Improvements in the energy policy, resolutions and contracts - Marcelo Castilho ANP/SDP - Apresentação do PowerPoint
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Improvements in the energy policy, resolutions and contracts Marcelo Castilho Development and Production Superintendent ANP/SDP May, 2019
Brazilian Oil & Gas System Structure Policymaking From 2016 up to today PRESIDENT OF THE REPUBLIC 02 48 New Laws for New CNPE National Energy Policy Council - CNPE Resolutions for E&P E&P Regulation and Policy implementation
Nov/2016 – Law 13,365 Optional Operation New Operators in PS regime Law 13,365/2016 Petrobras is no longer required to be the sole operator of Pre-Salt. The change allows Petrobras to decide to act as an operator and hold a minimum of 30% (thirty percent) in the consortia formed to operate blocks in the PS regime.
Dec/2017 – Law 13,586 Repetro Extension – Fiscal Regime Extended the special tax regime for exploration, development and production of oil and natural gas
Mar/2016 – CNPE Resolution 02 Contract Extension Offshore Onshore i. Marlim; i. Fazenda Alegre; ii. Marlim Leste; ii. Araçás; iii. Marlim Sul; iii. Canto do Amaro. CNPE Resolution 2/2016 9 extensions approved iv. Frade; Established the guidelines v. Voador; ~ US$ 945 MM for the concession contracts vi. Ubarana. extensions ~ US$ 18 Bi and The Concessionaire may apply for extension upon submission of a request to Offshore ANP, together with a i. 12 concessões reviewed Development Plan 56 currently in analysis Onshore i. 44 concessões
Apr/2017 and Jun/2018 – CNPE Resolutions 10 Predictability for the Oil Market Bidding Planning Brazil 2017 14ª Round CNPE Resolutions 2018 10/2017 and 10/2018 Brazil Established the guidelines for multi-year planning of 2019 16ª Round 6 E&P Bidding Rounds up to 2021 Brazil 7 2020 17ª Round Brazil 8 2021 18ª Round
Apr/2017 – CNPE Resolutions 04 and 08 Exploratory Phase Out/2017 – ANP Ordinance 708 Extension Several concessionaires operating in Brazil, mainly in blocks CNPE Resolutions 04 and related to the 11th and 12th Bidding Rounds, due to difficulties 08 related to environmental licensing and deficient logistics in some of the offered Basins, have requested ANP to extend of the It allows the extension of the Exploration Phase, exploratory phase to carry out the minimum exploratory considering not only the program. contractual clauses, but also the greater objective of national interest and the The ANP Ordinance allows the extension of the Exploration preservation of investments Phase for a period of two (2) years in the Country. 40 Extensions Approved
Apr/2017 – CNPE Resolution 07 New LC Policy Onshore Blocks Offshore Blocks Exploration Phase = 50% Exploration Phase = 18% CNPE Resolution 07 Establishes new guidelines Development Phase = 50% Development Phase: for definition of Local Content for the Exploration and Production Phases Well Construction = 25%; Collection & Drainage System= 40%; Stationary Production Unit= 25%;
Jun/2017 – CNPE Resolution 17 Royalties Reduction Set/2018 – ANP Ordinance 749 Royalties Reduction up to 5% on Incremental Production in Mature Fields. What is Mature?? CNPE Resolution 17/2017 Royalties reduction, up to 5% (five 25 years of Production OR Production Cumulative ≥ 70% Number of Eligible Fields per Basin of percent), on incremental production estimated recovery considering 1P reserves Camamu resulted by new investment plan to Tucano Sul be implemented, in order to Santos 53% of Brazilian Fields promote life extension and Ceará maximize field’s recovery factor. Number of Eligible Solimões Alagoas 241 54% of Campos Basin Fields Fields: Sergipe Campos Espírito Santo Potiguar Recôncavo 0 20 40 60 80
Set/2018 – ANP Ordinance 749 Royalties Reduction up to 5% on Incremental Production in Mature Fields. Promote Field Life 40 cases under evaluation Extension Maximize Recovery Factor 7,5 or 5% Royalties Increase project Profitability 10% Royalties More Jobs and Income Complementary Historical Project Increase Mature Fields attractiveness
Mar/2018 – CNPE Resolutions 01 New LC Policy Mar/2018 – ANP Ordinance 726 This Resolution establishes the criteria, requirements and procedures applicable to the reduction or even the exemption of CNPE Resolution 01 the Local Content obligation, as well as the general rules of It defines guidelines for the compromised percentage adjustments and surplus transfers. ANP to evaluate the possibility of adopting Local Content requirements It gives operators the possibility of making a contractual distinct from those amendment. established in the signed Contracts 233 Contractual Amendments Signed
Bidding rounds promoted Results 2018
15th Bidding Round – Campos and Santos Basins Consortia and signature bonuses by block
15th Bidding Round – Record Results Signature Bonuses for Concession Rounds (MM R$) The largest signature bonuses in concession bidding rounds ever (R$ 8 billion) and the highest signature bonus by block in the history (R$ 2.8 billion) 22 blocks were acquired and 12 winners from 11 countries A variety of operators and a geographic diversity
4th Pre-salt Results Pre-Salt Play 14 3 Blocks 3 Blocks Bbbl Awarded Awarded Estimated unrisked oil in place volume Petrobras will operate Dois Irmãos, Três Marias and Uirapuru with 30%. Potential for large oil discoveries
5th Pre-salt Bidding Round SW Tartaruga Verde Pre-Salt Play 16.5 4 Blocks 4 Blocks Bbbl Awarded Awarded Estimated Titã unrisked oil in place volume (P50) Saturno Petrobras will operate SW Tartaruga Verde Pau Potential for large oil Brasil discoveries
4th and 5th Pre-Salt Brazil – Excellent Results
What´s up for 2019/2020 2019 2020
What´s up for 2019/2020? New Areas (publication) 2019 Jul/2019 2ndS/2019 May/2019 2ndS/2019 2ndS/2019 2020 New ANP Ordinance: ANP Ordinance Update: Petrobras Divestment Plan Farm-in and Farm-out (Topázio and Ártico Projects): Process and Reserve Descomissioning first farm-ins/farm-outs (public consultation) Based Lending Approvals (publication)
What´s up for 2019/2020? ANP Ordinance Update: Development Plan (public consultation) 2020 1ndS/2020 1ndS/2020 1ndS/2020 2021 Petrobras Divestment Plan ANP Ordinance Update: (Topázio and Ártico Projects): Modalities of abandonment first farm-ins/farm-outs guarantees Approvals (public consultation)
16th Bidding Round 5 36 111 Basins Blocks Bbbl Camamu-Almada Camamu, Jacuípe, 12 blocks in New CAMPOS Pernambuco, Estimated unrisked SANTOS Frontier Campos and Santos. 24 blocks in High oil in place volume Potential Basin (P50) Minimum Bonuses can vary from: R$ 1,5 MM up to 3,3 MM (NF) R$ 8,9 MM up to 1,3 Bi (HP)
16th Bidding Round 1-Publication of the Protocol Tender and Contract; 2-Environmental and 2019 2019 legal Seminar 2019 (03.25.19) (July) Auction (Up to 09.26.19) Draft of Protocal Tender 2019 2019 (Available) (Up to 08.05.2019) Deadline for submission of offer (Oct/2019) Technical Seminar guarantees 2019 (Up to 08.20.2019) Deadline for completing the registration form *Indicative Schedule and payment the participation fee
6th Pre-salt Bidding Round Pre-Salt Play 5 42 Blocks Bbbl Estimated unrisked oil in place volume Potential for a large oil discovery Bonuses can vary from: R$ 500 MM up to 5.05 Bi Minimum Profit Oil vary from: 22,87% up to 36,98%
6th Pre-salt Bidding Round September: Environmental and legal Seminar Publication of the Protocol Tender and 2019 2019 Contract; 2019 (04.15.19) (August) Auction (Up to 10.23.19) Draft of Protocal Tender 2019 2019 (Available) (Up to 09.04.2019) Deadline for submission of offer (Nov/2019) Technical Seminar guarantees 2019 (Up to 09.19.2019) Deadline for completing the registration form *Indicative Schedule and payment the participation fee
Potential investments and forecast production R$845 Brazilian Oil Production Forecast (bpd) 6.000.000 39 5.000.000 New Billion of potential platforms investments in development 4.000.000 3.000.000 2.000.000 The pre-salt region has the potential to contribute 1.000.000 with the largest non-OPEC production growth in the decade to come. According to IEA, Brazil will 0 be one of the four countries responsible for covering the world´s demand growth up to 2020
THANK YOU! More information: brazilrounds.anp.gov.br anp.gov.br mcastilho@anp.gov.br
You can also read