Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG

Page created by Alfredo Conner
 
CONTINUE READING
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
Presentation S2R and AWP2018
  Giorgio Travaini, Head of Research & Innovation a.i.

               2017 December 4th 2017
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
A PUBLIC-PRIVATE PARTNERSHIP
R&I PLATFORM FOR RAILWAY
WORKING TOGETHER TO
DRIVE INNOVATION
BY 2024

                               #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
#Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
the S2R MAAP*
•   is a collaborative long-term investment planning document, which now also
    contains an Executive View (Part A) providing the S2R vision and Capabilities.
•   translates strategic R&I priorities for the Railway sector – as per S2R Master Plan -
    into concrete R&I activities, milestones and deliverables
•   contains the description of R&I activities worth an estimated value of about EUR
    777 million
•   is a living document (ongoing “maintenance” for Part B)
•   enables the preparation of result-oriented Annual Work Plans and Calls for
    Proposals
•   grants awarded for the actions(Projects) should aim to implement part(s) of the
    MAAP

                                                       * multi-annual action plan

                                                                                    #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
MAAP Part A

              #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
#Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
Innovation Capabilities

                            Capability 1_Automated
                                train operation
Capability 12_Rapid and                              Capability 2_Mobility as a
  reliable R&I delivery                                       service

      Capability
                                                     Capability 3_Logistics on
 11_Environmental and
                                                             demand
  social sustainability

Capability 10_Stations                               Capability 4_More value
and “smart” city mobility                                  from data

Capability 9_Intelligent                              Capability 5_Optimum
         trains                                           use of enrgy

Capability 8_Guaranteed
                                                       Capability 6_Service
    asset health and
                                                        timed to the second
       availability         Capability 7_Low cost
                                   railway

                                                                     #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
Automated Train Operation

                            1A_ Automated (passengers
                            and freight) trains run closer
                            together with increased
                            flexibility

                            1B_ Passenger and freight
                            train preparation processes
Trains are able             are automated
to operate
                            1C_ Vehicles split and join on
themselves and              the move. New operational
run closer                  approaches (e.g., virtual
together                    coupling, convoying, reduced
                            headway, communication
                            connections between
                            trains/units) are employed

                            1D_ Self-propelled
                            automated / autonomous
                            single units guide themselves
                            through the system

                                                 #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
ATO through… Building Blocks

Passengers and
Freight ATO

                       On-board Train Integrity
                       Cyber security
                      Traffic Management

                                                  #Shift2Rail
Presentation S2R and AWP2018 - Giorgio Travaini, Head of Research & Innovation a.i. 2017 December 4th 2017 - FFG
MAAP Part B

              #Shift2Rail
S2R PROGRAMME:
                 INTEGRATED
                 CONSISTENT
              DELIVERY ORIENTED
                                  R&I FOR INNOVATION CAPABILITIES

#Shift2Rail
From TRL0 to TRL6/7

                #Shift2Rail
IP1 (225 Mio EUR)

                    #Shift2Rail
Example of a Technology Demonstrator
       Final Demos of TD 1.2 TCMS :                                                                                                                                                    Interaction with other TDs and
Research Area
                    Specific                   Specification    Demonstrator
                                                                                   Focus of activity                                                                                   IPs:
                    Techn. objective           Activities       Market      TRL
                                               Ra di o techn.,
                                                               Metro      6/7      Incorpora te wi rel es s technol ogi es to the tra i n communi ca tion network s ol utions
                    Wi rel es s TCMS           a rchi tecture
                                                                                   (i .e. tra i n ba ckbone, cons i s t network a nd tra i n to ground communi ca tion).
                                               a nd protocol s Regi ona l 6/7
Train Control   &                                                                  Provi de a tra i n-wi de communi ca tion network for ful l TCMS s upport i ncl udi ng the
                                               Archi tecture,   Metro       6/7
Monit. System       Dri ve-by-da ta                                                repl a cement of tra i n l i nes , connecting s a fety functions up to SIL4 (i ncl .
                                               protocol s
                                                                Regi ona l 5       s i gna l l i ng).
                                                Speci fi ca tion, Metro      6/7   New a rchi tectura l concept ba s ed on s tanda rd fra mework & a ppl i ca tion profi l es ,
                    Functiona l di s tri bution a rchi tecture                     di s tri buted computing to a l l ow execution of compl i a nt functions on end devi ces
                    a rchi tecture              a nd i nterfa ce             5     di s tri buted a l ong the vehi cl e meeting di fferent s a fety & i ntegri ty requi rements
                                                                  Regi ona l
                                                defi ni tion                 6/7   Support the Functiona l Open Coupl i ng
                                                Technol ogy
                                                                                   Standa rdi s ed s i mul a tion fra mework i n whi ch a l l s ubs ys tems of the tra i n wi l l be
                    Vi rtua l Pl a ci ng on the defi ni tion,
                                                                Generi c    6/7    s i mul a ted, a l l owi ng remote a nd di s tri buted tes ting i ncl udi ng ha rdwa re i n-the-
                    Ma rket                     protocol s a nd
                                                                                   l oop through heterogeneous communi ca tion networks .
                                                procedures

       • Planning (budget estimated at 48,8M€):

                                                                                                                                                                                                  14

                                                                                                                                                                                                            #Shift2Rail
IP2 (195 Mio EUR)

                    #Shift2Rail
IP3 (153 Mio EUR)

                    #Shift2Rail
IP4 (86 Mio EUR)

                   #Shift2Rail
IP5 (83 Mio EUR)
                                                           Maximizing service quality, productivity,
• High load efficiency
                                                             resource utilization and network
• Low energy               • Increased flexibility
                                                             capacity
  consumption                through train
                                                           Pan-European rail freight as key enabler
• Low noise emissions        coupling/ sharing
                                                             for automated driving systems
• Fully integrated         • Increased train
  logistical chain           length for growth
                                                                                Automated train
• Increased intermodal       on European
  competitiveness            corridors                                          composition and
• New services for new     • Competitive                                           operation
  markets                    strength
                                                                                                             Asset Control
                                                                                                           tower & customer
                                                                                                            communication
         Logistics capable Future        Longer coupled trains
                  wagon                  with distributed power

                                                                                                                 Boosting
                                                                                                                    productivity/
                                                                                                                    punctuality
                                                                   Condition monitoring                          Competitive cost
                                                                                                                    structures
                                                                      for predictive
                                                                                           LCC cost and          Stimulating
                                                                      maintenance                                   sustainable rail
                                                                                             customers
                                                                                             benefit                freight growth
                                                                                           Cost-efficiency in       in Europe
                               Smart eco-efficient
                                                                                             maintenance
                             propulsion technologies
                                                       Driver assistance, hybridization      and operations
                                                          and advanced propulsion          Based on smart
                                                                                             freight assets              18
                                                          technologies
                                                       Significantly reducing energy       Maximizing
                                                          consumption and emissions          reliability

                                                                                                                                       #Shift2Rail
CCA (35 Mio EUR)

                   #Shift2Rail
WHAT’S GOING ON
                                                                       R&I
                                                                     BEYOND
                                                                      2020
                                                        STANDARDS’
                                                        ROADMAP
                                                DEMOS
                                                PLANS
                                     R&I 2018
                                       AND
                          S2R MID    BEYOND
              MAAP         TERM
            STRATEGIC   EVALUATION
Around 50    REVIEW
PROJECTS
ONGOING

                                                                     #Shift2Rail
#Shift2Rail
#Shift2Rail
TD2.1: Adaptable communications for all railways (quality of
                      service, interfaces
 2015    2016     2017       2018        2019          2020      2021          …
            Ongoing act.: X2Rail1, Mistral
                                 AWP 2018: CFM, OC
                                                          planned activities

TD2.2: Railway network capacity increase (ATO up to GoA4 – UTO)
 2015    2016    2017       2018      2019             2020      2021          …
           Ongoing act.: X2Rail1, ASTRail
                                                        planned activities

                          TD2.3 Moving Block
 2015    2016    2017       2018      2019    2020     2021                    …
           Ongoing act.: X2Rail1, ASTRail
                               AWP2018: CFM, OC
                                                planned activities

TD2.4: Fail-Safe Train Positioning (including satellite technology)
 2015    2016      2017       2018       2019          2020      2021          …
                      Ongoing act: X2RAIL-2; ASTRail
                                 AWP2018: OC
                                                         planned activities

                                                                                   #Shift2Rail
TD2.5: On-board Train Integrity
 2015     2016        2017       2018       2019        2020         2021        …
                         Ongoing act.: X2RAIL-2; ETALON
                                                            planned activities

TD2.6: Zero on-site testing (control command in lab demonstrators)
 2015     2016        2017       2018        2019       2020         2021        …
                 Ongoing act.: X2Rail1, Vite
                                     AWP 2018: CFM, OC
                                                                 planned activities

 TD2.7: Formal methods and standardisation for smart signalling
 2015     2016        2017       2018       2019        2020         2021        …
                          Ongoing act.: X2RAIL-2; ASTRail
                                                                 planned activities

           TD2.8: Virtually – Coupled Train Sets (VCTS)
 2015     2016        2017       2018      2019    2020              2021        …
                                         AWP2018: CFM, OC

                                                                                      #Shift2Rail
TD2.9: Traffic management evolution
2015       2016      2017      2018       2019     2020     2021          …
                            Ongoing act.: X2RAIL-2
                                                    planned activities

       TD2.10: Smart radio-connected all-in-all wayside objects
2015       2016      2017       2018       2019     2020      2021        …
               Ongoing act.: X2Rail1, ETALON
                                                     planned activities

                         TD2.11: Cyber Security
2015       2016     2017      2018        2019  2020      2021            …
              Ongoing act.: X2Rail1, Cyrail
                                    AWP2018: CFM, OC
                                                  planned activities

                                                                              #Shift2Rail
TD3.1 Enhanced Switch & Crossing System
2015     2016         2017        2018    2019      2020       2021        …
  ongoing activities: In2Rail, In2Track
                                          AWP 2018: CFM
                                                planned activities

         TD3.2 Next Generation Switch & Crossing System
2015     2016         2017       2018     2019      2020       2021        …
  ongoing activities: In2Rail, S-CODE
                                          AWP 2018: CFM
                                                           planned activities

                     TD3.3 Optimised Track System
2015     2016         2017        2018    2019      2020       2021        …
  ongoing activities: In2Rail, In2Track
                                          AWP 2018: CFM
                                                           planned activities

                 TD3.4 Next Generation Track System
2015     2016         2017      2018      2019      2020       2021        …
  ongoing activities: In2Rail
                                          AWP 2018: CFM
                                                           planned activities

                                                                                #Shift2Rail
TD3.5 Proactive Bridge and Tunnel Assessment, Repair and Upgrade
  2015     2016         2017        2018       2019      2020       2021     …
    ongoing activities: In2Rail, In2Track
                                            AWP 2018: OC & CFM
                                                             planned activities

TD3.6 Dynamic Railway Information Management System (DRIMS)
  2015      2016       2017       2018         2019      2020       2021     …
               ongoing activities: In2Smart, IN2DREAMS
                                                      planned activities

    TD3.7 Railway Integrated Measuring and Monitoring System
  2015      2016         2017      2018      2019    2020        2021        …
 ongoing activities: In2Rail, In2Smart, MOMIT
                                             AWP 2018: OC
                                                  planned activities

         TD3.8 Intelligent Asset Management Strategies (IAMS)
  2015       2016       2017       2018        2019      2020       2021     …
ongoing activities: In2Rail, In2Smart
                                                      planned activities

                                                                                  #Shift2Rail
TD3.9 Smart Power Supply
  2015        2016       2017       2018   2019       2020      2021        …
ongoing activities: In2Rail, In2Stempo
                                                       planned activities

  TD3.10 Smart Metering for Railway Distributed Energy Resource
                      Management System
   2015      2016     2017         2018        2019     2020     2021       …
               ongoing activities: In2Rail, In2Stempo, In2Dreams

                            TD3.11 Future Stations
   2015      2016       2017       2018     2019    2020      2021    …
                                   AWP 2017: IN2STEMPO, FAIR STATIONS

                                                                                #Shift2Rail
TD 4.1 Interoperability Framework
 2015         2016        2017        2018        2019        2020            2021        2022
Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE
                                         AWP 2018 Open Call 1
                                                       Planned activities

                                     TD4.2 Travel Shopping
 2015         2016         2017        2018       2019        2020            2021        2022
Ongoing act. IT2RAIL, Co-Active, COHESIVE
                                          AWP 2018 Call For Members
                                                      Planned activities

                                   TD4.3 Booking and Ticketing
 2015         2016         2017        2018       2019        2020            2021        2022
Ongoing act. IT2RAIL, Co-Active, COHESIVE
                                          AWP 2018 Call For Members
                                                      Planned activities

                                         TD4.4 Trip Tracker
 2015         2016          2017         2018        2019       2020        2021          2022
Ongoing act. IT2RAIL, Attracktive, My-TRAC
                                            AWP 2018 Call For Members
                                                                     Planned activities

                                                                                                 #Shift2Rail
TD4.5 Travel Companion
 2015         2016          2017         2018          2019     2020        2021           2022
Ongoing act. IT2RAIL, Attracktive, My-TRAC
                                            AWP 2018 Call For Members
                                                                     Planned activities

                                   TD4.6 Business Analytics
 2015         2016        2017       2018       2019        2020              2021         2022
Ongoing act. IT2RAIL, GOF4R, ST4RT, CONNECTIVE
                                                                      Planned activities

                           ITD4.7 Integrated Technical Demonstrator
 2015         2016       2017         2018       2019        2020             2021         2022
Ongoing act. IT2RAIL, COHESIVE
                                         AWP 2018 Open Call 2

                                                                                                  #Shift2Rail
TD 5.0 – Business analytics and implementation strategies
2015       2016      2017      2018       2019           2020   2021    …
ongoing projects: SMART-RAIL, FR8RAIL, INNOWAG, FR8HUB

         TD5.1 Freight electrification, brakes and telematics
2015       2016     2017       2018       2019    2020      2021        …
             ongoing projects: FR8RAIL, INNOWAG
                                         AWP2018: CFM
                                                   planned activities

                       TD5.2 Access and Operation
2015       2016     2017       2018     2019     2020      2021         …
             ongoing projects: ARCC, SMART, OPTIYARD
                                        AWP2018: CFM
                                                  planned activities

                            TD5.3 Wagon design
2015       2016     2017       2018       2019    2020      2021        …
             ongoing projects: FR8RAIL, INNOWAG, FR8HUB
                                         AWP2018: CFM
                                                   planned activities

                                                                            #Shift2Rail
TD 5.4 Novel Terminal, Hubs, Marshalling Yards, Sidings
2015      2016     2017       2018       2019       2020       2021       …
            ongoing projects: FR8HUB
                                                     planned activities

                 TD 5.5 New Freight Propulsion Concepts
2015      2016       2017     2018       2019       2020       2021       …
            ongoing projects: FFL4E, DYNAFREIGHT, FR8HUB
                                     AWP2018: CFM & OC
                                                 planned activities

                   TD 5.6 Autonomous train operation
2015      2016     2017       2018     2019     2020      2021            …
            ongoing projects: ARCC, SMART
                                       AWP2018: CFM
                                                 planned activities

                                                                              #Shift2Rail
WA1 Long-term needs and socio-economic research & SPD's
  2015       2016    2017      2018    2019      2020        2021   2022   …
ongoing act.: ROLL2RAIL, IMPACT1, NEAR2050, IMPACT2
                                              planned activities

                  WA2 KPI method and integrated assessment
  2015       2016    2017      2018      2019      2020     2021    2022   …
ongoing act.: ROLL2RAIL, IMPACT1, tender KPIs, IMPACT2

 WA3 Safety, Standardisation, Maintanance, Materials, Virtual Certification
  2015      2016     2017       2018    2019      2020       2021   2022   …
              ongoing act.: PLASA, GoSAFE RAIL, IMPACT2, SMaRTE
                                      AWP 2018: CFM
                                              planned activities

                                                                               #Shift2Rail
WA4 Smart Planning, I2M
  2015       2016       2017    2018     2019     2020        2021   2022   …
ongoing act.: IN2RAIL, PLASA, GoSAFE RAIL, IMPACT2
                                      AWP 2018: CFM
                                               planned activities

                          WA5 Energy and sustainability
  2015      2016     2017       2018    2019     2020        2021    2022   …
              ongoing act.: FINE1, OPEUS, DESTINATE
                                              planned activities

                                WA6 Human Capital
  2015      2016      2017     2018       2019    2020      2021     2022   …
                        ongoing act.: IMPACT2, SMaRTE, tender HC

                                                                                #Shift2Rail
AWP 2018

           #Shift2Rail
AWP 2018

Million of EUR                        Total          Members    Open to non-
                                                        only       Members

Value of the Call for Proposals R&I   155.2             134.1           21.1

   S2R Maximum Co-funding                 78.7           59.6           19.1
   In-Kind Contribution                   76.5           74.5               2
   No of topics                       18         7              11

Value of Call for tender R&I               2.3             0             2.3
    No of topics                      4          0              4

                                                                       #Shift2Rail
AWP 2018 S2R Programme specificities

     How to read the topics acronyms

                                           Action Type and
  Topic           Topic name              expected Technical     Maximum S2R co-
                   (*) indicative                                                   Complementarity
number – IP                                Readiness Level          funding (*)
                  figures in EUR
                                                (TRL)
S2R-OC-IPX-     Paradigm shifts                                                    - S2R-CFM-IP1-02-2018
                                      RIA, up to TRL 2               2,200,000     - S2R-CFM-IP2-01-2018
01-2018         for railway                                                        - S2R-CFM-IP3-01-2018

Number                IP1   IP2     IP3    IP4   IP5   CCA     IPX
CFM topic             2       1      1       1    1      1      0
                                                                         Scope:
OC topic              1       3      1       2    1      0      3        […] the proposed research
                                                                         should address all the
Linked tender                 2      1                   1
                                                                         following work-streams
topic                                                                    described below […]

                                                                                             #Shift2Rail
Technology Readiness Levels definition

                                 #Shift2Rail
AWP 2018 – CFM

                                              Type of
                                            action and
  Topic            Topic name                                            Maximum         In-kind
                                             expected     Value of the
number -                                                                   S2R co-     contribution
                                             Technical     actions (*)
    IP      (*) indicative figures in EUR                                funding (*)        (*)
                                            Readiness
                                            Level (TRL)
           Development of technology
S2R-CFM-   demonstrators for the next
                                          RIA , TRL 5
IP1-01-    generation of traction systems                 28,534,203     12,680,600    15,853,603
                                          to 6
2018       and adhesion management
           systems
S2R-CFM-
           Implementing new
IP1-02-                                     RIA, TRL 5    10,576,058     4,700,000      5,876,058
           technologies for the TCMS
2018
           Advanced Signalling,
S2R-CFM-
           Automation and
IP2-01-                                     IA, TRL6      38,900,540     17,287,400    21,613,140
           Communication System (IP2
2018
           and IP5)

                                                                                             #Shift2Rail
AWP 2018 – CFM

                                              Type of
                    Topic name              action and
  Topic                                                                  Maximum         In-kind
                                             expected     Value of the
number -                                                                   S2R co-     contribution
            (*) indicative figures in EUR    Technical     actions (*)
   IP                                                                    funding (*)        (*)
                                            Readiness
                                            Level (TRL)

S2R-CFM-
           Research into optimized and
IP3-01-                                     IA, TRL 6     30,153,015     13,400,000    16,753,015
           future railway infrastructure
2018

           Passenger service platform
S2R-CFM-   specifications for an enhanced
IP4-01-    multi-modal transport eco-     IA, TRL 6       11,701,170     5,200,000       6,501,170
2018       system including Mobility as a
           Service (MaaS)

                                                                                             #Shift2Rail
AWP 2018 – CFM

                                               Type of
                                             action and
                     Topic name                                           Maximum         In-kind
  Topic                                       expected     Value of the
                                                                            S2R co-     contribution
number -     (*) indicative figures in EUR
                                              Technical     actions (*)
                                                                          funding (*)        (*)
   IP                                        Readiness
                                             Level (TRL)

S2R-CFM-   Technology demonstrators for
IP5-01-    competitive, intelligent rail     IA, TRL 6     12,376,238     5,500,000       6,876,238
2018       freight operation

S2R-CFM-
           Virtual certification & smart
CCA-01-                                      RIA TRL 3      1,894,689      842,000        1,052,689
           planning
2018

TOTAL                                                      134,135,914    59,610,000    74,525,914

                                                                                             #Shift2Rail
AWP 2018 - OC

                                             Type of
                                           action and
 Topic           Topic name                                             Maximum         In-kind
                                            expected     Value of the
number                                                                    S2R co-     contribution
                                            Technical     actions (*)
  – IP    (*) indicative figures in EUR                                 funding (*)        (*)
                                           Readiness
                                           Level (TRL)

S2R-OC-
                                          RIA, up to
IPX-01- Paradigm shifts for railway                       2,200,000      2,200,000             n.a
                                          TRL 2
2018

S2R-OC- Transversal exploratory
IPX-02- research activities and           CSA              500,000        500,000              n.a
2018    knowledge transfer

S2R-OC- Innovative/breakthrough
IPX-03- mobility concepts (with rail      CSA              500,000        500,000              n.a
2018    as backbone)

                                                                                            #Shift2Rail
AWP 2018 - OC

                                             Type of
                                           action and
 Topic           Topic name                                             Maximum         In-kind
                                            expected     Value of the
number                                                                    S2R co-     contribution
                                            Technical     actions (*)
  – IP    (*) indicative figures in EUR                                 funding (*)        (*)
                                           Readiness
                                           Level (TRL)

S2R-OC-
        Technical solutions for the       RIA, up to
IP1-01-                                                   4,000,000      4,000,000              n.a
        next generation of TCMS           TRL 4/5
2018

S2R-OC- Analysis for Moving Block
                                          RIA, up to
IP2-01- and implementation of                             1,300,000      1,300,000              n.a
                                          TRL 3
2018    Virtual Coupling concept

        Modern methodologies and
S2R-OC-
        verifications for GNSS in         RIA, up to
IP2-02-                                                   1,020,000      1,020,000              n.a
        Railways and virtual test         TRL 3
2018
        environment.

                                                                                           #Shift2Rail
AWP 2018 - OC

                                             Type of
                                           action and
 Topic           Topic name                                             Maximum         In-kind
                                            expected     Value of the
number                                                                    S2R co-     contribution
                                            Technical     actions (*)
  – IP    (*) indicative figures in EUR                                 funding (*)        (*)
                                           Readiness
                                           Level (TRL)

S2R-OC-
        Communication environment RIA, up to
IP2-03-                                                    750,000        750,000               n.a
        assessment and validation TRL 5/6
2018

S2R-OC-
        Measuring and monitoring          IA up to TRL
IP3-01-                                                   6,785,714      4,750,000     2,035,714
        devices for railway assets        6
2018

S2R-OC- Semantic framework for
                                          RIA up to
IP4-01- multimodal transport                              2,000,000      2,000,000              n.a
                                          TRL4
2018    services

                                                                                            #Shift2Rail
AWP 2018 - OC

                                             Type of
                                           action and
 Topic           Topic name                                              Maximum         In-kind
                                            expected     Value of the
number                                                                     S2R co-     contribution
                                            Technical     actions (*)
  – IP    (*) indicative figures in EUR                                  funding (*)        (*)
                                           Readiness
                                           Level (TRL)
        Supporting the
S2R-OC-
        implementation of the IP4         RIA up to
IP4-02-                                                   1,500,000       1,500,000              n.a
        multi-modal transport             TRL4
2018
        ecosystem

        Radio communication and
S2R-OC-
        simulation of train dynamics      RIA up to
IP5-01-                                                    600,000         600,000               n.a
        for Distributed Power within      TRL5
2018
        long trains

TOTAL                                                    21,155,714      19,120,000     2,035,714

                                                                                           #Shift2Rail
AWP 2018 - Tenders
                                                                                                Maximu
           Subject of
Number                Indicative scope                                                          m
           tender
                                                                                                budget
                       The activity shall assess the railway environment and identify new
                      alternative bearer beyond established cellular technologies
                      (UMTS/HSPA, LTE, LTE-A, etc.) or other access technologies
           Study on (WiFi/802.11, SatCom, etc.), which are or expected to become
           alternativ available for on-board to trackside communication needs. The
           e          availability of the alternative bearers might be restricted to certain
           communic areas (for example train stations, shunting yards, high-speed lines,
1-         ation      different terrains, etc.). The alternative bearers could rely on or             €
contract   bearers in leverage already available infrastructure or equipment alongside the      150,000
           the        railway tracks. Some potential candidates include but are not limited
           railway    to data over power lines, free space optical communications, etc.
           environm The results of the study are expected to enrich the set of access
           ent        network options for infrastructure managers, when they deploy their
                       new adaptable communication system and leverage the benefits of
                       alternative bearers to address specific needs of their planned rollout
                       of advanced services and applications.

                                                                                                 #Shift2Rail
AWP 2018 - Tenders

                                                                                              Maximu
Number     Subject of tender    Indicative scope                                              m
                                                                                              budget

                                Under supervision of the JU, in collaboration with the ERA,
                                the study should collect bridge and train data, as well as
                                calculation and validation methods, including:
           Study on railway
2-         bridge dynamics         calculation methods to describe the dynamic interface           €
contract   and the interface        vehicle – bridge;                                         250,000
           with rolling stock      vehicle design assessment method;
                                   validation of calculation methods;
                                   load models and vehicle design limits;
                                   proposal and suggestions for standardisation and
                                    regulation.

                                                                                              #Shift2Rail
AWP 2018 - Tenders

              Subject of                                                                   Maximum
Number                                             Indicative scope
               tender                                                                       budget
                              This activity aims at supporting the implementation of the
                              ERTMS European Action Plan, published by the European
                              Commission in June 2017.
           Support to
           ERTMS              Under the supervision of the JU and together with Commission
           European Action    Services (DG Move), inter alia, the contractor will perform tasks
           Plan to pave the   such as support the ERA Change Control Management process’
3-
           way for the        and related update of specification documentation (including € 1,600,000
contract
           deployment of      test specifications); Identification of the existing sets of
           the future S2R     engineering rules regarding transitions between systems;
           Innovative         Contribution to the technical review of trackside deployment of
           Solutions          ERTMS in cross-border sections; Contribution to the
                              drafting/updating of technical specifications for upcoming
                              ERTMS communication system set to replace GSM-R and to the
                              appraisal of the impact on interoperability of its roll-out.

                                                                                              #Shift2Rail
AWP 2018 - Tenders

                                                                                        Maximum
 Number    Subject of tender                      Indicative scope
                                                                                         budget

                                This activity aims at analysing the business case of
                                hydrogen and fuel cell usage in the rail environment,
           Study on use of      both in passenger train and freight.
4-         fuel cell hydrogen   The investigation could for example include analyses      € 270,000
contract   in railway           on the CO2 performance (through Life Cycle Analysis
           environment          techniques) of current rail powertrain solutions and
                                demonstrate the specific emissions saving that can be
                                achieved by replacing conventional technologies.

TOTAL                                                                                    € 2,270,000

                                                                                           #Shift2Rail
Programme approach and
future/current projects

                          50

                               #Shift2Rail
YOUR PROJECT and the overall S2R programme

• EACH PROJECT contributes to the achievement of the Master Plan and
  the MAAP objectives
• EACH PROJECT is part of a programme and cooperation with other
  projects must be ensured
     Through the collaboration and input to the JU Members, EACH PROJECT
    will support the realization of long-term S2R technological demonstrations
    or innovative break-through
• Particular attention is given to ensure that there is no duplication of
  work between EACH PROJECT and current/future R&I activities
• EACH PROJECT results are taken into consideration for the next annual
  work plans to ensure sufficient complementarity and coherence.

                                                                     #Shift2Rail
Complementarity & Collaboration Agreement

1. Complementary is defined at topic level
2. Complementarity between topics is compulsory
   established in the Grant Agreement (need for a
   Collaboration Agreement)
3. IP/CCA SteCos, high level synchronization points: Project
   Coordinators may attend the SteeCo meetings as observer
   and IP Coordinators cooperate with project coordinator to
   foster/promote synergies
4. S2R Programme Managers: Central Contact Point for both
   projects

                                                        #Shift2Rail
Complementarity & Collaboration Agreement

Issues to be tackled in the Collaboration Agreement (COLA)
(examples/non-exhaustive list)
     • Rules for collaboration, “who does what?”; Point of Contacts etc.
     • Handling review of documents
     • Agreement on action to be performed by both sides + linked
       timing (e.g. project A provides “user requirements” by M6 to
       project B; project B provides input by M18 to project A  project
       A uses input for deliver their deliverable 2.3).
     • Participation to restricted meetings (for specific purpose) or to
       public meetings (including Advisory Groups, etc…).

                                                                   #Shift2Rail
Overview of the standard call process
                                                  Invitation to
       Call deadline                                                                  Grant signature
                                                grant preparation

submission              Proposal Evaluation               Grant Agreement Preparation            Prefinancing

                           5 months max.                            3 months max.               Accession GA

                                            8 months maximum

  H2020 max. duration to Grant signature:
     Maximum five months from call closure date to end of evaluation - until the date of informing applicants
     Maximum three months to prepare grant agreement from the date of inviting (informing) applicants until
      the signature of the grant agreement
     Maximum eight months from call closure - until the signature of the grant agreement

                                                                                                    #Shift2Rail
who can participate?
•   Standard H2020 eligibility conditions:
    •       'Research and Innovation Actions' (RIA) and 'Innovation Actions' (IA): Minimum three legal
            entities established in minimum three different Member States or an Associated Countries
    •       'Coordination and Support Actions' (CSA): one or more legal entity(ies) established in a
            Member State or in an Associated Country
     Other entities from countries outside a Member State or Associated Country may participate
      to the open calls, but are, in principle, not eligible for funding unless there is a reciprocal
      agreement in place with that country or the applicant can demonstrate that the entity has
      unique resources that render its participation essential for the project to go ahead
      successfully
•   Additional conditions of S2R (Art 9(5) of H2020 RfP & Art. 17 S2R Regulation):
        •    Calls for members: Open only to members of the S2R JU and their affiliated entities
        •    Open calls: Open only to entities that are not members or affiliated entities of members of
             the S2R JU

                                                                                                     55
                                                                                              #Shift2Rail
who can participate?
•   Who are the affiliated entities of the S2R JU members?
    •   Any legal entity that is under the direct or indirect control of a member (or, in the case of
        consortia, a constituent entity of the consortium), or under the same direct or indirect
        control as the member (or constituent entity of the consortium), or that is directly or
        indirectly controlling a member (or constituent entity of the consortium)
    •   The control may take in particular either of the following forms:
         •   direct or indirect holding of more than 50% of the nominal value of the issued share
             capital in the legal entity concerned, or of a majority of the voting rights of the
             shareholders or associates of that entity or
         •   the direct or indirect holding, in fact or in law, of decision-making powers in the legal
             entity concerned.
    •   The following relationships between legal entities do not constitute control relationships:
         •   the same public investment corporation, institutional investor or venture-capital
             company has a direct or indirect holding of more than 50% of the nominal value of the
             issued share capital or a majority of voting rights of the shareholders or associates;
         •   the legal entities concerned are owned or supervised by the same public body.

                                                                                                 56
                                                                                          #Shift2Rail
S2R Members
European Union
8 Founding        Alstom, Ansaldo STS, Bombardier, Construcciones y Auxiliar de Ferrocarriles (CAF),
Members           Siemens, Thales and infrastructure managers Trafikverket and Network Rail
12 Associated     Amadeus IT Group, AZD Praha, Deutsche Bahn, DIGINEXT, Faiveley Transport, HaCon
Members (single   Ingenieurgesellschaft, INDRA Sistemas, Kapsch CarrierCom, Knorr-Bremse, MER MEC,
legal entities)   SNCF Mobilités, Patentes Talgo
7 Associated      •   AERFITEC (AERNNOVA Aerospace, FIDAMC, Fundacion TECNALIA)
Members           •   Competitive Freight Wagon (Contraffic, DLR, Waggonbau Niesky, Centro de Estudios e
(consortia)           Investigaciones Técnicas (CEIT), Verband der Bahnindustrie in Deutschland)
                  •   EUropean Rail Operating community (Infraestruturas de Portugal, BLS, CP, Finnish
                      Transport Agency, ÖBB-Infrastruktur, Polskie Koleje Państwowe, PRORAIL
                      ,Schweizerische Bundesbahnen, Slovenske zeleznice, Türkiye Cumhuriyeti Devlet
                      Demiryollari)
                  •   Smart DeMain (Strukton Rail, ACCIONA Infraestructuras, DLR, Fraunhofer, CEMOSA)
                  •   SmartRaCon (DLR, CEIT, Fondation Railenium, Nottingham Scientific Ltd)
                  •   Swi'Tracken (Fondation Railenium, Universidade Do Porto, Universidad Del Pais Vasco,
                      Universidade Do Minho, TATASTEEL, VOSSLOH-COGIFER, Institut für Zukunftsstudien
                      und Technologiebewertung, EGIS RAIL, Groupe EUROTUNNEL, TRONICO ALCEN)
                  •   Virtual Vehicle Austria consortium+ (Kompetenzzentrum, FCP Firtsch, Getzner
                      Werkstoffe, Kirchdorfer Fertigteilholding, Plasser&Theurer, Vvoestalpine Schienen,
                      Voestalpine VAE, Wiener Linien, AVL List, PJM Messtechnik, TATRAVAGONKA, AC2T
                      research, Materials Center Leoben Forschung                                      57
                                                                                                #Shift2Rail
funding rates
•   Applicable funding rates for the open calls:
     •   Funding rate depending on the type of action:
           • Up to 100% of eligible costs for 'Research and Innovation Actions' (RIA) and for
             'Coordination and Support Actions' (CSA)
           • Up to 70% for 'Innovation Actions' (IA), except non-profit organisations (up to 100%)
     •   One project = One funding rate for all beneficiaries / activities in the grant*
         *However, if non-profit organisations are in an IA together with for-profit organisations,
         their eligible costs will be reimbursed according to the different reimbursement rates
         specified above

     The reimbursement rates apply to all forms of costs, including indirect costs (overheads):
        25% flat rate (calculated on the basis of eligible direct costs, excluding direct sub-
        contracting costs)

                                                                                                  58
                                                                                           #Shift2Rail
http://shift2rail.org
                Twitter@Shift2Rail_JU

Thank you

                         #Shift2Rail
You can also read