Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Community Planning and
Facility Collaboration Meeting
      TVDSB & Elgin County
           2019 June 12
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Introduction

                           Meeting Chair:
                        Trustee Bruce Smith

    Susan Mark, Superintendent of Facility Services and Capital Planning
              Carlos Henriquez, Manager of Capital Projects
                   Holly Gerrits, Manager of Early Years
                          Christie Kent, Planner
                  Lara Cutler, GIS & Planning Technician
                   Kim Gleeson, Administrative Assistant
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Introduction
The objective of the meeting is to:

  Provide an opportunity for TVDSB and Community Organizations to share
information which may assist with managing of excess space, projecting future
        needs, and identifying opportunities for facility collaborations

 Community Planning and Facility Collaboration Meetings are intended to help
  ensure TVDSB’s long-term accommodation planning is well informed, well
 coordinated, transparent, sustainable and supportive of student achievement
                               (TVDSB Procedure 4015b)
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Introduction
                  Ministry of Education Updates

               Overview of Student Accommodation
                            Planning
                  Overview of Capital Planning

                   Collaboration Opportunities

                  Presentations by Community
                         Organizations
                           Discussion
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
MINISTRY OF EDUCATION
       UPDATES
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Ministry of Education Update

 The Provincial election in June 2018 provided a new government with the
 Progressive Conservatives winning the election.

 The first announcement from the new government was released on 2018
 July 12. The Honourable Lisa Thompson, Minister of Education, released
 a memo outlining several initiatives for the Ministry, including:

  School closures – Maintain the current school closures moratorium until
         we complete a full review of the school closure process.
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Ministry of Education Update

 2018 July 05: Cancellation of Greenhouse Gas Reduction Funding
 (GGRF)

 The provincial government cancelled the Cap and Trade Program effective
 2018 July 03 and the GGRF Program was funded through Cap and Trade
 proceeds

 The Ministry would cover any contractual agreements for capital works
 made on or before 2018 July 03

 TVDSB was originally funded $ 4.67 M and had agreements in place for
 $ 4.17 M at the time of this announcement

 On 2018 November 08, the Ministry committed to work with school boards
 to continue projects initiated under GGRF which were without contractual
 agreements by managing these projects within existing funding streams
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Ministry of Education Update

 2019 January 23: Hiring Practices and Class Size Engagements

 The Ministry invited education partners to provide input on Ontario’s hiring
 practices (Ontario Regulation 274/12) and class sizes in Ontario

 The impact of decreasing or increasing class sizes has a direct affect on
 facility utilization and future planning initiatives

 Specific Considerations were posed by the Ministry for feedback:
 • Hard caps and board-wide average class sizes
 • Kindergarten classroom
 • Overall class size

 Submissions were required by 2019 May 31
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Ministry of Education Update

 2019 March 15: New Vision for Education

 Class size:
 Kindergarten – no proposed changes to either caps or average class size
 and no change in the educator to student ratio

 Primary grades (grades 1-3) – hard caps remain in place, no changes

 Intermediate (grades 4-8) - average class size increase of one student

 Secondary grades (grades 9-12) – average class size requirements
 adjusted from 22 to 28 students

 E-Learning (35 students / class) – delivery of these courses to be
 centralized and secondary students will take a minimum of four e-learning
 credits
Community Planning and Facility Collaboration Meeting - TVDSB & Elgin County 2019 June 12
Ministry of Education Update

 2019 March 15: New Vision for Education

 The Ministry continued with its consultations and provided the opportunity
 again for families, staff and school boards to submit feedback on the
 government’s direction.

 The proposed changes will begin to be phased in for the 2019-2020
 school year.
Ministry of Education Update

 2019 April 25: Regulatory Reporting: 5-Year Energy Conservation and Demand
 Management Plans; and Annual Energy Consumption and Greenhouse Gas
 Emissions Report

 School Boards are required to submit information for each facility in their asset
 portfolio for: total floor area, number of portables, number of operating hours per
 week, and the annual consumption values for each utility (electricity, natural gas,
 fuel oil, etc.)

 Boards must produce a plan that outlines their progress against the Plan that was
 completed in 2014

 In addition, the 5-Year Energy Conservation and Demand Management Plan must
 set out the board’s energy management strategies for the next five (5) fiscal years
 (2018/2019 through to 2022/2023) and include proposed measures to reduce
 energy consumption, the annual and cumulative conservation goals, and demand
 management strategies
Ministry of Education Update

 2019 April 25: Regulatory Reporting: 5-Year Energy Conservation and
 Demand Management Plans; and Annual Energy Consumption and
 Greenhouse Gas Emissions Report

 The 5-Year Energy Conservation and Demand Management Plan must be
 posted on the Board’s website

 Due date is 2019 July 01
Ministry of Education Update

 2019 April 26: Grant for Student Needs (GSN) Funding for 2019-2020

 This memo provided information on the Ministry’s “investments that have
 the greatest impact on the classroom, while ensuring tax dollars are used
 more effectively”.

 Some highlights related to Facility Services:

 Confirmation for the changes in class sizes

 School renewal funding increased slightly

 Capital Priorities – only information is that a “separate memorandum will
 follow” – no new information to-date
Ministry of Education Update

 2019 April 26: Previously-Approved School-Based Child Care Capital
 Projects

 The memo provided an update regarding funding and next steps for
 previously-approved school-based child care capital projects

 TVDSB has five (5) child care capital projects:
 New Southeast London PS

 Harrisfield PS in Oxford County

 Algonguin PS in Oxford County

 River Heights PS in Middlesex County

 Aldborough PS in Elgin County
Ministry of Education Update

 2019 April 26: Previously-Approved School-Based Child Care Capital
 Projects

 The Ministry will provide dedicated multi-year operating funding upon
 opening of the child care centres that are in a new school (New Southeast
 London PS)

 The Ministry has confirmed operating funds will be provided to Aldborough
 PS pending review of scope of work

 The Consolidated Municipal Service Managers (CMSMs) must confirm by
 2019 August 30 that they will provide the operating funds for the other
 school-based child care projects (Harrisfield PS, Algonquin PS, and River
 Heights PS) in order to receive capital funding
Ministry of Education Update

 2017 Early Years Capital Program (EYCP) Funding Allocation
      School          Region                Detail                        Spaces
                                                               Infant   Toddlers   Preschool
                                  Childcare Centre and Early
   Aldborough PS       Elgin        ON Child and Family         10        15          24
                                            Centre

                                  Childcare Centre and Early
                     Middlesex/
  River Heights PS                  ON Child and Family         10        30          48
                      London
                                            Centre

   Algonquin PS       Oxford      Childcare Centre Addition     10         -          24

   Harrisfield PS     Oxford      Childcare Centre Addition     10        15          24
Ministry of Education Update

Annual Update: Rural and Northern Education Fund (RNEF)

The purpose of the RNEF is to better support:
   • Quality rural education
   • Sustainable use of school space in rural communities; and
   • Decision-making around school closures

In 2018 – 2019, TVDSB continued to allocate funds received from the RNEF
to support staffing in rural Secondary Schools

Qualifying Secondary Schools:
   • Glencoe District High School
   • North Middlesex District High School
   • West Elgin Secondary School
   • East Elgin Secondary School

Additional Online Resources: https://www.tvdsb.ca/en/our-board/plans-and-reports.aspx
Ministry of Education Update

Uncertainties Remain for Planning Tools:

Moratorium remains on school consolidations and closures

Previously-released Pupil Accommodation Review Guidelines have not
yet been confirmed by the Progressive Conservative government

Capital Priorities for new schools and additions were speculated to be
requested in June 2019 with submittals to the Ministry in Fall 2019. It is
not clear what criteria will be required in order to submit business cases
with the moratorium still in effect
OVERVIEW OF STUDENT
ACCOMMODATION PLANNING
System Overview
Schools, Enrolment and Utilization
Enrolment and Utilization
Historic and Projected System Utilization – Elementary Panel
                         65000                                                                                    English Track (ET)
                                                                                                                                                             113
                                                                                                                  Grade JK-8
                         60000
                         55000                                                                                    French Immersion (FI)
                                                                                                                                                              9
                         50000                                                                                    Grade SK-8
Enrolment (Pupil FTE)

                         45000
                                                                                                                  English Track
                         40000                                                                                                                                2
                                                                                                                  Grade JK-3
                         35000
                         30000                                                                                    English Track
                                                                                                                                                              3
                                                                                                                  Grade 4-8
                         25000
                         20000                                                                                    English Track
                                                                                                                                                              3
                         15000                                                                                    Grade JK-6
                         10000
                                                                                                                  Dual Track - FI and ET
                          5000                                                                                                                                1
                                                                                                                  FI Grade SK-8 / ET
                              0
                                                                                                                  French Immersion
                                                                                                                                                              1
                                                                                                                  Grade SK-7
                                                   OTG      Historical Enrolment   Projected Enrolment
                                                                                                                  Total Schools                              132

         2018-2019 Enrolment                                2017-2018 YOY                      2018-2019 YOY
                        (Actualized 2018 Oct 31)           Enrolment Change                      Projection
                           55,130.6 FTE                  Increase of 1,275.81 FTE           Increase of 885 FTE   Note: Enrolment in charts is based on a October 31st
                                                                 (2.37%)                          (1.61%)         Trillium data pull and is not actualized through
                                                                                                                  the audit process.
Enrolment and Utilization
Historic and Projected Enrolment – Elementary Panel
                 Elementary Historical and Projected Enrolment FTE –
                                      1999-2022
    59,000

    57,000

    55,000

    53,000

    51,000

    49,000

    47,000

    45,000

                                                  School Year

  * Elementary FTE calculations starting in 2014-2015 as per Ministry of Education Memo 2014:SB19 to
  reflect the elimination of half-time register as a result of the full implementation of Full Day Kindergarten
Enrolment and Utilization
Elementary Panel by Region – City of London
                          2018-2019        2018-2019             2018-2019             2018-2019
                          Enrolment       OTG Capacity        Empty Pupil Places    Net Pupil Places
          (Actualized 2018 Oct 31)

                          31,350 FTE        33,044                    -4,031             -1,694
                                        (94% Utilization)
                        34000
                                                                                        English Track (ET)
                                                                                                                              59
                        32000                                                           Grade JK-8

                                                                                        French Immersion (FI)
                        30000                                                                                                  6
                                                                                        Grade SK-8
Enrolment (Pupil FTE)

                        28000                                                           English Track
                                                                                                                              1*
                                                                                        Grade 4-8
                        26000
                                                                                        Dual Track - FI and ET
                                                                                                                               1
                        24000                                                           FI Grade SK-8 / ET

                                                                                        Total Schools                         67
                        22000

                        20000

                                OTG    Historical Enrolment   Projected Enrolment

                                                                                                  Note: *Lester B. Pearson School for Arts
Enrolment and Utilization
Elementary Panel by Region – City of London
Enrolment and Utilization
Elementary Panel by Region – Middlesex County
            2018-2019 Enrolment                                2018-2019                    2018-2019              2018-2019
                        (Actualized 2018 Oct 31)              OTG Capacity               Empty Pupil Places     Net Pupil Places

                            6,581.9 FTE                          7,294                           -1,035              -712
                                                            (90% Utilization)
                        8000

                                                                                                              English Track (ET)
                        7000                                                                                                          17
                                                                                                              Grade JK-8
                        6000
                                                                                                              French Immersion (FI)
                        5000                                                                                                          1
                                                                                                              Grade SK-8
Enrolment (Pupil FTE)

                        4000
                                                                                                              English Track
                                                                                                                                      1
                        3000                                                                                  Grade JK-3
                                                                                                              English Track
                        2000                                                                                                          1
                                                                                                              Grade 4-8
                        1000
                                                                                                              Total Schools           20
                            0

                                     OTG           Historical Enrolment    Projected Enrolment
Enrolment and Utilization
Elementary Panel by Region – Middlesex County
Enrolment and Utilization
Elementary Panel by Region – Elgin County
                         2018-2019                 2018-2019                2018-2019                2018-2019   English Track (ET)
                         Enrolment                OTG Capacity           Empty Pupil Places          Net Pupil                           13
                                                                                                                 Grade JK-8
                        (Actualized 2018                                                              Places
                          October 31)

                        7,684.7 FTE                   8,734                    -1,313                 -1,049
                                                 (87% Utilization)                                               French Immersion (FI)
                        10000                                                                                                            1
                                                                                                                 Grade SK-8
                         9000

                         8000                                                                                    English Track
                                                                                                                                         1
                         7000                                                                                    Grade JK-3

                         6000
Enrolment (Pupil FTE)

                                                                                                                 English Track
                                                                                                                                         1
                         5000                                                                                    Grade 4-8
                         4000
                                                                                                                 English Track
                         3000                                                                                                            3
                                                                                                                 Grade JK-6
                         2000

                         1000                                                                                    French Immersion
                                                                                                                                         1
                                                                                                                 Grade SK-7
                             0

                                           OTG        Historical Enrolment     Projected Enrolment               Total Schools           20
Enrolment and Utilization
Elementary Panel by Region – Elgin County
Enrolment and Utilization
Elementary Panel by Region – Oxford County
                2018-2019 Enrolment                         2018-2019                         2018-2019                  2018-2019
                        (Actualized 2018 Oct 31)           OTG Capacity                    Empty Pupil Places         Net Pupil Places

                             9,514 FTE                       10,155                                -1,208                   -641
                                                         (94% Utilization)

                        11000

                        10000

                          9000                                                                                  English Track (ET)
                                                                                                                                         24
                                                                                                                Grade JK-8
                          8000

                          7000                                                                                  French Immersion (FI)
                                                                                                                                         1
Enrolment (Pupil FTE)

                          6000                                                                                  Grade SK-8
                          5000
                                                                                                                Total Schools            25
                          4000

                          3000

                          2000

                          1000

                             0

                                          OTG      Historical Enrolment      Projected Enrolment
Enrolment and Utilization
Elementary Panel by Region – Oxford County
Enrolment and Utilization
Historic and Projected System Utilization – Secondary Panel
                        31000

                        29000                                                                             English Track
                                                                                                          Grade 9-12
                                                                                                                                   16
                        27000
Enrolment (Pupil FTE)

                        25000                                                                             Dual Track - FI and ET
                                                                                                          Grade 9-12
                                                                                                                                   5
                        23000

                        21000                                                                             Emphasis Technology
                                                                                                          Grade 9-12
                                                                                                                                   6
                        19000

                        17000
                                                                                                          Specialized School
                                                                                                          Grade 9-12
                                                                                                                                   1
                        15000

                                                                                                          Total Schools            27
                                    OTG            Projected Enrolment        Historical Enrolment

       2018-2019 Enrolment                               2017-2018 YOY                 2018-2019 YOY
                        (Actualized 2018 Oct 31)        Enrolment Change                 Projection
                           22,900.5 FTE              Increase of 277.03 FTE       Decrease of 91.16 FTE
                                                            (1.21%)                     (-0.39%)
Enrolment and Utilization
System Utilization – Secondary Panel
Enrolment and Utilization
Historic and Projected Enrolment – Secondary Panel

                                 Secondary Historical and Projected Enrolment FTE - 1999 to 2022
                        29,000
                        28,500
                        28,000
                        27,500
Enrolment (Pupil FTE)

                        27,000
                        26,500
                        26,000
                        25,500
                        25,000
                        24,500
                        24,000
                        23,500
                        23,000
                        22,500
                        22,000

                                                               School Year
Enrolment and Utilization
     Secondary Panel by Region – City of London
       2018-2019 Enrolment                              2018-2019              2018-2019             2018-2019
                        (Actualized 2018 Oct 31)       OTG Capacity         Empty Pupil Places    Net Pupil Places

                           12,707.6 FTE                   14,244                     -2,438            -1,536
                                                      (89% Utilization)

                        17000
                                                                                                 English Track
                                                                                                                                      6
                                                                                                 Grade 9-12
                        15000

                                                                                                 Dual Track - FI and ET
Enrolment (Pupil FTE)

                        13000                                                                                                         2
                                                                                                 Grade 9-12

                        11000
                                                                                                 Emphasis Technology
                                                                                                                                      3
                         9000
                                                                                                 Grade 9-12

                         7000                                                                    Specialized School
                                                                                                                                      1
                                                                                                 Grade 9-12
                         5000

                                                                                                 Total Schools                       12
                                     OTG           Projected Enrolment    Historical Enrolment
                                                                                                 Note: Excludes Lord Dorchester SS and Medway HS
Enrolment and Utilization
Secondary Panel by Region – City of London
Enrolment and Utilization
Secondary Panel by Region – Middlesex County
                 2018-2019 Enrolment                          2018-2019                        2018-2019                             2018-2019
                        (Actualized 2018 Oct 31)             OTG Capacity                   Empty Pupil Places                    Net Pupil Places

                               3,085 FTE                        4,155                                 -1,080                             -1,069
                                                           (74% Utilization)

                        4500

                                                                                                                English Track
                        4000                                                                                                                                4
                                                                                                                Grade 9-12
Enrolment (Pupil FTE)

                        3500                                                                                    Dual Track - FI and ET
                                                                                                                                                            1
                                                                                                                Grade 9-12
                        3000
                                                                                                                Emphasis Technology
                                                                                                                                                            1
                                                                                                                Grade 9-12
                        2500

                                                                                                                Total Schools                               5
                        2000

                                   OTG             Projected Enrolment         Historical Enrolment
                                                                                                               Notes: SDCI included as Dual Track and Emphasis Technology
                                                                                                               Includes Lord Dorchester SS and Medway HS
Enrolment and Utilization
Secondary Panel by Region – Middlesex County
Enrolment and Utilization
   Secondary Panel by Region – Elgin County
         2018-2019 Enrolment                             2018-2019                2018-2019              2018-2019
                        (Actualized 2018 Oct 31)        OTG Capacity           Empty Pupil Places     Net Pupil Places

                            3,371.3 FTE                     4,557                       1,293             -1,185.8
                                                       (74% Utilization)

                        5000

                        4500
                                                                                                    English Track
                                                                                                                             3
Enrolment (Pupil FTE)

                                                                                                    Grade 9-12
                        4000

                                                                                                    Dual Track - FI and ET
                        3500                                                                                                 1
                                                                                                    Grade 9-12

                        3000                                                                        Emphasis Technology
                                                                                                                             1
                                                                                                    Grade 9-12
                        2500

                                                                                                    Total Schools            5
                        2000

                                      OTG          Projected Enrolment     Historical Enrolment
Enrolment and Utilization
Secondary Panel by Region – Elgin County
Enrolment and Utilization
Secondary Panel by Region – Oxford County

         2018-2019 Enrolment                                2018-2019                      2018-2019                2018-2019
                        (Actualized 2018 Oct 31)           OTG Capacity                 Empty Pupil Places       Net Pupil Places
                            3,736.6 FTE                        4,908                            -1,171                -1,171
                                                          (76% Utilization)

                        5500

                        5000
                                                                                                         English Track
                                                                                                                                    3
                        4500                                                                             Grade 9-12
Enrolment (Pupil FTE)

                        4000                                                                             Dual Track - FI and ET
                                                                                                                                    1
                                                                                                         Grade 9-12
                        3500

                                                                                                         Emphasis Technology
                        3000                                                                                                        1
                                                                                                         Grade 9-12
                        2500

                        2000
                                                                                                         Total Schools              5

                                    OTG            Projected Enrolment        Historical Enrolment
Enrolment and Utilization
Secondary Panel by Region – Oxford County
Enrolment and Utilization
  Summary – 2018‐2019 Estimated Grant Loss Due to Empty Pupil Places
                                          Secondary Grant                                               Proportion of
                   Elementary Grant Loss
                                         Loss Due to Vacant                          Combined Total      Schools by
                    Due to Vacant Space
                                               Space                                                   Panel / Region

TVDSB                      ($2,545,595)                       ($5,207,720)            ($7,753,315)         100%

                                                                                                       15% Elementary
Elgin                       ($603,858)                        ($1,094,386)            ($1,698,244)
                                                                                                      18.5% Secondary
City of
                           ($1,458,583                        ($2,872,746)                             51% Elementary
London                                                                                ($4,331,329)
                                                                                                      45.5% Secondary
                                                                                                       15% Elementary
Middlesex                   ($425,089)                          ($270,634)             ($695,723)
                                                                                                      18.5% Secondary
                                                                                                       19% Elementary
Oxford                       ($58,065)                        ($1,264,485)            ($1,322,550)
                                                                                                      18.5% Secondary

Data provided by Financial Services based on 2018‐2019 Revised Estimates
Note: Combined Total includes TV Alt Estimated School Operations Grant of $294,531
Accommodation Planning
Tools, Limitations and Priority Areas
Overview of Accommodation Planning

Goal
Providing long-term, sustainable and appropriate accommodation planning
solutions that align with the mission and vision of TVDSB

Accommodation Planning Tools
• Attendance Area Reviews

Temporary Accommodation Techniques
• Portables
• Holding Zones

Current Limitations
• Pupil Accommodation Reviews – Awaiting Templates from the Ministry
• Ministry Direction on Moratorium
• Submissions for Capital Priorities – Timing Unknown
Accommodation Planning Priority Areas
   Priority Area: Eagle Heights PS Attendance Area (Elementary)
    284 Oxford Street
    London

    Considerations

    Newcomer settlement area

    Concentration of high density
    housing
    Large attendance area

    Students clustered in parts of
    attendance area

               2018-2019 Enrolment                2017/2018-2018/2019            2018-2019
                      (Actualized)                 Enrolment Change             OTG Capacity    Number of Classrooms
                                                   (2017 Oct 31 Actualized to                       in Portables
                                                   2019 March 31 Actualized)
                                                                                                   and Porta-Paks
                 983 FTE (2018 Oct 31)                     +114.5                   680            7 + 6 (2018 Oct 31)
                1006 FTE (2019 Mar 31)                                          (+326 Pupils)      9 + 6 (2019 Mar 31)
                                                                                                        11 + 6
                                                                                                   (Projected 2019-2020)
Note: Eagle Heights PS Utilization as of 2019 March 31 – 147.9%
Accommodation Planning Priority Areas
Priority Area: North London (Elementary)
Sir Arthur Currie PS
2435 Buroak Drive
London                                                                             A

Considerations                                                A

Area of significant residential
development
Two large holding zones with growing
                                                                                              A
student populations
Students in holding zones designated
to attend Ryerson PS
                                                       A – Holding Zones designated to attend Ryerson PS as Holding School

2018-2019 Enrolment       2017/2018-2018/2019                2018-2019                Number              2018-2019 Number of
       (Actualized)        Enrolment Change                 OTG Capacity           Classrooms in          Students in Holding at
                          (2017 Oct 31 Actualized to                                 Portables                 Ryerson PS
                          2019 March 31 Actualized)                                                         (2018 Oct 31 Actualized)

  589 FTE (2018 Oct 31)           +139 FTE                       533                   0 (2018 Oct 31)                92
  599 FTE (2019 Mar 31)                                      (+56 Pupils)              2 (2019 Mar 31)
                                                                                             6
                                                                                  (Projected 2019-2020)
Accommodation Planning Priority Areas
Priority Area: West London (Elementary)

Schools                  B – Holding Zones to
                         Byron Somerset PS
Byron Northview PS
Byron Southwood PS       C – Holding Zone to
Byron Somerset PS        W. Sherwood Fox PS         B
                                                                                                E
John Dearness PS
                         D – Holding Zone to
Riverside PS
                         Sir Isaac Brock PS
Westmount PS                                              B
W. Sherwood Fox PS       E – Holding Zones to                     B
Arthur Ford PS           Victoria PS                                            C                   F
                                                                                                F
Sir Isaac Brock PS                                                                      D
                         F – Holding Zone to                             C                  E
Sir G.E. Cartier PS      Mountsfield PS                                             D

Considerations

Number of holding zones in areas of rapid residential growth designated to attend various schools

Balance utilization across this portion of the TVDSB system and determine if pursuing funding for a
new elementary school is warranted
Accommodation Planning Priority Areas
Priority Area: South West London (Elementary)
Schools
Lambeth PS                                                                C
Ashley Oaks PS                                           C
Rick Hansen PS                                                   C                D
                                                C                D
White Oaks PS                                          G D                D
                                       G                                          G
                                                             H   G
                                           H
C – Holding Zone to                                                           H              H
W. Sherwood Fox PS

D – Holding Zone to                                                   G                G
Sir Isaac Brock PS

G – Holding Zones to
White Oaks PS

H – Holding Zone to
Rick Hansen PS

Considerations

Number of holding zones in areas of rapid residential growth designated to attend various schools

Balance utilization across this portion of the TVDSB system and determine if pursuing funding for a
new elementary school is warranted
Accommodation Planning Priority Areas
Priority Area: St. Thomas (Elementary)

Schools
Forest Park PS
Mitchell Hepburn PS
Elgin Court PS
South East St. Thomas Holding Zone
(Holding at Kettle Creek PS)

Considerations

Balance utilization across this portion of the TVDSB system to support a business case for funding for
a new elementary school (See EPAR-01)
Accommodation Planning Priority Areas
Priority Area: Woodstock / Oxford County (Elementary)
Schools
                                                                         I – Holding Zones to Central PS
Hickson Central PS
Northdale PS                                                             J – Holding Zone to Winchester
                                           I
Algonquin PS                                                             Street PS
Springbank PS
Winchester Street PS         I
Eastdale PS
                                                               J
Oliver Stephens PS
Southside PS                                      J
                                     I
Central PS
Roch Carrier FI PS

Considerations

Number of holding zones in areas of rapid residential growth designated to attend various schools

Balance utilization across this portion of the TVDSB system and determine if pursuing funding for a
new elementary school is warranted
Accommodation Planning Priority Areas
Priority Area: Elementary Pupil Accommodation Review – 01

Schools
Davenport PS
McGregor PS
Mitchell Hepburn PS
New Sarum PS (Approved for closure)
Kettle Creek PS
River Heights PS
South Dorchester PS (Approved for closure)
Éva Circé Côté FI PS
Springfield PS (Approved for closure)
Summers’ Corners PS
Westminster Central PS (Approved for closure)

Considerations

Two new elementary schools necessary to fully implement EPAR-01, continent on Ministry funding
New Belmont PS
New South East St. Thomas PS
Accommodation Planning Priority Areas
Priority Area: Secondary Panel – All Schools
Accommodation Planning Priority Areas
Priority Area: ReThink Secondary
A re-visioning of the secondary school experience

Based on extensive stakeholder input over two years

Addresses:
• Teaching and learning
• Program organization and delivery (curricular and extra-curricular)
• Specialized programing, experiential learning
• Technology enabled learning
• Facility needs to support a new approach to secondary school
Accommodation Planning Priority Areas
Priority Area: ReThink Secondary

The Challenge

• Geography

• Unbalanced school facility utilization

• Future renewal investments requirements, including programming space

• Ministry funding model
Accommodation Planning
Update on the Implementation of Reviews
Accommodation Planning
Elementary Pupil Accommodation Review 01 – Elgin / St. Thomas
Schools
Davenport PS
McGregor PS
Mitchell Hepburn PS
New Sarum PS (Approved for closure)
Kettle Creek PS
River Heights PS
South Dorchester PS (Approved for closure)
Éva Circé Côté FI PS
Springfield PS (Approved for closure)
Summers’ Corners PS
Westminster Central PS (Approved for closure)
Southeast St. Thomas Holding Zone
(Holding at Kettle Creek PS)

Proposed Schools*
New Southeast St. Thomas PS
New Belmont PS

*Contingent upon Ministry Funding
Accommodation Planning
Elementary Pupil Accommodation Review 02 – South East London
Schools
Fairmont PS (Approved for Closure)
Tweedsmuir PS

Spring 2019 Update
Working with the Ministry of Education on approvals to
proceed with construction

Rendering of Addition at Tweedsmuir PS
          Nicholson Sheffield Architects Inc.
Accommodation Planning
Elgin County Elementary French Immersion Attendance Area Review
Schools
Pierre Elliott Trudeau FI PS
Former Port Stanley PS (Dual Track)
Former Sparta PS

New School (Opened 2018)
Éva Circé Côté FI PS in Sparta

Consolidated School (Opened in 2018)
Kettle Creek PS
(Students from RT Port Stanley PS and
Sparta PS)

Implementation Timeline
2019 July 01: Pierre Elliott Trudeau FI PS – SK to Gr 8
              Éva Circé Côté FI PS – SK to Gr 8
Accommodation Planning
Western Middlesex Attendance Area Review
Schools
Centennial Central PS
Oxbow PS
East Williams Memorial PS
Valleyview PS
Parkview PS
Caradoc PS
Delaware Central PS
East and West Ilderton Holding Zones
(Holding at Valleyview PS)

2019 May 28: Decision by the Board of
Trustees deferred until June 2019
OVERVIEW OF
CAPITAL PLANNING
Capital Planning
Updates on Investments and Projects
Capital Planning
Additions
                                          Masonville PS
                                          Cornerstone Architecture

         Tweedsmuir PS
     Nicholson Sheffield Architects Inc
Capital Planning
Renovations
                   McGregor PS
Davenport PS

                     Kettle Creek PS
                     Cornerstone Architecture
Capital Planning
Library Learning Commons                           Saunders SS
                                             Nicholson Sheffield Architects Inc

               Parkside CI
        Nicholson Sheffield Architects Inc

                                                            Huron Park SS
                                                       Nicholson Sheffield Architects Inc
Capital Planning
Louise Arbour French Immersion PS
       Nicholson Sheffield Architects Inc
Capital Planning
Medway High School Playing Field Remediation
Capital Planning
Renewal Needs and Facility Conditions
Capital Planning
Facility Information: 2018 – 2019 Summary of Non-Permanent Space

                                    Elementary          Secondary
                Total
            Non-Permanent               Classrooms in                    % Share
             Classrooms     Portables                   Portables
                                         Porta Paks

TVDSB            247           190          30 (5)         27              100%

Elgin             22           20                -          2                9%

City of
                 159           111          24 (4)         24               64%
London

Middlesex         28           28                -          -               11%

Oxford            38           31           6 (1)           1               16%

                                                           Note: Data as of 2019 May 31
Capital Planning
Facility Information: Facility Condition Index

             MOE Comparative Facility Condition Index (FCI)

            *The lower the FCI the lower the need for remedial or
               renewal funding relative to the facility’s value.
Capital Planning
Facility Information: Summary of Facility Condition Index

                 TVDSB Average Facility Condition Index (FCI)*
                            2016 – 2020 Assessment Cycle
                               Elementary                     Secondary
TVDSB                              37%                            43%

Elgin                              41%                            65%

City of London                     40%                            42%

Middlesex                          31%                            24%
Oxford                             28%                            45%

                 FCI information for individual schools can be found at
            http://www.edu.gov.on.ca/eng/parents/renewal_data_2017.html

                                                                 Note: Data as of 2017 Oct 10
Capital Planning
        Renewal Funding Investment in Elementary and Secondary Schools
                             2013/2014 – 2017/2018

                                                132 Elementary
                    TVDSB      $168,904,588
                                                 27 Secondary

                      Elgin    $28,081,595      20 Elementary
                                                 5 Secondary
                   City of
                               $89,157,404      67 Elementary
                   London
                                                12 Secondary

                 Middlesex     $15,575,322      20 Elementary
                                                 5 Secondary

                                                25 Elementary
                    Oxford     $36,089,267
                                                 5 Secondary
Note: Data as of 2019 May 10
Capital Planning
               Capital Investments in Elementary and Secondary Schools
                                 2013/2014 - 2017/2018

                          TVDSB                             $43,118,760

                            Elgin                                -

                    City of London                          $35,879,302

                        Middlesex                           $2,452,603

                           Oxford                           $4,786,854

Note: Data as of 2019 May 10
Capital Investments include additions or new construction
COLLABORATION
OPPORTUNITIES
Collaboration Opportunities
Collaboration Criteria and Facilities
Schools with less than 60% utilization for two (2) years and / or 200 or more empty pupil
places

                    City of London                  Elgin County
                      Aberdeen PS                  Arthur Voaden SS
                       Ealing PS                     West Elgin SS
                   Knollwood Park PS
                   Nicholas Wilson PS
                      Trafalgar PS
                     B. Davison SS
                    Clarke Road SS
                      Montcalm SS
                    Westminster SS

                   Middlesex County                Oxford County
                    Glencoe District HS           Ingersoll District CI
                North Middlesex District HS
Collaboration Opportunities
Facility Collaboration Opportunities for Co-Building

                   City of London                  Elgin County
               New Southwest London PS*     New Southeast St. Thomas PS*
                                                 New Belmont PS*

                  Middlesex County                Oxford County
                    None at this time         Springbank PS – Addition*

 For more information regarding Facility Collaborations and Co-Build Opportunities,
                            please visit our website at:

           https://www.tvdsb.ca/en/our-board/collaboration-and-co-build-
                          opportunities.aspx?_mid_=1092

                                                               *Contingent upon Ministry Funding
DISPOSITION OF SURPLUS LANDS
Disposition of Surplus Property
Ontario Regulation 444/98

Amendment
Extend 90 days circulation period of surplus property to 180 days for the listed
agencies to submit an offer

Timeline from school closure to surplus
1-3 year timeframe from the trustees decision to close a school to the school being
closed

Circulation of surplus schools to listed agency occurs after the school has been
closed

                  There are currently no properties for sale.

             For future properties for sale please monitor our website at
             https://www.tvdsb.ca/en/our-board/properties-for-sale.aspx
PLANNING WEBSITE
Planning Website

 https://www.tvdsb.ca/en/our-board/future-development-and-planning.aspx
DISCUSSION
THANK YOU