New Developments on Industrial Steam Turbines
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
New Developments on Industrial Steam Turbines Enhanced Platform The next generation of Siemens industrial steam turbines Flexibility meets Efficiency The new pre-designed multistage steam turbine SST-111 Power-Gen Europe 12. Juni 2012, Köln Markus Tacke CEO Industrial Power Oil and Gas Division of Siemens Energy © Siemens AG 2012. Alle Rechte vorbehalten.
Enhanced Platform The Heritage of Siemens Industrial ST Technology Görlitzer Maschinenbau- 1992 Anstalt Demag Delaval 2002 KK&K 2007 Industrial Steam Turbines Steam Turbines Large Steam Turbines AEG Kanis AEG Alstom Industrial 1969 ABB 2004 Steam Turbines Turbines ASEA STAL 1990 1980 20th 1960 1970 1980 1990 2000 2010 century © Siemens AG 2012. Alle Rechte vorbehalten. Seite 2 Power-Gen Europe 2012
Enhanced Platform Drivers to develop a new Turbine Platform External requirements Internal drivers Use of state of the art Acquisition history led to design allowing overlap in product portfolio significant gains and power range Extended features e.g. Huge variation of Steam optimized start-up time Turbine Types incl. the Extended operating maintenance of the tools capabilities Implementation of Increased flexibility to advantages of all families in adapt to customer needs one product Increased efficiency Incorporation of new state Improved economical of the art features solutions The Enhanced Platform The next generation of Siemens industrial steam turbines © Siemens AG 2012. Alle Rechte vorbehalten. Seite 3 Power-Gen Europe 2012
Enhanced Platform Key Parameters Power output 15 – 250 MW Speed 18000 – 3000 rpm Live steam Inlet pressure/temp ≤ 165 bar/≤ 565 °C Inlet pressure/temp ≤ 2393 psi/≤ 1049 °F Controlled extractions (up to 2) Pressure, ext. valve ≤ 72 bar/1044 psi Pressure, int. valve ≤ 55 bar/798 psi Temperature ≤ 480 °C/895 °F Bleeds (up to 6) ≤ 85 bar/1233 psi Exhaust conditions Improvements Back-pressure ≤ 80 bar/1160 psi Power output +75 MW Condensing ≤ 1.0 bar/15 psi Inlet temperature +25 K District heating ≤ 3.0 bar/43 psi Extraction pressure +20 bar © Siemens AG 2012. Alle Rechte vorbehalten. Seite 4 Power-Gen Europe 2012
Enhanced Platform Blades and Vanes Improved blade and seal concept provides highest efficiency. Optimized seal concept in shape of shroud and number of fins minimizes leakages All HP blades utilize well proven root/clamping design, thus ensuring reliability Improved cylindrical and conical HP blades allow for longer airfoils and provide most competitive cost 3D optimized HP blades reach highest efficiency, still allowing simple processes in sales, engineering, and production due to predefined sub-components The integration of all current state of the art last stage blades provides full flexibility to meet customer requirements © Siemens AG 2012. Alle Rechte vorbehalten. Seite 5 Power-Gen Europe 2012
Enhanced Platform Customer Benefits Higher Steam Parameter at In- and Outlets High Reliability Reduced Start-up Time Optimized Faster Load Changes Performance Improved Efficiency Long Life Cycle – Increased Life Time Extensive Tested and Verified First Turbine © Siemens AG 2012. Alle Rechte vorbehalten. Seite 6 Power-Gen Europe 2012
SST-111 Siemens Pre-designed steam turbine range Type Power Output (MWe) 0,5 1 2 3 4 5 6 7 8 9 10 11 12 SST-040 0.3 SST-050 0.75 SST-060 6 SST-110 7 SST-111 12 SST-111: Filling the multistage gap © Siemens AG 2012. Alle Rechte vorbehalten. Seite 7 Power-Gen Europe 2012
SST-111 General overview Technical Data Power output up to 12 MW Main steam pressure up to 131 bar(a) Main steam temperature up to 530° C Exhaust steam pressure: Condensation down to 0.06 bar(a) Typical Dimensions Length: approximately 8 m, including generator Width: 4.0 m Height: 4.0 m © Siemens AG 2012. Alle Rechte vorbehalten. Seite 8 Power-Gen Europe 2012
SST-111 Technical features Quick start capable (no preheating) Saturated steam operation Backpressure / condensing type Pressure-controlled extraction and/or admission steam Robust blisk design Nozzle-group control valves Compact package design Integrated oil supply system ATEX design available (optional) High efficient and reliable Designed according to the latest functional safety standards IEC 61508 / 61511 Maximum flexibility and optimized efficiency through multicasing design: up to two controlled extractions, reheat and / or admission steam possible © Siemens AG 2012. Alle Rechte vorbehalten. Seite 9 Power-Gen Europe 2012
SST-111 Seven good reasons to go with the SST-111 1 Higher efficiency 2 Flexibility (Controlled Extraction / Condensing / Reheat) 3 Quick start-up 4 Competitive price 5 Proven solution 6 Compact design and simple installation 7 Low maintenance costs © Siemens AG 2012. Alle Rechte vorbehalten. Seite 10 Power-Gen Europe 2012
SST-111 A perfect fit for decentralized power generation Biomass, waste to energy Production (High efficiency) engineering companies Waste heat, CHP Flexibility (Value for money, availability) Municipal meets Power Efficiency Combined cycle Generation (Controlled extraction) Industrial Concentrated Solar Power Power (High efficiency, quick start-up) Generation © Siemens AG 2012. Alle Rechte vorbehalten. Seite 11 Power-Gen Europe 2012
Thank you for your Attention! © Siemens AG 2012. All rights reserved.
Disclaimer NOTES AND FORWARD-LOOKING STATEMENTS This document contains statements related to our future business and financial performance and future events or developments involving Siemens that may constitute forward-looking statements. These statements may be identified by words such as “expects,” “looks forward to,” “anticipates,” “intends,” “plans,” “believes,” “seeks,” “estimates,” “will,” “project” or words of similar meaning. We may also make forward-looking statements in other reports, in presentations, in material delivered to stockholders and in press releases. In addition, our representatives may from time to time make oral forward-looking statements. Such statements are based on the current expectations and certain assumptions of Siemens’ management, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect Siemens’ operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements or anticipated on the basis of historical trends. These factors include in particular, but are not limited to, the matters described in Item 3: Risk factors of our most recent annual report on Form 20-F filed with the SEC, in the chapter “Risks” of our most recent annual report prepared in accordance with the German Commercial Code, and in the chapter “Report on risks and opportunities” of our most recent interim report. Further information about risks and uncertainties affecting Siemens is included throughout our most recent annual, and interim reports as well as our most recent earnings release, which are available on the Siemens website, www.siemens.com, and throughout our most recent annual report on Form 20-F and in our other filings with the SEC, which are available on the Siemens website, www.siemens.com, and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results, performance or achievements of Siemens may vary materially from those described in the relevant forward-looking statement as being expected, anticipated, intended, planned, believed, sought, estimated or projected. Siemens neither intends, nor assumes any obligation, to update or revise these forward-looking statements in light of developments which differ from those anticipated. Due to rounding, numbers presented throughout this and other documents may not add up precisely to the totals provided and percentages may not precisely reflect the absolute figures. This document includes supplemental financial measures that are or may be non-GAAP financial measures. New orders and order backlog; adjusted or organic growth rates of revenue and new orders; book-to-bill ratio; Total Sectors profit; return on equity (after tax), or ROE (after tax); return on capital employed (adjusted), or ROCE (adjusted); Free cash flow, or FCF; cash conversion rate, or CCR; adjusted EBITDA; adjusted EBIT; adjusted EBITDA margins, earnings effects from purchase price allocation, or PPA effects; net debt and adjusted industrial net debt are or may be such non-GAAP financial measures. These supplemental financial measures should not be viewed in isolation as alternatives to measures of Siemens’ financial condition, results of operations or cash flows as presented in accordance with IFRS in its Consolidated Financial Statements. Other companies that report or describe similarly titled financial measures may calculate them differently. Definitions of these supplemental financial measures, a discussion of the most directly comparable IFRS financial measures, information regarding the usefulness of Siemens’ supplemental financial measures, the limitations associated with these measures and reconciliations to the most comparable IFRS financial measures are available on Siemens’ Investor Relations website at www.siemens.com/nonGAAP. For additional information, see supplemental financial measures and the related discussion in Siemens’ most recent annual report on Form 20-F, which can be found on our Investor Relations website or via the EDGAR system on the website of the United States Securities and Exchange Commission. © Siemens AG 2012. Alle Rechte vorbehalten. Seite 13 Power-Gen Europe 2012
You can also read