OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS

Page created by Marcus Fischer
 
CONTINUE READING
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
OFFICER SOUTH EMPLOYMENT
PRECINCT STRUCTURE PLAN
PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
WORKSHOP HELD ON 26 NOVEMBER 2020 AND 4 DECEMBER 2020

FEBRUARY 2021
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
CONTENTS
1 INTRODUCTION                                                                                                                              1

1.1		 PSP 2.o Process                                                                                                                       1

1.2		 Purpose of the Place-Based Plan Co-Design Workshop Summary Report                                                                    2

2 PLACE-BASED PLAN CO-DESIGN WORKSHOP                                                                                                      3

2.1		 Who was involved?                                                                                                                    3

2.2 Place-Based Plan Co-Design Workshop Structure                                                                                          4

3 WHAT WE HAVE HEARD FROM YOU ALREADY                                                                                                      5

3.1		 Emerging Themes, Purpose Statement and Ambitions                                                                                     5

3.2 Additional Ambitions + PSP Tools                                                                                                       7

4 CO-DESIGN PLACE-BASED PLANS                                                                                                              15

4.1		 Introduction                                                                                                                         15

4.2 Types and Forms of Development / Land Uses                                                                                             16

4.3 Land Use Structure                                                                                                                     18

4.2 Open Space + Drainage                                                                                                                  25

4.3 Transport + Infrastructure                                                                                                          28

5 NEXT STEPS                                                                                                                               31

Prepared by:

Level 2, 299 Clarendon Street, South Melbourne, VIC 3205
phone. +61 3 9070 1166 meshplanning.com.au

                                                                    Disclaimer

                                                                    All professional care has been taken to ensure that the content of
© Mesh Livable Urban Communities Pty Ltd 2021                       this report is current and accurate. However, it is not purported
                                                                    that it is complete, and it is not guaranteed that the content of
This work is copyright. Apart from any use permitted under
                                                                    the report is free from errors. Mesh accepts no liability for error,
the Copyright Act 1968, no part may be reproduced by any
                                                                    loss, damages or other consequences arising from reliance on
process without written permission from Mesh Livable Urban
                                                                    information contained in this report.
Communities Pty Ltd

OFFICER SOUTH EMPLOYMENT PSP 2.o                              2                        PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
INTRODUCTION

PSP 2.o PROCESS                                               PURPOSE OF THE PLACE-BASED PLAN
                                                              CO-DESIGN WORKSHOP
The Victorian Planning Authority (VPA) is
                                                              SUMMARY REPORT
taking an innovative approach to shaping
the future of Melbourne’s communities,                        VPA would like to thank all participants for
through collaborative strategic planning.                     joining and contributing at the Officer South PSP
                                                              Place Based Plan (PBP) Co-Design Workshops
The Precinct Structure Plan (PSP) process was
                                                              in November and December 2020.
reviewed by the VPA in 2019 as part of a program of
continuous improvement. This reform agenda created            This summary report captures the key outcomes
the next generation of strategic planning - ‘PSP              from the Place-Based Plan Co-Design Workshop,
2.o ‘to deliver outcomes focused on vision, purpose           held online on 26 November 2020 and 4
and place in partnership with local communities.              December 2020 via Zoom and MURAL.

PSP 2.o sets aspirational targets for PSP development         The MURAL outputs identify comments raised
including ‘Co-Design’, streamlining preparation,              and ideas contributed for each workshop activity
optimising the PSP product to embrace                         (from each group) to guide the development
innovation and delivering government policy.                  of a Conceptual Place-Based Plan and does
                                                              not represent elements with any finality.
The Co-Design approach is key to achieving integrated
planning outcomes through the streamlined PSP                 The overarching purpose of this Summary Report
preparation process. This collaborative and iterative         will be to highlight key points of interest, preferences
approach provides opportunities for a range of                and views from stakeholders and landowners (from
diverse stakeholders to participate in workshops              the workshop activities) to inform the Conceptual
that generate and refine new ideas, and craft, test           Place-Based Plan(s). The Conceptual Place-Based
and deliver meaningful and distinct visions for our           Plan(s) will represent the early ideas and proposed
new greenfield neighbourhoods and communities.                directions for the Officer South Employment PSP
In particular, the PSP 2.o process aims to:                   area. These plans will inform the testing and design
                                                              and agency validation phases, prior to the preparation
` Facilitate the Co-Design of a Place-
                                                              of the draft Place-Based Plan for public exhibition.
  Based Structure Plan (PSP);
                                                              These plans will also inform the ICP. The VPA will
` Achieve up-front, early resolution of issues;
                                                              undertake testing of the ICP and if a supplementary
` Gain better and earlier information on infrastructure
                                                              ICP is required, this will also be exhibited with the PSP.
  demands to inform agency planning and budget bids;
` Update guidance on PSP content reflecting new
  government policy and promoting innovation; and
` Provide stronger guidance in PSPs
  for staging of development.
The VPA is rolling out the new PSP 2.o process as part
of our Greenfields work program, which includes
the Officer South Employment PSP. Figure 1 below
illustrates where we are now in the PSP 2.o process.

OFFICER SOUTH EMPLOYMENT PSP 2.o                          1                     PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
WE ARE HERE
                                                                                                           1. MURAL OUTPUT

                                                                                                      2. PBP CO-DESIGN WORKSHOP
                                                                                                          SUMMARY DOCUMENT

                                                                    Vision, Purpose & Place                                        Exhibition & Planning Panel                  Finalisation
                                                                                                              Co-design
                                          Pitching Sessions             Vision & Purpose                   Place‐based Plan

     PRE COMMENCEMENT
                                                                                                           Issue elimination          Targeted community               Finalise the Place-based Plan
                                          Council Strategic                  Site Tour                       and resolution               engagement                              and PSP
                                           Statement PSP
       Third Party Funding
                                         Purpose and Vision

     Early Opportunities and                                                                                                           Landowners and
      Constraints Mapping                                                                              Co-design options for the
                                                                        Issue Identification                                         community validation
                                                                                                          Place-based Plan
                                                                                                                                         of draft Plan
       Site Tour with Council
                                      Agencies work program                                                                                                                 Minister’s Approval
                                                                                                                                              VPA
                                       budget commitments,                                               Council & Agencies           Consider submissions
   Front load Assessment of PSP      policy and provision ratios        Set Purpose of PSP             Facilitate Resolution of
                                                                                                                Issues
                                                                                                                                    Targeted issue escalation
                                                                                                                                         and resolution                          DELWP
                                                                                                                                                                           Coordinate Ministerial
            COUNCIL                                                                                                                                                       approval of PSP and ICP
                                                                                                                                   Informal expert conclaves on
                                      Landowners /developers             Set Vision of PSP             Landowners /developers           unresolved matters
             AGENCY                    pitch Plans to VPA and                                          Co-design balanced PSP
                                               Council                                                       outcomes
                                                                                                                                          Panel Hearing                     Minister’s Approval
      Early Issues Validation

                                            PLACE-BASED                   PLACE-BASED                           DRAFT
              DELWP                       PLAN PROPOSALS                PLAN CONCEPTUAL                      PLACE-BASED                PANEL REPORT                            GAZETTAL
   informs early issues validation
                                                                         OPPORTUNITIES                       PLAN OPTION

                                                         PLACE-BASED STRUCTURE PLAN (PSP PREPARATION)
      Phase 1 land capability
       studies (e.g heritage,
    contamination, topography)                                         Targeted community                      AGENCY
                                                                   engagement on the Vision and       Endorsement of PSP options
                                                                        Purpose of the PSP                and approach for
                                                                                                         unresolved matters
         EARLY ISSUES
          VALIDATION
                                                                                                          Phase 2 studies to
                                                                                                            test key issues

                                                                                                            Design review
Figure 1. PSP 2.o

                                                                                                       Board Approval to exhibit

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                  2                                                    PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
PLACE BASED PLAN
CO-DESIGN WORKSHOP

INTRODUCTION                                              WHO WAS INVOLVED?
The Place-Based Plan Co-Design Workshop (held             A diverse range of stakeholders attended the
online on 26 November 2020 and 4 December                 two (2) Place-Based Plan Co-Design Workshop
2020 via Zoom and MURAL) was held as a key part           sessions with approximately 70 participants
of the Officer South Employment PSP 2.o process           attended from the following organisations:
and built upon the outcomes of the Pitching               → Victorian Planning Authority and
Sessions (held in April 2020) and the Vision and            appointed consultants;
Purpose Co-Design Webinar (held in July 2020).
                                                          → Cardinia Shire Council;
The purpose of the Place-Based Plan
Co-Design Workshop was:                                   → Traditional Owner Groups / Anthropologists;

` To update key stakeholders and landowners               → Landowners and landowner representatives
  on the status of the project.
                                                          → DELWP – Melbourne Strategic Assessment;
` To provide additional information from background
                                                          → Department of Treasury and Finance
  technical studies (via video and documentation).
                                                            Victoria - Invest Victoria;
` To collaboratively develop and prepare
  a conceptual place-based plan for the                   → Department of Jobs, Precincts and
  Officer South Employment Precinct.                        Regions - Sport and Recreation;

` To provide an opportunity for key stakeholders          → Environment Protection Authority;
  and landowners to visually map out key land
                                                          → APA Group;
  uses, transport connections, open spaces
  and other infrastructure, and provide any               → Melbourne Water;
  commentary on their considerations.                     → South East Water - Sewer Infrastructure;
` To encourage and capture innovative ideas
                                                          → South East Water - Planning;
  in shaping the future urban structure for the
  Officer South Employment Precinct and to                → Ausnet;
  inform the scope of further technical studies.          → Parks Victoria;
` To provide a clear, transparent and inclusive
                                                          → Major Road Projects Victoria; and
  consultation program and provide stakeholders
  with a summary of what information was                  → + More.
  captured through the workshops.
` To outline the next steps for the Officer South
  Employment Precinct PSP 2.o process.

OFFICER SOUTH EMPLOYMENT PSP 2.o                      3                       PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
PLACE BASED PLAN CO-DESIGN WORKSHOP STRUCTURE
In preparation for the Place-Based Plan Co-Design
Workshops, VPA sent out a package of information                        EMERGING CHALLENGES
                                                                          & CONSIDERATIONS
to participants prior to the Place-Based Plan Co-
                                                                               Short Video
Design Workshops as the workshop activities were
                                                                            18 November 2020
developed in consideration of this information.

The background content included (available
on the Officer South VPA website):                                   OFFICER SOUTH EMPLOYMENT
                                                                      PSP PLACE-BASED PLAN CO-
` An Emerging Challenges and Considerations                             DESIGN WORKSHOP #1
  Video via YouTube to outline the technical input                             26 November

  and emerging challenges and considerations
  influencing the Officer South Employment
  Precinct Structure Plan development.                                          ACTIVITY 1.
                                                                         AMBITIONS + PSP TOOLS
    Click here for the Emerging Challenges
    and Considerations Video

                                                                               ACTIVITY 2.
` Summary of Phase 1 Background Reports.
                                                                           TYPES AND FORM OF
                                                                        DEVELOPMENT / LAND USES
    Click here for the Phase 1
    Background Reports

                                                                               ACTIVITY 3.
` The Officer South ePSP Emerging                                    LAND USE STRUCTURE EXERCISES
  Challenges & Considerations Slide Pack.
The Place-Based Plan Co-Design Workshop was run
online via Zoom. While different online techniques were
used at the workshops, the format was essentially the
                                                                     OFFICER SOUTH EMPLOYMENT
same as a face-to-face workshop, commencing with a                    PSP PLACE-BASED PLAN CO-
brief presentation from the VPA to provide a summary                    DESIGN WORKSHOP #2
of the current status of the project and an update on                       4 December 2020
issue resolution pathways, followed by online interactive
activities in small break out groups (the breakdown
and structure of the day are illustrated in Figure 2).                          ACTIVITY 1.

Workshop activities were undertaken via a digital                      OPEN SPACE AND DRAINAGE
workspace tool called ‘MURAL’ which is an online
platform similar to a format that would be used
for face-to-face workshops. The workshops
                                                                               ACTIVITY 2.
were facilitated by the VPA and Mesh.
                                                                             TRANSPORT AND
Refer to the Place-Based Plan Co-Design Workshop                            INFRASTRUCTURE
- MURAL Outputs, December 2020 for the output
data recorded on MURAL during the workshops.

   Click here for the Place-Based
                                                                Figure 2 Workshop Schedule
   Plan Co-Design Workshop - MURAL
   Outputs, December 2020

OFFICER SOUTH EMPLOYMENT PSP 2.o                            4                    PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
WHAT WE HAVE
HEARD FROM YOU
ALREADY
EMERGING THEMES, PURPOSE STATEMENTS AND AMBITIONS

The information gathered at the Pitching Sessions
held in April 2020 was analysed and categorised into
emerging themes and purpose statements. These
were further validated, refined and consolidated
at the Vision and Purpose Co-Design Webinar
held in July 2020. In addition, key ambitions of the
Officer South Employment PSP for each theme
are identified below (see Figure 3 below).

These themes are objective/ placed-based that will
transform throughout the PSP 2.o process to form the
basis of a vision for the Officer South Employment PSP.

OFFICER SOUTH EMPLOYMENT PSP 2.o                          5   PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
Figure 3 Emerging Themes, Purpose Statements and Ambitions

OFFICER SOUTH EMPLOYMENT PSP 2.o                          6         PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
ADDITIONAL AMBITIONS + PSP TOOLS
The aim of Workshop #1 - Activity #1 – Ambitions                Participants were then asked to categorise each
and PSP Tools was to identify what the PSP                      ambition by dragging and dropping each ambition
tool(s) is to achieve the purposes statements                   (i.e. each sticky note) into the three (3) key PSP
and ambitions for each theme.                                   tools – Partnerships and Commitment, Place-
                                                                Based Guidance and Strategies. A key question to
In small Zoom breakout groups (eight (8) groups of
                                                                consider was - What are the PSP tools to help achieve/
approximately 5-7 people), workshop participants
                                                                deliver these ambitions or purpose statements?
were required to review the existing ambitions that
were raised at the Pitching Sessions and Vision and             New and existing ambitions and comments for
Purpose Co-Design Webinar and to add any additional             each group were reviewed, consolidated, and
ambitions for individual sites and/or the overall Officer       summarised for each theme as shown below.
South Employment PSP. This was completed by                     Further details and other information have been
participants placing a comment (via a sticky note)              noted and taken into consideration (see Place-
under each of the six (6) themes. Key questions that            Based Plan Co-Design Workshop - MURAL
participants considered (but not limited to) were:              Outputs, December 2020 for the output data -
                                                                available on the Officer South VPA website).
` What are some key successful features
  of other employment precincts that
  we can bring to Officer South?
` What opportunities, such as innovations,
  partnerships and state and local infrastructure
  may act as a catalyst for the precinct?
` Theme 1 – What are some key successful
  features of other employment precincts
  that we can bring to Officer South?
` Theme 2 – What are some opportunities to enhance
  and strengthen surrounding communities?
` Theme 3 – What are some alternative
  transport opportunities and/or
  innovations for Officer South ePSP?
` Theme 4 – What are some amenity or recreational
  opportunities within or surrounding Cardinia
  Creek, Gum Scrub Creek and future Drainage
  assets? What are some community infrastructure
  opportunities, activities and services within
  the Business with Residential area?
` Theme 5 – What are some opportunities or
  innovations to better utilise/manage water within
  Officer South ePSP? What are some innovative
  practices in relation to stormwater harvesting?
` Theme 6 – What are some innovative
  technologies/infrastructure that we
  can bring to Officer South ePSP?

OFFICER SOUTH EMPLOYMENT PSP 2.o                            7                    PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
AMBITIONS + PSP TOOLS METHODOLOGY

                                                                                                                                                                                                            2 Place-Based Guidance
                                                                                                                                                                                                                                                                                                                                                                    3 Strategies
                                                                                                                                                                                                             Identifies whether key
                                                                              1 Partnerships +                                                                                                                ambitions need to be                                                                                                                    Key strategies (i.e. written
                                                                                Commitment                                                                                                                  spatially accommodated                                                                                                                    requirements) the Officer
                     Theme
                                                                                                                                                    Combination of                                           for, in the Place-Based                                                                                                                   South Employment PSP
                                                                          Identifies creative                                                       Partnerships +                                             Plan, such as widths                                                          Combination of                                             could adopt/deliver i.e.
            An initial preliminary idea
                                                                          collaboration and /                                                      Commitment and                                          and/or alignment of roads,                                                          Place-Based                                             planning requirements,
                 that recurred in
                                                                        strategic partnerships                                                       Place-Based                                             open spaces or activity                                                          Guidance and                                             applied zones or design
            presentations, workshops
                                                                            opportunities.                                                            Guidance                                                      centres etc.                                                                Strategies                                                    guidance.
                 and discussions.

                                               Theme 1. Providing for employment and industries of the future                                                                    (within the Regionally Significant Commerical Area or State Significant Industrial Precinct)

                                                                                                                                                                                                                                                                                                                                                                                                                         PSP Tools
                                     Additional Ambitions                                                                                                                                                                       PSP Tools
                                         for Theme 1
                                                                                                                                                                                                                                                                                                                                                                                                                  Key PSP tools required to
                                                                                                                   1                                                                                                                    2                                                                                                                 3                                                         help achieve/deliver
                                      After hours activation via                                                                                                                                                                                                                                                                                                                                                  ambitions and/or purpose
                                           mixed uses and
                                         recreational spaces                    Partnerships + Commitment                                                            1   +   2                                  Place-based Guidance                                                               2   + 3                                     Strategies                                                               statements.
                                                                     What creative and ambitious thinking could you deliver, including in partnership with others?                          Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or               What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                                                                  alignment of roads, open spaces, activity centres etc.                                                             requirements, applied zones or design guidance

                                       Mixture of commercial                                  +4                                      +3                                                                                          +4                                                +1                                                                         +1
                                           and industrial               Hybrid TAFE/                          Target indutries                            24-hour business                       24 hour business hubs                              Vertically mixed-use                         Logistic and                            Vertically                            Access to major
                                      opportunities (similar to          University                           with high water                            hubs to be located                        to be located away                                 developments                            warehouse precinct                        mixed-use                                 transport
                                       that surrounding the                                                        usage                                 away from existing                         from existing and                                                                                                                  developments                             infrastructure
                                        Moorabbin Airport)                                                                                              and future residential                   future residential areas
               Additional                                                                     +2                                                                areas

             ambitions for                                            Access to major                                                  +1                                                                                                               Access to major                          Advanced
                                                                         transport                               Advanced                                                                                                                                  transport                         manufacturing, Food                     24 hour business                            Advanced
              each Theme                  Flexible employment          infrastructure                         manufacturing,                                                                          Logistic and                                       infrastructure                        and fibre and                             hubs to be                            manufacturing,
                                          outcomes that do not                                                                                              Logistic and                                                                                                                      pharmaceutical                           located away                            Food and fibre
            An additional or                                                                                   food and fibre
                                                                                                                                                         warehouse precinct
                                                                                                                                                                                                   warehouse precinct
                                                                                                                                                                                                                                                                                                  precinct                             from existing                                and
                                          compete with existing                                                     and
             new ambition                    uses in the area                                                 pharmaceutical                                                                                                                                                                                                             and future                            pharmaceutical
             relevant to the                                                                                      precinct                                                                                                                                                                                                           residential areas                            precinct
                                                                        Vertically                                                                                                                                                                        Hybrid TAFE/
            specific theme.                                            mixed-use                                                                       Target industries with
                                                                                                                                                                                                 Community uses to be                                      University
                                                                                                                                                                                                                                                                                             Target industries with
                                                                      developments                                                                                                                integrated within the
                                                                                                                                                         high water usage                                                                                                                      high water usage
                                          Employment uses to be                                                                                                                                      SSIP, RSCA and
                                                                                                                                                                                                                                                                                                                                         Logistic and                         Target industries
                                           responsive to sensitive                                             Employment                                                                           surroudning PSPs
                                                                                                                                                                                                                                                                                                                                          warehouse                           with high water
                                                   uses                                                      through Natural                                                                                                                           Vulnerable uses                                                                     precinct                                usage
                                                                         Circular                               Resources                                                                                                                           (identified in Clause
                                                                                                                                                            Access to major
                                                                        economy                               Management                                                                                                                           13.02-1S) to be located
                                                                                                                                                               transport
                                                                      considerations                              (NRM)                                                                           Water intensive land                              away from identified
                                                                                                                                                             infrastructure
                                              Clean industry                                                                                                                                      uses i.e. opportunities                             bushfire hazards
                                                                                                                                                                                                                                                                                                                                        High quality                               Circular
                                                                                                                                                                                                  to incorporate reuse/                                                                                                                industrial with                            economy
                                                                                                                                                                                                    managing urban                                                                                                                         mix of                               considerations
                                                                                                                                                                                                            runoff                                                                                                                   commercial uses
                                                                       Agriculture /                         Water harvesting                              Advanced
                                          Medical / Hospitial uses   food businesses                            initiatives                             manufacturing, food                                                                         Professional services                                                             and some retail
                                                                       or industries                                                                      and fibre and                                                                                and business
                                                                                                                                                         pharmaceutical                                                                                                                                                                                                           Sustainable
                                                                                                                                                            precinct                                Places of worship in                                                                                                                                                          operations
                                                                                                                                                                                                     suitable locations                                                                                                                   Renewable
                                       Employment uses that
                                                                                                                                                                                                                                                    Consistent industrial                                                                   energy
                                         support 20-minute               Support
                                         neighbourhood for              provision of                                                                                                                                                                outcomes via Design
                                      existing residential areas     community uses                                                                      Vertically mixed-use                                                                            Guidelines                                                                                                              After hours
                                                                          within                                                                           developments                           Streetscape greenery                                                                                                                                                           support i.e.
                                                                       employment                                                                                                                                                                                                                                                        Flexible and                           well-designed
                                                                                                                                                                                                                                                                                                                                          innovative                              lighting
                                                                                                                                                                                                                                                       Road and active                                                                     planning
                                                                                                                                                            Food precinct -                                                                          transport corridors                                                                   controls
                                                                                                                                                          innovation centre /                      Land use activity to
                                                                                                                                                         centre of excellence                     reflect the location i.e.
                                                                                                                                                                                                                                                                                                                                                                                  Release of
                                                                                                                                                         for food production,                        industrial next to
                                                                                                                                                                                                                                                                                                                                                                                employment
                                                                                                                                                         linking with tertiary                    conservation area and
                                                                                                                                                                                                                                                                                                                                                                                land to align
                                                                                                                                                           education centre                              waterway                                  Food processing to be                                                                                                        with demand
                                                                                                                                                                                                                                                      separated from
                                                                                                                                                                                                                                                    industry with buffer
                                                                                                                                                                                                                                                       requirements
                                                                                                                                                          Energy generation                        Shared approach to
                                                                                                                                                          and connection to                         prevent / alert of
                                                                                                                                                               industry                             pollution spills to
                                                                                                                                                                                                       waterways                                    Future proof industry
                                                                                                                                                                                                                                                    needs, i.e. high speed
                                                                                                                                                                                                                                                     data connection or
                                                                                                                                                                                                                                                        smart cities
                                                                                                     Total number of                                                                                   Land to be
                                                                                                                                                                                                   appropriately staged
                                                                                                       groups who                                                                                  and responds to the
                                                                                                      validated the                                                                                      market                                     Degree of flexibility is
                                                                                                    existing ambition.                                                                                                                                 important for
                                                                                                                                                                                                                                                        investment

                                                                                                                                                                                                                                                                                   New idea/ambition                                                                                               Further Comments
                                                                                                                                                                                                                                                                                         raised

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                                                                                    8                                                                                                                                                        PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 1. Providing for employment and industries of the future                                                                    (within the Regionally Significant Commerical Area or State Significant Industrial Precinct)

         Additional Ambitions                                                                                                                                                                   PSP Tools
             for Theme 1

                                                                                     1                                                                                                                  2                                                                                                                 3
          After hours activation via
               mixed uses and
             recreational spaces                  Partnerships + Commitment                                                            1   + 2                                  Place-based Guidance                                                               2   + 3                                     Strategies
                                       What creative and ambitious thinking could you deliver, including in partnership with others?                        Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or               What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                                  alignment of roads, open spaces, activity centres etc.                                                             requirements, applied zones or design guidance

           Mixture of commercial                                +4                                      +3                                                                                        +4                                                +1                                                                         +1
               and industrial             Hybrid TAFE/                          Target indutries                            24-hour business                     24 hour business hubs                              Vertically mixed-use                        Logistic and                             Vertically                            Access to major
          opportunities (similar to        University                           with high water                            hubs to be located                      to be located away                                 developments                           warehouse precinct                         mixed-use                                 transport
           that surrounding the                                                      usage                                 away from existing                       from existing and                                                                                                                  developments                             infrastructure
            Moorabbin Airport)                                                                                            and future residential                 future residential areas
                                                                +2                                                                areas
                                        Access to major                                                  +1                                                                                                             Access to major                          Advanced
                                           transport                               Advanced                                                                                                                                transport                         manufacturing, Food                     24 hour business                            Advanced
           Flexible employment           infrastructure                         manufacturing,                                                                        Logistic and                                       infrastructure                        and fibre and                             hubs to be                            manufacturing,
           outcomes that do not                                                                                               Logistic and                                                                                                                    pharmaceutical                           located away                            Food and fibre
                                                                                 food and fibre                                                                    warehouse precinct
           compete with existing                                                                                           warehouse precinct                                                                                                                     precinct                             from existing                                and
                                                                                      and
              uses in the area                                                  pharmaceutical                                                                                                                                                                                                           and future                            pharmaceutical
                                                                                    precinct                                                                                                                                                                                                         residential areas                            precinct
                                          Vertically                                                                                                                                                                      Hybrid TAFE/
                                         mixed-use                                                                                                               Community uses to be                                      University
                                                                                                                         Target industries with                                                                                                              Target industries with
                                        developments                                                                                                              integrated within the
                                                                                                                           high water usage                                                                                                                    high water usage
          Employment uses to be                                                                                                                                      SSIP, RSCA and
                                                                                                                                                                                                                                                                                                         Logistic and                         Target industries
           responsive to sensitive                                               Employment                                                                         surroudning PSPs
                                                                                                                                                                                                                                                                                                          warehouse                           with high water
                   uses                                                        through Natural                                                                                                                         Vulnerable uses                                                                     precinct                                usage
                                           Circular                               Resources                                                                                                                         (identified in Clause
                                                                                                                              Access to major
                                          economy                               Management                                                                                                                         13.02-1S) to be located
                                                                                                                                 transport
                                        considerations                              (NRM)                                                                         Water intensive land                              away from identified
                                                                                                                               infrastructure
               Clean industry                                                                                                                                     uses i.e. opportunities                             bushfire hazards
                                                                                                                                                                                                                                                                                                        High quality                               Circular
                                                                                                                                                                  to incorporate reuse/                                                                                                                industrial with                            economy
                                                                                                                                                                    managing urban                                                                                                                         mix of                               considerations
                                                                                                                                                                            runoff                                                                                                                   commercial uses
                                         Agriculture /                         Water harvesting                              Advanced
           Medical / Hospitial uses    food businesses                            initiatives                             manufacturing, food                                                                       Professional services                                                             and some retail
                                         or industries                                                                      and fibre and                                                                              and business
                                                                                                                           pharmaceutical                                                                                                                                                                                                         Sustainable
                                                                                                                              precinct                              Places of worship in                                                                                                                                                          operations
                                                                                                                                                                     suitable locations                                                                                                                   Renewable
           Employment uses that
                                                                                                                                                                                                                    Consistent industrial                                                                   energy
             support 20-minute             Support
             neighbourhood for            provision of                                                                                                                                                              outcomes via Design
          existing residential areas   community uses                                                                      Vertically mixed-use                                                                          Guidelines                                                                                                              After hours
                                            within                                                                           developments                         Streetscape greenery                                                                                                                                                           support i.e.
                                         employment                                                                                                                                                                                                                                                      Flexible and                           well-designed
                                                                                                                                                                                                                                                                                                          innovative                              lighting
                                                                                                                                                                                                                       Road and active                                                                     planning
                                                                                                                              Food precinct -                                                                        transport corridors                                                                   controls
                                                                                                                            innovation centre /                    Land use activity to
                                                                                                                           centre of excellence                   reflect the location i.e.
                                                                                                                                                                                                                                                                                                                                                  Release of
                                                                                                                           for food production,                      industrial next to
                                                                                                                                                                                                                                                                                                                                                employment
                                                                                                                           linking with tertiary                  conservation area and
                                                                                                                                                                                                                                                                                                                                                land to align
                                                                                                                             education centre                            waterway                                  Food processing to be                                                                                                        with demand
                                                                                                                                                                                                                      separated from
                                                                                                                                                                                                                    industry with buffer
                                                                                                                                                                                                                       requirements
                                                                                                                            Energy generation                      Shared approach to
                                                                                                                            and connection to                       prevent / alert of
                                                                                                                                 industry                           pollution spills to
                                                                                                                                                                       waterways                                    Future proof industry
                                                                                                                                                                                                                    needs, i.e. high speed
                                                                                                                                                                                                                     data connection or
                                                                                                                                                                                                                        smart cities
                                                                                                                                                                       Land to be
                                                                                                                                                                   appropriately staged
                                                                                                                                                                   and responds to the
                                                                                                                                                                         market                                     Degree of flexibility is
                                                                                                                                                                                                                       important for
                                                                                                                                                                                                                        investment

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                                            9                                                                                                              PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 2. Value add to existing communities

      Additional Ambitions                                                                                                                                                         PSP Tools
          for Theme 2

                                                                                  1                                                                                                        2                                                                                                                 3
         Integrate 20-minute
      neighbourhood principles
                                               Partnerships + Commitment                                                            1   + 2                        Place-based Guidance                                                               2   + 3                                     Strategies
                                    What creative and ambitious thinking could you deliver, including in partnership with others?              Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or               What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                     alignment of roads, open spaces, activity centres etc.                                                             requirements, applied zones or design guidance

       Locate residential within
      close proximity to existing                            +2                                                                                                                                                                                                                                                   +3                                       +2
                                                                                                                                                                                                                                                                                                                                                           +3
       communities to support            Social and                           Minimum of 1                             Social and affordable         Minimum of 1 job per                                Environmental                          Social and affordable                      Diverse and                             Environmental
      community infrastructure           affordable                              job per                                      housing                  household to meet                              sustainable design for                           housing                              integrated                               sustainable
             e.g. schools                 housing                             household to                                                                  Cardinia's                                   residential and                                                                 housing located                              design for
                                                                             meet Cardinia's                                                            sustainability and                             employment areas                                                                  close to existing                         residential and
                                                                              sustainability                                                         liveability of residents                                                                                                            and/or proposed                            employment
                                                                             and liveability of                             Diverse and                                                                                                            Environmental                             services,                                  areas
                                      Diverse and                               residents                               integrated housing                                                                                                      sustainable design for                    transport and
        Social and affordable
                                       integrated                                                                         located close to                                                                                                         residential and                             jobs.
       housing to be located in                                                                                                                                                                        Utilise easements for
       areas with high levels of    housing located                                                                        existing and/or
                                                                                                                                                            Community                                   active open space/                       employment areas                                                                                          +1
                                    close to existing                                                                    proposed services,                                                                                                                                                                                           Social and
        amenity, services and                                                                                                                           infrastructure and                               recreational uses
           infrastructure.          and/or proposed                         Environmentally
                                                                                                                        transport and jobs.
                                                                                                                                                      links to support both                             /walking trails that                                                                                      +2                  affordable
                                        services,                              sustainable                                                               existing and new                               connect to existing                                                               Minimum of 1                                 housing
                                     transport and                              design for                                                                   residential                                      networks                                                                       job per
                                          jobs                               residential and                                                               communities                                                                                                                    household to
                                                                              employment                                    Access to food                                                                                                                                               meet Cardinia's
                                                                                  areas                                                                                                                                                                                                   sustainability                         Based on density
                                                                                                                                                                                                                                                                                         and liveability of                       20-30 dwelling
                                                                                                                                                                                                            Easy access to
                                     Mixed uses that                                                                                                 Green links between                                                                                                                    residents                            per NDA access
                                                                                                                                                                                                       educational facilities
                                       encourage                                                                                                        major drainage                                                                                                                                                            to community
                                                                                                                                                                                                       (i.e. walk rather than
                                      home-based                                                                                                      infrastructure and                                                                                                                                                           food gardens
                                                                               Access to                                                                                                                        drive)
                                       businesses                                                                                                    co-locate open space                                                                                                                                                            important
                                                                            community food
                                                                               gardens                                                               with major drainage                                                                                                                Zero Net Carbon
                                                                                                                                                         infrastructure                                                                                                                 neighbourhoods
                                                                                                                                                                                                            Residential
                                       Government                                                                                                                                                         development to                                                                                                             Density
                                         Project                                                                                                                                                          respond to the                                                                                                         guidance for the
                                       Investment                           Opportunities for                                                          Smooth integration                                                                                                                                                           Business /
                                                                                 higher                                                                                                                growing community                                                                    Catchment
                                                                                                                                                       between residential                            to the east to generate                                                            requirements to                           Residential
                                                                             education and                                                             and industrial areas
                                                                             health services                                                                                                           a population density                                                              be met through
                                                                                                                                                                                                        adjacent to Kaduna                                                               town centres for
                                    Partnership with                                                                                                                                                           Park.                                                                          future
                                    DET and Council                                                                                                                                                                                                                                      populations and                           Connectivity
                                    to co-locate any                                                                                                  Active and passive                                                                                                                     the PSP                               (walk/ride) to
                                      mainstream                                                                                                       open space that                                                                                                                    supports other                         open spaces and
                                     education and                                                                                                      interacts with                                 High level of amenity                                                               town centres                             waterways
                                      community                                                                                                      employment to active                              residential sensitive
                                        facilities                                                                                                         at night.                                   use along the creek

                                                                                                                                                                                                                                                                                         Residential land
                                                                                                                                                                                                                                                                                           to provide a
                                                                                                                                                                                                                                                                                         critical mass to
                                                                                                                                                                                                                                                                                           support the
                                                                                                                                                                                                                                                                                          nearby activity
                                                                                                                                                                                                                                                                                            centre and
                                                                                                                                                                                                                                                                                               future
                                                                                                                                                                                                                                                                                          employment
                                                                                                                                                                                                                                                                                                land.

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                            10                                                                                                        PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 3. Releasing key transport/economic links

    Additional Ambitions                                                                                                                                                           PSP Tools
        for Theme 3

                                                                                 1                                                                                                         2                                                                                                                3
    Thompsons Road corridor
       delivery essential to
      enable infrastructure                   Partnerships + Commitment                                                            1   + 2                         Place-based Guidance                                                              2   + 3                                     Strategies
                                   What creative and ambitious thinking could you deliver, including in partnership with others?               Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or              What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                     alignment of roads, open spaces, activity centres etc.                                                            requirements, applied zones or design guidance

    Adequate local connector                                +1                                                                                                                        +1                                                                                                                         +2                                       +2
            roads                   Early delivery of                       Connection to a                               Early delivery of             Green main street                                 Early delivery of                       Trackless tram                        Cross Councils                           Early delivery of
                                     Thompsons                             future south east                             Thompsons Road                                                                  Thompsons Road                                                                Service to train                           Thompsons
                                          Road                                  airport                                                                                                                                                                                                  stations with                                 Road
                                                                                                                                                                                                                                                                                       public transport
     Active transport links to                                                                                                                                                                                                                  Green main street                      modes (road, rail
                                                                                                                                                         Electric charging                                                                                                                and bus or
    community infrastructure                                                                                               Trackless tram                    stations                                   Pakenham Freeway
      (school, open space)                                                                                                                                                                                                                                                                alternative)                           Trackless trams
                                   Electric charging                        Cross Councils                                                                                                               ramps to require
                                       stations                            Service to train                                                                                                              funding for early                                                                                                          are getting
                                                                             stations with                                                                                                                   delivery                                                                                                             traction these
                                                                                                                                                                                                                                                Officer South Road
                                                                           public transport                              Electric charging                                                                                                      key public transport                                             +1                    days
                                                                           modes (road, rail                                 stations                        Distinct                                                                                                                   Connection to a
                                                                                                                                                                                                                                                       route
                                                                              and bus or                                                                 neighbourhood                                                                                                                 future south east
                                   Adequate bicycle                           alternative)                                                                opportunity                                                                                                                       airport
                                     and walking                                                                                                                                                             Electricity
                                                                                                                                                                                                                                                                                                                                    Green main
                                       routes to                                                                                                                                                           transmission
                                                                                                                                                                                                                                                                                                                                       street
                                     commute to                                                                       Green Transportation                                                                separation and                          Co-locate linear
                                    work within the                                                                     i.e. trams buses/                                                              alignment needs to                        wetland + cycling
                                       precinct                               Deliver bus                                                               Alignment of                                         consider                           infrastructure with                    Incorporate local
                                                                                                                      cycling/walking trails
                                                                            routes on main                                                           Thompsons Road to                                 landownership (i.e.                      north-south Officer                        east-west
                                                                              roads early                                                           consider the electricity                            current alignment                           South Road                         access/connector                          Strategies on
                                                                                                                                                        transmission                                  goes through multiple                                                              road north of                            alternative
                                                                                                                                                          easement                                          ownership)                                                                   Lecky Road to                             transport
                                     Extensive bus                                                                                                                                                                                                                                         provide a                            guidance (i.e. EV
                                       network                                                                                                                                                                                                                                            separation                               charging
                                                                             Officer South                                                                                                                                                                                                                                          stations)
                                                                                                                                                                                                                                                                                         between core
                                                                             Road to be an
                                                                                                                                                     Address the buffers to                                                                                                              business uses
                                                                               important                                                                                                                 Perimeter road to
                                                                                                                                                          surrounding                                                                                                                    and potential
                                                                           arterial road for                                                                                                           provide a buffer from
                                                                                                                                                     residential areas - how                                                                                                            residential land
                                                                            linkages to the                                                                                                             bushfire hazards to
                                                                                                                                                     do we represent in the                                                                                                                   uses                                    Enable
                                                                              Officer Town                                                                                                             future development
                                                                           Centre and train                                                                   PSP                                                                                                                                                                 connectivity
                                                                                 station                                                                                                                                                                                                                                            between
                                                                                                                                                                                                                                                                                                                                neighbourhoods
                                                                                                                                                                                                                                                                                           Residential                          and workplaces
                                                                                                                                                                                                       Shared path network                                                              development to                           via sustainable
                                                                                                                                                     Adequate access and
                                                                                                                                                                                                       that connects to the                                                               lead with the                             transport
                                                                                                                                                     egress points for the
                                                                                                                                                                                                       north and east-west                                                                  delivery of
                                                                                                                                                       safe movement of
                                                                                                                                                      emergency vehicles                                                                                                                    transport
                                                                                                                                                                                                                                                                                         infrastructure
                                                                                                                                                                                                                                                                                                                                 Zones that are
                                                                                                                                                                                                                                                                                                                                  flexible and
                                                                                                                                                                                                                                                                                                                                  responds to
                                                                                                                                                     Appropriate buffers to
                                                                                                                                                                                                                                                                                                                                change and uses
                                                                                                                                                      provide investment
                                                                                                                                                           certainty

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                              11                                                                                                     PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 4. Integrating complementary community and open

    Additional Ambitions                                                                                                                                                            PSP Tools
        for Theme 1

                                                                                    1                                                                                                       2                                                                                                                 3
     Employment land uses to
          interface open
     space/drainage corridors                    Partnerships + Commitment                                                            1   + 2                       Place-based Guidance                                                               2   + 3                                     Strategies
       to enhance/ protect            What creative and ambitious thinking could you deliver, including in partnership with others?             Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or               What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                      alignment of roads, open spaces, activity centres etc.                                                             requirements, applied zones or design guidance
      environmental values

                                                               +1                                       +1                                                                             +3                                               +1
                                       Urban farming                          Incorporation of                                                        Kindergartens and                                Regional trail network                    Regional trail network                  Incorporation of                           Kindergartens
       Community facilities or                                                Aboriginal values                                                      maternal health linked                             to link and connect                       to link and connect                    Aboriginal values                          and maternal
         open spaces to not                                                     into PSP plan                                                            with school                                    Cardinia Parklands                        Cardinia Parklands                       into PSP plan                            health linked
     reduce areas dedicated to                                                 (street names,                                                                                                                                                                                             (street names,                             with school
     residential (i.e. 50/50 split)     Regional trail                        park names etc.)                                                                                                                                                                                           park names etc.)
                                       network to link                                                                                                                                 +1
                                        and connect                                                                                                                                                      Incorporation of                         Wellness Hub (swim
                                                                                                                                                       Wellness Hub (swim
                                          Cardinia                                                                                                                                                     Aboriginal values into                    school, gym, medical,                                                             Green canopies
                                                                                                                                                      school, gym, medical,
                                         Parklands                             Ability to modify                                                                                                         PSP plan (street                          a pharmacy and                           Regional trail                         along roads to
                                                                                                                                                        a pharmacy and
                                                                                 and adapt                                                                                                              names, park names                              childcare)                          network to link                         avoid heat sink
                                                                                                                                                            childcare)
                                                                                   drainage                                                                                                                    etc.)                                                                        and connect
                                                                               scheme design                                                                                                                                                                                                  Cardinia
                                        Shared trails                                                                                                                                                                                                                                        Parklands
                                      along waterways                                                                                                                                                                                              Integrate a green                                                              Incorporate APA
                                                                                                                                                       Active Open Space                                                                          walking and cycling
                                                                                                                                                                                                            Urban farming                                                                                                             National
                                                                                                                                                      and schools required                                                                       network with existing
                                                                                 Provision of                                                                                                                                                                                                                                        Landscape
                                                                                                                                                       to service Cardinia                                                                         rail infrastructure
                                                                                schools, active                                                                                                                                                                                            Capitalise on                            guidelines to
                                                                                                                                                      Road PSP community
                                                                                 open space,                                                                                                                                                                                             opportunities for                            provide
                                        Recreation and                                                                                                                                                                                                                                                                              guidance for
                                                                                 community                                                                                                                                                                                                 residential in
                                            amenity                                                                                                                                                    Ensure proposed new
                                                                                 centres and                                                                                                                                                                                               surrounding                            enhancement of
                                        alongside high                                                                                                                                                   development and
                                                                                     other                                                                                                                                                                                                   areas with                            gas easement
                                         value habitat                                                                                                                                                 open space does not
                                                                                 community                                                           Allocate greens spaces                                                                                                                 appropriate
                                      links for Growling                                                                                                                                               increase potential for
                                                                                infrastructure                                                          within residential                                                                                                                integration to
                                           Grassfrog,                                                                                                                                                      bushfire risk
                                                                               close to existing                                                      areas for recreational                                                                                                                    PSP
                                       Southern Brown
                                                                                communities                                                                 activities
                                        Bandicoot, etc.                                                                                                                                                                                                                                                                            Management of
                                                                                                                                                                                                                                                                                                                                       conflicts
                                                                                                                                                                                                                                                                                                                                       between
                                                                                                                                                                                                             Facilitate                                                                                                              surrounding
                                                                                                                                                                                                          non-government                                                                                                              precincts -
                                                                                                                                                          Connectivity via
                                                                                                                                                                                                        school opportunities                                                                                                      interface areas to
                                                                                                                                                        bicycle and walking
                                                                                                                                                               paths                                                                                                                                                                be considered

                                                                                                                                                                                                            Co-location to
                                                                                                                                                                                                        residential areas with
                                                                                                                                                      Dedicated bike tracks                                 open space is
                                                                                                                                                      to encourage people                                   important for
                                                                                                                                                          to travel within                                accessibility and
                                                                                                                                                      precinct rather than                                    livability
                                                                                                                                                       just being industrial

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                              12                                                                                                      PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 5. Understand sustainable environmental and drainage needs

    Additional Ambitions                                                                                                                                                          PSP Tools
        for Theme 1

                                                                                 1                                                                                                        2                                                                                                                3
    Businesses to incorporate
    sustainable practices into
       their development                      Partnerships + Commitment                                                            1   + 2                        Place-based Guidance                                                              2   + 3                                     Strategies
                                   What creative and ambitious thinking could you deliver, including in partnership with others?              Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or              What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                    alignment of roads, open spaces, activity centres etc.                                                            requirements, applied zones or design guidance

      Intergrate open space                                 +2                                                                                                                                                                                                                                                  +1                                       +2
        and environmental            Stormwater                               Closed loop                                Passive irrigation             Passive irrigation                              Closed loop water                       Closed loop water                        Stormwater                               Closed loop
            outcomes                harvesting and                            water system                                                                                                                   system                                  system                             harvesting and                            water system
                                    reuse on open                                                                                                                                                                                                                                       reuse on open
                                        space                                                                                                                                                                                                                                               space
                                                                                                                        Integrated Water
                                                                                                                                                    Green spaces to utilise
      Encourage use of solar                                                  Partnership                                Management -                                                                    Adopt ‘Net Zero                           Stormwater                                                                  Passive irrigation
                                                                                                                                                    harvested stormwater
             energy                                                        between Council,                            Regional and Local                                                              Strategies’ i.e. green                  harvesting and reuse
                                      Encourage                             MW and SEW to                                   response                                                                     and sustainable                          on open space                         Achieve urban
                                   commercial and                               deliver                                                                                                                      precinct                                                                  forest objectives
                                    industrial uses                           meaningful                                                                                                                                                                                                  and reduce
                                                                                                                                                    Dedicated frog ponds                                                                                                                                                       Environmentally
                                      that utilises                        Integrated Water                                                                                                                                                                                               urban heat
     Protection of biodiversity                                                                                                                     to provide stormwater                                                                                                                                                        significant
                                       reuse and                             Management                                                                                                                                                                                                  island effect
           values within                                                                                                                                management,                                                                                                                                                            waterways to be
                                      stormwater                               outcomes
       Conservation Area 36                                                                                                                            biodiversity and                              Avoid adverse impacts                                                                                                      protected by
                                       harvesting
     including Growling Grass                                                                                                                              amenity                                    from stormwater on                                                                                                        sensitive uses
     Frog, Dwarf Galaxias and                                                                                                                                                                         native fauna in creek
        Australian Grayling.                                                                                                                                                                                 corridor                                                                       Protect
                                                                            High priority to                                                                                                                                                                                               Australian
                                    Use drainage                           protect RAMSAR                                                                                                                                                                                                Grayling and
                                      corridors as                         Westernport Bay                                                           Utilise non-potable                                                                                                                Dwarf Galaxias
                                    assets for the                          downstream -                                                             water to maintain all                                                                                                              via stormwater
     Locate residential near         surrounding                              must meet                                                              green infrastructure                                                                                                               management
     waterways for improved        development i.e.                          SEPP/BEPM                                                                                                                                                                                                      strategy
            amenity                    increased                             water quality
                                   biodiversity and
                                     reduce heat
                                         island

                                   Ensure interfaces
                                        are well
                                      balanced
                                      between
                                    waterways and
                                       industry

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                             13                                                                                                     PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 6. Industry ready services and infrastructure

    Additional Ambitions                                                                                                                                                          PSP Tools
        for Theme 1

                                                                                 1                                                                                                        2                                                                                                          3
     After hours activation via
          mixed uses and
        recreational spaces                   Partnerships + Commitment                                                            1   + 2                        Place-based Guidance                                                         2   + 3                                    Strategies
                                   What creative and ambitious thinking could you deliver, including in partnership with others?              Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or        What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning
                                                                                                                                                                    alignment of roads, open spaces, activity centres etc.                                                      requirements, applied zones or design guidance

      Mixture of commercial                                 +2                                       +1                                                                              +2                                               +1                                                                  +1                                       +1
          and industrial              Smart City                              Clean energy                                 Clean energy             Innovative and carbon                            Leveridge off drainage                                                       Innovative and                         Solar panels with
     opportunities (similar to     Technology (free                            generation                                   generation                 positive precinct                                assets, electricity                                                       carbon positive                         battery storage
      that surrounding the           high speed                                technology                                technology (solar,                                                               transmission                                                               precinct
       Moorabbin Airport)            public wi-fi,                           (solar, water or                            water or water to                                                            easement, APA gas
                                    environmental                           water to energy)                                  energy)                                                                         main
                                    sensors, water                                                                                                                                   +1                                                                                                                   +1
                                                                                                                                                        Solar panels with                                                                                                                                                   Require 100
                                    management,                                                                                                                                                                                                                                   Leveridge off                           gigabyte (super
                                                                                                                                                         battery storage
      Flexible employment           smart lighting)                                                  +1                                                                                                                                                                          drainage assets,                         fast internet) to
      outcomes that do not                                                  Innovative and                                                                                                                                                                                          electricity                                support
                                                                                                                                                                                                     Smart City Technology
      compete with existing                                                 carbon positive                                                                                                                                                                                       transmission                               innovation
                                                                                                                                                                                                       (free high speed
         uses in the area                                   +1                 precinct                                                                                                                   public wi-fi,
                                                                                                                                                                                                                                                                                 easement, APA
                                      Require 100                                                                                                    Require 100 gigabyte                                                                                                           gas main
                                                                                                                                                                                                        environmental
                                    gigabyte (super                                                                                                 (super fast internet) to
                                                                                                                                                                                                         sensors, water
                                    fast internet) to                                                                                                 support innovation
                                                                                                                                                                                                      management, smart                                                                                                     Smart City
     Employment uses to be               support                                                                                                                                                           lighting)                                                                                                     Technology (free
                                                                             Leveridge off
      responsive to sensitive          innovation                                                                                                                                                                                                                                    Bioenergy                             high speed
                                                                            drainage assets,
              uses                                                             electricity                                                                                                                                                                                           options i.e.                          public wi-fi,
                                                                             transmission                                                               Clean energy                                                                                                                community                             environmental
                                                                            easement, APA                                                          generation technology                                                                                                               power                              sensors, water
                                                                                                                                                                                                         Green industrial                                                                                                 management,
                                     Community                                 gas main                                                             (solar, water or water
                                                                                                                                                                                                        estates integrated                                                                                                smart lighting)
          Clean industry           energy project to                                                                                                      to energy)
                                                                                                                                                                                                        with surrounding
                                    deliver zero net                                                                                                                                                      environment
                                       ambition                                                                                                                                                                                                                                     Industrial
                                                                                 Circular                                                                                                                                                                                        ecology/circular
     Medical / Hospitial uses                                                                                                                                                                                                                                                       economy                              Ensure release of
                                                                              economy i.e.                                                          Build on existing food
                                                                                                                                                                                                                                                                                    elements                             land is ready and
                                                                            create demand                                                             and agricultural
                                                                                                                                                                                                                                                                                                                            responds to
                                                                            for recycled and                                                             businesses
                                                                                                                                                                                                                                                                                                                              demand
                                                                               low carbon
                                                                                materials
      Employment uses that
        support 20-minute                                                                                                                                                                                                                                                       Embed planning
        neighbourhood for                                                                                                                                                                                                                                                          controls for
                                                                                                                                                                                                                                                                                 Carbon Neutral                          Integrated Water
     existing residential areas
                                                                                                                                                                                                                                                                                                                           Management
                                                                                                                                                                                                                                                                                                                            Plans to be
                                                                                                                                                                                                                                                                                                                         mandatory for all
                                                                                                                                                                                                                                                                                                                              future
                                                                                                                                                                                                                                                                                                                           developments

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                             14                                                                                               PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
CO-DESIGN PLACE
BASED PLANS
INTRODUCTION

This section of the report summarises                 In small Zoom breakout groups (eight (8) groups
key findings from feedback collated from              were formed consisting of approximately 5-7
the following workshop activities:                    people), participants undertook a series of
                                                      interactive activities via MURAL aimed to:
` Workshop #1
→ Activity #2 – Types and Form of Development/        ` Determine the spatial and physical needs of each
  Land Uses (refer to Section 4.2)                      land use, identify the opportunities each land use
                                                        could deliver and to illustrate what that may look like;
→ Activity #3 – Land Use Structure
                                                      ` Locate key land uses and key facilities for the
  Exercise (refer to Section 4.3)
                                                        Officer South Employment PSP; and
` Workshop #2
                                                      ` Review and validate key open space, drainage,
→ Activity #1 – Open Space + Drainage                   transport and infrastructure connections
  Mapping (refer to Section 4.4)                        for the Officer South Employment PSP.
→ Activity #2 – Transport + Infrastructure            Ultimately, a combination of these plans will form the
  Mapping (refer to Section 4.5)                      basis of the Conceptual Place-Based Plan for Officer
                                                      South Employment PSP. Each sub-section below
                                                      describes the purpose of each activity and summarises
                                                      comments received for particular elements of the plan.

                                                                                 ` Workshop #2 Plans
                                                                                 → Activity #1 – Open Space
                                                                                   + Drainage Mapping

                                                                                 → Activity #2 – Transport +
                                                                                   Infrastructure Mapping

OFFICER SOUTH EMPLOYMENT PSP 2.o                 15                     PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
TYPES AND FORM OF DEVELOPMENT / LAND USES

The key objective of this activity was to determine the spatial and physical needs of various land
uses as well as the requirements and opportunities. The table below summarises key spatial and
physical needs that participants identified of each land use and key performance criteria (i.e. benefits/
opportunities) each land use could deliver. The types of land uses that were workshopped include large
and heavy, light industry, high intensity/finer grain, mixed use, activity centre and residential.

                                                                                PERFORMANCE CRITERIA
                 SPATIAL AND PHYSICAL NEEDS                                     (OPPORTUNITIES AND BENEFITS)

   LARGER / HEAVIER EMPLOYMENT USES
   ` Locate along key freight routes                             ` Opportunities for landscaping between
   ` Locate food production to east and south-east                 the street and built form

   ` Low-rise development and clean industrial uses              ` Environmentally sustainable buildings
     adjacent southern Green Wedge interface                       and operations i.e. renewable energy
                                                                   generation within heavy industry
   ` Requires buffers to existing sensitive
     uses (such as residential areas)                            ` Rainwater harvesting, Water Sensitive Urban
                                                                   Design (WSUD) and on-site water treatments
   ` Consideration of conservation areas and
     sensitive uses (i.e. residential, heritage, noise/          ` Allow for innovation, partnerships and flexibility
     pollution, interface, buffers and setbacks etc)               i.e. industrial robotics and automation

   ` Utilise existing constraints i.e. transmission              ` Co-location of agricultural business
     easement - opportunities of uses                            ` Opportunity for emerging resource recovery
   ` Allowance for larger lot sizes                                industry, business innovation hub, research
                                                                   and development (R&D), supporting skills
   ` Ensure emergency vehicles access,
                                                                   development and symbiotic industry
     sufficient parking, and delivery facilities.
   ` Consider fire risks associated with dangerous
     goods industry and/or manufacturing
   ` Ensure appropriate setbacks from
     identified bushfire hazards

   LIGHT INDUSTRY

   ` Street-orientated development                               ` Clean emissions technologies and ESD
   ` Located close to Neighbourhood                              ` Ability to allow for suitable non-industrial uses
     Activity Centre and amenities                               ` Reusable and adaptable building typologies
   ` Located on periphery of creeks, with                        ` Sustainable buildings and integrated
     potential for uses to activate main roads                     renewable energy
   ` Used as buffer to more sensitive areas and                  ` Co-sharing spaces
     between heavy industry and residential areas
                                                                 ` Connection to food i.e. production
   ` Range of lot sizes to encourage new                           and distribution, food technology and
     industries and start-ups                                      automation and vertical uses/farming.
   ` Access to infrastructure i.e. recycled                      ` Opportunity for warehousing with residential above
     water and 100 gigabyte
                                                                 ` Complement bigger industries i.e. ancillary uses
   ` Consider truck movement and on-
                                                                 ` Include amenity outcomes i.e. Integrated
     street parking for visitors
                                                                   Water Management (IWM) bushfire
   ` Access to public transport and Officer Train Station          hazards and major arterial roads
   ` Ensure appropriate setbacks from identified                 ` Include mixed agricultural industry and research
     bushfire hazards and major arterial roads                     centre to take advantage of the PSP’s position
   ` Vehicle access from main connector roads                      adjacent to one of Australia’s largest food bowls

OFFICER SOUTH EMPLOYMENT PSP 2.o                            16                      PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PERFORMANCE CRITERIA
                 SPATIAL AND PHYSICAL NEEDS                                      (OPPORTUNITIES AND BENEFITS)

   HIGH INTENSITY / FINER GRAIN
   ` Smaller lots sizes                                           ` Co-sharing spaces
   ` Multi-level                                                  ` Integrate Environmentally Sustainable Design (ESD)
   ` Access to local parks and                                    ` Include higher education and health service
     Neighbourhood Activity Centre                                  opportunities that responds to the market
   ` Ensure appropriate setbacks from                               and complements broader areas
     identified bushfire hazards                                  ` SoHo Living i.e. people living and working
   ` Mechanism to provide a ‘transitional’ area / function
     as a buffer to sensitive uses i.e. residential
   ` Activation and street level activity
   ` Access to main roads

   MIXED USE

   ` 4-6 storeys                                                  ` “live-work-play” lifestyle
   ` Adjacent to areas of high amenity                            ` Integrate Environmentally Sustainable Design (ESD)
   ` After hours activation i.e. include recreational spaces ` Medical centre
   ` Connections to main employment activities                    ` Flexible land uses that are responsive to the market
     such as schools, hospitals and universities                  ` Housing diversity i.e. smaller town houses and
   ` Shop-top housing/ SOHO                                         apartments and affordable housing opportunities
   ` Include pocket parks and co-locate with residential.         ` Reusable and adaptable building typologies
   ` Close to Neighbourhood Activity                              ` Micro-brewery
     Centre and community facilities.                             ` Less car reliance
   ` Height of the development to consider                        ` Tech focused industry - urban
     appropriate road width to ensure larger fire                   farming- food - integrated uses
     fighting vehicles can access the area
                                                                  ` Promote 20-minute neighbourhood
   ` Ensure appropriate setbacks from
     identified bushfire hazards
   ` Access to public transport and Officer Train Station
   ` Along Pakenham bypass interface

   NEIGHBOURHOOD ACTIVITY CENTRE

   ` Mixed uses vertically (shop-top                              ` Mixture of shops and services that
     housing) and horizontally                                      extend the hours of activity
   ` Fine grained street patterns                                 ` To support two centres between CREP and
   ` Located centrally with residential and                         OS PSP and service residential, employment
     aligned with development size i.e.                             uses and high exposure sites
     neighbourhood vs local convenience                           ` Office spaces and flexible working
   ` Height of the development to consider appropriate              spaces i.e. office hubs
     road width to ensure access of emergency vehicles            ` Solar, recycled water, circular waste
   ` Ensure appropriate setbacks from                             ` Utilise roof tops
     identified bushfire hazards                                  ` Opportunity to co-locate with school, retirement
   ` Arterial Road frontage                                         living, wellness hub and swim school

OFFICER SOUTH EMPLOYMENT PSP 2.o                             17                         PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PERFORMANCE CRITERIA
                 SPATIAL AND PHYSICAL NEEDS                                   (OPPORTUNITIES AND BENEFITS)

   RESIDENTIAL
   ` Public and active transport networks.                      ` Opportunity to complete existing
   ` Access to parks and open spaces.                             isolated residential communities.

   ` Proximity to amenities, community services,                ` Opportunity to capitalise on higher
     schools and employment opportunities.                        amenity along creeks.

   ` Service vehicle access i.e. waste vehicles                 ` Walking and bike tracks along the creek.
     and emergency services.                                    ` Include affordable / social housing.
   ` Located along freeway with sound attenuation.              ` Deliver innovative home office arrangements.
   ` Close to natural environment and                           ` Opportunity for more than 2,000 dwellings.
     access to other neighbourhoods i.e.                        ` Separate residential areas in PSP to
     interface with conservation areas.                           enjoy various high amenity areas.
   ` Prevent commercial / industrial traffic                    ` Support small businesses, home businesses and
     through residential areas.                                   tradesmen when planning for residential mix.
   ` Interface and complement with
     existing residential areas.
   ` Buffer from industrial uses and provide a
     transition between the employment uses.
   ` Location should be as close to the existing Officer
     Town Centre as possible (i.e. north of Lecky
     Road) to avoid fragmented communities.
   ` Ensure appropriate setbacks from
     identified bushfire hazards.
   ` Deliver attractive affordable residential
     precinct for workers in Jesmond Dene.

LAND USE STRUCTURE

The aim of Activity #3 – Land Use Structure Exercises was to spatially locate key land uses
including industry/business, neighbourhood activity centre, mixed uses and residential.

Key facilities were also mapped including Government Primary (P-6) and Non-Government
Schools, Level 1 Multipurpose Community Centre, Local Active Recreation Reserve, Indoor
Recreation and Passive Open Spaces on the Officer South Employment PSP plan.

The activity was organised into four steps as follows:

` Step 1 – To review each land use and key facilities as listed on the MURAL. Participants also had
  the option to locate ‘other land uses’ if a particular use was not available and was considered to be
  required. General design principles were noted on the MURAL to provide guidance to participants
  on where key land uses must not be located due to a constraint (i.e. gas pipeline buffer). Participants
  were also invited to provide additional design principles for each of the land uses.
` Step 2 – To locate each land use and key facilities by dragging and dropping selected
  scaled shapes on the corresponding Officer South Employment PSP plan.
` Step 3 – To add a comment using a sticky note to explain the choice of location and/
  or give reasons for the answer (i.e. whether you agree or disagree).
` Step 4 – To provide written comments/ short justification if you consider an alternative
  that is not consistent with emerging directions and/or state policy.

OFFICER SOUTH EMPLOYMENT PSP 2.o                           18                      PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
GROUP 1                                            GROUP 2               GROUP 3

     GROUP 4                                            GROUP 5               GROUP 6

                                                                             DRAWING KEY
                                                                                  PRECINCT BOUNDARY                           POTENTIAL CONSERVATION AREA

                                                                                  LARGER/HEAVIER EMPLOYMENT USERS             POTENTIAL DRAINAGE AREA

                                                                                   OTHER EMPLOYMENT                           PRINCES FREEWAY
                                                                                                                              FREEWAY DIAMOND INTERCHANGE
                                                                                   LIGHT INDUSTRIAL
                                                                                                                              MAJOR ARTERIAL (THOMSONS RD) - 6 LANES
                                                                                   HIGH INTENSITY/FINER GRAIN
                                                                                                                              ARTERIAL ROAD - 2 to 4 LANES
                                                                                   MIXED USE                                  CONNECTOR - 2 LANES
                                                                                                                              POTENTIAL CONNECTOR - 2 LANES
                                                                                   RESIDENTIAL
                                                                                                                              GAS PIPELINE
                                                                                   NEIGHBOURHOOD ACTIVITY CENTRE              GAS PIPELINE BUFFER
                                                                                                                              POWER - TRANSMISSION LINE / TOWER
                                                                                                                              POWER - TRANSMISSION EASEMENT

     GROUP 7                                            GROUP 8

                                                                                                                    January 2021

   Figure 4 Land Use Structure Exercises - All Groups (Groups 1 to 8)
                                                                                                                    OFFICER SOUTH ePSP
OFFICER SOUTH EMPLOYMENT PSP 2.o                                        19                                                 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
LAND USE - COMMONALITIES + VARIATIONS

` There was general preference for high intensity/finer grain land uses in proximity to Minta
  Farm PSP and Cardinia Creek, and north of, and adjacent to, Lecky Road. The locational
  preference of this land use was to provide a ‘transitional’ area/ buffer to the residential
  areas and to ensure proximity to the proposed Neighbourhood Activity Centre.
` Majority of groups have placed light industrial land uses east of Cardinia Creek and/or west of Gum Scrub
  Creek. Participants noted that this would provide a buffer to sensitive areas (i.e. residential land uses,
  Cardinia Creek and Gum Scrub Creek) and between the larger/heavier employment users. In addition,
  the preference for these locations would also provide workers easy access to the Neighbourhood Activity
  Centre and other amenities, Officer Train Station and vehicular access from main connector roads.
` There was general preference (i.e. approximately more than 50% of groups) for larger/heavier employment users
  to be located within the southern part of the Officer South Employment PSP area. This was to ensure that these
  land uses are located away from conservation areas and sensitive uses and to provide medium to large lots sizes.
` Six groups (Groups 1 to 6) have placed the Neighbourhood Activity Centre near the intersection of Officer
  South Road and Lecky Road. This was to ensure arterial road frontage, provide service to residential,
  employment uses and high exposure sites within Officer South Employment PSP and to support the
  Cardinia Road Employment Precinct population (east of the Officer South Employment PSP).
` There was preference to locate mixed uses north of Lecky Road and either side
  of Officer South Road to ensure connection to employment, the Neighbourhood
  Activity Centre, community facilities and access to Officer Train Station.
` All groups have placed portions of residential land uses north of Lecky Road however the locations are
  still sporadic with some groups placing portions of residential south of Lecky Road. It is also apparent that
  residential land uses have been placed in proximity to Cardinia Creek and Gum Scrub Creek to support
  both the Minta Farm and Cardinia Road Employment Precinct residential population respectively.

OTHER KEY FACILITIES

The plans below illustrate the placement of key facilities for the eight (8) workshop groups. Each plan consists of
a corresponding summary of comments, commonalities discussion and design principles. Key facilities include:
` Government Primary (P-6) School;
` Non-Government School;
` Level 1 Multipurpose Community Centre;
` Local Active Recreation Reserve;
` Indoor Recreation; and
` Passive Open Spaces.
These commonalities will be used as a starting point to locate key facilities for the future Conceptual Place-Based
Plan.

OFFICER SOUTH EMPLOYMENT PSP 2.o                            20                  PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Government Primary School (P-6)
There was preference among workshop groups to locate the Government Primary School (P-6) north-east of the
Officer South Employment PSP (i.e. north of Lecky Road and east of Officer South Road). Participants noted that
this was to ensure the Government Primary School (P-6) would be in close proximity to the future Neighbourhood
Activity Centre, residential area and to support the population of the Cardinia Road Employment Precinct.

                      Government Primary School (P-6)                                                                                                                                                             Potential Amount
                                                                                                                                                                  Drawing
                                                                                                                                                                                         Type
                                                                                                                                                                 Key Symbol
                                                                                                                                                                                                             Number            Size

                                                                                                                                                                               Government Primary
                                                                                                                                                                                                                   1          3.5ha
                                                                                                                                                                               School (P-6)
                                 STEPHENS RD

                                                                                 PRINC
                                                                                      ES FW
                                                                                                   Y

                                                                                         GU
                                                                                           MS
                                                                                                                                                                 Design
                                                                         H RD

                                                                                                                                                                                Key Design Principles - Comments Received
                                                                                             CRU

  GRICES
                                               LECKY
                                                        RD                                                                                                       Element
                                                                                                BC

         RD
                                                                          SOUT

                                                                                                  REE
                                                                                                     K

                                                                                                                                                                 Road Access    ` Not located on Arterial Roads
                                                                  OFFICER

              C
               A
                R
                 D
                  IN
                    IA
                         C
                          R
                           EE
                             K                      A
                                                                                                                                                                 Co-located     ` Preferred located with sports reserves
          THO
             MP
               SON
                                                        B                                                                                                        with other
                  SR
                    D                                                B                                                                                           uses           ` Co-located with a Community Centre
                                                             A

                                                                                                                                                                 Other          ` Must be located within the Regionally
                                                                                                                                                                                  Significant Commercial Area
                                                                 PA
                                                                   TT
                                                                     ER
                                                                       SO
                                                                                                                                                                                ` Must be located outside the gas buffer
                                                                         N
                                                                                 RD

                                                                                                                        N
                                                                                                                            0m   200m   400m   800m   1km

                                                                                                         January 2021
                                                                                                         OFFICER SOUTH ePSP
WORKSHOP GROUPS:

   1     2        3              4              5                6               7       8

Non-Government School (P-6)
There was consensus among groups to locate Non-Government Schools north of Lecky Road. Although the
placements were generally scattered across the precinct, it was apparent that the placement of Non-Government
Schools must be within close proximity to the Neighbourhood Activity Centre, key amenities and community
facilities.

                           Non-Government School (P-6)                                                                                                                                                            Potential Amount
                                                                                                                                                                  Drawing
                                                                                                                                                                                        Type
                                                                                                                                                                 Key Symbol
                                                                                                                                                                                                             Number           Size

                                                                                                                                                                               Non-Government School
                                                                                                                                                                                                                  1          2.0ha
                                                                                                                                                                               (P-6)
                                 STEPHENS RD

                                                                                 PRINC
                                                                                      ES FW
                                                                                                   Y
                                                                                         GU
                                                                                           MS

                                                                                                                                                                 Design
                                                                         RD

                                                                                                                                                                                Key Design Principles - Comments Received
                                                                                             CRU

                                               LECKY                                                                                                             Element
                                                                     SOUTH

  GRICES                                                RD
                                                                                                BC

         RD
                                                                                                  REE
                                                                                                     K

                                                                                                                                                                 Road Access    ` Located on Connector Roads
                                                                  OFFICER

              C
               A
                R
                 D
                  IN
                    IA
                         C
                                                                                                                                                                 Co-located
                          R
                           EE
                             K                      A                                                                                                            with other     ` Located near Neighbourhood Activity Centre
          THO
             MP                                         B                                                                                                        uses
               SON
                  SR
                    D                                        A
                                                                     B

                                                                                                                                                                 Other          ` Must be located within the Regionally
                                                                                                                                                                                  Significant Commercial Area
                                                                 PA                                                                                                             ` Within walkable catchment to community facilities
                                                                   TT
                                                                     ER
                                                                       SO
                                                                         N
                                                                                 RD

                                                                                                                        N
                                                                                                                            0m   200m   400m   800m   1km

                                                                                                         January 2021
                                                                                                         OFFICER SOUTH ePSP
WORKSHOP GROUPS:

   1     2        3              4              5                6               7       8

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                            21                        PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Level 1 Multipurpose Community Centre
There was preference among workshop groups to co-locate the Level 1 Multipurpose Community
Centre with the Government Primary School (P-6) and within proximity to the Neighbourhood
Activity Centre. One group (Group 1) noted that there is potential for another Level 1 Multipurpose
Community Centre in proximity to Stephens Road and the future connector road.

              Level 1 Multipurpose Community Centre                                                                                                                                                              Potential Amount
                                                                                                                                                                  Drawing
                                                                                                                                                                                        Type
                                                                                                                                                                 Key Symbol
                                                                                                                                                                                                            Number           Size

                                                                                                                                                                               Level 1 Multipurpose
                                                                                                                                                                                                                 1           1.2ha
                                                                                                                                                                               Community Centre
                                 STEPHENS RD

                                                                                 PRINC
                                                                                      ES FW
                                                                                                   Y
                                                                                         GU
                                                                                           MS

                                                                                                                                                                 Design
                                                                         H RD

                                                                                                                                                                               Key Design Principles - Comments Received
                                                                                             CRU

  GRICES
                                               LECKY
                                                        RD                                                                                                       Element
                                                                                                BC

         RD
                                                                          SOUT

                                                                                                  REE
                                                                                                     K

                                                                                                                                                                 Road Access   ` Not located on Arterial Roads
                                                                  OFFICER

              C
               A
                R
                 D
                  IN
                    IA
                         C
                                                                                                                                                                 Co-located
                          R
                           EE
                             K                      A                                                                                                            with other    ` Within a walkable catchment from activity centre
          THO
             MP                                         B                                                                                                        uses
               SON
                  SR
                    D                                        A
                                                                     B

                                                                                                                                                                 Other         ` Must be located within the Regionally
                                                                                                                                                                                 Significant Commercial Area
                                                                 PA
                                                                                                                                                                               ` Must be located outside the gas buffer
                                                                   TT
                                                                     ER
                                                                       SO
                                                                         N
                                                                                 RD

                                                                                                                        N
                                                                                                                            0m   200m   400m   800m   1km

                                                                                                         January 2021
                                                                                                         OFFICER SOUTH ePSP
WORKSHOP GROUPS:

   1     2        3              4              5                6               7       8

Local Active Recreation Reserve
There was general agreement among groups to locate the Local Active Recreation Reserve in the north-east
portion of the Officer South Employment PSP. This correlates with the need to co-locate the Local Active
Recreation Reserve with the Government Primary School (P-6) and Neighbourhood Activity Centre.

                          Local Active Recreation Reserve                                                                                                                                                        Potential Amount
                                                                                                                                                                  Drawing
                                                                                                                                                                                        Type
                                                                                                                                                                 Key Symbol
                                                                                                                                                                                                            Number           Size

                                                                                                                                                                               Local Active Recreation
                                                                                                                                                                                                                 1          6.66ha
                                                                                                                                                                               Reserve
                                 STEPHENS RD

                                                                                 PRINC
                                                                                      ES FW
                                                                                                   Y
                                                                                         GU
                                                                                           MS

                                                                                                                                                                 Design
                                                                         RD

                                                                                                                                                                               Key Design Principles - Comments Received
                                                                                             CRU

                                               LECKY                                                                                                             Element
                                                                     SOUTH

  GRICES                                                RD
                                                                                                BC

         RD
                                                                                                  REE
                                                                                                     K

                                                                                                                                                                 Co-located    ` Must be co-located with Government
                                                                  OFFICER

              C
               A
                R
                                                                                                                                                                 with other      Primary School (P-6)
                 D
                  IN
                    IA                                                                                                                                           uses          ` Within proximity to Public Transport
                         C
                          R
                           EE
                             K                      A

          THO
             MP                                         B                                                                                                        Other         ` Must be located within the Regionally
               SON
                  SR
                    D                                        A
                                                                     B                                                                                                           Significant Commercial Area
                                                                                                                                                                               ` Must be located outside the gas buffer

                                                                 PA
                                                                   TT
                                                                     ER
                                                                       SO
                                                                         N
                                                                                 RD

                                                                                                                        N
                                                                                                                            0m   200m   400m   800m   1km

                                                                                                         January 2021
                                                                                                         OFFICER SOUTH ePSP
WORKSHOP GROUPS:

   1     2        3              4              5                6               7       8

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                            22                       PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Indoor Recreation
There were two (2) key clusters identified for the placement of the Indoor Recreation:

` Cluster 1 - Co-located with the cluster of high, very high and potential high retention
  value tree area in the south of the Officer South Employment Precinct; and
` Cluster 2 – Co-located with the Government Primary School (P-6)
Note that the ‘all’ represents double placements i.e. two groups placing Indoor Recreation at the same location.

                                               Indoor Recreation                                                                                                                                              Potential Amount
                                                                                                                                                                  Drawing
                                                                                                                                                                                       Type
                                                                                                                                                                 Key Symbol
                                                                                                                                                                                                           Number         Size

                                                                                                                                                                              Indoor Recreation                1          0.8ha
                                 STEPHENS RD

                                                                                 PRINC
                                                                                      ES FW
                                                                                                   Y
                                                                                         GU
                                                                                           MS

                                                                                                                                                                 Design
                                                                         H RD

                                                                                                                                                                              Key Design Principles - Comments Received
                                                                                             CRU

  GRICES
                                               LECKY
                                                        RD                                                                                                       Element
                                                                                                BC

         RD
                                                                          SOUT

                                                                                                  REE
                                                                                                     K

                                                                                                                                                                 Co-located   ` Must be co-located with Government
                                                                  OFFICER

              C
               A
                R
                                                                                                                                                                 with other     Primary School (P-6)
                 D
                  IN
                    IA                                                                                                                                           uses         ` Within proximity to Public Transport
                         C
                          R
                           EE
                             K                      A

          THO
             MP                                         B                                                                                                        Other        ` Must be located within the Regionally
               SON
                  SR
                    D                                        A
                                                                     B                                                                                                          Significant Commercial Area
                                                                                                                                                                              ` Must be located outside the gas buffer

                                                                 PA
                                                                   TT
                                                                     ER
                                                                       SO
                                                                         N
                                                                                 RD

                                                                                                                        N
                                                                                                                            0m   200m   400m   800m   1km

                                                                                                         January 2021
                                                                                                         OFFICER SOUTH ePSP
WORKSHOP GROUPS:

   1     2        3              4              5                6               7       8 All

OFFICER SOUTH EMPLOYMENT PSP 2.o                                                                                                                            23                      PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
You can also read