LHC BWS Electro-Mechanical
      Consolidation

        Project Meeting
        February 4th 2020

          Dmitry Gudkov, BE-BI-ML   1
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Content

• Status of Prototypes
• Project Schedule
• Spares

• Future Work
• Discussion

                         Dmitry Gudkov, BE-BI-ML   2
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Status of Prototypes
• Prototype #1
  • Assembly done in December 2019
  • Electromechanical tests done in December 2019 – January 2020 (see Jonathan’s presentation)
  • Vacuum acceptance test has been agreed with TE-VSC, planned for February 2020

• Prototype #2
  • Components have been ordered for Prototype #1 and #2
  • Assembly is under way (readiness 95%) – Morad, Jean
  • Vacuum acceptance tests will be done after Prototype #1 (if necessary)
  • Cabling to be done

               Do we install one or two beam wire scanners in the LHC in 2020?

                                             Dmitry Gudkov, BE-BI-ML                             3
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Status of Prototypes: now in the BI Assembly Hall
Thanks to Morad, Jonathan, Guillaume, Jean!

                                                        Guides           Bellows

                                                        Front Plate                Back Plate

                                                        ConFlat Flange

                                                        Wire

                                                         Motor

                                                                                     Hub

                                                                               Ball Screw

                                                         Position
                                                         measurement
                                                         device

                                              Dmitry Gudkov, BE-BI-ML                       4
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Project Schedule

• No changes since last meeting

• On schedule

• Next steps are
   • Finalize second prototype
   • Adjust fork position to avoid clash with vacuum chamber
   • Perform vacuum acceptance test (1 or 2 instruments)
   • Install the instrument(s) in the LHC

                                              Dmitry Gudkov, BE-BI-ML   5
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Spares
• We have 5 vacuum chambers, ready for installation
• + One complete spare (old design) in 867
  • Bellows state is unknown
  • Vacuum chamber can be replaced
  • This one can be prepared for installation
• + Two complete sets of parts for 2 more spares (old design)
  • some commercial components need to be ordered (bearings, guides)
  • 2 more spares can be prepared for installation
• + One or Two BWS currently installed (to be removed from the LHC)
  • Bellows state is known
  • To be seen whether they need replacement
  • 1 or 2 more spares can be prepared
• Total: 4 or 5 spares (old design) can be prepared
• In case we need one more prototype (new design), a new set of parts should be ordered
  • ~ 5000 CHF

                                                Dmitry Gudkov, BE-BI-ML                   6
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Future Work
• We have all-metal bellows-less prototype for fast linear scanners from UHVD

• Test results (identical system in UHVD):
        • Total N of cycles: 350,000
        • Shaft speed (rev/sec): 50 (corresponding to 1000 mm/sec with 20 mm ballscrew lead)
        • End position repeatability within 0.03 mm
        • Good support for the next BWS Upgrade:
Front Plate      Magnetically-coupled
                                        Back Plate
                      actuator

ConFlat Flange

Wire

Motor

                                              Hub

Position
measurement                             Ball Screw
device

                                                      Dmitry Gudkov, BE-BI-ML                  7
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Thank you!
…discussion…

               Dmitry Gudkov, BE-BI-ML   8
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
Extra slides
Backup material

                  Dmitry Gudkov, BE-BI-ML   9
LHC BWS Electro-Mechanical Consolidation - Project Meeting February 4th 2020 - CERN Indico
1
Detailed Electromechanical Design                                                            8

1. Electric Motor Kollmorgen AKM23F-ACC2R-00 – ordered, arrival in July                                           12

2. Ballscrew Bosch Rexroth D16x16 T5 C3 (Preloaded) - received
3. Vacuum chamber with bellows – will be reused
4. Linear Guides – will be reused
                                                                                                     3
5. Supports – will be reused                                                10
6. Power Connector HARTING : 09 62 816 0301
                                                                                 5       4           2
7. Connector BURNDY : UTO0-16-19S-21T (x2)
8. Potentiometer for linear position measurements – will be reused
9. Linear Bushing Bosch Rexroth : R1083 612 20 (x2) - received                                               11
                                                                                     9
10. Supporting plates – to be produced
11. Hub – to be produced                                                    10
12. Installation guides – will be reused

                                                                                                 6

                                                  Dmitry Gudkov, BE-BI-ML                                         10
Project Status
• Without supporting frame modification only the replacement of horizontally installed BWS is possible
• It was decided not to modify the supporting frame (Meeting 28.05.2019)
LHC-RA43 / C05L4                                                LHC-RA46 / C05R4

                                                Dmitry Gudkov, BE-BI-ML                                  11
Change Proposal – Interferometry Positioning
Sensor
                                                Sensors’ supplier – Attocube (DE)
                                                M12/C7.6
                                                Necessary mechanical changes:
                                                1. Design and manufacturing of sensor
                                                   head interface plate
                                                2. Design and manufacturing of mirror
                       1            2              interface part
                                                3. Modification of the hub (2 tapped
                                                   holes)
                                                Questions:
                   1. Sensor head
                                                1. Are we interested in integrating this
                   2. Mirror (5 mm/9 mm)
                                                   sensor with prototypes?
                                                2. Interfaces with control electronics?
                                                   Other electronics, cables, optical
                                                   fibers in the tunnel?
                                                3. Budget

                      Dmitry Gudkov, BE-BI-ML                                          12
Dmitry Gudkov, BE-BI-ML   13
Future Linear BWS Alternatives and Study
          Bellows/Ballscrew/Rot. motor                      Magnetically-coupled/Ballscrew/Rot. motor                Magnetically-coupled/Lin. motor
 Guides                              Bellows                 Front Plate      Magnetically-coupled
                                                                                                        Back Plate
                                                                                   actuator

 Front Plate                                   Back Plate

 ConFlat Flange                                              ConFlat Flange

 Wire                                                        Wire

  Motor                                                       Motor

                                                                                                             Hub
                                                 Hub

                                           Ball Screw

                                                              Position                                                   Bellows/Lin. motor
  Position                                                    measurement                            Ball Screw
  measurement                                                 device
  device

                  Direct Drive/Lin. Motor/thin wall vac. chamber

                                                                              Dmitry Gudkov, BE-BI-ML                                                  14