OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN - PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY - AWS
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
OFFICER SOUTH EMPLOYMENT PRECINCT STRUCTURE PLAN PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY WORKSHOP HELD ON 26 NOVEMBER 2020 AND 4 DECEMBER 2020 FEBRUARY 2021
CONTENTS 1 INTRODUCTION 1 1.1 PSP 2.o Process 1 1.2 Purpose of the Place-Based Plan Co-Design Workshop Summary Report 2 2 PLACE-BASED PLAN CO-DESIGN WORKSHOP 3 2.1 Who was involved? 3 2.2 Place-Based Plan Co-Design Workshop Structure 4 3 WHAT WE HAVE HEARD FROM YOU ALREADY 5 3.1 Emerging Themes, Purpose Statement and Ambitions 5 3.2 Additional Ambitions + PSP Tools 7 4 CO-DESIGN PLACE-BASED PLANS 15 4.1 Introduction 15 4.2 Types and Forms of Development / Land Uses 16 4.3 Land Use Structure 18 4.2 Open Space + Drainage 25 4.3 Transport + Infrastructure 28 5 NEXT STEPS 31 Prepared by: Level 2, 299 Clarendon Street, South Melbourne, VIC 3205 phone. +61 3 9070 1166 meshplanning.com.au Disclaimer All professional care has been taken to ensure that the content of © Mesh Livable Urban Communities Pty Ltd 2021 this report is current and accurate. However, it is not purported that it is complete, and it is not guaranteed that the content of This work is copyright. Apart from any use permitted under the report is free from errors. Mesh accepts no liability for error, the Copyright Act 1968, no part may be reproduced by any loss, damages or other consequences arising from reliance on process without written permission from Mesh Livable Urban information contained in this report. Communities Pty Ltd OFFICER SOUTH EMPLOYMENT PSP 2.o 2 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
INTRODUCTION PSP 2.o PROCESS PURPOSE OF THE PLACE-BASED PLAN CO-DESIGN WORKSHOP The Victorian Planning Authority (VPA) is SUMMARY REPORT taking an innovative approach to shaping the future of Melbourne’s communities, VPA would like to thank all participants for through collaborative strategic planning. joining and contributing at the Officer South PSP Place Based Plan (PBP) Co-Design Workshops The Precinct Structure Plan (PSP) process was in November and December 2020. reviewed by the VPA in 2019 as part of a program of continuous improvement. This reform agenda created This summary report captures the key outcomes the next generation of strategic planning - ‘PSP from the Place-Based Plan Co-Design Workshop, 2.o ‘to deliver outcomes focused on vision, purpose held online on 26 November 2020 and 4 and place in partnership with local communities. December 2020 via Zoom and MURAL. PSP 2.o sets aspirational targets for PSP development The MURAL outputs identify comments raised including ‘Co-Design’, streamlining preparation, and ideas contributed for each workshop activity optimising the PSP product to embrace (from each group) to guide the development innovation and delivering government policy. of a Conceptual Place-Based Plan and does not represent elements with any finality. The Co-Design approach is key to achieving integrated planning outcomes through the streamlined PSP The overarching purpose of this Summary Report preparation process. This collaborative and iterative will be to highlight key points of interest, preferences approach provides opportunities for a range of and views from stakeholders and landowners (from diverse stakeholders to participate in workshops the workshop activities) to inform the Conceptual that generate and refine new ideas, and craft, test Place-Based Plan(s). The Conceptual Place-Based and deliver meaningful and distinct visions for our Plan(s) will represent the early ideas and proposed new greenfield neighbourhoods and communities. directions for the Officer South Employment PSP In particular, the PSP 2.o process aims to: area. These plans will inform the testing and design and agency validation phases, prior to the preparation ` Facilitate the Co-Design of a Place- of the draft Place-Based Plan for public exhibition. Based Structure Plan (PSP); These plans will also inform the ICP. The VPA will ` Achieve up-front, early resolution of issues; undertake testing of the ICP and if a supplementary ` Gain better and earlier information on infrastructure ICP is required, this will also be exhibited with the PSP. demands to inform agency planning and budget bids; ` Update guidance on PSP content reflecting new government policy and promoting innovation; and ` Provide stronger guidance in PSPs for staging of development. The VPA is rolling out the new PSP 2.o process as part of our Greenfields work program, which includes the Officer South Employment PSP. Figure 1 below illustrates where we are now in the PSP 2.o process. OFFICER SOUTH EMPLOYMENT PSP 2.o 1 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
WE ARE HERE 1. MURAL OUTPUT 2. PBP CO-DESIGN WORKSHOP SUMMARY DOCUMENT Vision, Purpose & Place Exhibition & Planning Panel Finalisation Co-design Pitching Sessions Vision & Purpose Place‐based Plan PRE COMMENCEMENT Issue elimination Targeted community Finalise the Place-based Plan Council Strategic Site Tour and resolution engagement and PSP Statement PSP Third Party Funding Purpose and Vision Early Opportunities and Landowners and Constraints Mapping Co-design options for the Issue Identification community validation Place-based Plan of draft Plan Site Tour with Council Agencies work program Minister’s Approval VPA budget commitments, Council & Agencies Consider submissions Front load Assessment of PSP policy and provision ratios Set Purpose of PSP Facilitate Resolution of Issues Targeted issue escalation and resolution DELWP Coordinate Ministerial COUNCIL approval of PSP and ICP Informal expert conclaves on Landowners /developers Set Vision of PSP Landowners /developers unresolved matters AGENCY pitch Plans to VPA and Co-design balanced PSP Council outcomes Panel Hearing Minister’s Approval Early Issues Validation PLACE-BASED PLACE-BASED DRAFT DELWP PLAN PROPOSALS PLAN CONCEPTUAL PLACE-BASED PANEL REPORT GAZETTAL informs early issues validation OPPORTUNITIES PLAN OPTION PLACE-BASED STRUCTURE PLAN (PSP PREPARATION) Phase 1 land capability studies (e.g heritage, contamination, topography) Targeted community AGENCY engagement on the Vision and Endorsement of PSP options Purpose of the PSP and approach for unresolved matters EARLY ISSUES VALIDATION Phase 2 studies to test key issues Design review Figure 1. PSP 2.o Board Approval to exhibit OFFICER SOUTH EMPLOYMENT PSP 2.o 2 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PLACE BASED PLAN CO-DESIGN WORKSHOP INTRODUCTION WHO WAS INVOLVED? The Place-Based Plan Co-Design Workshop (held A diverse range of stakeholders attended the online on 26 November 2020 and 4 December two (2) Place-Based Plan Co-Design Workshop 2020 via Zoom and MURAL) was held as a key part sessions with approximately 70 participants of the Officer South Employment PSP 2.o process attended from the following organisations: and built upon the outcomes of the Pitching → Victorian Planning Authority and Sessions (held in April 2020) and the Vision and appointed consultants; Purpose Co-Design Webinar (held in July 2020). → Cardinia Shire Council; The purpose of the Place-Based Plan Co-Design Workshop was: → Traditional Owner Groups / Anthropologists; ` To update key stakeholders and landowners → Landowners and landowner representatives on the status of the project. → DELWP – Melbourne Strategic Assessment; ` To provide additional information from background → Department of Treasury and Finance technical studies (via video and documentation). Victoria - Invest Victoria; ` To collaboratively develop and prepare a conceptual place-based plan for the → Department of Jobs, Precincts and Officer South Employment Precinct. Regions - Sport and Recreation; ` To provide an opportunity for key stakeholders → Environment Protection Authority; and landowners to visually map out key land → APA Group; uses, transport connections, open spaces and other infrastructure, and provide any → Melbourne Water; commentary on their considerations. → South East Water - Sewer Infrastructure; ` To encourage and capture innovative ideas → South East Water - Planning; in shaping the future urban structure for the Officer South Employment Precinct and to → Ausnet; inform the scope of further technical studies. → Parks Victoria; ` To provide a clear, transparent and inclusive → Major Road Projects Victoria; and consultation program and provide stakeholders with a summary of what information was → + More. captured through the workshops. ` To outline the next steps for the Officer South Employment Precinct PSP 2.o process. OFFICER SOUTH EMPLOYMENT PSP 2.o 3 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PLACE BASED PLAN CO-DESIGN WORKSHOP STRUCTURE In preparation for the Place-Based Plan Co-Design Workshops, VPA sent out a package of information EMERGING CHALLENGES & CONSIDERATIONS to participants prior to the Place-Based Plan Co- Short Video Design Workshops as the workshop activities were 18 November 2020 developed in consideration of this information. The background content included (available on the Officer South VPA website): OFFICER SOUTH EMPLOYMENT PSP PLACE-BASED PLAN CO- ` An Emerging Challenges and Considerations DESIGN WORKSHOP #1 Video via YouTube to outline the technical input 26 November and emerging challenges and considerations influencing the Officer South Employment Precinct Structure Plan development. ACTIVITY 1. AMBITIONS + PSP TOOLS Click here for the Emerging Challenges and Considerations Video ACTIVITY 2. ` Summary of Phase 1 Background Reports. TYPES AND FORM OF DEVELOPMENT / LAND USES Click here for the Phase 1 Background Reports ACTIVITY 3. ` The Officer South ePSP Emerging LAND USE STRUCTURE EXERCISES Challenges & Considerations Slide Pack. The Place-Based Plan Co-Design Workshop was run online via Zoom. While different online techniques were used at the workshops, the format was essentially the OFFICER SOUTH EMPLOYMENT same as a face-to-face workshop, commencing with a PSP PLACE-BASED PLAN CO- brief presentation from the VPA to provide a summary DESIGN WORKSHOP #2 of the current status of the project and an update on 4 December 2020 issue resolution pathways, followed by online interactive activities in small break out groups (the breakdown and structure of the day are illustrated in Figure 2). ACTIVITY 1. Workshop activities were undertaken via a digital OPEN SPACE AND DRAINAGE workspace tool called ‘MURAL’ which is an online platform similar to a format that would be used for face-to-face workshops. The workshops ACTIVITY 2. were facilitated by the VPA and Mesh. TRANSPORT AND Refer to the Place-Based Plan Co-Design Workshop INFRASTRUCTURE - MURAL Outputs, December 2020 for the output data recorded on MURAL during the workshops. Click here for the Place-Based Figure 2 Workshop Schedule Plan Co-Design Workshop - MURAL Outputs, December 2020 OFFICER SOUTH EMPLOYMENT PSP 2.o 4 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
WHAT WE HAVE HEARD FROM YOU ALREADY EMERGING THEMES, PURPOSE STATEMENTS AND AMBITIONS The information gathered at the Pitching Sessions held in April 2020 was analysed and categorised into emerging themes and purpose statements. These were further validated, refined and consolidated at the Vision and Purpose Co-Design Webinar held in July 2020. In addition, key ambitions of the Officer South Employment PSP for each theme are identified below (see Figure 3 below). These themes are objective/ placed-based that will transform throughout the PSP 2.o process to form the basis of a vision for the Officer South Employment PSP. OFFICER SOUTH EMPLOYMENT PSP 2.o 5 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Figure 3 Emerging Themes, Purpose Statements and Ambitions OFFICER SOUTH EMPLOYMENT PSP 2.o 6 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
ADDITIONAL AMBITIONS + PSP TOOLS The aim of Workshop #1 - Activity #1 – Ambitions Participants were then asked to categorise each and PSP Tools was to identify what the PSP ambition by dragging and dropping each ambition tool(s) is to achieve the purposes statements (i.e. each sticky note) into the three (3) key PSP and ambitions for each theme. tools – Partnerships and Commitment, Place- Based Guidance and Strategies. A key question to In small Zoom breakout groups (eight (8) groups of consider was - What are the PSP tools to help achieve/ approximately 5-7 people), workshop participants deliver these ambitions or purpose statements? were required to review the existing ambitions that were raised at the Pitching Sessions and Vision and New and existing ambitions and comments for Purpose Co-Design Webinar and to add any additional each group were reviewed, consolidated, and ambitions for individual sites and/or the overall Officer summarised for each theme as shown below. South Employment PSP. This was completed by Further details and other information have been participants placing a comment (via a sticky note) noted and taken into consideration (see Place- under each of the six (6) themes. Key questions that Based Plan Co-Design Workshop - MURAL participants considered (but not limited to) were: Outputs, December 2020 for the output data - available on the Officer South VPA website). ` What are some key successful features of other employment precincts that we can bring to Officer South? ` What opportunities, such as innovations, partnerships and state and local infrastructure may act as a catalyst for the precinct? ` Theme 1 – What are some key successful features of other employment precincts that we can bring to Officer South? ` Theme 2 – What are some opportunities to enhance and strengthen surrounding communities? ` Theme 3 – What are some alternative transport opportunities and/or innovations for Officer South ePSP? ` Theme 4 – What are some amenity or recreational opportunities within or surrounding Cardinia Creek, Gum Scrub Creek and future Drainage assets? What are some community infrastructure opportunities, activities and services within the Business with Residential area? ` Theme 5 – What are some opportunities or innovations to better utilise/manage water within Officer South ePSP? What are some innovative practices in relation to stormwater harvesting? ` Theme 6 – What are some innovative technologies/infrastructure that we can bring to Officer South ePSP? OFFICER SOUTH EMPLOYMENT PSP 2.o 7 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
AMBITIONS + PSP TOOLS METHODOLOGY 2 Place-Based Guidance 3 Strategies Identifies whether key 1 Partnerships + ambitions need to be Key strategies (i.e. written Commitment spatially accommodated requirements) the Officer Theme Combination of for, in the Place-Based South Employment PSP Identifies creative Partnerships + Plan, such as widths Combination of could adopt/deliver i.e. An initial preliminary idea collaboration and / Commitment and and/or alignment of roads, Place-Based planning requirements, that recurred in strategic partnerships Place-Based open spaces or activity Guidance and applied zones or design presentations, workshops opportunities. Guidance centres etc. Strategies guidance. and discussions. Theme 1. Providing for employment and industries of the future (within the Regionally Significant Commerical Area or State Significant Industrial Precinct) PSP Tools Additional Ambitions PSP Tools for Theme 1 Key PSP tools required to 1 2 3 help achieve/deliver After hours activation via ambitions and/or purpose mixed uses and recreational spaces Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies statements. What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Mixture of commercial +4 +3 +4 +1 +1 and industrial Hybrid TAFE/ Target indutries 24-hour business 24 hour business hubs Vertically mixed-use Logistic and Vertically Access to major opportunities (similar to University with high water hubs to be located to be located away developments warehouse precinct mixed-use transport that surrounding the usage away from existing from existing and developments infrastructure Moorabbin Airport) and future residential future residential areas Additional +2 areas ambitions for Access to major +1 Access to major Advanced transport Advanced transport manufacturing, Food 24 hour business Advanced each Theme Flexible employment infrastructure manufacturing, Logistic and infrastructure and fibre and hubs to be manufacturing, outcomes that do not Logistic and pharmaceutical located away Food and fibre An additional or food and fibre warehouse precinct warehouse precinct precinct from existing and compete with existing and new ambition uses in the area pharmaceutical and future pharmaceutical relevant to the precinct residential areas precinct Vertically Hybrid TAFE/ specific theme. mixed-use Target industries with Community uses to be University Target industries with developments integrated within the high water usage high water usage Employment uses to be SSIP, RSCA and Logistic and Target industries responsive to sensitive Employment surroudning PSPs warehouse with high water uses through Natural Vulnerable uses precinct usage Circular Resources (identified in Clause Access to major economy Management 13.02-1S) to be located transport considerations (NRM) Water intensive land away from identified infrastructure Clean industry uses i.e. opportunities bushfire hazards High quality Circular to incorporate reuse/ industrial with economy managing urban mix of considerations runoff commercial uses Agriculture / Water harvesting Advanced Medical / Hospitial uses food businesses initiatives manufacturing, food Professional services and some retail or industries and fibre and and business pharmaceutical Sustainable precinct Places of worship in operations suitable locations Renewable Employment uses that Consistent industrial energy support 20-minute Support neighbourhood for provision of outcomes via Design existing residential areas community uses Vertically mixed-use Guidelines After hours within developments Streetscape greenery support i.e. employment Flexible and well-designed innovative lighting Road and active planning Food precinct - transport corridors controls innovation centre / Land use activity to centre of excellence reflect the location i.e. Release of for food production, industrial next to employment linking with tertiary conservation area and land to align education centre waterway Food processing to be with demand separated from industry with buffer requirements Energy generation Shared approach to and connection to prevent / alert of industry pollution spills to waterways Future proof industry needs, i.e. high speed data connection or smart cities Total number of Land to be appropriately staged groups who and responds to the validated the market Degree of flexibility is existing ambition. important for investment New idea/ambition Further Comments raised OFFICER SOUTH EMPLOYMENT PSP 2.o 8 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 1. Providing for employment and industries of the future (within the Regionally Significant Commerical Area or State Significant Industrial Precinct) Additional Ambitions PSP Tools for Theme 1 1 2 3 After hours activation via mixed uses and recreational spaces Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Mixture of commercial +4 +3 +4 +1 +1 and industrial Hybrid TAFE/ Target indutries 24-hour business 24 hour business hubs Vertically mixed-use Logistic and Vertically Access to major opportunities (similar to University with high water hubs to be located to be located away developments warehouse precinct mixed-use transport that surrounding the usage away from existing from existing and developments infrastructure Moorabbin Airport) and future residential future residential areas +2 areas Access to major +1 Access to major Advanced transport Advanced transport manufacturing, Food 24 hour business Advanced Flexible employment infrastructure manufacturing, Logistic and infrastructure and fibre and hubs to be manufacturing, outcomes that do not Logistic and pharmaceutical located away Food and fibre food and fibre warehouse precinct compete with existing warehouse precinct precinct from existing and and uses in the area pharmaceutical and future pharmaceutical precinct residential areas precinct Vertically Hybrid TAFE/ mixed-use Community uses to be University Target industries with Target industries with developments integrated within the high water usage high water usage Employment uses to be SSIP, RSCA and Logistic and Target industries responsive to sensitive Employment surroudning PSPs warehouse with high water uses through Natural Vulnerable uses precinct usage Circular Resources (identified in Clause Access to major economy Management 13.02-1S) to be located transport considerations (NRM) Water intensive land away from identified infrastructure Clean industry uses i.e. opportunities bushfire hazards High quality Circular to incorporate reuse/ industrial with economy managing urban mix of considerations runoff commercial uses Agriculture / Water harvesting Advanced Medical / Hospitial uses food businesses initiatives manufacturing, food Professional services and some retail or industries and fibre and and business pharmaceutical Sustainable precinct Places of worship in operations suitable locations Renewable Employment uses that Consistent industrial energy support 20-minute Support neighbourhood for provision of outcomes via Design existing residential areas community uses Vertically mixed-use Guidelines After hours within developments Streetscape greenery support i.e. employment Flexible and well-designed innovative lighting Road and active planning Food precinct - transport corridors controls innovation centre / Land use activity to centre of excellence reflect the location i.e. Release of for food production, industrial next to employment linking with tertiary conservation area and land to align education centre waterway Food processing to be with demand separated from industry with buffer requirements Energy generation Shared approach to and connection to prevent / alert of industry pollution spills to waterways Future proof industry needs, i.e. high speed data connection or smart cities Land to be appropriately staged and responds to the market Degree of flexibility is important for investment OFFICER SOUTH EMPLOYMENT PSP 2.o 9 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 2. Value add to existing communities Additional Ambitions PSP Tools for Theme 2 1 2 3 Integrate 20-minute neighbourhood principles Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Locate residential within close proximity to existing +2 +3 +2 +3 communities to support Social and Minimum of 1 Social and affordable Minimum of 1 job per Environmental Social and affordable Diverse and Environmental community infrastructure affordable job per housing household to meet sustainable design for housing integrated sustainable e.g. schools housing household to Cardinia's residential and housing located design for meet Cardinia's sustainability and employment areas close to existing residential and sustainability liveability of residents and/or proposed employment and liveability of Diverse and Environmental services, areas Diverse and residents integrated housing sustainable design for transport and Social and affordable integrated located close to residential and jobs. housing to be located in Utilise easements for areas with high levels of housing located existing and/or Community active open space/ employment areas +1 close to existing proposed services, Social and amenity, services and infrastructure and recreational uses infrastructure. and/or proposed Environmentally transport and jobs. links to support both /walking trails that +2 affordable services, sustainable existing and new connect to existing Minimum of 1 housing transport and design for residential networks job per jobs residential and communities household to employment Access to food meet Cardinia's areas sustainability Based on density and liveability of 20-30 dwelling Easy access to Mixed uses that Green links between residents per NDA access educational facilities encourage major drainage to community (i.e. walk rather than home-based infrastructure and food gardens Access to drive) businesses co-locate open space important community food gardens with major drainage Zero Net Carbon infrastructure neighbourhoods Residential Government development to Density Project respond to the guidance for the Investment Opportunities for Smooth integration Business / higher growing community Catchment between residential to the east to generate requirements to Residential education and and industrial areas health services a population density be met through adjacent to Kaduna town centres for Partnership with Park. future DET and Council populations and Connectivity to co-locate any Active and passive the PSP (walk/ride) to mainstream open space that supports other open spaces and education and interacts with High level of amenity town centres waterways community employment to active residential sensitive facilities at night. use along the creek Residential land to provide a critical mass to support the nearby activity centre and future employment land. OFFICER SOUTH EMPLOYMENT PSP 2.o 10 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 3. Releasing key transport/economic links Additional Ambitions PSP Tools for Theme 3 1 2 3 Thompsons Road corridor delivery essential to enable infrastructure Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Adequate local connector +1 +1 +2 +2 roads Early delivery of Connection to a Early delivery of Green main street Early delivery of Trackless tram Cross Councils Early delivery of Thompsons future south east Thompsons Road Thompsons Road Service to train Thompsons Road airport stations with Road public transport Active transport links to Green main street modes (road, rail Electric charging and bus or community infrastructure Trackless tram stations Pakenham Freeway (school, open space) alternative) Trackless trams Electric charging Cross Councils ramps to require stations Service to train funding for early are getting stations with delivery traction these Officer South Road public transport Electric charging key public transport +1 days modes (road, rail stations Distinct Connection to a route and bus or neighbourhood future south east Adequate bicycle alternative) opportunity airport and walking Electricity Green main routes to transmission street commute to Green Transportation separation and Co-locate linear work within the i.e. trams buses/ alignment needs to wetland + cycling precinct Deliver bus Alignment of consider infrastructure with Incorporate local cycling/walking trails routes on main Thompsons Road to landownership (i.e. north-south Officer east-west roads early consider the electricity current alignment South Road access/connector Strategies on transmission goes through multiple road north of alternative easement ownership) Lecky Road to transport Extensive bus provide a guidance (i.e. EV network separation charging Officer South stations) between core Road to be an Address the buffers to business uses important Perimeter road to surrounding and potential arterial road for provide a buffer from residential areas - how residential land linkages to the bushfire hazards to do we represent in the uses Enable Officer Town future development Centre and train PSP connectivity station between neighbourhoods Residential and workplaces Shared path network development to via sustainable Adequate access and that connects to the lead with the transport egress points for the north and east-west delivery of safe movement of emergency vehicles transport infrastructure Zones that are flexible and responds to Appropriate buffers to change and uses provide investment certainty OFFICER SOUTH EMPLOYMENT PSP 2.o 11 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 4. Integrating complementary community and open Additional Ambitions PSP Tools for Theme 1 1 2 3 Employment land uses to interface open space/drainage corridors Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies to enhance/ protect What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance environmental values +1 +1 +3 +1 Urban farming Incorporation of Kindergartens and Regional trail network Regional trail network Incorporation of Kindergartens Community facilities or Aboriginal values maternal health linked to link and connect to link and connect Aboriginal values and maternal open spaces to not into PSP plan with school Cardinia Parklands Cardinia Parklands into PSP plan health linked reduce areas dedicated to (street names, (street names, with school residential (i.e. 50/50 split) Regional trail park names etc.) park names etc.) network to link +1 and connect Incorporation of Wellness Hub (swim Wellness Hub (swim Cardinia Aboriginal values into school, gym, medical, Green canopies school, gym, medical, Parklands Ability to modify PSP plan (street a pharmacy and Regional trail along roads to a pharmacy and and adapt names, park names childcare) network to link avoid heat sink childcare) drainage etc.) and connect scheme design Cardinia Shared trails Parklands along waterways Integrate a green Incorporate APA Active Open Space walking and cycling Urban farming National and schools required network with existing Provision of Landscape to service Cardinia rail infrastructure schools, active Capitalise on guidelines to Road PSP community open space, opportunities for provide Recreation and guidance for community residential in amenity Ensure proposed new centres and surrounding enhancement of alongside high development and other areas with gas easement value habitat open space does not community Allocate greens spaces appropriate links for Growling increase potential for infrastructure within residential integration to Grassfrog, bushfire risk close to existing areas for recreational PSP Southern Brown communities activities Bandicoot, etc. Management of conflicts between Facilitate surrounding non-government precincts - Connectivity via school opportunities interface areas to bicycle and walking paths be considered Co-location to residential areas with Dedicated bike tracks open space is to encourage people important for to travel within accessibility and precinct rather than livability just being industrial OFFICER SOUTH EMPLOYMENT PSP 2.o 12 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 5. Understand sustainable environmental and drainage needs Additional Ambitions PSP Tools for Theme 1 1 2 3 Businesses to incorporate sustainable practices into their development Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Intergrate open space +2 +1 +2 and environmental Stormwater Closed loop Passive irrigation Passive irrigation Closed loop water Closed loop water Stormwater Closed loop outcomes harvesting and water system system system harvesting and water system reuse on open reuse on open space space Integrated Water Green spaces to utilise Encourage use of solar Partnership Management - Adopt ‘Net Zero Stormwater Passive irrigation harvested stormwater energy between Council, Regional and Local Strategies’ i.e. green harvesting and reuse Encourage MW and SEW to response and sustainable on open space Achieve urban commercial and deliver precinct forest objectives industrial uses meaningful and reduce Dedicated frog ponds Environmentally that utilises Integrated Water urban heat Protection of biodiversity to provide stormwater significant reuse and Management island effect values within management, waterways to be stormwater outcomes Conservation Area 36 biodiversity and Avoid adverse impacts protected by harvesting including Growling Grass amenity from stormwater on sensitive uses Frog, Dwarf Galaxias and native fauna in creek Australian Grayling. corridor Protect High priority to Australian Use drainage protect RAMSAR Grayling and corridors as Westernport Bay Utilise non-potable Dwarf Galaxias assets for the downstream - water to maintain all via stormwater Locate residential near surrounding must meet green infrastructure management waterways for improved development i.e. SEPP/BEPM strategy amenity increased water quality biodiversity and reduce heat island Ensure interfaces are well balanced between waterways and industry OFFICER SOUTH EMPLOYMENT PSP 2.o 13 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Theme 6. Industry ready services and infrastructure Additional Ambitions PSP Tools for Theme 1 1 2 3 After hours activation via mixed uses and recreational spaces Partnerships + Commitment 1 + 2 Place-based Guidance 2 + 3 Strategies What creative and ambitious thinking could you deliver, including in partnership with others? Does this need to be spatially accommodated for in the Place Based Plan, such as widths and/or What strategies (i.e. written requirements) should the Officer South ePSP adopt/deliver? i.e. planning alignment of roads, open spaces, activity centres etc. requirements, applied zones or design guidance Mixture of commercial +2 +1 +2 +1 +1 +1 and industrial Smart City Clean energy Clean energy Innovative and carbon Leveridge off drainage Innovative and Solar panels with opportunities (similar to Technology (free generation generation positive precinct assets, electricity carbon positive battery storage that surrounding the high speed technology technology (solar, transmission precinct Moorabbin Airport) public wi-fi, (solar, water or water or water to easement, APA gas environmental water to energy) energy) main sensors, water +1 +1 Solar panels with Require 100 management, Leveridge off gigabyte (super battery storage Flexible employment smart lighting) +1 drainage assets, fast internet) to outcomes that do not Innovative and electricity support Smart City Technology compete with existing carbon positive transmission innovation (free high speed uses in the area +1 precinct public wi-fi, easement, APA Require 100 Require 100 gigabyte gas main environmental gigabyte (super (super fast internet) to sensors, water fast internet) to support innovation management, smart Smart City Employment uses to be support lighting) Technology (free Leveridge off responsive to sensitive innovation Bioenergy high speed drainage assets, uses electricity options i.e. public wi-fi, transmission Clean energy community environmental easement, APA generation technology power sensors, water Green industrial management, Community gas main (solar, water or water estates integrated smart lighting) Clean industry energy project to to energy) with surrounding deliver zero net environment ambition Industrial Circular ecology/circular Medical / Hospitial uses economy Ensure release of economy i.e. Build on existing food elements land is ready and create demand and agricultural responds to for recycled and businesses demand low carbon materials Employment uses that support 20-minute Embed planning neighbourhood for controls for Carbon Neutral Integrated Water existing residential areas Management Plans to be mandatory for all future developments OFFICER SOUTH EMPLOYMENT PSP 2.o 14 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
CO-DESIGN PLACE BASED PLANS INTRODUCTION This section of the report summarises In small Zoom breakout groups (eight (8) groups key findings from feedback collated from were formed consisting of approximately 5-7 the following workshop activities: people), participants undertook a series of interactive activities via MURAL aimed to: ` Workshop #1 → Activity #2 – Types and Form of Development/ ` Determine the spatial and physical needs of each Land Uses (refer to Section 4.2) land use, identify the opportunities each land use could deliver and to illustrate what that may look like; → Activity #3 – Land Use Structure ` Locate key land uses and key facilities for the Exercise (refer to Section 4.3) Officer South Employment PSP; and ` Workshop #2 ` Review and validate key open space, drainage, → Activity #1 – Open Space + Drainage transport and infrastructure connections Mapping (refer to Section 4.4) for the Officer South Employment PSP. → Activity #2 – Transport + Infrastructure Ultimately, a combination of these plans will form the Mapping (refer to Section 4.5) basis of the Conceptual Place-Based Plan for Officer South Employment PSP. Each sub-section below describes the purpose of each activity and summarises comments received for particular elements of the plan. ` Workshop #2 Plans → Activity #1 – Open Space + Drainage Mapping → Activity #2 – Transport + Infrastructure Mapping OFFICER SOUTH EMPLOYMENT PSP 2.o 15 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
TYPES AND FORM OF DEVELOPMENT / LAND USES The key objective of this activity was to determine the spatial and physical needs of various land uses as well as the requirements and opportunities. The table below summarises key spatial and physical needs that participants identified of each land use and key performance criteria (i.e. benefits/ opportunities) each land use could deliver. The types of land uses that were workshopped include large and heavy, light industry, high intensity/finer grain, mixed use, activity centre and residential. PERFORMANCE CRITERIA SPATIAL AND PHYSICAL NEEDS (OPPORTUNITIES AND BENEFITS) LARGER / HEAVIER EMPLOYMENT USES ` Locate along key freight routes ` Opportunities for landscaping between ` Locate food production to east and south-east the street and built form ` Low-rise development and clean industrial uses ` Environmentally sustainable buildings adjacent southern Green Wedge interface and operations i.e. renewable energy generation within heavy industry ` Requires buffers to existing sensitive uses (such as residential areas) ` Rainwater harvesting, Water Sensitive Urban Design (WSUD) and on-site water treatments ` Consideration of conservation areas and sensitive uses (i.e. residential, heritage, noise/ ` Allow for innovation, partnerships and flexibility pollution, interface, buffers and setbacks etc) i.e. industrial robotics and automation ` Utilise existing constraints i.e. transmission ` Co-location of agricultural business easement - opportunities of uses ` Opportunity for emerging resource recovery ` Allowance for larger lot sizes industry, business innovation hub, research and development (R&D), supporting skills ` Ensure emergency vehicles access, development and symbiotic industry sufficient parking, and delivery facilities. ` Consider fire risks associated with dangerous goods industry and/or manufacturing ` Ensure appropriate setbacks from identified bushfire hazards LIGHT INDUSTRY ` Street-orientated development ` Clean emissions technologies and ESD ` Located close to Neighbourhood ` Ability to allow for suitable non-industrial uses Activity Centre and amenities ` Reusable and adaptable building typologies ` Located on periphery of creeks, with ` Sustainable buildings and integrated potential for uses to activate main roads renewable energy ` Used as buffer to more sensitive areas and ` Co-sharing spaces between heavy industry and residential areas ` Connection to food i.e. production ` Range of lot sizes to encourage new and distribution, food technology and industries and start-ups automation and vertical uses/farming. ` Access to infrastructure i.e. recycled ` Opportunity for warehousing with residential above water and 100 gigabyte ` Complement bigger industries i.e. ancillary uses ` Consider truck movement and on- ` Include amenity outcomes i.e. Integrated street parking for visitors Water Management (IWM) bushfire ` Access to public transport and Officer Train Station hazards and major arterial roads ` Ensure appropriate setbacks from identified ` Include mixed agricultural industry and research bushfire hazards and major arterial roads centre to take advantage of the PSP’s position ` Vehicle access from main connector roads adjacent to one of Australia’s largest food bowls OFFICER SOUTH EMPLOYMENT PSP 2.o 16 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PERFORMANCE CRITERIA SPATIAL AND PHYSICAL NEEDS (OPPORTUNITIES AND BENEFITS) HIGH INTENSITY / FINER GRAIN ` Smaller lots sizes ` Co-sharing spaces ` Multi-level ` Integrate Environmentally Sustainable Design (ESD) ` Access to local parks and ` Include higher education and health service Neighbourhood Activity Centre opportunities that responds to the market ` Ensure appropriate setbacks from and complements broader areas identified bushfire hazards ` SoHo Living i.e. people living and working ` Mechanism to provide a ‘transitional’ area / function as a buffer to sensitive uses i.e. residential ` Activation and street level activity ` Access to main roads MIXED USE ` 4-6 storeys ` “live-work-play” lifestyle ` Adjacent to areas of high amenity ` Integrate Environmentally Sustainable Design (ESD) ` After hours activation i.e. include recreational spaces ` Medical centre ` Connections to main employment activities ` Flexible land uses that are responsive to the market such as schools, hospitals and universities ` Housing diversity i.e. smaller town houses and ` Shop-top housing/ SOHO apartments and affordable housing opportunities ` Include pocket parks and co-locate with residential. ` Reusable and adaptable building typologies ` Close to Neighbourhood Activity ` Micro-brewery Centre and community facilities. ` Less car reliance ` Height of the development to consider ` Tech focused industry - urban appropriate road width to ensure larger fire farming- food - integrated uses fighting vehicles can access the area ` Promote 20-minute neighbourhood ` Ensure appropriate setbacks from identified bushfire hazards ` Access to public transport and Officer Train Station ` Along Pakenham bypass interface NEIGHBOURHOOD ACTIVITY CENTRE ` Mixed uses vertically (shop-top ` Mixture of shops and services that housing) and horizontally extend the hours of activity ` Fine grained street patterns ` To support two centres between CREP and ` Located centrally with residential and OS PSP and service residential, employment aligned with development size i.e. uses and high exposure sites neighbourhood vs local convenience ` Office spaces and flexible working ` Height of the development to consider appropriate spaces i.e. office hubs road width to ensure access of emergency vehicles ` Solar, recycled water, circular waste ` Ensure appropriate setbacks from ` Utilise roof tops identified bushfire hazards ` Opportunity to co-locate with school, retirement ` Arterial Road frontage living, wellness hub and swim school OFFICER SOUTH EMPLOYMENT PSP 2.o 17 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
PERFORMANCE CRITERIA SPATIAL AND PHYSICAL NEEDS (OPPORTUNITIES AND BENEFITS) RESIDENTIAL ` Public and active transport networks. ` Opportunity to complete existing ` Access to parks and open spaces. isolated residential communities. ` Proximity to amenities, community services, ` Opportunity to capitalise on higher schools and employment opportunities. amenity along creeks. ` Service vehicle access i.e. waste vehicles ` Walking and bike tracks along the creek. and emergency services. ` Include affordable / social housing. ` Located along freeway with sound attenuation. ` Deliver innovative home office arrangements. ` Close to natural environment and ` Opportunity for more than 2,000 dwellings. access to other neighbourhoods i.e. ` Separate residential areas in PSP to interface with conservation areas. enjoy various high amenity areas. ` Prevent commercial / industrial traffic ` Support small businesses, home businesses and through residential areas. tradesmen when planning for residential mix. ` Interface and complement with existing residential areas. ` Buffer from industrial uses and provide a transition between the employment uses. ` Location should be as close to the existing Officer Town Centre as possible (i.e. north of Lecky Road) to avoid fragmented communities. ` Ensure appropriate setbacks from identified bushfire hazards. ` Deliver attractive affordable residential precinct for workers in Jesmond Dene. LAND USE STRUCTURE The aim of Activity #3 – Land Use Structure Exercises was to spatially locate key land uses including industry/business, neighbourhood activity centre, mixed uses and residential. Key facilities were also mapped including Government Primary (P-6) and Non-Government Schools, Level 1 Multipurpose Community Centre, Local Active Recreation Reserve, Indoor Recreation and Passive Open Spaces on the Officer South Employment PSP plan. The activity was organised into four steps as follows: ` Step 1 – To review each land use and key facilities as listed on the MURAL. Participants also had the option to locate ‘other land uses’ if a particular use was not available and was considered to be required. General design principles were noted on the MURAL to provide guidance to participants on where key land uses must not be located due to a constraint (i.e. gas pipeline buffer). Participants were also invited to provide additional design principles for each of the land uses. ` Step 2 – To locate each land use and key facilities by dragging and dropping selected scaled shapes on the corresponding Officer South Employment PSP plan. ` Step 3 – To add a comment using a sticky note to explain the choice of location and/ or give reasons for the answer (i.e. whether you agree or disagree). ` Step 4 – To provide written comments/ short justification if you consider an alternative that is not consistent with emerging directions and/or state policy. OFFICER SOUTH EMPLOYMENT PSP 2.o 18 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 5 GROUP 6 DRAWING KEY PRECINCT BOUNDARY POTENTIAL CONSERVATION AREA LARGER/HEAVIER EMPLOYMENT USERS POTENTIAL DRAINAGE AREA OTHER EMPLOYMENT PRINCES FREEWAY FREEWAY DIAMOND INTERCHANGE LIGHT INDUSTRIAL MAJOR ARTERIAL (THOMSONS RD) - 6 LANES HIGH INTENSITY/FINER GRAIN ARTERIAL ROAD - 2 to 4 LANES MIXED USE CONNECTOR - 2 LANES POTENTIAL CONNECTOR - 2 LANES RESIDENTIAL GAS PIPELINE NEIGHBOURHOOD ACTIVITY CENTRE GAS PIPELINE BUFFER POWER - TRANSMISSION LINE / TOWER POWER - TRANSMISSION EASEMENT GROUP 7 GROUP 8 January 2021 Figure 4 Land Use Structure Exercises - All Groups (Groups 1 to 8) OFFICER SOUTH ePSP OFFICER SOUTH EMPLOYMENT PSP 2.o 19 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
LAND USE - COMMONALITIES + VARIATIONS ` There was general preference for high intensity/finer grain land uses in proximity to Minta Farm PSP and Cardinia Creek, and north of, and adjacent to, Lecky Road. The locational preference of this land use was to provide a ‘transitional’ area/ buffer to the residential areas and to ensure proximity to the proposed Neighbourhood Activity Centre. ` Majority of groups have placed light industrial land uses east of Cardinia Creek and/or west of Gum Scrub Creek. Participants noted that this would provide a buffer to sensitive areas (i.e. residential land uses, Cardinia Creek and Gum Scrub Creek) and between the larger/heavier employment users. In addition, the preference for these locations would also provide workers easy access to the Neighbourhood Activity Centre and other amenities, Officer Train Station and vehicular access from main connector roads. ` There was general preference (i.e. approximately more than 50% of groups) for larger/heavier employment users to be located within the southern part of the Officer South Employment PSP area. This was to ensure that these land uses are located away from conservation areas and sensitive uses and to provide medium to large lots sizes. ` Six groups (Groups 1 to 6) have placed the Neighbourhood Activity Centre near the intersection of Officer South Road and Lecky Road. This was to ensure arterial road frontage, provide service to residential, employment uses and high exposure sites within Officer South Employment PSP and to support the Cardinia Road Employment Precinct population (east of the Officer South Employment PSP). ` There was preference to locate mixed uses north of Lecky Road and either side of Officer South Road to ensure connection to employment, the Neighbourhood Activity Centre, community facilities and access to Officer Train Station. ` All groups have placed portions of residential land uses north of Lecky Road however the locations are still sporadic with some groups placing portions of residential south of Lecky Road. It is also apparent that residential land uses have been placed in proximity to Cardinia Creek and Gum Scrub Creek to support both the Minta Farm and Cardinia Road Employment Precinct residential population respectively. OTHER KEY FACILITIES The plans below illustrate the placement of key facilities for the eight (8) workshop groups. Each plan consists of a corresponding summary of comments, commonalities discussion and design principles. Key facilities include: ` Government Primary (P-6) School; ` Non-Government School; ` Level 1 Multipurpose Community Centre; ` Local Active Recreation Reserve; ` Indoor Recreation; and ` Passive Open Spaces. These commonalities will be used as a starting point to locate key facilities for the future Conceptual Place-Based Plan. OFFICER SOUTH EMPLOYMENT PSP 2.o 20 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Government Primary School (P-6) There was preference among workshop groups to locate the Government Primary School (P-6) north-east of the Officer South Employment PSP (i.e. north of Lecky Road and east of Officer South Road). Participants noted that this was to ensure the Government Primary School (P-6) would be in close proximity to the future Neighbourhood Activity Centre, residential area and to support the population of the Cardinia Road Employment Precinct. Government Primary School (P-6) Potential Amount Drawing Type Key Symbol Number Size Government Primary 1 3.5ha School (P-6) STEPHENS RD PRINC ES FW Y GU MS Design H RD Key Design Principles - Comments Received CRU GRICES LECKY RD Element BC RD SOUT REE K Road Access ` Not located on Arterial Roads OFFICER C A R D IN IA C R EE K A Co-located ` Preferred located with sports reserves THO MP SON B with other SR D B uses ` Co-located with a Community Centre A Other ` Must be located within the Regionally Significant Commercial Area PA TT ER SO ` Must be located outside the gas buffer N RD N 0m 200m 400m 800m 1km January 2021 OFFICER SOUTH ePSP WORKSHOP GROUPS: 1 2 3 4 5 6 7 8 Non-Government School (P-6) There was consensus among groups to locate Non-Government Schools north of Lecky Road. Although the placements were generally scattered across the precinct, it was apparent that the placement of Non-Government Schools must be within close proximity to the Neighbourhood Activity Centre, key amenities and community facilities. Non-Government School (P-6) Potential Amount Drawing Type Key Symbol Number Size Non-Government School 1 2.0ha (P-6) STEPHENS RD PRINC ES FW Y GU MS Design RD Key Design Principles - Comments Received CRU LECKY Element SOUTH GRICES RD BC RD REE K Road Access ` Located on Connector Roads OFFICER C A R D IN IA C Co-located R EE K A with other ` Located near Neighbourhood Activity Centre THO MP B uses SON SR D A B Other ` Must be located within the Regionally Significant Commercial Area PA ` Within walkable catchment to community facilities TT ER SO N RD N 0m 200m 400m 800m 1km January 2021 OFFICER SOUTH ePSP WORKSHOP GROUPS: 1 2 3 4 5 6 7 8 OFFICER SOUTH EMPLOYMENT PSP 2.o 21 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Level 1 Multipurpose Community Centre There was preference among workshop groups to co-locate the Level 1 Multipurpose Community Centre with the Government Primary School (P-6) and within proximity to the Neighbourhood Activity Centre. One group (Group 1) noted that there is potential for another Level 1 Multipurpose Community Centre in proximity to Stephens Road and the future connector road. Level 1 Multipurpose Community Centre Potential Amount Drawing Type Key Symbol Number Size Level 1 Multipurpose 1 1.2ha Community Centre STEPHENS RD PRINC ES FW Y GU MS Design H RD Key Design Principles - Comments Received CRU GRICES LECKY RD Element BC RD SOUT REE K Road Access ` Not located on Arterial Roads OFFICER C A R D IN IA C Co-located R EE K A with other ` Within a walkable catchment from activity centre THO MP B uses SON SR D A B Other ` Must be located within the Regionally Significant Commercial Area PA ` Must be located outside the gas buffer TT ER SO N RD N 0m 200m 400m 800m 1km January 2021 OFFICER SOUTH ePSP WORKSHOP GROUPS: 1 2 3 4 5 6 7 8 Local Active Recreation Reserve There was general agreement among groups to locate the Local Active Recreation Reserve in the north-east portion of the Officer South Employment PSP. This correlates with the need to co-locate the Local Active Recreation Reserve with the Government Primary School (P-6) and Neighbourhood Activity Centre. Local Active Recreation Reserve Potential Amount Drawing Type Key Symbol Number Size Local Active Recreation 1 6.66ha Reserve STEPHENS RD PRINC ES FW Y GU MS Design RD Key Design Principles - Comments Received CRU LECKY Element SOUTH GRICES RD BC RD REE K Co-located ` Must be co-located with Government OFFICER C A R with other Primary School (P-6) D IN IA uses ` Within proximity to Public Transport C R EE K A THO MP B Other ` Must be located within the Regionally SON SR D A B Significant Commercial Area ` Must be located outside the gas buffer PA TT ER SO N RD N 0m 200m 400m 800m 1km January 2021 OFFICER SOUTH ePSP WORKSHOP GROUPS: 1 2 3 4 5 6 7 8 OFFICER SOUTH EMPLOYMENT PSP 2.o 22 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
Indoor Recreation There were two (2) key clusters identified for the placement of the Indoor Recreation: ` Cluster 1 - Co-located with the cluster of high, very high and potential high retention value tree area in the south of the Officer South Employment Precinct; and ` Cluster 2 – Co-located with the Government Primary School (P-6) Note that the ‘all’ represents double placements i.e. two groups placing Indoor Recreation at the same location. Indoor Recreation Potential Amount Drawing Type Key Symbol Number Size Indoor Recreation 1 0.8ha STEPHENS RD PRINC ES FW Y GU MS Design H RD Key Design Principles - Comments Received CRU GRICES LECKY RD Element BC RD SOUT REE K Co-located ` Must be co-located with Government OFFICER C A R with other Primary School (P-6) D IN IA uses ` Within proximity to Public Transport C R EE K A THO MP B Other ` Must be located within the Regionally SON SR D A B Significant Commercial Area ` Must be located outside the gas buffer PA TT ER SO N RD N 0m 200m 400m 800m 1km January 2021 OFFICER SOUTH ePSP WORKSHOP GROUPS: 1 2 3 4 5 6 7 8 All OFFICER SOUTH EMPLOYMENT PSP 2.o 23 PLACE-BASED PLAN CO-DESIGN WORKSHOP SUMMARY
You can also read