for the TCMS 2018 Advanced Signalling, S2R-CFM- Automation and IP2-01- IA, TRL6 38,900,540 17,287,400 21,613,140 Communication System (IP2 2018 and IP5) #Shift2Rail
AWP 2018 – CFM Type of Topic name action and Topic Maximum In-kind expected Value of the number - S2R co- contribution (*) indicative figures in EUR Technical actions (*) IP funding (*) (*) Readiness Level (TRL) S2R-CFM- Research into optimized and IP3-01- IA, TRL 6 30,153,015 13,400,000 16,753,015 future railway infrastructure 2018 Passenger service platform S2R-CFM- specifications for an enhanced IP4-01- multi-modal transport eco- IA, TRL 6 11,701,170 5,200,000 6,501,170 2018 system including Mobility as a Service (MaaS) #Shift2Rail
AWP 2018 – CFM Type of action and Topic name Maximum In-kind Topic expected Value of the S2R co- contribution number - (*) indicative figures in EUR Technical actions (*) funding (*) (*) IP Readiness Level (TRL) S2R-CFM- Technology demonstrators for IP5-01- competitive, intelligent rail IA, TRL 6 12,376,238 5,500,000 6,876,238 2018 freight operation S2R-CFM- Virtual certification & smart CCA-01- RIA TRL 3 1,894,689 842,000 1,052,689 planning 2018 TOTAL 134,135,914 59,610,000 74,525,914 #Shift2Rail
AWP 2018 - OC Type of action and Topic Topic name Maximum In-kind expected Value of the number S2R co- contribution Technical actions (*) – IP (*) indicative figures in EUR funding (*) (*) Readiness Level (TRL) S2R-OC- RIA, up to IPX-01- Paradigm shifts for railway 2,200,000 2,200,000 n.a TRL 2 2018 S2R-OC- Transversal exploratory IPX-02- research activities and CSA 500,000 500,000 n.a 2018 knowledge transfer S2R-OC- Innovative/breakthrough IPX-03- mobility concepts (with rail CSA 500,000 500,000 n.a 2018 as backbone) #Shift2Rail
AWP 2018 - OC Type of action and Topic Topic name Maximum In-kind expected Value of the number S2R co- contribution Technical actions (*) – IP (*) indicative figures in EUR funding (*) (*) Readiness Level (TRL) S2R-OC- Technical solutions for the RIA, up to IP1-01- 4,000,000 4,000,000 n.a next generation of TCMS TRL 4/5 2018 S2R-OC- Analysis for Moving Block RIA, up to IP2-01- and implementation of 1,300,000 1,300,000 n.a TRL 3 2018 Virtual Coupling concept Modern methodologies and S2R-OC- verifications for GNSS in RIA, up to IP2-02- 1,020,000 1,020,000 n.a Railways and virtual test TRL 3 2018 environment. #Shift2Rail
AWP 2018 - OC Type of action and Topic Topic name Maximum In-kind expected Value of the number S2R co- contribution Technical actions (*) – IP (*) indicative figures in EUR funding (*) (*) Readiness Level (TRL) S2R-OC- Communication environment RIA, up to IP2-03- 750,000 750,000 n.a assessment and validation TRL 5/6 2018 S2R-OC- Measuring and monitoring IA up to TRL IP3-01- 6,785,714 4,750,000 2,035,714 devices for railway assets 6 2018 S2R-OC- Semantic framework for RIA up to IP4-01- multimodal transport 2,000,000 2,000,000 n.a TRL4 2018 services #Shift2Rail
AWP 2018 - OC Type of action and Topic Topic name Maximum In-kind expected Value of the number S2R co- contribution Technical actions (*) – IP (*) indicative figures in EUR funding (*) (*) Readiness Level (TRL) Supporting the S2R-OC- implementation of the IP4 RIA up to IP4-02- 1,500,000 1,500,000 n.a multi-modal transport TRL4 2018 ecosystem Radio communication and S2R-OC- simulation of train dynamics RIA up to IP5-01- 600,000 600,000 n.a for Distributed Power within TRL5 2018 long trains TOTAL 21,155,714 19,120,000 2,035,714 #Shift2Rail
AWP 2018 - Tenders Maximu Subject of Number Indicative scope m tender budget The activity shall assess the railway environment and identify new alternative bearer beyond established cellular technologies (UMTS/HSPA, LTE, LTE-A, etc.) or other access technologies Study on (WiFi/802.11, SatCom, etc.), which are or expected to become alternativ available for on-board to trackside communication needs. The e availability of the alternative bearers might be restricted to certain communic areas (for example train stations, shunting yards, high-speed lines, 1- ation different terrains, etc.). The alternative bearers could rely on or € contract bearers in leverage already available infrastructure or equipment alongside the 150,000 the railway tracks. Some potential candidates include but are not limited railway to data over power lines, free space optical communications, etc. environm The results of the study are expected to enrich the set of access ent network options for infrastructure managers, when they deploy their new adaptable communication system and leverage the benefits of alternative bearers to address specific needs of their planned rollout of advanced services and applications. #Shift2Rail
AWP 2018 - Tenders Maximu Number Subject of tender Indicative scope m budget Under supervision of the JU, in collaboration with the ERA, the study should collect bridge and train data, as well as calculation and validation methods, including: Study on railway 2- bridge dynamics calculation methods to describe the dynamic interface € contract and the interface vehicle – bridge; 250,000 with rolling stock vehicle design assessment method; validation of calculation methods; load models and vehicle design limits; proposal and suggestions for standardisation and regulation. #Shift2Rail
AWP 2018 - Tenders Subject of Maximum Number Indicative scope tender budget This activity aims at supporting the implementation of the ERTMS European Action Plan, published by the European Commission in June 2017. Support to ERTMS Under the supervision of the JU and together with Commission European Action Services (DG Move), inter alia, the contractor will perform tasks Plan to pave the such as support the ERA Change Control Management process’ 3- way for the and related update of specification documentation (including € 1,600,000 contract deployment of test specifications); Identification of the existing sets of the future S2R engineering rules regarding transitions between systems; Innovative Contribution to the technical review of trackside deployment of Solutions ERTMS in cross-border sections; Contribution to the drafting/updating of technical specifications for upcoming ERTMS communication system set to replace GSM-R and to the appraisal of the impact on interoperability of its roll-out. #Shift2Rail
AWP 2018 - Tenders Maximum Number Subject of tender Indicative scope budget This activity aims at analysing the business case of hydrogen and fuel cell usage in the rail environment, Study on use of both in passenger train and freight. 4- fuel cell hydrogen The investigation could for example include analyses € 270,000 contract in railway on the CO2 performance (through Life Cycle Analysis environment techniques) of current rail powertrain solutions and demonstrate the specific emissions saving that can be achieved by replacing conventional technologies. TOTAL € 2,270,000 #Shift2Rail
Programme approach and future/current projects 50 #Shift2Rail
YOUR PROJECT and the overall S2R programme • EACH PROJECT contributes to the achievement of the Master Plan and the MAAP objectives • EACH PROJECT is part of a programme and cooperation with other projects must be ensured Through the collaboration and input to the JU Members, EACH PROJECT will support the realization of long-term S2R technological demonstrations or innovative break-through • Particular attention is given to ensure that there is no duplication of work between EACH PROJECT and current/future R&I activities • EACH PROJECT results are taken into consideration for the next annual work plans to ensure sufficient complementarity and coherence. #Shift2Rail
Complementarity & Collaboration Agreement 1. Complementary is defined at topic level 2. Complementarity between topics is compulsory established in the Grant Agreement (need for a Collaboration Agreement) 3. IP/CCA SteCos, high level synchronization points: Project Coordinators may attend the SteeCo meetings as observer and IP Coordinators cooperate with project coordinator to foster/promote synergies 4. S2R Programme Managers: Central Contact Point for both projects #Shift2Rail
Complementarity & Collaboration Agreement Issues to be tackled in the Collaboration Agreement (COLA) (examples/non-exhaustive list) • Rules for collaboration, “who does what?”; Point of Contacts etc. • Handling review of documents • Agreement on action to be performed by both sides + linked timing (e.g. project A provides “user requirements” by M6 to project B; project B provides input by M18 to project A project A uses input for deliver their deliverable 2.3). • Participation to restricted meetings (for specific purpose) or to public meetings (including Advisory Groups, etc…). #Shift2Rail
Overview of the standard call process Invitation to Call deadline Grant signature grant preparation submission Proposal Evaluation Grant Agreement Preparation Prefinancing 5 months max. 3 months max. Accession GA 8 months maximum H2020 max. duration to Grant signature: Maximum five months from call closure date to end of evaluation - until the date of informing applicants Maximum three months to prepare grant agreement from the date of inviting (informing) applicants until the signature of the grant agreement Maximum eight months from call closure - until the signature of the grant agreement #Shift2Rail
who can participate? • Standard H2020 eligibility conditions: • 'Research and Innovation Actions' (RIA) and 'Innovation Actions' (IA): Minimum three legal entities established in minimum three different Member States or an Associated Countries • 'Coordination and Support Actions' (CSA): one or more legal entity(ies) established in a Member State or in an Associated Country Other entities from countries outside a Member State or Associated Country may participate to the open calls, but are, in principle, not eligible for funding unless there is a reciprocal agreement in place with that country or the applicant can demonstrate that the entity has unique resources that render its participation essential for the project to go ahead successfully • Additional conditions of S2R (Art 9(5) of H2020 RfP & Art. 17 S2R Regulation): • Calls for members: Open only to members of the S2R JU and their affiliated entities • Open calls: Open only to entities that are not members or affiliated entities of members of the S2R JU 55 #Shift2Rail
who can participate? • Who are the affiliated entities of the S2R JU members? • Any legal entity that is under the direct or indirect control of a member (or, in the case of consortia, a constituent entity of the consortium), or under the same direct or indirect control as the member (or constituent entity of the consortium), or that is directly or indirectly controlling a member (or constituent entity of the consortium) • The control may take in particular either of the following forms: • direct or indirect holding of more than 50% of the nominal value of the issued share capital in the legal entity concerned, or of a majority of the voting rights of the shareholders or associates of that entity or • the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned. • The following relationships between legal entities do not constitute control relationships: • the same public investment corporation, institutional investor or venture-capital company has a direct or indirect holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the shareholders or associates; • the legal entities concerned are owned or supervised by the same public body. 56 #Shift2Rail
S2R Members European Union 8 Founding Alstom, Ansaldo STS, Bombardier, Construcciones y Auxiliar de Ferrocarriles (CAF), Members Siemens, Thales and infrastructure managers Trafikverket and Network Rail 12 Associated Amadeus IT Group, AZD Praha, Deutsche Bahn, DIGINEXT, Faiveley Transport, HaCon Members (single Ingenieurgesellschaft, INDRA Sistemas, Kapsch CarrierCom, Knorr-Bremse, MER MEC, legal entities) SNCF Mobilités, Patentes Talgo 7 Associated • AERFITEC (AERNNOVA Aerospace, FIDAMC, Fundacion TECNALIA) Members • Competitive Freight Wagon (Contraffic, DLR, Waggonbau Niesky, Centro de Estudios e (consortia) Investigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland) • EUropean Rail Operating community (Infraestruturas de Portugal, BLS, CP, Finnish Transport Agency, ÖBB-Infrastruktur, Polskie Koleje Państwowe, PRORAIL ,Schweizerische Bundesbahnen, Slovenske zeleznice, Türkiye Cumhuriyeti Devlet Demiryollari) • Smart DeMain (Strukton Rail, ACCIONA Infraestructuras, DLR, Fraunhofer, CEMOSA) • SmartRaCon (DLR, CEIT, Fondation Railenium, Nottingham Scientific Ltd) • Swi'Tracken (Fondation Railenium, Universidade Do Porto, Universidad Del Pais Vasco, Universidade Do Minho, TATASTEEL, VOSSLOH-COGIFER, Institut für Zukunftsstudien und Technologiebewertung, EGIS RAIL, Groupe EUROTUNNEL, TRONICO ALCEN) • Virtual Vehicle Austria consortium+ (Kompetenzzentrum, FCP Firtsch, Getzner Werkstoffe, Kirchdorfer Fertigteilholding, Plasser&Theurer, Vvoestalpine Schienen, Voestalpine VAE, Wiener Linien, AVL List, PJM Messtechnik, TATRAVAGONKA, AC2T research, Materials Center Leoben Forschung 57 #Shift2Rail
funding rates • Applicable funding rates for the open calls: • Funding rate depending on the type of action: • Up to 100% of eligible costs for 'Research and Innovation Actions' (RIA) and for 'Coordination and Support Actions' (CSA) • Up to 70% for 'Innovation Actions' (IA), except non-profit organisations (up to 100%) • One project = One funding rate for all beneficiaries / activities in the grant* *However, if non-profit organisations are in an IA together with for-profit organisations, their eligible costs will be reimbursed according to the different reimbursement rates specified above The reimbursement rates apply to all forms of costs, including indirect costs (overheads): 25% flat rate (calculated on the basis of eligible direct costs, excluding direct sub- contracting costs) 58 #Shift2Rail
http://shift2rail.org Twitter@Shift2Rail_JU Thank you #Shift2Rail