Cypress Springhill Project - Mt. Shasta, California
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Cypress Springhill Project Scheduled for Review February 16, 2021 Planning Commission Summary: The City of Mt. Shasta received an Architectural Design Application from JAM Group Management, LLC. for a new cannabis cultivation, manufacturing, and distribution facility on a 4.9 acre vacant parcel (APN 057-771-030) in the northwestern corner of City Limits. The project site is located on the westside of Springhill Road across from Black Butte Transfer Station and directly east of Interstate 5. The proposed project is 1,440 square feet in building size and would occupy 0.75 acres with a 6 space parking lot and landscaped areas. The facility will be used as a cannabis cultivation, manufacturing, and distribution facility with 3 employees and will not use hazardous materials. Project Description: The proposed project is for a 1,1440 square foot cannabis cultivation, manufacturing, and distribution facility with supporting parking and landscaped areas. The proposed development is relatively limited in size and scale compared with adjacent developments. The proposed project includes a small building, water storage tank, paved entrance, parking lot and underground water and wastewater infrastructure to serve the new building. Existing vegetation is limited due to previous uses. Minor grading will occur for building construction and for site landscaping purposes, estimated at less than 0.75 acres of ground disturbance. The remainder of the site will remain as existing. The project is not within 500 feet of City water or wastewater service; therefore, the project is not required to extend the wastewater mainline or connect to City services. The project will install onsite treatment of wastewater and install a well for water service. Siskiyou County will be the permitting agency for the onsite wastewater processing and well installation with the City Public Works Department. The project will also not result in the expansion of the main electrical service. The main hours of operation are 9:00 a.m. - 5:30 p.m. every day of the week. Management may be on-site other than standard business hours. The facility would house 3 full time employees. The facility would not store or use hazardous materials that would not require a hazardous materials plan, hazardous material reporting or hazardous waste generator requirements. The project site is zoned Employment Center (EC) which is intended to replace the conventional "industrial" zoning districts used in older zoning regulations. Businesses permitted within EC do not rely on regular customer traffic and produces products or services for export outside of the City. The proposed use is considered a use by right in EC zoning. Project Location:
The Project is located within the City of Mt. Shasta on the west side of Springhill Road, generally east of Interstate 5 (I-5), south/southeast of Black Butte Transfer Station, and north/northeast of Blue Star Gas Facility in Section 6, Township 40 North, Range 4 West of the U.S. Geological Survey (USGS) City of Mount Shasta quadrangle. Latitude: 41° 20' 52.7" N; Longitude: 122° 20' 42.4" W. Assessor’s Parcel Number: 057-771-030
JOINT UTILITY TRENCH SOUTHERN OREGON READY MIX, LLC & STRUCTURES, PER UTILITY 021-071-320 (E) SWING TOP 5 FEET REMOVED FUTURE PEDESTRIAN FROM (E) BERM 386.40' GATE TOP ELEV. = 3877' + - PATH ALIGNMENT N88° 53' 46.92"W FROM ROW TO BLDG, 3860' PER SITE NOTE 4 ' 65 L= 38 R= 25 11 4 . 7 E (N) COMMERCIAL MSS DEVELOPMENT, LLC 60 8 3870' 3870' .0 0 PAD MOUNT DRIVEWAY ENCROACHMENT 057-771-020 3865' TRANSFORMER, 550 LF OF PRIMARY UTILITY PER UTILITY 3870' TRENCH FROM TRANSFER 3870' STATION ENTRANCE VAULT 5' (E) CURB & 6 38 GUTTER 387 36' OWTS, SEE SITE NOTE 9 5' STEEL SWING GATE W/ LOCK (E) EDGE OF 3880' E PAVEMENT 40.0' 3875' SP STORM WATER SCREENED 5,000 GAL FIRE SUPPRESSION RIN WATER STORAGE TANK, PER FIRE CHIEF W G HIL RETENTION POND, BLACK BUTTE SIZING TBD PLUMB TO WELL & STANDPIPE W/ FDC L RO TRANSFER AD STATION BLDG 24' HVAC WELL & FIRE DEPT CONNECTION (FDC) NEW PRODUCTION 48" MIN. CONC. WALK FACILITY, SAD TO COVERED BLDG FF=3871' + - ENTRANCE, SAD N68 159.9 ' 3875 ° 00 2 ' 00 ' .13 PROJECT GRADE & LANDSCAPE DEMO (E) GATE, FILL "W PAVED DRIVEWAY & (E) BERM LOCATION PARKING LOT (E) ENTRANCE 38 TOP ELEV. = 3877' + - 65 ' XERISCAPING W/ ROCK & NATIVE PLANTS, PER OWNER ' 70 38 ' 75 38 ' SOUZA READY MIX 80 38 38 65 38 ' 60 ADMIN BLDG & SCALES 38 ' ' 85 55 38 ' ' 90 38 MSS DEVELOPMENT, LLC 057-771-030 BLUE STAR L= 75 R 3 4.9 AC 8 00 = 38 GAS BLDG 7. . 65 57 ' 00 38 60 ' 3895' N0° 16' 16.00"E 3890' 347.58' 3885' ' 80 VICINITY & ADJACENT DEVELOPMENT MAP 38 NTS B 38 75 ' 38 65 ' LEGEND GENERAL NOTES: 1. EXISTING TOPOGRAPHY & MAPPING IS PROVIDED BY BRIAN CHRISTENSEN LAND SURVEYING BASED PROPERTY BOUNDARY ON A CLOSE RANGE UAS PHOTOGRAMMETRIC FIELD SURVEY 2. HORIZONTAL AND VERTICAL DATUM WITH LOCAL CONTROL PROVIDED AS FOLLOWS: EDGE OF ROAD/PAVEMENT 2.1. NAD83 (20110), EPOCH 2010 CA STATE PLANE ZONE 1, US SURVEY FEET 2.2. NAVD88 (GEOID 12B), US SURVEY FEET GRAVEL ROAD 3. THIS SITE PLAN IS DIAGRAMMATIC IN NATURE AND IS FOR REFERENCE PURPOSES ONLY. PARCEL INFORMATION SHOWN DOES NOT REPRESENT A SURVEY MAP. WATER LINE SITE NOTES: J:\Clients\200 - The Cypress Group\03 - Spring Hill Phase 1\04 - Civil\dwg\SpringHillPH1_Civil.dwg, 11/11/2020 10:41:59 AM STATE OF CALIFORNIA 0' 387 SANITARY SEWER 1. PARCEL ZONING IS EC - EMPLOYMENT CENTER 2. 6 PARKING STALLS ARE PROPOSED BASED ON THE PEAK EMPLOYEE SHIFT, INCLUDING ONE OVERHEAD POWER ACCESSIBLE STALL, SUBJECT TO APPROVAL BY THE PLANNING DIRECTOR PER MSMC 15.44. DIVISION OF HIGHWAYS 3. LANDSCAPING AND XERISCAPING, INCLUDING DROUGHT TOLERANT NATIVE PLANTINGS, TO BE UNDERGROUND POWER PROVIDED AROUND THE BUILDING AND ON EARTHEN BERMS. WEED FREE NATIVE GRASSES SHALL BE 036-010-410 USED TO STABILIZE DISTURBED SURFACES FOLLOWING CONSTRUCTION. OVERHEAD TELECOM 4. CURB, GUTTER & SIDEWALK IMPROVEMENTS ALONG SPRING HILL DRIVE AND PEDESTRIAN AMENITIES FENCE X FROM THE PUBLIC RIGHT OF WAY TO THE BUILDING ARE DEFERRED BECAUSE THE FACILITY IS NOT 0' OPEN TO THE PUBLIC AND THERE ARE NO OTHER FACILITIES OPEN TO THE PUBLIC PAST THE 387 DRAINAGE FLOW TRANSFER STATION. FUTURE PEDESTRIAN AMENITIES MAY INCLUDE AN ACCESSIBLE CURB RAMP & INTERSTATE 5 S89° 13' 02.00"E CONCRETE SIDEWALK FROM THE COMMERCIAL DRIVEWAY APRON TO THE BUILDING, SUBJECT TO CONTOUR MAJOR EDGE OF PAVEMENT 163.38' FUTURE CITY SIDEWALK LOCATION(S) AND FINAL DESIGN REQUIREMENTS APPROVED BY THE CITY. 5. AN ACCESSIBLE ROUTE IS PROVIDED FROM ALL ACCESSIBLE PARKING STALLS TO THE BUILDING. CONTOUR MINOR N0° 16' 16.00"E 6. A HYDROLOGIC ANALYSIS AND STORM WATER DETENTION CALCULATIONS WILL BE PROVIDED FOR THE PROJECT IN CONJUNCTION WITH THE CEQA EVALUATION. STORM WATER DETENTION/RETENTION UTILITY POLE W/ GUY 57.45' WILL BE PROVIDED AS AN ABOVE GRADE POND, AS SHOWN ON THE SITE PLAN. STREET LIGHT 7. ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) IS SUBJECT TO SITE AND PROJECT EVALUATION BY SISKIYOU COUNTY ENVIRONMENTAL HEALTH DEPARTMENT. OWTS LEACH LINES ARE INSTALLED POWER VAULT E BELOW GRADE AND THE GROUND SURFACE ABOVE WILL BE RESTORED TO ORIGINAL GRADE WITH DEVELOPMENT RESTRICTIONS. TORREY FAMILY PROPERTIES, LLC 8. FIRE SUPPRESSION WATER STORAGE TANK TO BE POLYETHYLENE PLASTIC MATERIAL. PROPOSED SIZING TO BE APPROVED BY THE MT. SHASTA CITY FIRE OFFICIAL. 057-771-380 N 1 inch = 30 feet 9. 10. TRASH RECEPTACLES WILL BE STORED INSIDE THE BUILDING. EXTERIOR SITE LIGHTING WILL BE WALL MOUNTED AND PROVIDED AT THE ENTRANCE AND PARKING STALLS. SITE LIGHTING WILL PROVIDE THE MINIMUM ILLUMINATION REQUIRED, WILL BE HIGH SITE PLAN Contour Interval = 5 foot 11. EFFICACY AND WILL BE DIRECTED DOWNWARD. 1,500 FT² SNOW STORAGE AREA IS PROVIDED AT 25% OF AND OUTSIDE OF THE PAVED PARKING AREA 1" = 30' A ©
Rendering of Approach From Spring Hill Road Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 November 10, 2020 Mt Shasta, CA 96067
Front Elevation Left Elevation Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Rear Elevation Right Elevation Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Front Elevation Rendering Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Left Side Elevation Rendering Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Right Side Elevation Rendering Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Rear Elevation Rendering Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
Main Body Paint: Trim Paint: Accent Paint: Benjamin Moore 509 Cypress Green Benjamin Moore 1493 Morning Dew Benjamin Moore 1484 Ashwood Moss Fiber Cement Lap Siding: Stone Veneer: Architectural Shingle Roofing: James Hardie HardiePlank Coronado Stone, Old Country Ledge. Owens Corning, Oakridge. Select Cedarmill or Equal Color: Chablis Color: Driftwood with 7" Exposure. Grout Joint: Drystacked Fire Class A Colors & Materials Note: Colors shown are approximate due to printing limitations. Production Facility The Cypress Group, Inc. 508 Chestnut St, Suite 3 Mt Shasta, CA 96067
You can also read