Planning Justification Report - GSP Group
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Planning Justification Report 510 Centennial Parkway North, Hamilton Submitted to the City of Hamilton On behalf of: Confederation Park Shopping Centres Ltd. and Confederation Park Shopping Centres II Ltd. / SmartStop Self Storage Official Plan Amendment and Zoning By-law Amendment September 2021
Planning Justification Report 510 Centennial Parkway North, Hamilton Submitted to the City of Hamilton Official Plan Amendment and Zoning By-law Amendment September 2021
TABLE OF CONTENTS 1.0 INTRODUCTION .......................................................................................................... 1 Project Team .................................................................................................. 1 Site Description............................................................................................... 2 Surrounding Context ....................................................................................... 5 Transportation Context ................................................................................... 7 2.0 PROPOSED DEVELOPMENT ................................................................................... 10 Required Planning Applications .................................................................... 15 3.0 SUPPORTING STUDIES ........................................................................................... 17 Functional Servicing Report .......................................................................... 17 4.0 PLANNING POLICY FRAMEWORK .......................................................................... 18 Ontario Planning Act, R.S.O. 1990, c. P.13 ................................................... 18 Provincial Policy Statement, 2020 ................................................................. 21 A Place to Grow: Growth Plan for the Greater Golden Horseshoe, 2020 ...... 22 Urban Hamilton Official Plan (UHOP)............................................................ 23 Centennial Neighbourhoods Secondary Plan ................................................ 28 City of Hamilton Zoning By-law No. 6593 ...................................................... 48 5.0 PLANNING ANALYSIS .............................................................................................. 52 Provincial Policy and Plans ........................................................................... 52 Site Location, Community Context, and Proposed Land Use ........................ 52 Inclusion of Warehouse (self-storage facility) Use ......................................... 58 Request to Exclude Self-Storage Facility from the Maximum GFA ................ 58 Request to Permit a GFA Above 10,000m2 for a Single Use ......................... 60 Request to Amend Parking Requirements .................................................... 60 Conclusion .................................................................................................... 61 6.0 RECOMMENDATIONS .............................................................................................. 62 Planning Justification Report | 510 Centennial Parkway North, Hamilton i GSP Group Inc. | September 2021
Figures Figure 1 Site Location and Surrounding Context ................................................................... 4 Figure 2 Transit Context ....................................................................................................... 9 Figure 3 Overall Site Context .............................................................................................. 11 Figure 4 Proposed Development Area Conceptual Site Plan .............................................. 12 Figure 5 South & West Elevations....................................................................................... 13 Figure 6 North & East Elevations ........................................................................................ 14 Figure 7 Urban Hamilton Official Plan Schedule E – Urban Structure ................................. 24 Figure 8 Urban Hamilton Official Plan Schedule E-1 – Urban Land Use Designations ........ 27 Figure 9 Centennial Neighbourhoods Secondary Plan – Land Use Plan ............................. 29 Figure 10 Centennial Neighbourhoods Secondary Plan – Site Specific Policy Area Map .... 30 Figure 11 Centennial Neighbourhoods Secondary Plan – Transportation and Connections 47 Figure 12 Hamilton Zoning By-law No. 6593 ....................................................................... 49 Tables Table 1 Provincial Interest in regard to Subject Applications ............................................... 18 Table 2 Special Policy Area D – Response to Mixed-Use Gateway Policy .......................... 28 Table 3 Special Policy Area D – Response to District Commercial Policies ......................... 31 Table 4 Special Policy Area D – Response to Required Urban Design Guidelines .............. 33 Table 5 Special Policy Area D – Response to Overall Site Layout Urban Design Policies ... 34 Table 6 Special Policy Area D – Response to Urban Design Policies for Buildings ............. 36 Table 7 Special Policy Area D – Response to Public Road Adjacency Design Guidelines .. 38 Table 8 Special Policy Area D – Response to Additional Urban Design Guidelines ............. 39 Table 9 Special Policy Area D – Response to Additional Urban Design Guidelines ............. 39 Table 10 Special Policy Area D – Response to Pedestrian Realm Policies ......................... 41 Table 11 Special Policy Area D – Response to Landscaped Areas Policies ........................ 43 Table 12 Special Policy Area D – Response to Parking, Loading, and Service Policies ...... 44 Table 13 Special Policy Area D – Response to Vehicular Access Policies .......................... 45 Table 14 Zoning Compliance Chart ..................................................................................... 50 Table 15 Overall Site Parking Requirements ....................................................................... 51 Appendices Appendix A – Formal Consultation Document (FC-21-021) Appendix B – Draft Official Plan Amendment Appendix C – Draft Zoning By-law Amendment Appendix D – Public Consultation Strategy Planning Justification Report | 510 Centennial Parkway North, Hamilton ii GSP Group Inc. | September 2021
1.0 INTRODUCTION GSP Group Inc. has been retained by Confederation Park Shopping Centres Limited and Confederation Park Shopping Centres II Limited (the “Owner”) to prepare this Planning Justification Report in support of a 4-storey SmartStop self-storage facility at 510 Centennial Parkway North, in Hamilton, Ontario (the “Site”). Several planning approvals are required to implement the proposed development, including an Official Plan Amendment, Zoning By-law Amendment, Consent for Severance, and Site Plan Approval. This Planning Justification Report has been prepared in support of applications for an Official Plan Amendment and Zoning By-law Amendment (the “Subject Applications”). Specifically, this report provides an overview of the Site (Section 1.0); an outline of the proposed development (Section 2.0); an overview of the technical studies that have been completed in support of the Subject Applications (Section 3.0); an evaluation of the proposed development in the context of the Provincial Policy Statement (2020), A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020), the Urban Hamilton Official Plan (UHOP), and the City of Hamilton Zoning By-law No. 6593 (Section 4.0); a planning analysis (Section 5.0); and finally, our recommendations (Section 6.0). The Subject Applications and supporting materials are submitted in accordance with the Formal Consultation Document (FC-21-021) dated March 3, 2021 and constitute a complete application as described in Sections 22(4) and 34(10) of the Planning Act. The Formal Consultation document is attached to this report as Appendix A. A Consent to Sever application and Site Plan Control application required to implement the proposed development will be submitted under separate cover at the appropriate time in the development review process. Please note that throughout this report, the phrases ‘self-storage facility’, ‘mini-storage facility’ and ‘mini-warehousing’ are used interchangeably to refer to the proposed development. Project Team A team of professionals has been assembled as follows: Owner/Applicant: Confederation Park Shopping Centres Ltd. and Confederation Park Shopping Centres II Ltd. / SmartStop Self Storage Planning: GSP Group Inc. Architect: WPT Architecture Inc. Civil Engineering: The Odan/Detech Group Inc. Planning Justification Report | 510 Centennial Parkway North, Hamilton 1 GSP Group Inc. | September 2021
Site Description The Site consists of a large parcel of land located on the east side of Centennial Parkway North; south of the Queen Elizabeth Way (QEW), and north of the CN Railway. The overall Site has frontage on Centennial Parkway North to the west and Warrington Street to the northeast. The Proposed Development Area is located within the Site, centered from east-to- west, near the northern lot line. The area of the overall Site is 14.3 hectares (35.5 acres). The area of the Proposed Development Area is 0.5 hectares (1.3 acres), or 3.6% of the overall Site. The Proposed Development Area does not contain frontage on a public road (see Image A). The intention is to sever the Proposed Development Area from the Site at an appropriate later date. The future severance may include a narrow strip of land connecting the Proposed Development Area to Warrington Street in order to provide frontage on a public road. With respect to existing development, the Site consists of a large commercial shopping centre anchored by a Walmart department store and contains a variety of retail stores, financial institutions, health/dental offices, and restaurants, including: Toys “R” Us, Mucho Burrito, One Love Caribbean Cuisine, Great Clips (salon), Altum Health (physiotherapy), Castlemore Dental, Sally Beauty, LendDirect, Five Guys Burgers and Fries, Dollar Tree, PetSmart, Healthy Planet, and Buffalo Wild Wings. A picture of several of these commercial uses is provided in Image B. The balance of the Site consists of a network of internal drive aisles, a large surface parking area, and several vacant future development parcels The Proposed Development Area is vacant, relatively flat, and is covered by gravel, dirt, and scattered grass. The Site, and the Proposed Development Area within it, are shown in Figure 1. Planning Justification Report | 510 Centennial Parkway North, Hamilton 2 GSP Group Inc. | September 2021
Proposed Development Area Source: Google Streetview, Oct. 2020 Image A: The Proposed Development Area, seen here looking southeast, is vacant and relatively flat. The proposed self-storage facility will face east toward the Toys “R” Us—which can be seen here on the left side of the image. Source: Google Streetview Image B: The Site is largely developed as a commercial shopping centre and consists of a number of retail stores and restaurants, as well as a large surface parking area, as seen here looking east toward the Walmart. Planning Justification Report | 510 Centennial Parkway North, Hamilton 3 GSP Group Inc. | September 2021
Industrial Lake Ontario y kw leyP Val Hill Red Nor Site th S Con Proposed erv fed era ice tion Development Area Rd Dr Industrial Sou QEW th S Hotel erv ice Rd N kwy God rich ial P Dr Toys ‘R’ Confederation St tenn Restaurant rk GO Station na Commercial Cen La Industrial Walmart W Dollar Tree ar rin Industrial gt on St Petsmart & Healthy Planet Arr ows CN mit hR Rail Home Depot Ave d Cas cad ora eS t Ken t on S Commercial ingt Cov Industrial eN Av ke La Bar ton St Commercial Eas tgat e Ct Residential Residential 1 Figure Surrounding Context Source: Google Aerial Imagery (2018) Planning Justification Report | 510 Centennial Parkway North, Hamilton GSP Group | September 2021
Surrounding Context The dominant factor in the surrounding lands is the QEW and its large interchange with Centennial Parkway North and the Red Hill Valley Parkway. Between the QEW and Barton Street, Employment Areas prevail, with commercial uses found along both sides of Centennial Parkway North. Details of the surrounding land uses are as follows: North: To the northwest, there is a 6-storey hotel (Sandman—see Image C) with two attached restaurants (Moxie’s Grill Bar and Denny’s). To the northeast, a hydro corridor runs parallel to Warrington Street, beyond which are industrial uses and the QEW. East: Industrial uses prevail to the east, including a heavy-machinery equipment rental (Sunbelt Rentals), metal wholesalers (Alcarb Resources—see Image D), a mechanical contractor (Mattina Mechanical), and a variety of other industrial uses found along Warrington Street, Lanark Street, and Lake Avenue North. South: An active CN railway is located directly to the south, beyond which are a variety of industrial and commercial uses. The industrial uses are found along Cascade Street (see Image E) and Covington Street, and the commercial uses are located along Centennial Parkway North. The largest commercial operation is a Home Depot. The other commercial and industrial operations are of a smaller scale and include warehouses, vehicle repair shops, and outdoor storage. West: Across Centennial Parkway North, on the west side of the street, there is a commercial retail plaza and a hotel (Sheraton), as well as the Centennial GO Station (see Image F). The Centennial GO Station is currently operating as a bus depot, with a train station planned to be constructed in the near future. (Source: Google Street View; Oct. 2018) Image C: A 6-storey hotel (Sandman) with two attached restaurants (Moxie’s Grill Bar and Denny’s) is located to the northwest of the Site. Planning Justification Report | 510 Centennial Parkway North, Hamilton 5 GSP Group Inc. | September 2021
(Source: Google Street View; Oct. 2018) Image D: Industrial uses prevail to the east of the Site, including metal wholesalers, such as Alcarb Resources. (Source: Google Street View; Oct. 2018) Image E: A mixture of industrial and commercial uses are located to the south of the Site, as seen here looking west on Cascade Street. The rear entrance to Home Depot can be seen at the end of the street. (Source: Google Street View; Oct. 2020) Image F: The Confederation GO Station is located across Centennial Parkway North and can be reached within a 5-minute walk (400 metres). Planning Justification Report | 510 Centennial Parkway North, Hamilton 6 GSP Group Inc. | September 2021
Transportation Context Road Network and Highway Access The Site is in close proximity to the QEW, which can be readily accessed from Centennial Parkway North. The South Service Road also has a one-way exit through to Warrington Street, which provides two secondary accesses to the rear of the Site. The primary access is off a signalized intersection at Centennial Parkway North to the west. There are three accesses in total. A network of internal drive aisles provide vehicular access throughout the Site. Local Transit As shown in Figure 2, the Site is internally serviced by two local HSR bus routes: • HSR Route 44—Rymal: Provides service from the Site to the Ancaster Business Park via Centennial, Upper Centennial, and Rymal Road. Service runs 7 days a week from the early morning until after midnight. Notably, Route 44 is the ‘S’ in the City’s proposed BLAST frequent rapid transit system, which was developed as part of the City’s 2007 Transportation Master Plan. • HSR Route 56—Centennial: Provides service between Eastgate Square and the Beach Strip. This route only services Confederation Park and Wild Waterworks during the weekends of the summer season when the park is open. Regional Transit The Confederation GO Station (see Image F) is located across Centennial Parkway North and can be reached within a 5-minute walk (400 metres). A public tender was issued in April 2020 to construct the future train station, which will include a pedestrian tunnel, and direct stair access from the platform to Centennial Parkway North. The Confederation GO Station will be part of the Lakeshore West line with access to Toronto’s Union Station as well as in-between stations. In the interim, GO Bus Route 12 currently operates out of the station and provides regional connections to Burlington GO Station, Mapleview Mall, the Dundas Street-Highway 407 Park & Ride, Grimsby, St. Catharines, and Niagara Falls. Planning Justification Report | 510 Centennial Parkway North, Hamilton 7 GSP Group Inc. | September 2021
Relevance of Transportation Context to the Site: Convenient vehicular access is essential to the operation of the proposed self-storage facility, as the majority of users will likely utilize vehicles to pick-up and drop-off bulky and/or heavy storage items. The Site’s convenient access to Centennial Parkway North and the QEW is well-suited for this purpose. While transit access may not seem necessary for the operation of a self-storage facility, it does allow employees to access the facility, and for users to deposit and retrieve lighter/less bulky items. In this way, the Site benefits from a direct HSR bus connection and short a 5-minute walk to the Centennial GO Station. Planning Justification Report | 510 Centennial Parkway North, Hamilton 8 GSP Group Inc. | September 2021
HSR Bus Routes 2 Route 2 - Barton 44 Route 44 - Rymal 56 Route 56 - Centennial Limited Service Site 2 Figure Transit Context Source: Hamilton Street Railway System Map (December 2019) Planning Justification Report | 510 Centennial Parkway North, Hamilton GSP Group | September 2021
2.0 PROPOSED DEVELOPMENT The proposed development consists of a 4-storey self-storage facility with a building footprint of 3,207 square metres (34,524 square feet) and a total floor area of 12,482 square metres (134,355 square feet). The principle entrance is located on the east side of the building, closest to the parking area, and leads to an office that is approximately 161 square meters. For pedestrian comfort, a canopy is provided above the principle entrance, at the northeast corner, and at the rear of the building where access is provided to the electrical and mechanical rooms. There are two emergency exits provided, one at the north and one at the south side of the building. A total of sixteen (16) surface parking spaces are provided at grade, with an additional three (3) pull-in loading zone spaces that are located internal to the building. One (1) barrier-free parking space is provided closest to the principle entrance. Pedestrian access is provided by sidewalks on all sides of the building, with the exception of the area immediately behind the pull-in loading zones. The building will continue to be accessed from the Site’s existing internal drive aisles, which are located to the north, west, and south of the Proposed Development Area. Overall, the proposed development will: • Develop a vacant portion of land within a large commercial shopping centre; • Diversify the available uses within the shopping centre; • Facilitate further commercial intensification by providing a convenient storage service to local and regional businesses; • Optimize the use of existing municipal water and waste water services; and • Support HSR routes 44 and 56, as well as the Centennial GO Station. The proposed development concept has been prepared by WPT Architecture Inc. and is shown on the next page; the overall Site is shown in Figure 3, and the Proposed Development Area is shown in Figure 4. The conceptual south and west building elevations are shown on Figure 5, and the north and east elevations are shown in Figure 6. Planning Justification Report | 510 Centennial Parkway North, Hamilton 10 GSP Group Inc. | September 2021
ARCHITECTURAL SITE PLAN - OVERALL 3 Figure 1 A100 Overall Site Context SCALE: 1:750 Source: WPT Architect Inc. (August 2021) Planning Justification Report | 510 Centennial Parkway North, Hamilton GSP Group | September 2021
EQR[TKIJV &'5+)0'4 %+8+. '.'%64+%#. /'%*#0+%#. 5647%674#. 2.#00'4#0&. %.+'06.1)1 %.+'06 RPRTQLGEVPQTV 1 ARCHITECTURAL SITE PLAN 4 ^/d^dd/^d/^͗^>&Ͳ^dKZ'h/>/E' >'E Figure A101 SCALE: 1:200 Proposed Development Area Conceptual Site Plan >'>^Z/Wd/KEK&WZKWZdz͗ KE/E'Z'h>d/KE ZYh/Z WZKWK^͘ Source: WPT Architect Inc. (August 2021) VPVTWGPQTVJ CTEJKVGEV ϱϭϬEdEE/>WZKdZ ϰ͕ϬϬϬ^D WZKWK^s>KWDEdZ ^hZszz,K>/E':KE^sEZsE/E͘ dK^sZ/E&hdhZ͗цϱ͕ϯϲϱ^D dh'h^dϬϰ͕ϮϬϮϭ Planning Justification Report | 510 Centennial Parkway North, Hamilton WZD/ddh^^ tZ,Kh^;&/E/d/KEK^EKd tZ,Kh^;^W/&/>>z͕ WZKWK^h/>/E' /E>hD/E/Ͳ^dKZ'&/>/dzͿ D/E/Ͳ^dKZ'&/>/dzͿ GSP Group | September 2021 WZKWK^^>&Ͳ^dKZ'h/>/E' ^/dZ͗ Dy͘'& Dy/DhDdKd>'&K&ϰϱ͕Ϭϱϴ^D hZZEd'&K&>>s>KWDEd͗ϯϲ͕ϲϯϲ^D y/^d/E'h/>/E'^KE^/d y/^d/E',KDWKd^/d;ΎͿ ϯϱ͘ϱϰĐƌĞƐ ϭ͕ϱϰϴ͕Ϯϵϴ^& ϭϰϯ͕ϴϯϳ^D ^,>>WZD/dd ^>&Ͳ^dKZ'&/>/dz͗ϭϮ͕ϴϬϴ^D WZKWK^^sZE&KZ^DZd^dKW ϭ͘ϯϮĐƌĞƐ ϱϳ͕ϲϰϬ^& ϱ͕ϯϱϱ^D dKd>'&͗ϰϵ͕ϰϰϰ^D >E^WZ WZKWK^,KDWKd^/ddKZD/E ϯϰ͘ϮϮĐƌĞƐ ϭ͕ϰϵϬ͕ϲϬϳ^& ϭϯϴ͕ϰϴϮ^D D/y͘,/',d h/>/E'͗ϭϮ^dKZz^ h/>/E'͗ϰ^dKZz^
ϭ Ϯ ϯ ϰ ϱ ϲ #TEJ( Z VKVNGDNQEM 926#4%*+6'%674'+0% EQR[TKIJVRTQVGEVGF (145 + IGPGTCNPQVGUV[RKEC +,*+3$5$3(7 • %1064#%614+54'52105+$.'618 &+/'05+105&'6#+.552'%+(+%#6+ 07/ 07/ 07/ 8'4+(;5+6'%10&+6+105#0&4'2 07/ 07/$ 0/7 07/$ 07/ 07/$ 07/ 07/ #0&&+5%4'2#0%+'5616*'#4%*+ /2:3$5$3(7 241%''&+0)9+6*6*'914- >@>@ • &1%7/'065#4'61$'4'#&+0%1 %1057.6#065&1%7/'06#6+10 • &10165%#.'&4#9+0)5&1016 86522)'(&. %105647%6+1070.'55+0&+%#6'& 56#/2'�&5+)0'&$;6*'#4%* • %1064#%614#0&%105647%6+10 %1&'5$;.#952418+0%+#.#0&( 4'37+4'/'065 >@ • #..&1%7/'0654'/#+06*'2412 #0&/#;016$'75'&144'241& 2'4/+55+10 )2857+ >@ 7+,5' >@ ϯ ϮϬϮϭͲϬϴͲϯϭ /^^h&KZ^W Ϯ ϮϬϮϭͲϬϴͲϮϳ /^^h&KZ/^h^^/KE 6(&21' ϭ ϮϬϮϬͲϬϴͲϬϱ /^^h&KZ/^h^^/KE ;;;;Ä//Ä&& 4 '8 +5+10 5 >@ *5281' 72)227,1* 07/ */6 &3@ )2857+ /'%*#0+%#. >@ 7+,5' 5647%674#. >@ 6(&21' 2.#00+0) >@ .#0&5%#2+0) *5281' 72)227,1* 67 &3
ϭ Ϯ ϯ ϰ ϱ ϲ #TEJ( Z VKVNGDNQEM 926#4%*+6'%674'+0% EQR[TKIJVRTQVGEVGF (145 + IGPGTCNPQVGUV[RKECN • %1064#%614+54'52105+$.'618 &+/'05+105&'6#+.552'%+(+%#6+1 07/$ 07/$ 07/ 07/$ 07/ 07/ 07/$ 07/ 07/$ 07/$ 07/$ 07/ 8'4+(;5+6'%10&+6+105#0&4'21 07/ 07/$ #0&&+5%4'2#0%+'5616*'#4%*+6 +,*+3$5$3(7 241%''&+0)9+6*6*'914- >@>@ • &1%7/'065#4'61$'4'#&+0%1 /2:3$5$3(7 %1057.6#065&1%7/'06#6+10 • &10165%#.'&4#9+0)5&1016 86522)'(&. %105647%6+1070.'55+0&+%#6'& 56#/2'�&5+)0'&$;6*'#4%* • %1064#%614#0&%105647%6+10/ %1&'5$;.#952418+0%+#.#0&( 4'37+4'/'065 >@ • #..&1%7/'0654'/#+06*'2412' #0&/#;016$'75'&144'241&7 2'4/+55+10 )2857+ >@ 7+,5' >@ ϯ ϮϬϮϭͲϬϴͲϯϭ /^^h&KZ^W Ϯ ϮϬϮϭͲϬϴͲϮϳ /^^h&KZ/^h^^/KE 6(&21' ϭ ϮϬϮϬͲϬϴͲϬϱ /^^h&KZ/^h^^/KE ;;;;Ä//Ä&& 4 '8 +5+10 5 >@ *5281' 72)227,1* */6 &3@ )2857+ /'%*#0+%#. >@ 7+,5' 5647%674#. >@ 6(&21' 2.#00+0) >@ .#0&5%#2+0) *5281' 72)227,1* 67 */6 &3
Required Planning Applications Through the Formal Consultation process (FC-21-021) it was determined that an Official Plan Amendment (OPA) and Zoning By-law Amendment (ZBA) are required to implement the proposed self-storage facility. Official Plan Amendment An amendment to Special Policy Area D of the Centennial Neighbourhoods Secondary Plan within the Urban Hamilton Official Plan is required to address the following: 1. To amend Policy 6.7.18.4 b) i) to add an additional permission for “enclosed storage including mini warehousing”, identical wording used for a self-storage facility in the Arterial Commercial Designation; 2. To amend Policy 6.7.18.4 b) iv) to permit a maximum gross floor area of 12,482 square meters for the “mini warehousing” (self-storage facility), whereas Policy E.4.7.3 c) of Volume 1 of the UHOP permits a maximum of 10,000 square metres for a single use; and 3. To amend Policy 6.17.18.4 d) i) to exclude self-storage facilities from the maximum gross floor area (45,058 square metres) permitted for all development on the Site. The proposed OPA is further discussed in Section 5.0 Planning Analysis of this report, and a draft amendment is appended to this report as Appendix B. Zoning By-law Amendment An amendment to Hamilton Zoning By-law No. 6593 and By-law 10-081 is required to permit a self-storage facility in a G-1 (Designed Shopping Centre) District, Modified by S-1613. The proposed zoning by-law amendment further modifies S-1613 (By-law 10-081) as follows: 1. To amend Section 2.3(j) to update the definition of Warehouse to include “Mini Storage Facility,” consistent with the definition of Warehouse as provided in Zoning By-law 05-200; 2. To amend Section 2.3(a) to exclude self-storage facilities (defined as Warehouse in the zoning by-law) from the maximum gross floor area (45,058 square metres) permitted for all development on the Site; and 3. To amend the parking requirements for a Warehouse using the parking standard established in Zoning By-law 05-200, which requires parking for a Warehouse to be Planning Justification Report | 510 Centennial Parkway North, Hamilton 15 GSP Group Inc. | September 2021
provided at a rate of 1 parking space for each 30 square metres of gross floor area that accommodates the Office component of the use. The proposed ZBA is further discussed in Section 5.0 Planning Analysis of this report, and a draft by-law is appended to this report as Appendix C. Planning Justification Report | 510 Centennial Parkway North, Hamilton 16 GSP Group Inc. | September 2021
3.0 SUPPORTING STUDIES In addition to this Planning Justification Report, the Pre-Consultation Document (FC-21-021) identified the following report requirements for a complete application: • Stormwater Management Report; and • Functional Servicing Report. The following is intended to provide a brief summary of the key findings and conclusions of the study. However, the report should be reviewed in its entirety. Functional Servicing Report The Odan/Detech Group Inc., August 16, 2021 The Odan/Detach Group Inc. was retained by Smart Centres to complete a Functional Servicing Report in support of the proposed development. The report evaluates the serviceability of the site with respect to sanitary waste water, water and storm water management (SWM) and will implement the SWM criteria identified by City staff in prior correspondence. Sanitary Sewers The report found that there are existing 200mm and 250mm diameter sanitary sewers within the site which connect to an existing 450mm diameter municipal sanitary sewer flowing northerly on Warrington Street, adjacent to the site’s north boundary. The report states that based on the calculations provided therein the proposed development will have no negative impacts to the downstream sanitary sewer. Watermains The report found that there are existing 200mm diameter watermains within the site and 300mm diameter municipal watermains adjacent to the site on the Warrington Street and Centennial Parkway. The intention is to connect the proposed development to an existing 200mm stub (provided previously) for domestic and firefighting purposes. The report states that based on the analysis contained therein we can confirm that there is sufficient pressure and flows for the proposed development. Conclusion The report concludes that the Proposed Development Area is serviceable utilizing existing sanitary, storm and water main infrastructure within and adjacent to the site. Storm water management for the proposed development will match existing conditions as described in the report. Planning Justification Report | 510 Centennial Parkway North, Hamilton 17 GSP Group Inc. | September 2021
4.0 PLANNING POLICY FRAMEWORK The following is intended to provide a review and highlight the planning policy framework applicable to the Site. These policy documents include: the Planning Act, the Provincial Policy Statement (2020), A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020), the Urban Hamilton Official Plan, and City of Hamilton Zoning By-law No. 6593. Ontario Planning Act, R.S.O. 1990, c. P.13 Section 2 of the Planning Act sets out matters of Provincial Interest when considering and carrying out responsibilities under the Act. The following table provides an analysis of the Subject Applications in response to the prescribed Provincial interest: Table 1 Provincial Interest in regard to Subject Applications Provincial Interest Policy Response a) The protection of ecological systems, The Site is not located in a Natural Heritage including natural areas, features and System as per Ministry of Natural Resources and functions Forestry online mapping. As per Schedule B— Natural Heritage System of the Urban Hamilton Official Plan, the Site is not incumbered by any natural heritage features. b) The protection of the agricultural The Site is not located in the Agricultural Land resources of the Province Base for the Greater Golden Horseshow as per online mapping (Agricultural Systems Portal). c) The conservation and management As per Appendix C: Non-Renewable Resources of natural resources and the mineral of the UHOP, the Site is not located in a Mineral resource base Resource Area. d) The conservation of features of As per the City of Hamilton’s online heritage significant architectural, cultural, mapping, there appear to be no cultural heritage historical, archaeological or scientific resources on or adjacent to the Site. interest e) The supply, efficient use and The Site will utilize existing energy and water conservation of energy and water infrastructure. In addition, the proposed development is intended to utilize TPO white roofing, which is bright white and highly reflective, reducing the amount of heat absorption during the summer. The two lavatories also intend to use water-efficient toilets. Planning Justification Report | 510 Centennial Parkway North, Hamilton 18 GSP Group Inc. | September 2021
Provincial Interest Policy Response f) The adequate provision and efficient The proposed development will utilize existing use of communication, water and wastewater infrastructure. As outlined transportation, sewage and water in Section 1.4 of this Report, the proposed services and waste management development will utilize and support HSR Routes systems 44, and 56; and GO Bus Route 12. g) The minimization of waste A self-storage facility allows users the option of storing goods and materials that might otherwise be discarded in the landfill due to space constraints. h) The orderly development of safe and One (1) barrier free parking space has been healthy communities; the provided closest to the principle entrance. accessibility for persons with disabilities to all facilities, services Through the building permit process, the and matters to which this Act applies proposed development will be required to demonstrate compliance with the Ontario Building Code, which includes barrier-free design provisions. i) The adequate provision and N/A distribution of educational, health, social, cultural and recreational facilities j) The adequate provision of a full N/A range of housing, including affordable housing k) The adequate provision of The proposed development will create employment opportunities employment opportunities limited to the auxiliary office use as well as any security arrangements. l) The protection of the financial and The proposed development will protect the economic well-being of the Province financial and economic well-being of the Province and its municipalities and the City of Hamilton by optimizing the use of existing infrastructure and services within the Built-up Area. m) The co-ordination of planning N/A activities of public bodies n) The resolution of planning conflicts N/A involving public and private interests Planning Justification Report | 510 Centennial Parkway North, Hamilton 19 GSP Group Inc. | September 2021
Provincial Interest Policy Response o) The protection of public health and N/A safety p) The appropriate location of growth The Proposed Development Area is an and development appropriate location for development as it is located in Hamilton’s Built-up Area, within a commercial shopping centre and will utilize existing municipal services and transit. q) The promotion of development that is As outlined in Section 1.4 of this report, the designed to be sustainable, to proposed development will utilize and support support public transit and to be HSR Routes 44, and 56; and GO Bus Route 12. oriented to pedestrians With respect to pedestrians, the proposed development includes sidewalks surrounding the building (with the exception of the loading zone), which will provide a comfortable pedestrian route to the nearby bus platforms and contribute to the internal pedestrian circulation system. r) The promotion of built form that, The proposed development has been (i) is well-designed, professionally-designed by WPT Architecture Inc. (ii) encourages a sense of place, to provide a safe, accessible, and attractive self- and storage facility in the context of a commercial (iii) provides for public spaces shopping centre. that are of high quality, safe, accessible, attractive and vibrant s) The mitigation of greenhouse gas As outlined in Section 1.4 of this report, the emissions and adaptation to a proposed development will utilize and support changing climate HSR Routes 44, and 56; and GO Bus Route 12. Planning Justification Report | 510 Centennial Parkway North, Hamilton 20 GSP Group Inc. | September 2021
Provincial Policy Statement, 2020 The Provincial Policy Statement, 2020 (“PPS”) provides policy direction on matters of provincial interest related to land use planning and development. The PPS is issued under the authority of Section 3(1) of the Planning Act and came into effect on May 1, 2020. Section 3(5) of the Planning Act requires that decisions affecting planning matters be consistent with the PPS. The following policies, amongst others, apply to the proposed development. “1.1.1 Healthy, liveable and safe communities are sustained by: b) accommodating an appropriate affordable and market-based range and mix of residential types (including single-detached, additional residential units, multi-unit housing, affordable housing and housing for older persons), employment (including industrial and commercial), institutional (including places of worship, cemeteries and long-term care homes), recreation, park and open space, and other uses to meet long-term needs; 1.1.3.1 Settlement areas shall be the focus of growth and development, and their vitality and regeneration should be promoted. 1.1.3.2 Land use patterns within settlement areas shall be based on densities and a mix of land uses which: a) efficiently use land and resources; b) are appropriate for, and efficiently use, the infrastructure and public service facilities which are planned or available, and avoid the need for their unjustified and / or uneconomical expansion; Land use patterns within settlement areas shall also be based on a range of uses and opportunities for intensification and redevelopment in accordance with the criteria in policy 1.1.3.3, where this can be accommodated. 1.1.3.3 Planning authorities shall identify appropriate locations and promote opportunities for transit-supportive development, accommodating a significant supply and range of housing options through intensification and redevelopment where this can be accommodated taking into account existing building stock or areas, including brownfield sites, and the availability of suitable existing or planned infrastructure and public service facilities required to accommodate projected needs”. Planning Justification Report | 510 Centennial Parkway North, Hamilton 21 GSP Group Inc. | September 2021
Relevance to the Site: The Site is located within the Urban Boundary and a settlement area. While the overall Site is largely developed as a commercial shopping centre, the Proposed Development Area is vacant. The proposed development will contribute to the mix of land uses in the area by diversifying the available commercial services provided within the shopping centre. The proposed development represents a more efficient use of land and existing infrastructure. Based on the foregoing, the proposal is consistent with the Provincial Policy Statement (2020). A Place to Grow: Growth Plan for the Greater Golden Horseshoe, 2020 On May 16, 2019 “A Place to Grow: Growth Plan for the Greater Golden Horseshoe” came into effect, replacing the 2017 “Growth Plan for the Great Golden Horseshoe”. Amendment 1 (2020) to the Growth Plan for the Grater Golden Horseshoe 2019 was approved and came into effect on August 28, 2020 (“the Growth Plan”). The Growth Plan applies to the area designated as the Greater Golden Horseshoe Growth Plan Area which includes the entire City of Hamilton. All decisions that affect a planning matter must conform to the Growth Plan. The following is a summary of the policies applicable to the proposed modifications and how the policies of the Growth Plan have been addressed. The Growth Plan directs the majority of growth to settlement areas that have access to municipal water and wastewater systems and can support the achievement of complete communities. The following policies, amongst others, apply to the proposal: “2.2.1.2 Forecasted growth to the horizon of this Plan will be allocated based on the following: a) the vast majority of growth will be directed to settlement areas that: i. have a delineated built boundary. ii. have existing or planned municipal water and wastewater systems; and, iii. can support the achievement of complete communities; c) within settlement areas, growth will be focused in: i. delineated built-up areas; ii. strategic growth areas; iii. locations with existing or planned transit, with a priority on high order transit where it exists or is planned; and, iv. areas with existing or planned public service facilities; 2.2.1.4 Applying the policies of this Plan will support the achievement of complete communities that: Planning Justification Report | 510 Centennial Parkway North, Hamilton 22 GSP Group Inc. | September 2021
a) feature a diverse mix of land uses, including residential and employment uses, and convenient access to local stores, services, and public service facilities; Relevance to the Site: The Site is located within the urban boundary and is fully serviced by municipal water and wastewater infrastructure. The proposal will facilitate the future development of a self-storage facility, which will diversify the uses available within an existing commercial shopping centre. As outlined in Section 1.4 of this report, the Site is located in an area with existing transit, including HSR Route 44 and 56, and GO Bus Route 12; and planned transit in the form of the upcoming Centennial GO train station. Based on the forgoing, the development proposal conforms to the policies of the Growth Plan (2020), as amended. Urban Hamilton Official Plan (UHOP) The City of Hamilton Urban Official Plan (“UHOP”) was adopted by City Council on July 9, 2009, approved by the Ministry of Municipal Affairs and Housing (“MMAH”) on March 16, 2011 and came into effect on August 16, 2013. The UHOP provides direction and guidance on the management of land use change and physical development within the City. Urban Structure Hamilton’s urban structure formally identifies how the City will physically grow over the long-term and provides a general high level land use vision for the City. The urban structure is based on a system of Urban Nodes, Urban Corridors, Major Activity Centres, Neighbourhoods, Employment Areas, and Major Open Space. With respect to the planned urban structure, the Site is identified as part of the Neighbourhoods element on Schedule E – Urban Structure (see Figure 7). The policies of the Neighbourhoods urban structural element are found in Section E.2.6 of Volume 1 of the UHOP. Among numerous other functions, Neighbourhoods contain commercial areas, which “…will see some physical change over time. Neighbourhoods will evolve as […] infill development occurs, commercial areas are invigorated, or underutilized commercial areas redeveloped.” Planning Justification Report | 510 Centennial Parkway North, Hamilton 23 GSP Group Inc. | September 2021
NT ALBIO RD RD MOU IN RD E Nodes NTA MOUNTA UPPER GREEN UPPER QEW N IN Downtown Urban Growth Centre BRO N RD OTTAWA MOUNTAI GREEN GAGE AV LEWIS RD W WINONA SECOND THIRD RD ELEVENTH MUD ST MCNEILY BLV GLOVER EAST TOW UPPER TENTH RD Sub Regional Service D EIGHTH RD ST SEVENTH RD E RHVP E RD FRUITL RD E QEW RD MOHAWK RD E E FIFTY RD SIXTH RD RD MUD ST N UPPER KENILWO FIFTH RD E E ARVIN AV BARTON ST LINE RD Community AND RD RD E RD E HIGHLAND MUD ST Legend JONES NASH RD E FIRST RD E ST E CENTENNIA NINTH RD RTH ST BARTON DEWITT FIRST RD Urban Structure Elements Corridors MILLEN GREEUP RD 8 RD E HIGHLAND E GRAYS RD DR N E NT RD C Primary N RD L OU W E RD RD TOWN LIN CENTEN M PER W SOUTH RA HLAND RD Neighbourhoods PKWY PA HIG RHVP RIDGE RD 8 20 ELEVEN PRITCHA NIAL MOUNT AL Secondary DARTNA UPPER RE WY VALLEY RD E TENTH RD N RD QUEENSTO Employment Areas ST E TH RD PKWY EIGHTH RD KING LAKE AV RYMAL RD RD NASH RD LL RD E BION RD PK Other Features RD D HILL RIDGE RD Major Activity Centres E S E KING ST E TAPLEYTOWN Rural Area Major Open Space NEBO RD GLOVER John C. Munro MILES RD RD FLETCHER 56 WESTBRO Nodes Hamilton International Airport RD UBTARD CLUN IN RD E GOLFMO GREEN OK RD RD TRINITY Downtown Urban Growth Centre HENDER MOUNTAI N RD Niagara Escarpment GREEN SECOND THIRD RD ELEVENTH MUD ST CHURCH SHOT RD EAST TOW TENTH RD Sub Regional Service Urban Boundary EIGHTH RD SEVENTH RD E RD RD E E SIXTH RD MUD ST N LINE RD UPPER FIFTH RD E Community RD E RD Municipal Boundary E HIGHLAND MUD ST E FIRST RD RD GUYATT E CENTENNIA NINTH RD FIRST RD WOODBU HIGHLAND RD E Corridors Lands Subject to Non Decision E DR 113 West Harbour Setting Sail E NT Primary RN RD L U NEBO RD W E RD MO SOUTH TOWN LIN R A D RD W HIGHLAN PKWY PA 20 Secondary Council Adoption: July 9, 2009 Ministerial Approval: March 16, 2011 RYMAL RD Effective Date: August 16, 2013 LBION RD RD E Other Features K RD BINBROO 56 Rural Area Urban Hamilton Official Plan Schedule E WOODWA John C. Munro Urban Structure FLETCHER 56 WESTBRO RD E UB RD KIRK RD Hamilton International Airport QEW GOLF CL TYNESIDE WOODBU MILES RD OK RD RD HENDER TRIMBLE Niagara Escarpment RN RD FERRIS RD RD HARRISO BELL RD SHOT RD Not To Scale RD RD E BERRY CHIPPEWA RCH RD Urban Boundary Date: February 2021 N RD RD PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT Municipal Boundary C Teranet Land Information Services Inc. and its licensors. [2009] May Not be Reproduced without Permission. THIS IS NOT A PLAN RD GUYATT OF SURVEY WOODBU Lands Subject to Non Decision Site RD AVE 113 West Harbour Setting Sail RN RD DALE AV NASH R Council Adoption: July 9, 2009 ST E Ministerial Approval: March 16, 2011 BARTON Effective Date: August 16, 2013 K RD BINBROO 56 Urban Hamilton Official Plan Schedule E G Urban Structure EN KIRK RD DN WOODBU TRIMBLE GRAYS R RN RD HARRISO BELL RD Not To Scale RD BERRY Date: February 2021 N RD RD PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT C Teranet Land Information Services Inc. and its licensors. [2009] CENTEN May Not be Reproduced without Permission. THIS IS NOT A PLAN OF SURVEY RHVP D 8 NIAL PK ON RD QUEENST E G ST LAKE A K I N NASH R WY VE DS KING ST E 7 Figure RD Urban Hamilton Official Plan - Urban Structure Source: Urban Hamilton Official Plan Schedule E (October 2016) MOUNT Planning Justification Report | 510 Centennial Parkway North, Hamilton GSP Group | September 2021 RD AL
The following policies describe the commercial function of the Neighbourhoods: “2.6.5 The Neighbourhoods element of the urban structure shall permit a range of commercial uses including retail stores and services. These commercial uses may be clustered into plaza forms or in main street configurations. Over time, some of these commercial areas may evolve into a mixed use form, where appropriate. Commercial uses that cater to a broader regional market shall be directed to appropriate Urban Nodes. The Neighbourhoods element of the urban structure permits a broader range of commercial areas than the Neighbourhoods Designation. The different types of commercial areas are designated on Schedule E-1 – Land Use Designations. The policies of Section E.4.0 – Commercial and Mixed Use Designations, Section E.3.0 – Neighbourhoods Designation, and applicable secondary plans of Volume 2 shall provide specific direction on the scale of commercial uses in the various commercial and mixed use designations. 2.6.6 The Neighbourhoods element of the urban structure shall permit arterial commercial type uses in appropriate locations through specific land use designations as specified in Section E.4.0 – Commercial and Mixed Use Designations and where designated on Schedule E-1 – Urban Land Use Designations. These uses include services catering to the traveling or drive-by consumer as well as retail stores, which are land extensive, require outdoor storage, or have a warehouse-type character, and cannot be appropriately accommodated in the Urban Nodes.” Relevance to the Site: As per policy 2.6.5, a range of commercial uses, including services, are permitted in the Neighbourhoods element. These commercial uses may be clustered into plaza forms, such as they are in the Site. As per policy 2.6.6, the Neighbourhoods element of the urban structure shall permit arterial commercial type uses in appropriate locations. These uses include services catering to the traveling or drive-by consumer, or have a warehouse-type character, and cannot be appropriately accommodated in the Urban Nodes. The Site is an appropriate location for an arterial commercial type of use, such as the proposed self-storage facility. As an established shopping centre with a large parking area, the Site already caters to the travelling and drive-by consumer. The Site also has convenient, close access to Centennial Parkway North and the QEW. The proposed development may reinvigorate the area and develop on an underutilized vacant portion of the Site. Planning Justification Report | 510 Centennial Parkway North, Hamilton 25 GSP Group Inc. | September 2021
Urban Land Use Designation The Site is designated District Commercial on Schedule E – Urban Structure (see Figure 8). The policies of the District Commercial designation are contained in Section E.4.7 of Volume 1 of the UHOP. Areas designated District Commercial are intended to provide retail and service commercial uses to the immediate neighbourhood. The function of the District Commercial designation is outlined below: “4.7.1 The range of retail uses are intended to serve the daily and weekly shopping needs of residents in the surrounding neighbourhoods. The District Commercial areas shall also serve as a focus for the adjacent neighbourhood(s) by creating a sense of place.” Policy 4.7.2 specifies that permitted uses include commercial uses, including retail stores, financial establishments, restaurants, service stations, medical clinics, and other commercial uses. This policy has been modified with the site specific policies of the Secondary Plan that applies to the Site, adding additional uses. Policy 4.7.3 (c) prohibits a single use over 10,000 square metres in floor area. This policy has been modified with the site specific policies of the Secondary Plan that applies to the Site, increasing the single use floor are for one department store. Relevance to the Site: A self-storage facility is not a permitted use within the District Commercial Designation, and therefore an Official Plan Amendment permitting an “enclosed storage including mini warehousing” is required to implement the proposed development. In addition, the Total Floor Area of the proposed development is approximately 12,482 square metres, and therefore a modification permitting a single use over 10,000 square metres is also required. Both policies are proposed to be modified in the Site Specific Special Policy Area D section contained within the Centennial Neighbourhoods Secondary Plan. Planning Justification Report | 510 Centennial Parkway North, Hamilton 26 GSP Group Inc. | September 2021
VENTH E CANNON ST Mixed Use - High Density TENTH RD ughson Street South, MAI 75 N STJames E Street South, QUEENS TON RD 9 Jackson Street East ST E Note: For Rural Land Use Designations, refer EIGHTH RD LAKE AVE KING NASH RD 217, 219, 221, 225 and 231 Main Street West, 67 & 69 Queen Street South and RD CENTENN to Schedule D of the Rural Hamilton Mixed Use - Medium Density OTTAWA RIDGE RD 64 Hess Street South GAGE AVE Official Plan. E S IAL PKW TAPLEYTOWN VE KING ST E ST S LAWRENCE RD District Commercial GREENH S Y N AC MOUNT QUIGLEY ILL AVE RD Arterial Commercial RIDGE RD ALBION MOU RD N RD E NTA MOUNTAI GREEN UPPER RD Employment Area Designations IN B ROW E MOUNTAIN RD Neighbourhoods OTTAWA GREEN BLV SECOND ELEVENTH MUD ST THIRD RD Industrial Land D QEW EAST TOW TENTH RD UPPER ST Open Space EIGHTH RD RD E SEVENTH UPPER MOH AWK RD E RHVP LEWIS RD RD E E KENILWOR SIXTH RD MUD ST Business Park N LINE RD MC UPP FIFTH RD WINONA E GLOVER NEI GAGE AVE ERLYCEN Institutional RD E RD E HIGHLAND HERMAN FRUITLA MUD ST E FIRST RD RDTEN TH ST RD E NINTH RD RD FIRST RD QEW Airport Employment Growth District FIFTY RD GRAYS RD ND RD AVE NIAL PKW W Utilitiy AVE ARVIN ST RD E D BARTON ST HIGHLAND E MU DR E JONES T LINC UN Shipping & Navigation UPPER T RD O E RD Y ST E AM TOWN LIN W DEWIT UPPER RED HIL BARTON PA R RD W Commercial and Mixed Use Designations SOUTH MILLEN HIGHLAND RD GREEN RD 8 MOUNT ALB 20 Other Features VALLEY PRITCHARD RD DARTNALL RD E Downtown Mixed Use Area PKWY ION RD RYMAL RD RIDGE RD 8 Rural Area RD ELEVENT RD L Mixed Use - High Density TENTH RD ST E H RD John C. Munro EIGHTH RD LAKE AVE E RYMAL RD KING CENTENN NEBO RD RIDGE RD Mixed Use - Medium Density Hamilton International Airport GLOVER E IAL PKW TAPLEYTOWN B RD MILES RD GOLF CLU Niagara Escarpment WESTBRO District Commercial RD Y RD E Urban Boundary WOODBU OK RD RD Arterial Commercial HENDER RIDGE RD N RD E RN RD MOUNTAI GREEN Municipal Boundary SHOT RD RD Employment Area Designations MOUNTAIN 56 GREEN Lands Subject to Non Decision 113 West SECOND ELEVENTH MUD ST THIRD RD RD E Industrial Land Harbour Setting Sail EAST TOW TENTH RD EIGHTH RD NEBO RD RD E SEVENTH RD GUYATT RD E E SIXTH RD MUD ST Business Park N LINE RD Council Adoption: July 9, 2009 UPPER CEN FIFTH RD E TRINITY RD E RD E HIGHLAND UD ST Ministerial Approval: March 16, 2011 E FIRST RD E NINTH RD Airport Employment Growth District CHURCH TENNIAL RD E Effective Date: August 16, 2013 FLETCHER FIRST RD RD E HIGHLAND E PKWY E RD Urban Hamilton Official Plan TOWN LIN E RD Shipping & Navigation W RD D RD W SOUTH Other Features Schedule E-1 20 RD BINBROOK WOODWA E RPORT RD RYMAL RD Rural Area Urban Land Use Designations RCH RD E KIRK RD John C. Munro Hamilton International Airport QEW GRAYS R TYNESIDE WOODBUR MILES RD B RD GOLF CLU Niagara Escarpment TRIMBLE WESTB FERRIS RD 56 RD N RD HARRISON BELL RD Not To Scale ROOK RDRD RD RD E Urban Boundary BERRY WOODBU CHIPPEWA RD AVE HENDER Date: February 2021 RD RN RD Site Municipal Boundary SHOT RD PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT 56 Lands Subject to Non Decision 113 West ALE AVE © Teranet Land Information Services Inc. and its licensors. [2009] May Not NASH R Harbour Setting Sail be Reproduced without Permission. THIS IS NOT A PLAN OF SURVEY D RD GUYATT Council Adoption: July 9, 2009 ST E Ministerial Approval: March 16, 2011 BARTON Effective Date: August 16, 2013 FLETCHER Urban Hamilton Official Plan DN RD Schedule E-1 N RD BINBROOK Urban Land Use Designations KIRK RD WOODBUR TRIMBLE 56 N RD HARRISON BELL RD Not To Scale RD BERRY RD Date: February 2021 RD PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT © Teranet Land Information Services Inc. and its licensors. [2009] May Not be Reproduced without Permission. THIS IS NOT A PLAN OF SURVEY RHVP 8 ON RD QUEENST ST E LAKE AV K I N G NASH R CENTEN E DS NIAL PK KING ST E Urban Hamilton Official Plan - 8 Figure D Land Use Designations GREENH WY Source: Urban Hamilton Official Plan Schedule E-1 (February 2018) MOUNT QUIGLE Planning Justification Report | 510 Centennial Parkway North, Hamilton ILL AVE GSP Group | September 2021 RIDG ALBIO Y RD
You can also read