CONNECTING COMMUNITIES - TO NEW JOURNEYS - SMRT Corporation Ltd
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
CONTENTS MILESTONES 2 Our Vision Moving People, AT A GLANCE Enhancing Lives Mission 4 ▶ Improving Commuter Experience To deliver a public transport 9 ▶ Improving Reliability service that is safe, reliable and commuter-centric 12 ▶ Improving Connectivity 13 ▶ Nurturing Our People 16 ▶ Serving Our Community Core Values 17 ▶ Key Financial and Operating Data FROM OUR CHAIRMAN 18 19 FROM OUR GROUP CEO DEPUTY GROUP CEO’S MESSAGE 20 Integrity Service & Safety Excellence 21 PRESIDENT'S MESSAGE OUR OPERATIONS 22 26 SAFETY & SECURITY SMRT Trains Ltd. (SMRT Trains) is the pioneer Mass Rapid Transit operator in Singapore. ENGINEERING 34 Since 1987, we have provided safe and convenient transport services to millions of commuters, and have contributed to the vibrancy of our urban landscape. 38 COMMUTER ENGAGEMENT AND SERVICE EXCELLENCE Today, we operate and maintain the North-South and East-West Lines, the Circle Line, the new Thomson-East Coast Line and the Bukit Panjang Light Rail Transit system. OUR PEOPLE 42 Our lines cover over 148km of rail tracks across 108 stations. We are committed to enhancing our rail capability and deepening our engineering 46 OUR COMMUNITY expertise to deliver a best-in-class transport service that is safe, reliable and customer-centric. AWARDS AND ACCOLADES 50
MILESTONES 2014 ▶ The power rail replacement works on the NSEWL are completed. ▶ SMRT Trains crosses the landmark of 1987 2005 10 billion passenger journeys carried. ▶ SMRT Trains celebrates ▶ Singapore Mass Rapid Transit (MRT) is ▶ Raffles Xchange, the first MRT 30 years of MRT operations. incorporated. station to be redeveloped for ▶ SMRT Trains introduces Adopt-A-Station, transit retail, is launched. a community outreach programme with ▶ Stations along the NSL and EWL ▶ Singapore’s first MRT system begins local schools. experience early closure, late opening and operations with inaugural service full day closure to facilitate renewal and between Yio Chu Kang and Toa Payoh maintenance works. on the North-South Line (NSL). 2008 ▶ ‘SMRT is Green’ is launched 2015 organisation-wide as a commitment ▶ SMRT celebrates SG50 with free travel on to environmental sustainability. SMRT trains and buses. 2018 1988 ▶ SMRT and LTA commence works ▶ Fifteen more stations open and the ▶ Choa Chu Kang Xchange, SMRT’s first transit ▶ The SMRT Trains Engineering Programme is to renew and enhance the power MRT system is officially launched by retail development in the heartlands, opens. launched to develop a sustainable pipeline supply system on the NSEWL. Singapore’s first Prime Minister, of engineering professionals. the late Mr Lee Kuan Yew. ▶ SMRT launches first C151 trains from Bishan Depot. 2009 ▶ SMRT Corp achieves ISO 14001 certification 2016 ▶ Renewal works for the Bukit Panjang LRT 1990 for its Environmental Management System. ▶ The JurongHealth Mobility Park, sponsored system commence ▶ Boon Lay MRT station on the East-West by SMRT, is the first of its kind in Singapore Line (EWL) opens, marking the ▶ Singapore’s fourth rail line, Circle Line (CCL), where life-size public transportation models completion of the system. commences service from Bartley to help with patients’ rehabilitation. Marymount. 2019 ▶ Seven SMRT Trains engineers are accredited ▶ SMRT, with the support of LTA, 1996 as Singapore’s first Chartered Engineers in RELOCATES THE NSEWL OCC ▶ The NSL is extended to Woodlands, 2011 Railway and Transportation Engineering. at Victoria Street to Kim Chuan Depot. completing the loop. ▶ Train Service from Caldecott to ▶ SMRT Trains transitions to the New Rail HarbourFront CCL stations commences, Financing Framework on 1 October, following ▶ SMRT achieves MKBF OF 1,000,000 marking the completion of the line. shareholders’ vote at the Extraordinary TRAIN-KM on all three lines. 1999 General Meeting on 29 September. ▶ Singapore’s first light rail system, the ▶ The new CANBERRA MRT STATION Bukit Panjang Light Rail Transit (LRT), 2012 ▶ SMRT Corp is delisted from SGX on 31 October. on North-South Line (NSL) opens for service. opens for passenger service. ▶ Train service from Bayfront to Marina Bay CCL stations commences. ▶ Sleeper replacement works on the NSL and EWL are completed. 2000 2020 ▶ SMRT Corporation Ltd (SMRT Corp) is 2013 ▶ The 43KM THOMSON-EAST listed on Singapore Exchange (SGX). ▶ SMRT Trains embarks on a multi-year 2017 COAST LINE (TEL) opens and will Sleeper Replacement Project to improve ▶ Trial of the new signalling system on the eventually have 32 new stations. journey times and provide commuters with NSL begins. a smoother ride. 2001 ▶ The Tuas West Extension opens, adding ▶ SMRT Trains signed a contract with Bombardier Transportation (BT) for ▶ SMRT Corp launches its Learning ▶ Woodlands MRT station is the first MRT four new stations on the EWL. Journey Programme in collaboration the provision of LONG-TERM station in Singapore to be awarded the with the Ministry of Education. Building and Construction Authority’s ▶ SMRT Trains is awarded the Thomson-East SERVICE SUPPORT FOR THE Green Mark (Gold). Coast Line (TEL) contract to operate and 106 BOMBARDIER MOVIA maintain the line in stages from 2019 for TRAINS which will be used for 2002 ▶ SMRT Trains embarks on a holistic an initial nine-year period. TEL will add the NSEWL. ▶ Changi Airport MRT Station opens. network-wide predictive maintenance 43km and 32 new stations to the existing regime on the North-South and East-West train network. Lines (NSEWL), with introduction of new technologies. 02 | MILESTONES MILESTONES | 03
AT A GLANCE In Stations IMPROVING COMMUTER EXPERIENCE We aim to provide greater convenience and comfort to commuters throughout their journeys. iSTANDS QR-EMBEDDED for quick and POSTERS with easy access information on to vital alternative travel information options CUSTOMER SERVICE INITIATIVES In Stations All the toilets in SHARED- our stations have UMBRELLA attained the SERVICES GOOD RESTROOM are available at GRADING of four 24 OF OUR stars, awarded by the CHARGING POINTS PRIORITY QUEUES STATIONS. Restroom Association with digital screens for commuters with needs (Singapore). at elevators DEMENTIA Be A Dementia GO-TO POINTS Friend at selected stations where those with TRAIN SERVICE UPDATES dementia, or anyone EAST-WEST LINE NORMAL ELECTRONIC DIAPER CHANGING DEMENTIA-FRIENDLY SINGAPORE who sees a person NORTH-SOUTH LINE CIRCLE LINE NORMAL NORMAL DISPLAYS STATIONS in most with dementia, can BUKIT PANJANG LRT NORMAL show train service handicapped toilets seek help. 31 Jan 09:00AM updates along the Circle Line In Trains MUSIC IN STATIONS FESTIVE EVENTS STARiS™ for better ambience and to celebrate occasions NEXT STATION (SMRT Active Route Map TE2 NS9 WOODLANDS to delight commuters with our commuters Information System) provides real-time travel information in trains 04 | AT A GLANCE - IMPROVING COMMUTER EXPERIENCE AT A GLANCE - IMPROVING COMMUTER EXPERIENCE | 05
CUSTOMER SERVICE INITIATIVES ACCESSIBILITY At Passenger Service Centres For Visually Impaired Commuters CARE STICKERS DIGITAL DISPLAYS for commuters who to update commuters GUIDE DOGS TACTILE GROUND require special care on train services and are allowed in stations SURFACE INDICATORS provide answers to and onboard trains throughout the stations common queries Lift buttons with BRAILLE PLATES On Platforms CARE ZONES FANS for improved Care for commuters who ventilation For Hearing Impaired Commuters Zone need assistance 31 Jan PLASMA DISPLAYS FLASHING RED 5 Marina South Pier at platforms indicate ‘DOOR CLOSING’ Marina Bay 3 mins train arrival times lights at train doors Marina Bay 4 mins On the Go SMRTCONNECT E-TRAVEL CHIT FLUORESCENT is a multi-modal journey for greater DISPLAYS in trains provide planner app that convenience in multi-language messages provides real-time train obtaining a NS1 Jurong East ... > To Joo Koon (EW) 5, 8min To Pasir Ris (EW) and bus arrival timings, proof-of-travel To Marina Bay (NS) Arr, 9min NS2 Bukit Batok ... > NS3 Bukit Gombak ... > as well as detailed station during a disruption NS4 Choa Chu Kang ... > information within For Commuters in Wheelchairs the SMRT network WHEELCHAIR- BARRIER-FREE SNAP-REP SMRT’S TWITTER ACCESSIBLE ENTRANCES AND Report a FAULT to our WhatsApp service +65 9788 4398 (Snap and Report) FEED provides live snap a PICTURE lets commuters report travel advice and ELEVATORS WIDER FARE GATES and tell us about it technical defects in the updates network via WhatsApp WHEELCHAIR- ACCESSIBLE TRAIN CARRIAGES allow for two wheelchairs per train 06 | AT A GLANCE - IMPROVING COMMUTER EXPERIENCE AT A GLANCE - IMPROVING COMMUTER EXPERIENCE | 07
CUSTOMER SATISFACTION* IMPROVING RELIABILITY Our renewal works on the North-South and East-West Lines (NSEWL) will reduce the incidences of delays and breakdowns, resulting in smoother rides. 99.5% OUR RENEWAL WORKS 97.8% Power Rail Replacement 91.8% Improves the reliability of Completed in the electrical system, AUGUST 72.5 LEADING TO FEWER BREAKDOWNS Started in 2015 2017 64.6 65.0 63.4 Re-signalling Communications-Based Train Completed in Control signalling system APRIL 2019 allows trains to run at shorter intervals, substantially Started in IMPROVING TRAIN 2013 CAPACITY 2017 2018 2019 2020 * Figures updated as at September 2020. Power Supply System Renewal The Public Transport Customer Customer Satisfaction Index Fibre optic cables help Satisfaction Survey (PTCSS) by of Singapore (Average score To complete by transmit monitoring the Public Transport Council measures the percentage of 0–100) by the Institute of Service Excellence, Singapore information in real-time, Started in 2024 commuters who are satisfied Management University ALLOWING SYSTEM 2018 with our service and have TO BETTER PREDICT indicated a score of 6 and FAULTS above on a scale of 1 to 10 DO YOU KNOW ? DO YOU KNOW ? The power supply cable renewal involves about Our Twitter feed is one SMRTConnect of the most active in 3.0 APP Singapore, with close to was launched in 2018 with 1,300km 250km 480,000 AND enhanced features such as of power cables of fibre optic cables located 01011 FOLLOWERS train frequency indicator 00100 along the NSEWL’s tracks. 10010 and better user interface. 08 | AT A GLANCE - IMPROVING COMMUTER EXPERIENCE AT A GLANCE - IMPROVING RELIABILITY | 09
OUR RENEWAL WORKS OUR PERFORMANCE Adding New Trains How We Measure Reliability ALL 57 We measure the number of kilometres clocked before incurring a single delay lasting more than 5 minutes. This is referred to as Mean Kilometres Between Failure (MKBF) Completed in NEW TRAINS or MKBF* for short. Here is the 12-month moving average up to July 2020. have been delivered Started in 2019 2015 Trains progressively put into service from APRIL 2017 28,955 NSL Replacement of Trains TIMES Train fleet to be replaced with To complete by 106 NEW Announced in 2026 along the entire North-South Line BOMBARDIER TRAINS 2018 1,386,000 Correct as of end March 2020 Stage of Completion (%) Re-signalling NSL 100 EWL 35,190 Re-signalling EWL TIMES 100 Adding New Trains 100 along the entire East-West Line Power Rail Replacement NSL 91 2,014,000 Power Rail Replacement EWL 82 Power Supply System Renewal (Cables) NSL 59.5 Replacement of Direct Current (DC) Switchgears CCL 66,457 58 TIMES Power Supply System Renewal (Cables) EWL 48.9 along the entire Track Circuit System Replacement Work Circle line 32.8 2,307,000 Correct as of end March 2020 10 | AT A GLANCE - IMPROVING RELIABILITY AT A GLANCE - IMPROVING RELIABILITY | 11
IMPROVING CONNECTIVITY NURTURING OUR PEOPLE Our network will expand to include more lines and stations over the next five years. We are growing and upskilling our workforce to serve our commuters in the best possible way. THOMSON-EAST COAST LINE SECURING TALENT Outram Park 32 Marina Bay WE HAVE Sungei Bedok Gardens by the Bay Orchard Boulevard Woodlands South Woodlands North >540 Woodlands Upper Thomson Mount Pleasant Tanjong Katong Caldecott Marine Terrace Marine Parade Orchard Marina South Shenton Way Stevens Bedok South Tanjong Rhu Katong Park Great World Mayflower Springleaf Bright Hill NE3 Bayshore Havelock CE2 stations and Maxwell 43km Napier Lentor ENGINEERS Siglap EW16 NS27 NS22 DT37 DT10 CC17 NS9 TE24 TE28 TE20 TE27 TE30 TE26 TE29 TE22 TE23 TE25 TE14 TE18 TE10 TE17 TE16 TE19 TE12 TE21 TE13 TE15 TE31 TE4 TE8 TE7 TE11 TE6 TE9 TE2 TE3 TE5 TE1 when fully operational The line will be opening in stages: Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Fully underground, Early 2021 2022 2023 2024 driverless system 2020 CANBERRA STATION CIRCLE LINE LOOP Bishan Caldecott Serangoon NS12 Canberra STAFF STRENGTH IS NOW 5,980 Botanic Gardens MacPherson Paya Lebar Buona Dhoby Ghaut Vista Promenade Bayfront HarbourFront Marina Bay OPENED IN NOVEMBER 2019 SECOND MRT STATION in Singapore to be built on Circle Line completion date an existing rail line 2025 AND 5 ENTRANCES linking to the NEW STATIONS: >3,300 3 new housing estates KEPPEL, CANTONMENT MAINTENANCE AND PRINCE EDWARD Commuters can access the train platform directly through an WORKERS for better access to the Central Business ELEVATED LINK BRIDGE District, Marina Bay Area and HarbourFront *Correct as of end March 2020 12 | AT A GLANCE - IMPROVING CONNECTIVITY AT A GLANCE - NURTURING OUR PEOPLE | 13
WORKFORCE PROFILE STAFF PROGRAMMES Distribution by Employee Distribution by Gender (%) Category (%) SMRT Rail Career Roadmap 13 1 10 Builds competencies through systematic training and experience SMRT Trains Career Scheme Identifies skills, knowledge and experience that employees need to develop each stage of their career Non-Executives Male Executives 86 Female 90 Senior Management SMRT Train Engineer Professionalisation (STEP) Programme Attracts, develops and professionalises rail engineers with Chartership awarded by the Institution of Engineers, Singapore Staff Profile by Age (%) Staff Profile by Completed Years of Service (%) 9 25 27 Engineering Maintenance Manager Scheme 21 45 Attracts, develops and retains top engineering talent in frontline maintenance 26 19 Partnership with University of 27 Birmingham Offers Post Graduate Certificate In Urban Railway > 30 50 - 59 15 *Correct as of end March 2020 14 | AT A GLANCE - NURTURING OUR PEOPLE AT A GLANCE - NURTURING OUR PEOPLE | 15
SERVING OUR COMMUNITY KEY FINANCIAL AND OPERATING DATA We are committed to conducting our business in a socially and environmentally responsible way, balancing the interests of our stakeholders, from commuters to employees to business partners. Social Responsibility Financial Data ADDRESS RESIDENTS’ FAMILIARISATION Revenue ($m) Operating Expenses ($m) CONCERNS TOURS bring together AND FEEDBACK groups of beneficiaries to through engagement with discuss improvements to community leaders the INCLUSIVITY FEATURES at our stations. Empowering Through The Arts And Education Art in Transit tours conducted for 1,000 joined LEARNING 743.2 736.6 754.7 837.8 946.8 846.7 ABOUT 10,000 FY2018 FY2019 FY2020 FY2018 FY2019 FY2020 PARTICIPANTS JOURNEY Revenue has increased mainly due to Operating Expenses have reduced due increase in rail fare and rail non-fare. to reductions in staff costs, repairs & maintenance and other operating costs. Our People In 2019, SMRT launched the In partnership with the SMRT FACES programme People’s Association (PA) where selected senior level and LTA, the STATION Earning Before Interest and Tax ($m) Profit After Tax ($m) staff are appointed to AUDIT INITIATIVE FOSTER RELATIONSHIPS engages community leaders with key stakeholders in the as well as selected groups of community. commuters for feedback to improve our stations. (84.4) (165.5) (19.1) (85.9) (155.3) (19.8) FY2018 FY2019 FY2020 FY2018 FY2019 FY2020 Environmental Responsibility ENERGY CONSERVATION through installation of Operating Data LED LIGHTING and DISTRICT COOLING FY2016 FY2017 FY2018 FY2019 FY2020 Total route length (NSEWL & CCL) (to nearest km) 130 130 137 137 137 Use of recycled water at five train washing plants, Total car-kilometres operated (to nearest million) 131 135 142 143 143 SAVING APPROXIMATELY 160,000 LITRES PER MONTH Total ridership (to nearest million) 756 768 753 756 747 Average weekday ridership (to nearest thousand) 2,197 2,353 2,258 2,254 2,230 Eliminate, reuse and recycle waste. Total passenger-kilometres (to nearest million) 8,322 8,271 7,886 7,819 7,797 CLOSE TO 1,600 TONNES of scrap metal sent for recycling Average car occupancy (passenger per car) 63 61 55 55 54 16 | AT A GLANCE - SERVING OUR COMMUNITY AT A GLANCE - KEY FINANCIAL AND OPERATING DATA | 17
FROM OUR FROM OUR CHAIRMAN GROUP CEO “ 2020 has been disrupted by the COVID-19 pandemic, trade wars and unprecedented climate changes. While the ways “ Working together with MOT and LTA, the SMRT team has put our hearts and souls we live, work and play have changed tremendously and will into achieving the rail reliability we see continue to evolve, SMRT remains focussed on providing today. Our continued focus on reliability safe and reliable public transport services. I would like to has allowed us to achieve 1 million Mean thank commuters for your understanding and our staff for Kilometres Between Failure (MKBF). This your dedication in these challenging times. must not be taken for granted and we will continue to focus our efforts on sustaining In a dynamic environment, we must continuously adapt, this level of reliability. While we strive for innovate and invest in People and Technology to strengthen high operational performance, safety our rail operations, maintenance and service. We are on remains our top priority and we are track to deepen our engineering and operational capabilities determined to create a Zero Safety Incident through strategic partnerships. Through Kaizen, staff at operating environment by strengthening every level are empowered to take stronger ownership our safety culture, systems and processes. of their work. Efforts are made at individual, system and company levels for continuous improvement in productivity, We will leverage digitalisation and and to sustain the reliability and safety of our rail network. technology to be cost efficient and We will improve the efficacy and efficiency of our work effective, and will continually upskill our processes, and do everything cost effectively. workforce through workplace learning. We are also looking forward to serving As part of succession planning put in place by the Board to more commuters in Singapore, with the ensure business continuity and growth, Mr Lee Ling Wee was upcoming bids for Jurong Regional Line appointed Deputy Group CEO & President, SMRT International. and Cross Island Line being our focus. Ling Wee helmed Trains for seven years and led the team to achieve significant improvement in rail reliability. In his new To strengthen our foundation, smooth role, Ling Wee oversees the Singapore-Malaysia Rapid Transit leadership renewal is key. After seven System (RTS) project, which recently concluded its agreements. years of leading SMRT Trains, Ling Wee Mr Lam Sheau Kai has taken over from Ling Wee as President, has handed the helm of SMRT Trains Trains. The Board would like to express its appreciation to over to Sheau Kai. I am confident that Ling Wee for his dedication, contribution and services, and Sheau Kai, with his vast experience in welcome Sheau Kai to his new role. These appointments public service, will continue to raise our reinforce our leadership bench strength to augment standards in rail operations, maintenance, our local public transport operator business, while and service, while driving our efforts to we build capabilities to grow in both local and transform SMRT Trains into a future-ready selected overseas markets. outfit. Ling Lee will now serve SMRT as Deputy Group CEO and President, SMRT We remain committed to working with MOT International. One of the first projects and LTA as part of the One Transport Family to under SMRT International will be the serve commuters well and maintain our MRT as Johor Bahru-Singapore Rapid Transit among the most reliable systems in the world. System (RTS) Link Project, which recently reached a significant milestone with the official resumption of the project. Seah Moon Ming Chairman Neo Kian Hong SMRT Corporation & SMRT Trains Group CEO ” SMRT Corporation 18 | FROM OUR CHAIRMAN ” FROM OUR GROUP CEO | 19
DEPUTY GROUP PRESIDENT'S CEO’S MESSAGE MESSAGE FY20 was a year of highs and lows for SMRT accident at Bishan Depot in March 2020. One 创业难,守业更难 – it is tough to start a trained in relevant technologies and skillsets Trains. We have crossed 1 million MKBF (Mean life lost is one life too many. We will learn from business, and tougher to sustain it. I am for the future. Kilometres Between Failures) across all three this incident and work even harder to ensure under no illusion that my ride ahead would MRT lines operated by us – the North-South that our people come to work and go home be an easy one, despite taking over an SMRT Thirdly, the safety of our commuters will Line (NSL), East-West Line (EWL) and Circle safely to their families, each and every day. This Trains outfit that is in a good state with continue to be core in everything we do. Line (CCL), a target that was not even in our is SMRT Trains’ core responsibility to our people. significant achievements in FY20. Having For instance, in close collaboration with LTA, sights a few years back. Former Transport spent two years setting up the Thomson-East stringent tests are underway to prepare for a Minister Khaw set us the ambitious target. The COVID-19 pandemic, a black swan event, Coast Line (TEL), I know that running a public smooth commencement of the second stage As #OneTransportFamily, MOT, LTA and SMRT came into the picture towards the end of FY20. train network is a relentless journey of of the TEL in 2021, amid many challenges put our hearts and souls to achieve this. We had to react swiftly and decisively, increase improvements to meet the evolving needs of posed by the COVID-19 situation. We are cleaning and disinfecting frequencies, provide our commuters, where a team of dedicated committed to providing a safe and reliable We are happy to serve Woodlands residents hand sanitisers, and do all within our means to and hardworking staff is key to success. journey for all our ‘new commuters’ working with the launch of the first stage of the keep our staff and commuters safe. I am very and residing along the six new TEL stations, Thomson-East Coast Line (TEL) in January proud of what the team has done and achieved, The disruption to train services on 14 October from Springleaf to Caldecott. 2020. Another key milestone is the opening in particular how we had kept the network 2020, which occurred on the North-South, of Canberra MRT station in November 2019, running smoothly during the circuit breaker East-West and Circle Lines, is a good reminder Moving ahead, we remain focused on an infill station built on the existing NSL, to period, ensuring that all essential workers can that things can go wrong and we should not delivering Safe and Reliable train service to better serve the community in northern get to work with minimum fuss. take anything for granted. We are deeply our commuters as we continue our journey Singapore. Last year, we also consolidated sorry for the disruption and will work closely of moving people, enhancing lives. our Rail Operations Centre (ROC), the nerve Much has changed since I joined SMRT Trains with LTA and Alstom to resolve the underlying centre of our operations, in Kim Chuan Depot in 2013, especially the ways we connect with our issues that caused this disruption. The (KCD). ROC@KCD now houses the Operation commuters and improve their travel experiences disruption also further strengthened SMRT Lam Sheau Kai Control Centres of the NSL, EWL and CCL with us. The results have been heartening. Trains’ resolve to focus our efforts in three President under one roof for integrated command and For example, according to the annual Public key areas: SMRT Trains control, and enhanced situational awareness. Transport Customer Satisfaction Survey (PTCSS), the percentage of respondents who are satisfied Firstly, reliability across all lines must be On the other hand, it greatly saddens me that with MRT service hit a record high of 99.5% sustained, and this involves everyone in we lost one of our colleagues in an industrial in 2019. I would like to express my deepest SMRT Trains to stay focused and play their appreciation to all SMRT staff who have parts well. We also need to continue working contributed one way or another to achieve this closely with MOT and LTA to renew core excellent outcome. However, we must not rest on systems on the North-South and East-West our laurels. We must continue to put in our best to Lines (NSEWL). The resignalling works, and sustain a high level of service to our commuters. the replacement of worn-out railway track sleepers and the third rail had been I am delighted to have Sheau Kai on board in completed. The power supply and track his new capacity as President, SMRT Trains. circuit system replacements are underway Sheau Kai has demonstrated excellent and slated for completion by 2024. Our leadership and strong commitment to set up commuters can look forward to 106 new the TEL’s operations and maintenance from Bombardier MRT trains which will enter scratch. With valuable experience gained from service from 2022; when fully introduced, setting up a new line, and support from a 53% of the NSEWL trains will be brand new. committed workforce that is continuously striving to raise standards, I am confident that Next, to stay ahead of the curve, we will focus SMRT Trains will go on to achieve greater on transformation, especially the training and heights in the years ahead. upgrading of our people. We want to help our people upskill and reskill, so that they can continue to contribute to the upgraded Lee Ling Wee and expanding MRT network. Over the next Deputy Group CEO 5 years, we will work closely with LTA, the SMRT Corporation Union, Workforce Singapore and SkillsFuture Singapore to ensure that our people are President SMRT International 20 | DEPUTY GROUP CEO’S MESSAGE PRESIDENT’S MESSAGE | 21
The 43km-long TEL is Singapore’s sixth OUR OPERATIONS MRT line, adding 32 new stations to the existing rail network with eight interchange stations. THOMSON-EAST COAST LINE 6th MRT LINE 32 NEW IN SINGAPORE STATIONS 8 INTERCHANGE 43km STATIONS LONG The second stage of TEL is scheduled to commence revenue service in 2021. About 100,000 commuters will benefit from the first and second stages of TEL. These nearby commuters will be able to reduce their travelling time by up to 50%. When fully operational in 2024, TEL is expected to serve approximately 500,000 commuters daily in the initial years. This is expected to increase to one million commuters per year in the longer term. The 43km-long TEL is Singapore's sixth MRT line, adding 32 new stations to the existing rail network with eight interchange stations. ENHANCING AND RENEWING OUR NETWORK THE NORTH-SOUTH AND We serve commuters across North-South and East-West EAST-WEST LINES (NSEWL) Lines (NSEWL), Circle Line (CCL), Thomson-East Coast Line We are working closely with the Land (TEL) and Bukit Panjang Light Rail Transit (BPLRT). Transport Authority (LTA) to renew and improve NSEWL’s power supply system. The laying of fibre optic cables along viaducts and tunnels helps transmit In the past year, we continued to improve rail reliability through various renewal and maintenance monitoring information in real-time to efforts, even as we worked towards growing our network. The new Canberra MRT station on the Operations Control Centre (OCC). North-South Line (NSL) was opened for service on 2 November 2019. With the new Canberra This allows the system to better predict station, the NSL now has 27 MRT stations connecting commuters from Jurong East to Marina faults and address them before they The laying of fibre optic cables along the viaducts and tunnels South Pier. The first stage of TEL officially opened on 31 January 2020 with three stations: occur. helps transmit monitoring information to the OCC. Woodlands North, Woodlands and Woodlands South. The installation of Voltage Limiting Devices (VLDs) to replace the 64P touch voltage protection system has helped to localise and isolate power failures. EXPANDING SMRT’S RAIL NETWORK The new Canberra MRT station is located between Our engineers optimise the scheduled early closures and late openings of stations to complete Sembawang and Yishun MRT stations. It is the these complex projects within a limited given time. As of 31 March 2020, 91% and 82% of the fibre second* infill station in Singapore constructed optic cables had been laid in NSL and EWL respectively. The VLD installation in NSEWL was in the middle of a running line. The station will completed in June 2019. benefit over 17,000 households that are within 10-minute radius of the station. This is expected to At the same time, as of 31 March 2020, about 58% of the Direct Current (DC) switchgears had been save nearby commuters up to 10 minutes of travel replaced, with the remaining DC switchgear replacement works expected to be completed by the time when they travel towards the city centre or second quarter of 2021 due to the COVID-19 disruption. The DC switchgears combine electrical Jurong East. switches, fuses or circuit breakers to control, protect and isolate electrical equipment in a power network. The high voltage system that comprises 22kV switchgears, transformers, rectifiers and * The first infill station is Dover station on East-West Line (EWL). inverters in 13 stations have also been replaced. 22 | OUR OPERATIONS OUR OPERATIONS | 23
NSEWL TRACK CIRCUIT RENEWING THE BPLRT REPLACEMENT – R152 Renewal works to enhance Bukit Panjang The track circuit system LRT’s (BPLRT) reliability began in 2018 and replacement work was about will be completed by 2024. 33% done as of 31 March 2020. It is expected to be completed by Together with LTA and Bombardier (BPLRT’s 2022. The work on the track original equipment manufacturer), we have circuits along the NSL between begun installing the new signalling system Bukit Batok and Khatib stations from March 2019. Software testing for the had been completed. The new new Communications-Based Train Control track circuit system is able to (CBTC) signalling system has also started in automatically detect broken rails Bombardier’s overseas test laboratories. that require repairs, and speed up service recovery efforts. We have also intensified and accelerated maintenance and renewal works for BPLRT and this has resulted in higher reliability. This is made possible by the additional Replacing track circuits on the NSEWL which will automatically engineering hours gained through the detect broken rails. adjustment of operating timings and route service. ADDITION OF NEW TRAINS As part of the long-term fleet renewal programme for the NSEWL, another 40 new trains from Bombardier Transportation will arrive in batches starting from 2024 to replace the 2nd generation LOOKING AHEAD We will continue to strengthen our rail (Siemens) and 3rd generation (Kawasaki-Nippon Sharyo) trains currently in service on the NSEWL. maintenance capabilities by exchanging engineering knowledge and experiences Bombardier was previously awarded a contract in July 2018 to supply LTA with 66 new trains to with industry partners through regular replace the 1st generation (Kawasaki) trains that have served the NSEWL since it first opened in joint meetings. 1987. The latest batch of 40 trains uses the same design, and brings the total number of NSEWL trains supplied by Bombardier to 106. Together with LTA, we are building a Rail Discovery Centre (RDC) at Mandai Depot, These new trains will be equipped with an integrated suite of condition monitoring features that designed with a Learning Journey to cater can help SMRT pre-emptively detect potential faults to increase reliability. to school students and adults. It aims to showcase the story of Singapore’s railway industry and our commitment to improve MAINTAINING STATION ESCALATORS rail reliability, educate visitors, and instil a Our escalators in service have an availability rate of more than 99.5%. To ensure they remain safe sense of pride in Singapore’s MRT network. and in good working condition, we embarked on a five-year escalator refurbishment project across NSEWL in 2016. The project involves 233 escalators at 42 stations. With these developments, we envision a more inclusive and safer travelling As of 31 March 2020, 137 escalators had been fully refurbished, which translates to around 60% of experience for all our commuters in a the project. Work on another 23 escalators is currently in progress. The escalator refurbishment better-connected transport network. project is expected to be completed by 2021. Upon completion, escalators will be installed with new commuter-friendly features, such as dual-speed and directional traffic lights, along with additional safety enhancement features such as handrail speed monitoring and skirt deflectors. IN AUGUST 2016 we embarked on 5-YEAR 233 ESCALATORS IN 42 STATIONS Installation of the new signalling system for BPLRT. escalator refurbishment project refurbished of the NSEWL installed with new commuter-friendly features DUAL-SPEED DIRECTIONAL TRAFFIC LIGHTS 137 ESCALATORS HANDRAIL SPEED MONITORING have been fully refurbished SKIRT DEFLECTORS AS OF 31 MARCH 2020 24 | OUR OPERATIONS OUR OPERATIONS | 25
OUR SAFETY & SECURITY PERFORMANCE SAFETY & SECURITY In the current security climate, we continue to strengthen our physical security through planned security enhancement projects. Our FY20 Employee Accident Frequency Rate increased from 1.43 in FY19 and stood at 1.67 accidents per million man-hours, with 26 cases of reportable accidents*. As a result of a fatal industrial accident, our Employee Accident Severity Rate had increased significantly to 413.02 man-days lost per million man-hours, with 6441** man-days loss. On the other hand, our passenger safety performance had shown a 9% improvement at 0.3 accidents per million ridership, with 250 passenger accidents requiring beyond first aid treatment. We will continue to strengthen safety and security mindfulness, with emphasis on compliance, thereby ensuring our staff can ‘work safe, home safe’. Our focus on developing a strong safety culture resides in these areas: leadership and engagement, communication, performance management, discipline and rewards, workplace processes and resources, organisational safety system, and technological enablers. With commuter safety a high priority for SMRT Trains, we will also continue our existing efforts and collaborations with Land Transport Authority (LTA) and grassroots to engage and educate the public on safe travelling in our network. SAFETY FIRST * Reportable accident refers to work-related accident with medical leave of more than 3-day Safety is our key priority and strategic focus as we strive towards our vision of of hospitalisation or at least 24 hours (based on Zero Accident and Zero Security Breach. Every level of trains management and MOM’s definition before 1 Sep 2020). staff is actively involved in creating a safe environment for our staff, commuters ** Ministry of Manpower (MOM) defines one fatality and other stakeholders, as we continue to provide best-in-class public transport case as equivalent to a loss of 6,000-man days. service. Continued emphasis on compliance and inculcating a strong safety culture. “ The cyber threat landscape continues to evolve rapidly. It is of utmost importance for SMRT to protect its systems against these threats across all OUR SAFETY SYSTEM Our Health, Safety and Environmental (HSE) Management System provides a structured management approach and systematic way to identify hazards, control HSE risks and areas of business and operations, from enterprise achieve continual improvement. IT systems to Critical Information Infrastructure systems. It comprises various elements like Training, Competence & Communication, Regulatory SMRT is working closely with CSA, LTA and cyber & Authorised Documents, Management of security trusted partners on measures to address HSE Risks & Opportunities, Contractor cyber risks and to build resiliency. Only with such a Management, Audits & Inspections, Incident collaborative, concerted and continuous effort, along Handling & Investigation, Security, Emergency with vigilant monitoring and validation, can we Preparedness, and Reports & Data Analysis. enhance the cyber security of our systems. These form the basis of our HSE work in Trains, as we operate with a ‘Safety First’ mindset. Operating with a ‘Safety First’ mindset. Lee Fook Sun Deputy Chairman SMRT Trains Ltd. and SMRT TEL Pte. Ltd. ” 26 | SAFETY SAFETY | 27
INCULCATING SAFETY, SECURITY INVESTING IN AND CYBER SECURITY TECHNOLOGY MINDFULNESS We are committed to We have launched a comprehensive safety leveraging technology to and security awareness campaign that dives further optimise and enhance into intensive but meaningful education, work processes and systems engagement and promotional efforts. For to make our work and example, our annual Trains Safety & Security environment safer and more Forum provides a platform for all staff to secure. Some of our staff’s share their Line and Centre of Excellence safety innovation projects safety initiatives, promoting cross sharing have garnered the Workplace amongst divisions. Safety and Health (WSH) Trains Safety & security Forum 2019 Innovation Awards, and we In addition, Safety Moment messages are have adopted technology to communicated daily to our staff, where we strengthen our physical promulgate safety learnings through their security through planned toolbox briefings. security enhancement projects. Electronic Key Press system to tighten accountability and security. We also partnered DuPont Sustainable Solutions, a renowned world-class safety leader, to develop a safety culture transformation programme. The programme Safety Innovation Projects Security Enhancement Projects focuses on enhancing safety mindfulness, workforce discipline, compliance and • Speed Tester for Train Traction Control • Acquisition of VA Detection / Intrusion accountability of our line leaders, who then Unit Blower from Rolling Stock System in BPLRT Depot become trained advocates ready to cascade - A safer alternative method to test for safety knowledge to their teams. low- and high-speed functionality of the • Electronic Key Press - Operationalisation TCU blower to achieve reliable speed of this system network-wide to reduce To encourage an open reporting culture, we testing, and safer work environments the need for permanently-issued keys, have established various reporting channels without exposure to heating elements thereby tightening accountability for staff to proactively feedback on safety and The annual Safety Excellence Award and Best Premises security concerns. To empower our staff to Safety Awards recognise divisions and departments for • Remote Third Eye from Power • Radio-Frequency Identification (RFID) speak up and intervene, we have instituted their safety and security achievements. - An equipment developed to replace Locks for non-public area doors in all ‘Safety Time-Out and Stop Work Order’ physical inspection at heights, thereby NSEWL stations through a company-wide directive. reducing risk of injury This is reinforced with our ‘Safety and Security Activists’ scheme where we recognise staff who proactively contribute to improving the safety and security culture in the company. COMMUTER SAFETY In FY20, we had a total of 625 activists, a 53% Our safety and security efforts extend beyond our staff to include our commuters, contractors increase from FY19. working in SMRT premises, tenants and other relevant stakeholders. In addition, we have the annual Safety Excellence Awards and Best Premises Safety COMMUTERS: & Security Awards to recognise divisions and We are engaging our commuters on safe travel through ‘WeCare About departments for their outstanding safety Your Safety’ roadshows, Learning Journeys and communication outreach. and security achievements, and to motivate them towards better safety performances. The ‘Safety and Security Activists’ scheme recognises staff CONTRACTORS: Cyber security awareness is also promulgated who proactively contribute to improving the safety and Our focus on Contractor Safety, Security and Cyber Security requirements to our staff through education and promotion. security culture. governs how we engage our contractors to work safely in our premises. This includes the Cyber Security Awareness Prior to commencement of their work, our contractors have to be certified Day 2020, bite-sized learning introduced as competent in safety by attending our Contractor Safety Course. part of continuous reinforcement on specific topics, as well as e-learning curated for Trains Operational Technology (OT) cyber security. SAFETY & SECURITY SAFETY & SECURITY SAFETY & SECURITY TENANTS: ACTIVIST ACTIVIST ACTIVIST Safety requirements are in place for the fitting-out of their shops. Tenants are also engaged regularly to remind them on the importance of safety. Bronze Silver Gold 28 | SAFETY SAFETY | 29
SAFETY FIRST SMRT Trains continues to strengthen SMRT COVID-19 EFFORTS our lines of action to better deliver safety and security performance, to build a safer workplace and commuting environment where risks BACKGROUND are minimised. Safety remains first COVID-19 hit Singapore hard and fast in early 2020. Singapore and foremost for SMRT Trains. announced its first COVID-19 case on 23 January and within 15 days on 7 February, Singapore’s ‘Disease Outbreak Response System Condition (DORSCON)’ level was raised to DORSCON Orange, the second time in history that we had done so. This meant that the CERTIFICATION, AWARDS ‘disease is severe and spreads easily from person to person, but AND ACCOLADES: disease has not spread widely in Singapore and is being contained’. Our safety and security efforts are (Source: Ministry of Health) recognised at National & International Levels. SMRT is certified ISO 9001, ISO A myriad of measures was mandated by various Government 14001 and ISO45001, underscoring our authorities within a short time to manage the situation. SMRT commitment to adopt international had to react swiftly and nimbly to the evolving pandemic situation. standards and best practices in quality, health, and safety and environmental management. We are also accredited the bizSAFE Level Star by WSH Council. In addition, we are also OUR FRAMEWORK AND RESPONSE certified ISO 22301 in Business SMRT, as an essential service organisation providing public transportation to the population of Continuity Management systems. Singapore through our trains, buses and taxis network, is at the forefront of preparing for such a national crisis. The achievements listed below are testaments to our continued efforts Plans to contain COVID-19 took place even before the first case was detected in Singapore. In fact, towards safety excellence. It will further preparations for a generic pandemic situation started years earlier through discussions with spur us on to achieve greater heights relevant authorities, development of contingency plans, and ensuring adequate supply of as we commit to delivering safety to essential items such as personal protective equipment. North-South Line received an Excellence Award for Safe Rail Line of everyone who journeys with us. the Year at the annual LTA Public Transport Operator Safety Awards. The COVID-19 pandemic was identified as a strategic risk as part of SMRT's holistic risk management programme. We work closely with the authorities LTA Public Transport Operator Safety Awards to align control measures and ensure LTA – Safe Rail Line of the Year: consistency across the entire network. NS Line: Excellence Award (Winner) It is our commitment and assurance IN FY20, SMRT to our commuters to safeguard their TRAINS HAD well-being when commuting on our GARNERED THE WSH Council – WSH Innovation Awards 2019: public transport network. FOLLOWING LTA Speed Tester for Train Traction Control Unit Blower [Rolling Stock] – Gold Award AWARDS: SMRT's Emergency Planning Committee is chaired by our Group Chief Executive WSH Council – WSH Innovation Awards 2019: Officer Mr. Neo Kian Hong. This Remote Third Eye [Power] – Certificate of Committee meets weekly to provide WSH strategic guidance and close monitoring Commendation of the COVID-19 situation within and beyond SMRT. COVID-19 responses are discussed through this Committee and Total Defence Awards 2019 will continue to do so as the situation MINDEF NS Mark (Gold) improves and our ridership increases. The Board also reviews the adequacy of the planned actions by the Committee and monitors the ground situation Total Defence Awards 2019 closely. MINDEF Stepped up cleaning efforts in our stations and trains, for the NS Award safety of our commuters. 30 | SAFETY SAFETY | 31
KEEPING OUR To support Ministry of Health's (MOH) rapid NETWORK SAFE contact tracing efforts, SMRT has To help maintain safe distancing, SMRT mandated the use of SafeEntry and Trains has added more trains into the system TraceTogether apps by all staff. Twice daily during peak hours and increased peak hour temperature taking is implemented using frequency from five minutes to three a customised travel and temperature minutes to minimise crowding. declaration system, known as HealthBot3. These are just some of the many measures SMRT adheres strictly to guidelines from the put in-place by SMRT to protect and ensure authorities to ensure safe journeys for our the health and well-being of our staff. commuters through a rigorous cleaning regime and provision of free hand sanitisers However, for a company of 11,000 staff, for public use. SMRT is not immune to the impacts of COVID-19. As of 1 December 2020, SMRT All public toilets in our train stations have had reported a total of 18 positive cases. obtained at least four stars out of the Most of these cases contracted COVID-19 maximum of six, under the Happy Toilets outside of SMRT's premises; only four were Programme by Restroom Association possibly infected in connection with the (Singapore), supported by the National Bukit Panjang Integrated Transport Hub Environment Agency (NEA). All stations cluster. Through our rigorous measures and and bus interchanges have also received close collaboration with the authorities, the Maintaining safe distance and service excellence with spreading of COVID-19 is effectively the SG CLEAN certification. the 'Hello Wave'. contained. With support from Temasek Foundation, Distributing apples, masks and sanitizers to frontline staff. SMRT further prevents the spread of COVID-19 Since the start of COVID-19 in Singapore, through the use of anti-microbial coating at about 4,000 SMRT staff had undergone high touchpoints in trains and stations. swab testing as part of the overall active screening strategy for public transport To discourage talking in public transport, workers by the MOH. This was done with posters and signs encouraging commuters the intent to protect our staff through early not to talk while travelling through our detection, and our commuters who interact network are prominently displayed. with them daily. In line with this, we also introduced the To prevent cross contamination at physical non-verbal greeting by station staff called touchpoints, SMRT has been rolling out a the 'Hello Wave'. series of touch-free innovations through the use of technology, such as the SMRT strongly supports other government installation of contactless sensors at initiatives, such as setting up temperature entrances and exits. We are also exploring self-check kiosks in our stations and the use of machines and automation to inculcating responsible individual behaviours supplement labour-intensive work such like practicing good personal hygiene while as the increase in cleaning regime. Temperature self-check kiosks in our stations. travelling on public transport through digital Exit buttons have been replaced with contactless sensors, reducing the risk of transmission. posters and station announcements. OUR BACKBONE, OUR STAFF MOVING FORWARD TOGETHER None of all the above initiatives and measures could have been possible without the backbone of Recognising that COVID-19 is here to stay for some time, we continue to innovate and evolve our organisation - our staff. Building upon responsible individual behaviours and workplace safe to prepare ourselves for the 'new normal' by incorporating more measures in our workplace management measures, we protect and safeguard the health and well-being of our staff through and work routines. the implementation of various infection control measures. SMRT conducts over a hundred inspections within our premises weekly to ensure compliance of these control measures. COVID-19 has brought about a paradigm shift on how we interact with one another and the environment. It compels everyone to adapt and adopt new social behaviours and norms to To minimise physical contact at the workplace, applicable staff are placed on work-from-home stay safe. No amount of measures put in place by the authorities and SMRT can stop the arrangements. Others who are required to report to work are put on staggered work hours and spread of COVID-19 without the active participation and compliance of our commuters. We mealtimes, with cross deployment of staff providing essential services ceased. must move forward together as a team to keep our transport system safe for everyone. Safe distancing is also enforced at places such as meeting rooms, rest areas and canteens. All staff are issued reusable masks and required to wear one throughout the day. 32 | COVID-19 COVID-19 | 33
guides resource prioritisation and improves productivity. With a handful of clicks, users are able ENGINEERING to trace maintenance history across different matrices (fleet, sub-systems or specific trains) and quickly identify areas with potential reliability concerns. Another monitoring system is the PSD monitoring system that offers automated alerts to flag out potential PSD-related issues. The quantified risk perspective, derived daily from analyses of tens of thousands of door commands, helps us identify PSD locations of interest for early intervention. The known pre-indicators to failure defined are subsequently used to prevent associated PSD-related train service delays. Lastly, the On-Demand Rail Reliability Incentive (RRI) computation assesses train service quality by taking onboard all actual train timetable data at platforms. Analyses that took hours in the past now take us mere minutes with the customised GUI, thereby improving productivity significantly. It also flags out events that are nearing regulatory limits and enables traceability to event origination. These allow us to better monitor, report and manage the situation. ARTIFICIAL INTELLIGENCE AND DATA ANALYTICS We have developed the Common Data Environment (CDE) platform on cloud, as the enabler for Artificial Intelligence (AI) and data-driven ENGINEERING GROUP projects. In addition, self-service analytics projects such as the Voice The Engineering Group focuses on improving the performance of SMRT Trains. Formed Dashboard and Trains Operating during the reorganisation exercise in 2019, the Group’s key objectives are raising new Performance Standard Dashboard capabilities, training a competent workforce, and achieving sustainable financial strength. have been built to make data more accessible. SMRT executives at a workshop on Artificial Intelligence (AI). We utilise data analytics, condition monitoring and maintenance techniques to strengthen the capabilities of SMRT Trains. We also support digitalisation efforts within We are building up Smart Mobility, Situation Awareness and Predictive Maintenance AI capabilities SMRT to transform work processes and enhance innovation, learning and agility. in collaboration with the Artificial Intelligence Singapore (ASIG). For example, we have embarked on a few Proof of Value (PoVs) on crowd sensing. A recent automated machine learning Proof of Concept (PoC) on feedback classification achieved an accuracy of 96% and is expected to be operationalized in FY22. CONDITION MONITORING We deploy decision-support solutions that span several Operations & Maintenance (O&M) fronts To foster a data-driven culture, we had partnered with Ernst & Young to conduct two executive through Condition Monitoring and Maintenance Data Analytics capabilities. These include workshops on AI. We had also partnered with Microsoft and Clayops to conduct a Power BI identifying assets with reliability issues, such as trains and Platform Screen Doors (PSDs), and workshop, so as to equip business units with the tools to create visualisations. assessing data from train-service timetable. TRACK ACCESS MANAGEMENT SYSTEM (TAMS) Rolling Stock Maintenance Analytics Platform (RS-MAP) is a train-focused application that The Track Access Management System (TAMS) is designed as a single integrated digital platform provides complex analyses, such as trending/outlier identification across train fleets and their to replace the manual track access process and legacy standalone systems. Enabled by Artificial sub-systems. The one-stop Graphical User Interface (GUI) which provides access to historical Intelligence (AI), TAMS optimises track access allocation planning, and effectively prevents human maintenance data, facilitates statistical measures for benchmarking and in-depth analysis, errors from planning to execution with interlocking safety features built-in. TAMS enables the provision of real-time updates on track application status and What is PSD Link Circuit Monitoring The Link Circuits confirmation of track allocation. LINK A TAMS enhances maintainability and reliability through a more LINK B efficient and optimised track CONTROLLER PSD access management. TAMS Phase 1 that covers the North-South and 2 Redundancy Circuits Automatic Train In-House Condition Operations & East-West Lines (NSEWL) is near that relay the door command Supervisory Monitoring Software Maintenance completion. Phase 2 will extend the from door controller to each PSD. (ATS) Server For example, ATS Stakeholder Alerts capability to the Circle Line (CCL), ATS Data is Door is analyzed for Automatic email alerts The link circuits are called train depots and the Bukit Panjang generated at door command loss upon detection of Link A and Link B. If both links the end of from all PSD link abnormal high door Light Rail Transit (BPLRT). fail, PSD fault occurs. service circuits command loss rate The Track Access Management System (TAMS) is a single integrated digital platform. 34 | ENGINEERING ENGINEERING | 35
DIGITAL TWIN Digital Twin (DT) is a virtual replica of the physical system that takes real-world data as inputs and produces output predictions or simulations on how the physical system can be affected by the inputs. These virtual systems allow modelling of future state and behaviour, and what-ifs scenarios, enabling real-time monitoring for proactive intervention and predictive capability. We have invested in innovative technologies, such as Simulation and Modelling, Condition Monitoring and Data Analytics & Visualisation, to kickstart the development of DT. Together with cross-functional stakeholders, we are exploring concepts and identifying more potential applications of DT in the Leveraging DT to explore concepts and identify potential near future. applications for the future. SMRT staff attending a hackathon session conducted in SMRTi. There are four concepts currently being explored for the development of DT: As the training arm of SMRT, the Institute continues to deliver trainings for pre-deployment ▶ iStation – Intelligent Stations and Interchanges ab initio qualification, core values (kaizen, safety, service delivery) building alongside internal ▶ iControl – Intelligent Rail Operations domain experts, as well as continual trade learning, refresher and mandatory courses. ▶ iDepot – Intelligent Depot Operations & Predictive Maintenance In addition, Mindfulness, Basic First Aid, Psychological First Aid and Transactional Analysis ▶ iLifestyles – Intelligent 5G Lifestyle & Digital Experience training courses are offered as part of the Life Skills series. These courses empower our workforce with the competencies to manage oneself effectively, and be adaptive to the rapidly changing operating environment. TRAINING To build up rail engineering capabilities in SMRT places emphasis on developing Singapore, the Institute has partnered Singapore our people with skills not just to perform Rail Academy and SBS Transit to roll out future jobs, but also to co-create the Fundamental in Rail Engineering Systems, future alongside our organisation. We Fundamental in Rail Operations & Maintenance, continuously upskill and reskill our staff and Rail Leadership Programme with the aim of to meet the challenges of an increasingly strengthening professionalism in the rail industry high-tech and digitalised rail network. and supporting the drive to increase the number and quality of rail engineers in Singapore. As the workforce upgrades their skills, Training courses to grow and enhance rail engineering they will be able to build a meaningful capabilities. and rewarding career, while supporting KEY STATISTICS : the organisation to achieve improvements in service reliability, No. of Graduates with Diploma in operational effectiveness and FY20 Total Trains Engineering (Electrical-Rapid Transit efficiency, as well as commuter Memorandum of Understanding (MOU) with SIT to encourage workplace learning. Training Hours: 568,580 Technology) from Singapore Polytechnic experience. through Earn and Learn Programme: 7 This year, SMRT Institute (SMRTi) has begun its collaboration with SkillsFuture Singapore (SSG), Singapore Institute of Technology (SIT), and Nanyang Polytechnic Centre of Excellence for PEOPLE FY20 Total Trains Workplace Learning (NACE) to adopt the national workplace learning framework. With the shift towards the workplace learning model, a bigger proportion of learning will take place at the Training Places: 111,418 workplace, supported by initiatives and tools to encourage self-directed and collaborative learning. Postgraduate Certificate (PGCert) graduates: SkillsFuture for Digital Workplace was introduced to strengthen digital literacy. Leveraging a 69 PEOPLE FY20 Total Trains familiar interface, @Learn was rolled out by SMRTi on Workplace© by Facebook to enable direct access to digitised content, enabling learning to take place anytime, anywhere. Digital Training Places: 64,231 36 | ENGINEERING ENGINEERING | 37