Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017

Page created by Debbie Cruz
 
CONTINUE READING
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Desert Lion Energy
INDUSTRIAL MINERALS LITHIUM CONFERENCE
                 June 2017

               Private and Confidential
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Disclaimer

         Cautionary Note Regarding Forward – Looking Information
         This presentation contains “forward-looking information” within the meaning of applicable securities laws. Generally, any statements that
         are not historical facts may contain forward-looking information, and forward-looking information can be identified by the use of forward-
         looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,
         “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or indicates that certain actions,
         events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved”. Forward-looking information includes, but is
         not limited to: statements and expectations regarding the initial targeted resource tonnage and grade for the Desert Lion lithium project in
         Namibia (the “Project”); timing and structure for the proposed going public transaction of Desert Lion Energy Corp. (the “Company” or
         “Desert Lion”); the Company’s applications for additional licenses; the Company’s planned work program for the Project and its
         exploration and development schedule and timetable; the rate at which electric vehicle penetration will increase and the resultant effect on
         global lithium demand; and the Company’s anticipated budget.
         Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time such
         statements are made, including but not limited to, continued exploration activities, lithium and other metal prices, the estimation of initial
         and sustaining capital requirements, the estimation of labour and production costs, the estimation of mineral reserves and resources,
         assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures, receipt of
         required regulatory approvals, the availability of necessary financing for the Project, permitting and such other assumptions and factors as
         set out herein. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the
         actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by
         such forward-looking information, including but not limited to: risks related to changes in lithium prices; sources and cost of power and
         water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation of labour and operating
         costs; general global markets and economic conditions; risks associated with exploration, development and operations of mineral deposits;
         the estimation of initial targeted mineral resource tonnage and grade for the Project; risks associated with uninsurable risks arising during
         the course of exploration, development and production; risks associated with currency fluctuations; environmental risks; competition faced
         in securing experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
         mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks related to
         regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing, capitalization and
         liquidity risks including the risk that the financing necessary to fund continued exploration and development activities at the Project may not
         be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of additional common shares of the Company;
         the risk of litigation.
         Although the Company has attempted to identify important factors that could cause actual results to differ materially from the forward-
         looking information set out in this presentation, there may be other factors that cause results not to be as anticipated, estimated or
         intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events
         could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking
         information. Forward-looking information is made as of the date of this presentation and the Company does not undertake to update or
         revise any forward-looking information that is included herein, except in accordance with applicable securities laws.

Private & Confidential                                                                                                                                      2
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Disclaimer – Cont’d

         THIRD PARTY INFORMATION
         This presentation includes market, industry and economic data which was obtained from various publicly available sources and other
         sources believed by Desert Lion to be true. Although Desert Lion believes it to be reliable, Desert Lion has not independently verified any
         of the data from third-party sources referred to in this presentation, or analyzed or verified the underlying reports relied upon or referred to
         by such sources, or ascertained the underlying economic and other assumptions relied upon by such sources. Desert Lion believes that its
         market, industry and economic data is accurate and that its estimates and assumptions are reasonable, but there can be no assurance as
         to the accuracy or completeness thereof and Desert Lion does not make any representation as to the accuracy of such information.
         CONFIDENTIALITY
         This presentation and its contents are confidential and proprietary to the Company and no part of it or its subject matter may be
         reproduced, redistributed, passed on, or the contents otherwise divulged, directly or indirectly, to any other person (as hereafter defined) or
         published in whole or in part for any purpose (collectively, “Disclose”) except as permitted hereby. The recipient of this presentation (the
         “Recipient”) by accepting this presentation hereby covenants with the Company that the Recipient: (i) shall maintain the information
         contained in this presentation (the “Confidential Information”) in the strictest confidence; and (ii) shall not, at any time, without the prior
         written consent of the Company, which consent may be unreasonably withheld, Disclose to any individual, firm, corporation, organization,
         government or government agency, or any other entity (collectively, “person”) this presentation or any Confidential Information. The
         Recipient further covenants that the Recipient and/or its representatives (as permitted by the Company) will not use the Confidential
         Information in any way detrimental to, or so as to obtain any commercial advantage over the Company. The Recipient agrees to be
         responsible for any breach of the covenants contained herein by the Recipient and/or its permitted representatives. The Recipient agrees
         to make all appropriate efforts to safeguard the Confidential Information from disclosure to any person other than as permitted hereby. If
         this presentation has been received in error then it must be returned immediately.
         CAUTIONARY NOTE REGARDING HISTORICAL TECHNICAL DATA
         The reader is cautioned that the technical data contained herein is considered historical in nature as it is based on prior data and reports
         prepared by previous owners of the Project and specifically the reports entitled “Rubikon Dumps Mapping and Resource Calculation” and
         “Report on Tailings Dump Resources, Rubikon Mine”, each dated October 2014 and prepared by Phoenix Mineral Resources Ltd. for the
         previous owners of the Project. Reference is also made to the report entitled “NI 43-101 Technical Report on the Rubikon Lithium
         Exploration Project” dated November 26, 2016 prepared by Benzu Minerals (Pty) Ltd. The Company was not able to verify the quality
         assurance and quality control processes and methods used in compiling this historical technical data. While there can be no certainty that
         the historical technical data contained herein is accurate, the Company believes that the historical technical data is relevant to the overall
         potential of the Project as it may indicate the presence of lithium mineralization. As sufficient work to complete the classification of the
         mineralization on the Project as current mineral resources or mineral reserves has not been completed by the Company, the Company is
         not treating the historical technical data as current and does not have a current mineral resource or mineral reserve estimates in respect of
         the Project. This technical data cannot, therefore, be treated as compliant with National Instrument 43-101 – Standard of Disclosure for
         Mineral Projects and should not be relied upon.

Private & Confidential                                                                                                                                      3
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Disclaimer – Cont’d

         CAUTIONARY NOTE REGARDING POTENTIAL QUANTITY AND GRADE FOR TARGETS
         The potential quantity and grade of the Project disclosed herein is conceptual in nature; there has been insufficient exploration to define a
         mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Estimates provided
         are based on the initial prospecting works carried out by the previous owners of the Project.
         QUALITY CONTROL AND ASSURANCE
         The scientific and technical content of this presentation was reviewed and approved by Desert Lion’s Vice-President, Exploration, Cesare
         Morales, who is a Qualified Person within the meaning of National Instrument 43-101.
         STATUTORY RIGHTS OF ACTION
         In certain circumstances, purchasers resident in certain provinces of Canada, are provided with a remedy for rescission or damages, or
         both, in addition to any other right they may have at law, where an offering memorandum (such as this presentation) and any amendment
         to it contains a misrepresentation. Where used herein, “misrepresentation” means an untrue statement of a material fact or an omission to
         state a material fact that is required to be stated or that is necessary to make any statement not misleading in light of the circumstances in
         which it was made. These remedies, or notice with respect to these remedies, must be exercised or delivered, as the case may be, by the
         purchaser within the time limits prescribed by applicable securities legislation.
         The following summary is subject to the express provisions of the applicable securities laws, regulations and rules, and reference is made
         thereto for the complete text of such provisions. Such provisions may contain limitations and statutory defences not described here on
         which the Company and other applicable parties may rely. Purchasers should refer to the applicable provisions of the securities legislation
         of their province for the particulars of these rights or consult with a legal adviser.
         The following is a summary of rights of rescission or damages, or both, available to purchasers resident in the province of Ontario, New
         Brunswick, Nova Scotia and Saskatchewan. If there is a misrepresentation herein and you are a purchaser under securities legislation in
         Ontario, New Brunswick, Nova Scotia and Saskatchewan you have, without regard to whether you relied upon the misrepresentation, a
         statutory right of action for damages, or while still the owner of the securities, for rescission against the “Company”. This statutory right of
         action is subject to the following: (a) if you elect to exercise the right of action for rescission, you will have no right of action for damages
         against the Company; (b) except with respect to purchasers resident in Nova Scotia, no action shall be commenced to enforce a right of
         action for rescission after 180 days from the date of the transaction that gave rise to the cause of action; (c) no action shall be commenced
         to enforce a right of action for damages after the earlier of (i) 180 days (with respect to purchasers resident in Ontario) or one year (with
         respect to purchasers resident in Saskatchewan and New Brunswick) after you first had knowledge of the facts giving rise to the cause of
         action and (ii) three years (with respect to purchasers resident in Ontario) or six years (with respect to purchasers resident in
         Saskatchewan and New Brunswick) after the date of the transaction that gave rise to the cause of action; (d) with respect to purchasers
         resident in Nova Scotia, no action shall be commenced to enforce a right of action for rescission or damages after 120 days from the date
         on which payment for the securities was made by you; (e) the Company will not be liable if it proves that you purchased the securities with
         knowledge of the misrepresentation; (f) in the case of an action for damages, the Company will not be liable for all or any portion of the
         damages that it proves do not represent the depreciation in value of the securities as a result of the misrepresentations; and (g) in no case
         will the amount recoverable in such action exceed the price at which the securities were sold to you. The foregoing is a summary only and
         is subject to the express provisions of the Securities Act (Ontario), the Securities Act (New Brunswick), the Securities Act (Nova Scotia)

Private & Confidential                                                                                                                                       4
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Disclaimer – Cont’d

         and the Securities Act (Saskatchewan), and the rules, regulations and other instruments thereunder, and reference is made to the
         complete text of such provisions contained therein. Such provisions may contain limitations and statutory defences on which the Company
         may rely.
         In Manitoba, the Securities Act (Manitoba), in Newfoundland and Labrador the Securities Act (Newfoundland and Labrador), in Prince
         Edward Island the Securities Act (PEI), in Yukon, the Securities Act (Yukon), in Nunavut, the Securities Act (Nunavut) and in the Northwest
         Territories, the Securities Act (Northwest Territories) provide a statutory right of action for damages or rescission to purchasers resident in
         Manitoba, Newfoundland, PEI, Yukon, Nunavut and Northwest Territories respectively, in circumstances where this presentation or an
         amendment hereto contains a misrepresentation, which rights are similar, but not identical, to the rights available to Ontario purchasers.
         The statutory right of action described above is in addition to and without derogation from any other right or remedy at law.
         RESALE RESTRICTIONS
         The securities offered in connection herewith are being offered on a private placement basis in reliance upon prospectus and registration
         exemptions under applicable securities legislation. Resale of the securities offered in connection herewith will be subject to restrictions
         under applicable securities legislation, which will vary depending on the relevant jurisdiction. Generally, such securities may be resold only
         pursuant to an exemption from the prospectus and registration requirements of applicable securities legislation or pursuant to an
         exemption order granted by appropriate securities regulatory authorities.

Private & Confidential                                                                                                                                     5
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         The Goal
         The making of a world class lithium project
          Lowest cost quartile production
           — Reagent supply, including logistics
           — Energy cost
           — Labor
           — Lithium units

          Capital efficiency
           — Infrastructure; power, transport and
             water
           — Labor; experienced local construction
             labor force
           — Climate; winterization

          Execution timeline
           — Permitting
           — Long lead items
           — Mobilization timeline
           — Mining/ process technology;
             implementation and ramp up
           — License to operate

Private & Confidential                                                                6
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Lowest Cost Quartile Production
         Lithium carbonate production from hard rock and brine

                                    Hard Rock                            Brine
                         Reagents               30-40%          Reagents               45-60%
                         Concentrate            20-35%          Salt Harvesting        10-20%
                         Energy                 15-25%          Energy                   7-15%
                         Labor                  10-20%          Labor                  10-20%
                         Maintenance              3-5%          Maintenance                5-8%

Operating Efficiency (US$/ t LC)                3,800 - 5,000                         3,000 - 4,500

              Higher operating cost, driven
              by cost of concentrate
              production and energy

            Key to low cost production from hard rock production is ability to access low
                      cost concentrate, energy and close proximity to reagents

Private & Confidential                                                                                           7
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         High Capital Efficiency
         Lithium carbonate production from hard rock and brine

                                 Hard Rock                        Brine
                         Concentrator        25-35%      Evaporation Ponds          45-60%
                         Infrastructure      15-25%      Infrastructure             20-40%
                         Lithium Carbonate               Lithium Carbonate
                                             45-60%                                 25-40%
                         Plant                           Plant

Capital Efficiency (US$/ a-t LCE) 10,000 - 15,000                                 13,000 - 17,000

              Higher capital efficiency,              Conversion plant required to
              typically due to absent of              be built at the location of the
              evaporation ponds and lower             deposit
              infrastructure costs

          Equipment generally internationally sourced, making labor the most significant
                          component of capital cost between regions

Private & Confidential                                                                                       8
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Low Cost mining Friendly Jurisdiction
         Project highlights

          Desert Lion Energy Corp. (“Desert Lion”)
           holds 80% of the Desert Lion lithium project                                                                                                                         Li
           in Namibia (“Project”)                                                                                                               2
                                                                                                                                                                             1
          Location: Namibia
                                                                                                                                   Legend
               — 240km from Walvis Bay
                                                                                                                                     Li         Project
               — 210km from Windhoek
                                                                                                                                                Airport
          Three past producing mines on the land
           package (Rubicon, Helikon and unnamed                                                                                                Port
           Lithium Mines)                                                                                                                       Highway
          Company believes target has potential for                                                                                            Railway
           10-15 MT @1.2%-2.0% Li2O(1)
          Near-term production potential from                                                                                     Desert Lion Energy will operate two sites,
           stockpiles: waste rock and fines from the                                                                               connected by existing road and rail
           historic floatation plant (1)(3)                                                                                        infrastructure:
                                                                                                                                   1.1           Mine and concentrator: located 30-
          Go public: RTO anticipated Q3 of 2017(2)
                                                                                                                                                 km south-east of Karabib, Erongo
                                                                                                                                   2.2           Conversion plant: located in Walvis
                                                                                                                                                 Bay. Will transform concentrate to
                                                                                                                                                 lithium carbonate for export
                         (1)   Refer to “Cautionary Note Regarding Historical Technical Data” and “Cautionary Note Regarding Quantity and Grade for Targets”.
                         (2)   Refer to “Cautionary Note Regarding Forward-Looking Information”.
Private & Confidential   (3)   Desert Lion has not made a formal production decision. A formal production decision will be made in respect of the stockpiles following receipt of all necessary permits, expected to be completed in   9
                               September 2017. A production decision by the Company in respect of stockpiles will not be based on a feasibility study of mineral reserves as defined under NI 43-101.
Desert Lion Energy INDUSTRIAL MINERALS LITHIUM CONFERENCE - June 2017
Corporate Presentation – June 2017

         Proximity to Existing Infrastructure
         Proximity to existing infrastructure

        Karabib

                  Primary
                  Road

                                                            Helikon Lithium Mine
                                         Secondary
                              Existing     Road
                             NamWater                            Exclusive Prospecting
                              Pipeline                             License (EPL) Area
                                                     Rubicon Lithium    301 km2
                          Existing                   Mine
                         Powerlines
                                                      Unnamed Lithium Mine

Private & Confidential                                                                                       10
Corporate Presentation – June 2017

         Desert Lion Lithium Geology
         Highly prospective geology including three historic lithium mines

          Legend
                Pegmatite Outcrops                                                                                     Potential
                Past-Producing Mines                                                                               Pegmatites to Field
                Exclusive Prospecting License (EPL)                                                                     Check
                Key Target Zones, Known Lithium Occurrences
                Secondary Targets, Future Exploration Areas

                                                                             Helikon Lithium Mine
                                                                                                                            Zoned Pegmatites
                                                                                                                              with Lepidolite

                                   Zoned Pegmatites
                                     with Lepidolite
                                                                                                          Potential
                                                                                                      Pegmatites to Field
                                                                Rubicon Lithium Mine                       Check

                         Zoned Pegmatites
                         with Li-Ta Bearing                         Unnamed Lithium Mine
                              Potential

        301 km2 EPL with potential to expand land package by >350 km2 with pending additional
                                          EPL applications (1)

Private & Confidential      (1)   Refer to “Cautionary Note Regarding Forward-Looking Information”.                                                        11
Corporate Presentation – June 2017

         Significant Geological Intelligence
         Rubicon Lithium Mine

                                                  Petalite zones

                         Outer zone
                                          Lepidolite
                                          zone

                                                                      Outer zone

                                                  zoned pegmatite, c.40m wide

                                      Rubicon Mine, looking NW

Private & Confidential                                                                                           12
Corporate Presentation – June 2017

         Rubicon Lithium Mine Geology
         Company believes target has potential for 10-15MT @ 1.2% - 2.0% Li2O(1)(2)

Private & Confidential   (1)   Refer to “Cautionary Note Regarding Historical Technical Data” and “Cautionary Note Regarding Quantity and Grade for Targets”. 13
                         (2)   Refer to “Cautionary Note Regarding Forward-Looking Information”.
Corporate Presentation – June 2017

         Project Execution Schedule (1)
         The next operating lithium mine

                                                         Phase 1 - PEA         Phase 2 – Feasibility                        Phase 3 – Execution
                Execution Planning
                                                                 2017                              2018                            2019                      2020
                         Activities                     Q1    Q2     Q3         Q4     Q1     Q2       Q3         Q4      Q1    Q2     Q3      Q4          Q1    Q2
Phase 1
Measured and Indicated Resource Definition
Environmental Studies
 EIA for Stockpile Processing
 EIA for Mine and Concentrator
 EIA for Conversion Plant
Permitting Approvals
 Stockpile Processing
 Mine and Concentrator
 Conversion Plant
Feasibility Study
 Mine and Concentrator
 Conversion Plant
Execution and First Production(2)
 First Production from Stockpiles                                                          The next operating lithium mine
 EPCM – Mine and Concentrator                                                                                                          Commercial conc. production

 EPCM - Conversion Plant

                                         Planned TSX.V Listing                                                                                               LiC production

Private & Confidential     (1)   Refer to “Cautionary Note Regarding Forward-Looking Information”.                                                                   14
                           (2)   Production timeline is indicative only and is dependent on results of feasibility study. The company has not made a production decision.
Corporate Presentation – June 2017

         The Next Operating Lithium Mine
         Historic stockpiles dumps provide opportunity for early production

          Rubicon and Helikon mines were historically mined for beryl, tantalum, amblygonite, petalite
           and lepidolite with target head grades of between 1.7% and 3.8% Li2O. Material that was either
           not required or did not meet the exceptionally high insitu grades was stacked in piles adjacent
           to the mines. (1)
          Two types of stockpiles; (i) approximately 500k - 1Mt of rock and (ii) approximately 500k - 1Mt
           of fines from the historic floatation plant (1)(3).
          Applications for mining license to crush and export expected to be received September 2017(2).
          Advanced discussions with Chinese processors for offtake of stockpile materials.

                         (1)   Refer to “Cautionary Note Regarding Historical Technical Data” and “Cautionary Note Regarding Quantity and Grade for Targets”.
                         (2)   Refer to “Cautionary Note Regarding Forward-Looking Information”.
Private & Confidential   (3)   Desert Lion has not made a formal production decision. A formal production decision will be made in respect of the stockpiles following receipt of all necessary permits, due to be completed in September   15
                               2017. A production decision by the Company in respect of stockpiles will not be based on a feasibility study of mineral reserves as defined under NI 43-101.
Corporate Presentation – June 2017

         Phase 1 Underway

          Phase 1 Activities:
                 Inferred Resource Definition
                 Market Studies
                 Metallurgical Testwork Program
                 Environmental Permitting Analysis
                 Social and Community Engagement
                 Preliminary Economic Assessment (“PEA”)

         Key Deliverables
                  Preliminary resource estimate, June 2017
                  PEA resource estimate
                  PEA report

Private & Confidential                                                                      16
Corporate Presentation – June 2017

         Value Created & Project De-Risked
         Significant progress advancing project in 2017

          Since completing its last financing round, Desert Lion has completed the following milestones:

                                                                   Key Activities

                           Closed the acquisition of the property with the sellers

                        

                         
                             6,500m of DD and RC drilling, extensive mapping/ sampling, structural analysis, hydrogeological
                             survey completed
                             Initial NI43-101 technical report expected end May

                        
                         
                             Have a plan to process and export the stockpiles
                             Currently being executed. Permitting submission underway. Off-take terms being negotiated.

                        
                         
                             Signed off-take Letters of Intent for the future concentrate production
                             Complete for potential 400ktpa of production with another 300ktpa expected from third partner

                           Arranged the ability to co-develop a conversion plant with existing lepidolite converters

                        
                         
                             Started PEA with Hatch
                             Started EIA with RBS

Private & Confidential                                                                                                                 17
Corporate Presentation – June 2017

Project Execution Team
Significant lithium project, geology and capital market experience

Tim Johnston                              Cesare Morelli                             Thomas Mushimba
President & CEO                           VP Exploration                             Namibian Management

10+ years of experience                   29+ years of experience                    20+ years of experience
Former Senior Lithium Consultant, Hatch   Former Exploration Manager across Africa   Namibian expertise and relationships

   Evaluated hundreds of lithium             Currently Technical Director of          Assists with logistics,
    projects globally                          Rainbow Rare Earths Ltd. &                management of government and
   Managed lithium projects for Rio           Benzu Minerals                            social relations in Namibia
    Tinto, Bacanora, AMG-NV, and              Managed exploration projects             Depth of logistics expertise
    many others                                across Africa with De Beers               gained within Namibia through
   Co-authored 7 technical                   Previously Exploration Manager            clearing and forwarding roles at
    publications in the lithium sector         for Africa with BHP Billiton              Kuehne & Nagel

                                                                                                                            18
Corporate Presentation – June 2017

         Board of Directors
         Highly credentialed board with mining, lithium, and finance expertise

          Adonis Pouroulis                              Tim Johnston                              Peter McCague
        Non-Executive Chairman                         President & CEO                       VP Corporate & Legal Affairs
        Founded Pella Resources, an                  10+ years developing and              15+ years corporate finance and
         African-focused natural resource              executing lithium projects             M&A experience in the mining sector
         and energy group                             Strong network across the             Depth of securities law experience
        >US$ 2 Bn raised & invested to date           lithium value chain                    at Cassels Brock

                Chris Berry                             Stephan Theron                               John Vettese
       Independent Energy Metals analyst         18+ years of mining capital project       Prominent corporate finance and
        since 2009, lithium domain expertise       development and M&A experience             M&A partner at Cassels Brock
       12+ years of buy & sell side capital      Mining project experience                 Recognized as a leading lawyer by
        markets experience                         throughout Africa, North America           Chambers Canada

                                                                                                                                    19
Corporate Presentation – June 2017

Recap – The Goal
The start of something great in Namibia
 Lowest cost production
  — Above average quality resource; low cost lithium units
  — Close proximity to existing infrastructure for reagents and concentrate transport
  — Low energy costs
  — Low cost, experienced local labor

 Capital efficiency
  — Existing transport, power and water infrastructure
  — Low cost, experienced local labor
  — Moderate climate, all year operation

 Execution timeline
  — Well defined permitting framework with ability to move into execution quickly
  — Existing local construction contractors available
  — Existing technology, with standard processing equipment
  — Excellent in country relations

                                                                                                          20
Corporate Presentation – June 2017

         Contact

                          Please direct all inquiries to:

                             Tim Johnston
                         E: tjohnston@desertlionenergy.com

Private & Confidential                                                                     21
Corporate Presentation – June 2017

         Appendix A
         Spodumene v. Lepidolite

     Parameter                 Units               Spodumene                          Lepidolite

     Chemical Formula             -                  LiAlSi2O6                 KLiAl2Si3O10(F,OH)3 *

     Theoretical max Li
                                %Li                     3.8%                           1.7-4.6%
     content

     Concentrate target       % Li2O                   5-7%                             4-4.5%

     Calcination
                                  -                  ~1150oC                            ~800oC
     temperature

                                                                              Concentrate + acid roast
     Processing                             Concentrate + acid roast
                                  -                                          leach or sulphate roast or
     methodology                                    leach
                                                                                   chloride roast

* Lepidolite exists in many forms including K2(LiAl)5-6Si6-7Al1-2O20(F,OH)4 and K2Li2Al4Si7O21(F,OH)3

Private & Confidential                                                                                          23
Corporate Presentation – June 2017

         Appendix B
         Property history
          The Project and the applicable mining claims were mined intermittently between 1930 and
           1994.
          Past production of approximately 17,000 tonnes of lithium mineral concentrate via small scale
           open pit and underground mining methods for ceramics and glass industry(1)(2).
          Reported head grades varied between 1.70% and 3.75% Li2O(1)(2).
          Most recently held by LiCore Mining (Pty) Ltd., who completed rock sampling, mapping, and
           ground geophysics.

                         (1)   Refer to “Cautionary Note Regarding Historical Technical Data” and “Cautionary Note Regarding Potential Quantity and Grade for Targets”.
Private & Confidential
                         (2)   NI 43-101 Technical Report on the Rubicon Lithium Exploration Project Namibia dated November 26, 2016.
                                                                                                                                                                     24
Corporate Presentation – June 2017

         Appendix F
         Risk Factors
         The operations of the Company are subject to significant uncertainty due to the high-risk nature of its business, which is the acquisition,
         financing, exploration, development and operation of mining properties. The following risk factors could materially affect the Company’s
         financial condition and/or future operating results and could cause actual events to differ materially from those described in forward-looking
         information relating to the Company.
         Risks related to the Offering of Securities Generally
              There is currently no market through which the common shares of the Company (the “Common Shares”) may be sold and purchasers
               may not be able to resell the Common Shares. While the Company’s intends to complete a go-public transaction before the end of the
               third quarter of 2017, there is no assurance that the Common Shares will be admitted to a listing or qualified for distribution in Canada
               or any other jurisdiction.
              An investment in the Common Shares is highly speculative given the uncertain nature of the Company’s business and its present
               stage of development, and may result in the loss of an investor’s entire investment.
              The Company was formed on June 26, 2016, has not yet commenced commercial operations and has no assets other than the EPL.
               The Company has no history of earnings and will not generate earnings or pay dividends for the foreseeable future. The Company’s
               lack of operating history may make it difficult for investors to evaluate the Company’s prospects for success. There is no assurance
               that the Company will be successful and the likelihood of success must be considered in light of its relatively early stage of operations.
              The development of the business of the Company and its ability to execute on the opportunities described herein will depend, in part,
               upon the amount of additional financing available. Failure to obtain sufficient financing may result in delaying, scaling back, eliminating
               or indefinitely postponing the Company’s current or future operations. There can be no assurance that additional capital or other types
               of financing will be available if needed or that, if available, the terms of such financing will be acceptable.
              Forward-looking information may prove inaccurate. Investors are cautioned not to place undue reliance on forward-looking information.
               By their nature, forward-looking information involves numerous assumptions, known and unknown risks and uncertainties, of both a
               general and specific nature, that could cause actual results to differ materially from those suggested by the forward-looking information
               or contribute to the possibility that predictions, forecasts or projections will prove to be materially inaccurate. Additional information on
               the risks, assumptions and uncertainties are found in this presentation under the heading “Cautionary Note Regarding Forward-
               Looking Information”.
         Risks Related to the Company’s Business
              Lithium is considered an industrial mineral and the sales prices for the different lithium compounds are not public. Lithium is not a
               traded commodity like base and precious metals. Sales agreements are negotiated on an individual and private basis with each
               different end-user. In addition, there are a limited number of producers of lithium compounds and it is possible that these existing
               producers will try to prevent new-comers from entering the chain of supply by increasing their production capacity and lowering sales
               prices. Factors such as foreign currency fluctuation, supply and demand, industrial disruption and actual lithium market sale prices
               could have an adverse impact on operating costs and stock market prices and on the Company’s ability to fund its activities. In each
               case, the economics of the Project could be materially adversely affected, including to be rendered uneconomic.

Private & Confidential                                                                                                                                         25
Corporate Presentation – June 2017

         Appendix F – Cont’d
         Risk Factors
              The mining industry is heavily dependent upon the market price of the metals or minerals being mined. There is no assurance that a
               profitable market will exist for the sale of the same. There can be no assurance that mineral prices will be such that the Company’s
               properties can be mined at a profit. The price of the Common Shares and the financial results of the Company, like its mining activities,
               could undergo in the future, important negative effects because of the fall of the prices of minerals, resulting in an impact on the
               capacity of the Company to finance its activities.
              The Company has not generated any revenues since incorporation and anticipates it will continue to have negative cash flow from
               operating activities in future periods until commercial production is achieved at the Project. Even if commercial operations are achieved
               at the Project, short-term operating factors relating to the lithium deposits, such as the need for orderly development of the deposits or
               the processing of new or different grades of ore, may cause any mining operation to be unprofitable in any particular accounting period.
              The exploration and development of the Project, and the construction of mining facilities and commencement of mining operations, will
               require substantial additional financing. As the Company does not have revenues, it is dependent upon future financings to continue its
               plan of operation. Failure to obtain sufficient financing will result in a delay or indefinite postponement of exploration, development or
               production on the Project. Additional financing may not be available when needed or if available, the terms of such financing may not
               be favourable to the Company and might involve substantial dilution to existing shareholders. Failure to raise capital when needed
               would have a material adverse effect on the Company’s business, financial condition and results of operations.
              The Company expects future mining operations at the Project to account for most or all of the Company’s ore production unless
               additional properties are brought into production or other producing properties are acquired. Any adverse condition affecting the Project
               could be expected to have a material adverse effect on the Company’s financial performance, results of operations and prospects.
              The acquisition and maintenance of title to mineral properties is a very detailed and time-consuming process. While the Company has
               reviewed and is satisfied with the title to the EPL, and, to the best of its knowledge, such title is in good standing, there is no guarantee
               that title to the EPL will not be challenged or impugned. Title insurance is generally not available for mineral properties and the
               Company’s ability to ensure that it has obtained secure mine tenure may be severely constrained. Third parties may have valid claims
               underlying portions of the Company’s interests, including prior unregistered liens, agreements, royalty transfers or claims, including
               native land claims, other encumbrances and title may be affected by, among other things, undetected defects.
              The mining industry is intensely and increasingly competitive, and the Company competes with many companies with greater financial
               resources and technical facilities than itself. Competition in the mining industry could adversely affect the Company’s ability to develop
               the Project.
              The Company is dependent upon a number of key management personnel. The Company’s ability to manage its operating,
               development, exploration and financing activities will depend in large part on the efforts of these individuals. As the Company’s
               business grows, it will require additional key financial, administrative, mining, marketing and public relations personnel as well as
               additional staff for operations. The Company faces intense competition for qualified personnel, and there can be no assurance that the
               Company will be able to attract and retain such personnel. The loss of the services of one or more key employees or the failure to
               attract and retain new personnel could have a material adverse effect on the Company’s ability to manage and expand the Company’s
               business.

Private & Confidential                                                                                                                                         26
Corporate Presentation – June 2017

         Appendix F – Cont’d
         Risk Factors
              From time to time, the Company examines opportunities to acquire additional mining assets and businesses. Any acquisition that the
               Company may choose to complete may be of a significant size, may change the scale of the Company’s business and operations, and
               may expose the Company to new geographic, political, operating, financial and geological risks. The Company’s success in its
               acquisition activities depends on its ability to identify suitable acquisition candidates, negotiate acceptable terms for any such
               acquisition, and integrate the acquired operations successfully with those of the Company. Any acquisitions would be accompanied by
               risks. There can be no assurance that the Company would be successful in overcoming these risks or any other problems
               encountered in connection with such acquisitions.
              The development of the Project requires the construction of significant new facilities. The success of construction projects, plant
               expansions and the start-up of a new mine by the Company is subject to a number of risks and challenges including the availability
               and performance of engineering and construction contractors, suppliers and consultants, unforeseen geological formations, the
               implementation of new mining processes, the receipt of required governmental approvals and permits in connection with the
               construction of mining facilities and the conduct of mining operations, including environmental and operating permits, price escalation
               on all components of construction and start-up, engineering and mine design adjustments, the underlying characteristics, quality and
               unpredictability of the exact nature of mineralogy of a deposit and the consequent accurate understanding of ore or concentrate
               production, the successful completion and operation of haulage ramp and conveyors to move ore and other operational elements. Any
               delay in the performance of any one or more of the contractors, suppliers, consultants or other persons on which the Company is
               dependent in connection with its construction activities, a delay in or failure to receive the required governmental approvals and
               permits in a timely manner or on reasonable terms, or a delay in or failure in connection with the completion and successful operation
               of the operational elements in connection with the Project could delay or prevent the construction and start-up of the Project as
               planned and may result in additional costs being incurred by the Company beyond those budgeted. There can be no assurance that
               current or future construction and start-up plans implemented by the Company will be successful.
              The current operations of the Company and anticipated future operations, including exploration, development activities and
               commencement of production for the Project are subject to laws and regulations governing prospecting, development, mining,
               production, exports, taxes, labour standards, occupational health, waste disposal, toxic substances, land use, environmental
               protection, mine safety and other matters. Companies engaged in exploration activities, and in the development and operation of
               mines and related facilities, generally experience increased costs and delays in production and other schedules as a result of the need
               to comply with applicable laws, regulations and permitting requirements. Failure to comply with applicable laws, regulations, and
               permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities
               causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of
               additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss
               or damage by reason of mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or
               regulations and, in particular, environmental laws.

Private & Confidential                                                                                                                                   27
Corporate Presentation – June 2017

         Appendix F – Cont’d
         Risk Factors
              The Company is subject to various laws and regulations governing the protection of the environment. Environmental legislation
               provides for restrictions and prohibitions on spills, releases or emissions of various substances produced in association with certain
               mining industry operations, such as seepage from tailings disposal areas, which would result in environmental pollution. A breach of
               such legislation may result in the imposition of fines and penalties. In addition, certain types of operations require the submission and
               approval of environmental impact assessments. Environmental legislation is evolving in a direction of stricter standards and
               enforcement, and higher fines and penalties for non-compliance. Environmental assessments of proposed projects carry a heightened
               degree of responsibility for companies and directors, officers and employees. The cost of compliance with changes in governmental
               regulations has the potential to reduce the profitability of operations.
              The Company’s activities and operations require permits from various domestic authorities. There can be no assurance that various
               permits which the Company may require in the normal course for its current and anticipated exploration and development activities
               and mining operations, including without limitation, on the Project, will be obtainable on reasonable terms or on a timely basis or that
               such laws and regulations would not have an adverse effect on any mining project which the Company might undertake, including,
               without limitation, the Project. Furthermore, any delays in obtaining the anticipated construction permits in respect of the Project, would
               have an adverse effect on the Company’s timing and costs associated with start-up. Such delays could also allow other third-party
               projects to commence production before the Project, thereby potentially reducing the Company’s target market share, which would
               have an adverse impact on the level of product sales and economics of the Project.
              The business of exploration for minerals and mining involves a high degree of risk that even a combination of experience, knowledge
               and careful evaluation may not be able to overcome. Few properties that are explored are ultimately developed into mineral deposits
               with significant value. Unusual or unexpected ground or water conditions, geological formation pressures, fires, rock bursts, power
               outages, labour disruptions, flooding, earthquakes, explosions, cave-ins, landslides, mechanical equipment and facility performance
               problems, the inability to obtain suitable adequate machinery, equipment or labour and other unfavourable operating conditions are
               some of the risks involved in the operation of mines and the conduct of exploration and development programs. Unknown rock
               mechanics and hydrogeological conditions that cannot be predicted ahead of mining, such as faulting, zones of weak rock, or zones of
               unanticipated water inflow, may only be discovered during mining and may require significant changes to the mining plan. While lab
               testing may reduce uncertainty in some of the rock properties, it is never possible to identify all of these potential risks in advance. The
               Project and any future mining operations will be subject to all the hazards and risks normally incidental to exploration, development
               and production, any of which could result in work stoppages and damage to or destruction of exploration or development facilities,
               mines and other producing facilities, damage to life and property, environmental damage and possible legal liability for any or all
               damage.
              The mining industry is subject to significant risks that could result in damage to or destruction of property and facilities, personal injury
               or death, environmental damage and pollution, delays in production, expropriation of assets and loss of title to mining claims. No
               assurance can be given that insurance to cover the risks to which the Company’s activities are subject will be available at all or at
               commercially reasonable premiums.

Private & Confidential                                                                                                                                         28
Corporate Presentation – June 2017

         Appendix F – Cont’d
         Risk Factors
              Certain of the directors and officers of the Company also serve as directors and/or officers of other companies involved in natural
               resource exploration and development and, consequently, there exists the possibility for such directors and officers to be in a position
               of conflict. The Company expects that any decision made by any of such directors and officers involving the Company will be made in
               accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company and its
               shareholders, but there can be no assurance in this regard.
              All industries, including the mining industry, are subject to legal claims, with and without merit. Legal proceedings may arise from time
               to time in the course of the Company’s business. Such litigation may be brought in the future against the Company or the Company
               may be subject to another form of litigation. Defense and settlement costs of legal claims can be substantial, even with respect to
               claims that have no merit. As of the date hereof, no claims have been brought against the Company, nor has the Company received
               an indication that any claims are forthcoming. However, due to the inherent uncertainty of the litigation process, should a material
               claim be brought against the Company, the process of defending such claims could take away from the time and effort management of
               the Company would otherwise devote to its business operations and the resolution of any particular legal proceeding to which the
               Company may become subject could have a material adverse effect on the Company’s financial position and results of operations.

Private & Confidential                                                                                                                                     29
You can also read