Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director

Page created by Maria Stevens
 
CONTINUE READING
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Infrastructure,
Economics &
Sustainability
Considerations for MSW
into Viable Products
Stacy Katz, Project Director
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Agenda

    1   Purpose of Discussion

2
    2   Infrastructure Requirements

    3   Cost

    4   Environmental Considerations
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Cost

3
    01.                           02.                        03.
    Feedstock Acquisition         Facility Build & Ongoing   Residue
    Cost & Transportation         Maintenance
                                                             Transport & Disposal of
    Do you have to buy the        $8-$70M to build a         residue left over from
    Feedstock? Who are you        complex pre-processing     processing
    competing with?               facility.
                                                             $40-$100+ p/ton
    What does it cost to have                                depending on location
    the material delivered to
                                                             10-75%+ of input
    the pre-processing facility
                                                             (thousands of tons)
    and for further processing
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Environmental & Social Considerations
      Energy & Water Consumption   Chemicals &                  End of Life       Environmental Justice
                                   Emissions
      GHG emissions associated                                  What happens to   Who’s backyard are
                                   Are any chemical                               these projects
      with transportation;                                      the new product
                                   processes being used in                        occurring in?
      processing; product                                       at EOL?
                                   the product
      development, etc.
                                   development?                                   Who, how, what may
4
      Is any water being used                                                     be impacted?
                                   Are their other emissions
      after pre-processing or in
                                   or pollutants to consider?
      product development?
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Collection – The Pathway to Recovery
        MSW                 MRF or Processor   Source Separated
                            Residue            Waste

5

    Municipal Solid Waste   MRF Residues       Single Category of Materials
                                               Collected (i.e. organics,
                                               polystyrene, carpet, etc.)
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Pre-Processing   Infrastructure
    MSW              -Equipment, Footprint, Separation,

                     -Volume

                     -Maintenance - Staff

                     Oakland Mixed Materials MRF
6                    MSW > Recyclables + Organics

                     100 TPH

                     Cross-Contamination; Product Losses; Downtime

                     Advanced Facility

                     Shredders, Bag Breakers, Screens, Opticals, Magnets,
                     Eddy Current, Bunkers

                     Can’s shred into tiny materials

                     Flexible Film is an issue
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Pre-Processing   Shredding
    MSW              -can’t shred too small,

                     -need to identify material types

                     -AI and/or optical sorters can’t see/sort out of a big pile

                     Recovering Unrecyclable Plastics
7                    Issue: Flexible Film Plastics are an issue

                     MRFF Study film plastic out of paper only recovered 74%

                     Maintenance & Every day operations

                     Residue – Transport & Disposal
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Pre-Processing MSW – Cont’d
     Transportation            Mechanical Processes        Chemical Processes

     Transport material for    Shredding, screening, air   Chemicals, reaction & stabilization
     further processing into   classification,             processes, catalysts, dyes, etc.
     usable material           decontamination, drying,
                               grinding, fractionation,
8                              pellitization, etc.
Infrastructure, Economics & Sustainability Considerations for MSW into Viable Products - Stacy Katz, Project Director
Similar to facility requirements for processing MSW

                     Won’t require the same amount of throughput ~1/5

    Pre-Processing   Understand pre-sort vs processed residue ‘piles’

    MRF or           Audit the Residue to understand composition

    Processor        Titan >> MRF Residue to Make Fuel >> Ash >>Cement

    Residue          Additional Processing Required (Shredder, Magnets,
                     Opticals, etc. >> no PVC)

                     MRF Plastic Residue Misconception
9
                     MRFs recover materials of value

                     MRFs need a bunker for any material recovered

                     Low volume of Mixed Plastics

                     Unrecyclable plastics in MRFs disbursed

                     Unrecyclable plastics in MSW
Source –                                                                       Collect target material via a source separated process
       Source
       Separated                                                                      Will still require some amount of cleanup but will likely
       Wastes                                                                         require a much less complex process; smaller footprint; fewer
                                                                                      types of equipment needed, etc.

10                                                                                     Won’t generate as much residue or waste.

      High volume commercial
      wastes, i.e. carpet,
      polystyrene, medical
      packaging, Hefty®
      EnergyBag® Program
     Important note : neither I nor do most in the Recycling Industry supports the Hefty
     EnergyBag Program as it is designed to be put in the recycling. If this material could be
     collected separately at the curb and NOT as part of the recycling it would be a great
     initiative and would truly work to help solve the plastic problem.
Cost

11
     01.                           02.                        03.
     Feedstock Acquisition         Facility Build & Ongoing   Residue
     Cost & Transportation         Maintenance
                                                              Transport & Disposal of
     Do you have to buy the        $8-$70M to build a         residue left over from
     Feedstock? Who are you        complex pre-processing     processing
     competing with?               facility.
                                                              $40-$100+ p/ton
     What does it cost to have                                depending on location
     the material delivered to
                                                              10-75%+ of input
     the pre-processing facility
                                                              (thousands of tons)
     and for further processing
Environmental & Social Considerations
       Energy & Water Consumption   Chemicals &                  End of Life       Environmental Justice
                                    Emissions
       GHG emissions associated                                  What happens to   Who’s backyard are
                                    Are any chemical                               these projects
       with transportation;                                      the new product
                                    processes being used in                        occurring in?
       processing; product                                       at EOL?
                                    the product
       development, etc.
                                    development?                                   Who, how, what may
12
       Is any water being used                                                     be impacted?
                                    Are their other emissions
       after pre-processing or in
                                    or pollutants to consider?
       product development?
Thank you!