CHARLOTTE CENTRAL SCHOOL 2021 - January 29, 2021 - PROJECT MANUAL & SPECIFICATIONS

Page created by Tom Strickland
 
CONTINUE READING
PROJECT MANUAL &
         SPECIFICATIONS

         SITE IMPROVEMENTS

CHARLOTTE CENTRAL SCHOOL – 2021

         408 Hinesburg Road
          Charlotte, Vermont

        January 29, 2021
Colin P. Lindberg, Architect
                                        208 Flynn Avenue
                                     Burlington, VT 05401

        PROJECT MANUAL &
         SPECIFICATIONS

         SITE IMPROVEMENTS

CHARLOTTE CENTRAL SCHOOL – 2021

         408 Hinesburg Road
          Charlotte, Vermont

                                                  Architect:

                                Colin P. Lindberg, Architect
                               208 Flynn Avenue Suite 2B
                                     Burlington, VT 05401
Site Improvements                                                                                                                               Bid Set
Charlotte Central School                                                                                                               January 29, 2021

                                                      DOCUMENT 00 0200
                                                     NOTICE TO BIDDERS

PART 1 - GENERAL

1.01 REQUEST

     A. Owner request proposals on Work as follows:

          1.    Project:                    Charlotte Central School – Site Improvements

          2.    Project Addresses:          Charlotte Central School
                                            408 Hinesburg Road
                                            Charlotte, VT 05445

          3.    Owner:                      Champlain Valley School District
                                            5420 Shelburne Road
                                            Shelburne, VT 05482

          4.    Architect:                  Colin P. Lindberg, A.I.A.
                                            Attn: Randy Burnett
                                            208 Flynn Ave. Suite 2B
                                            Burlington, VT 05401
                                            Phone: 802-864-4950

          5.    Pre – Bid Meeting: None scheduled. To schedule a visit, see #9: Site Access Prior to Bid.

          6.    Bid Due Date:               Monday, February 15th, 2021                                             1:00 PM

          7.    Place Due:                  Electronic mailed bids only. Submit electronic bids to the following
                                            email addresses:
                                                   Chris Giard: cgiard@cvsdvt.org
                                                   Cc: randy@colinlindberg.com, brenda@colinlindberg.com
                                                   Subject Line: Charlotte Central School Site Improvements

          8.    Type of Bidding and Classes of Work:

                Lump sum base bid with selective alternates, unit prices & cost break out information.
                Demolition and General Construction

          9.    Site Access Prior to Bid:             Contact: Chris Giard, Maintenance Supervisor
                                                      (802) 383-1203

          10.   Final Questions & Addenda:
                a.    Final date to submit questions and requests for clarifications: Thursday, February 11th,
                      2021.
                      To assist with responses and turn around do not accumulate long list at deadline period, submit as early as possible.
                                                                                                                    th
                b.    Final Scheduled Addenda Release Date: Friday, February 12 , 2021.

Colin P. Lindberg, Architect                                      00 0200 - 1                                            NOTICE TO BIDDERS
Site Improvements                                                                                           Bid Set
Charlotte Central School                                                                           January 29, 2021

1.02 DESCRIPTION OF WORK
    A.    Site Improvements:
          1.    Work includes paving and stripping an existing gravel lot on the western side of the Charlotte
                Central School property

1.03 ASBESTOS CONTAINING MATERIALS – NOTICE TO CONTRACTORS
    A.    The use of asbestos or asbestos products will not be permitted in any form in the construction project
          for any new work. Discover of any such material is cause for rejection.

1.04 AVAILABILITY OF DOCUMENTS
    A.    All contractors acquiring bid documents shall register as a plan holder with Blueprints Etc. at 20 Farrell
          Street South Burlington, VT (802) 865-4503.
    B.    ‘Pre-Qualified’ General Contractors & Approved Trades may request electronic bid documents by
          contacting the Architects office at 864-4950 or via email to randy@colinlindberg.com.
    C.    Sub-Contractors and trades bidding portions of work under a listed pre-qualified bidder may access
          plans as follows:
          1.    Purchase full set of documents, at cost plus shipping and applicable taxes (see 1.04 D).
          2.    View/Obtain documents directly from a listed “Pre-Qualified” General Contractor.
          3.    View plans at Works in Progress: 20 Farrell Street South Burlington, VT (802) 286-3633.
    D.    Bid documents (non-returnable) in print format (hard copy) are available for purchase at cost plus
          shipping and applicable taxes by contacting the following:
          1.    Blueprints, Etc.:         (802) 865-4503
                                          20 Farrell Street
                                          South Burlington
          2.    Bid documents may be examined at the office of Colin P. Lindberg, Architect 208 Flynn Avenue
                Suite 2B Burlington, VT 05401.
          3.    All bidding contractors shall register email address with Blueprints Etc. for purposes of addenda
                and other bid communication distribution. It is the bidder’s responsibility to obtain all bid
                documents, including issued addenda and other referenced documents.
                a.     Forward email address to:            orders@blueprintsetc.com

                                            END OF DOCUMENT

Colin P. Lindberg, Architect                         00 0200 - 2                          NOTICE TO BIDDERS
Site Improvements                                                                                           Bid Set
Charlotte Central School                                                                           January 29, 2021

                                             DOCUMENT 00 0210
                                         INSTRUCTIONS TO BIDDERS

PART I – GENERAL

1.01 RECEIPT AND OPENING OF BIDS
      A.        Champlain School District, Shelburne, VT (herein called the "Owner") invites Bids for the
                following project: Charlotte Central School – Site Improvements
      B.        Bids will be received at place and time indicated in Notice to Bidders.
      C.        Electronic mailed bids only. Submit electronic bids to the following email addresses:
                    Chris Giard: cgiard@cvsdvt.org
                    Cc: randy@colinlindberg.com, brenda@colinlindberg.com
                    Subject Line: Charlotte Central School Site Improvements

1.02 METHOD OF BIDDING
      A.        Owner invites Bids on Work described in notice to Bidders.
      B.        Base Bid prices on lump sum. See Bid forms for specific requirements regarding bids, alternate
                & unit pricing and other cost breakdown information.

1.03 BIDDING DOCUMENTS
      A.        The bidding documents include the Invitation to Bid, Information for Bidders, the form of
                proposal, bid bond, non-collusive bidding certificate, A.I.A. document A101, Division I -
                general requirements, the project manual and specifications, the drawings, and all Addenda
                issued prior to opening of Bids.

1.04 BID SECURITY
      A.        Submit bid deposit in the form of a certified check, treasurer’s or cashier’s check (issued by a
                responsible bank or trust company) payable to the Owner or Bid Bond on form furnished herein,
                duly executed by Bidder as principal and having as surety thereon, Company authorized to issue
                Bond, in amount of 5 percent of Bid.
      B.        Agent who signs Bid Bond must file with Bond certified and effectively dated copy or his power
                of attorney showing any limitation in regard to total amount for which any single Bond can be
                issued.
      C.        The bid deposit will be retained from all bidders until a contract is executed. Upon contract
                award, bid deposits will be returned within ten (10) days.
      D.        Bid deposit is considered forfeited to the owner, as liquidated damages, in the event that a
                successful bidder fails or refuses to execute and deliver the contract and bonds required within
                    ten (10) days after issuance by the Owner.

   1.05 PREPARATION OF BID/TENDER
           A.       Submit on forms furnished herein.
           B.       Fill out in ink or typewritten, without erasure, interlineations or changes.
           C.       Make Bid in name of Principal; if co-partnership, give names of all parties. Give complete
                    address. If Bids are submitted by an agent, provide satisfactory evidence of agency
                    authority.

Colin P. Lindberg, Architect                           00 0210 - 1                INSTRUCTIONS TO BIDDERS
Site Improvements                                                                                         Bid Set
Charlotte Central School                                                                         January 29, 2021

           D.      Indicate on bid form the date work is to commence and number of consecutive calendar days
                   or specified date, in accordance with indicated format on bid form, in which construction
                   will be completed.
           E.      Fill in all blank spaces for bid prices in both words and figures.
           F.      Failure to submit the following documents may cause the bid to be considered irregular:
                   1. Bid Form
                   2. Bid Deposit
                   3. Certificate of Corporation, if bidder is incorporated
                   4. Non-Collusive Bidding Certificate

   1.06 NON-COLLUSIVE BIDDING CERTIFICATE
           A.      Each Bidder submitting a bid for any portion of the work contemplated by the bidding
                   documents shall execute a non-collusive certificate as required, in the form herein provided,
                   to the effect that he has not colluded with any other person, firm, or corporation in regard to
                   any bid submitted. Such certificate shall be attached to the bid. Failure of any bidder to
                   abide by this provision shall be cause for rejection of submitted bid

   1.07 SUBCONTRACTORS AND MATERIAL SUPPLIERS
           A.      The successful bidder for each Contract shall submit to the Architect after receipt of
                   notification of award of contract, a list of subcontractors, material suppliers and
                   manufacturers proposed for the various portions of the work.

   1.08 CONDITIONS OF THE CONTRACT AREAS
           A.      Each bidder must inform himself fully of the conditions relating to the scope of work,
                   project conditions, and employment of labor thereon. Failure to do so will not relieve a
                   successful bidder of their obligations to furnish all material, labor and equipment necessary
                   to carry out the provisions of the contracted scope of work. The Contractor, in the carrying
                   out the work, must employ such methods or means in a manner not to cause interruption or
                   interference with the work of other contractors or the operations of the Owner.

  1.09 OBLIGATION OF BIDDERS & CONDITIONS OF THE CONTRACT AREAS
           A.      At the time of the opening of bids, each bidder will be presumed to have inspected the site,
                   to have familiarized himself with local conditions, and to have read and to be thoroughly
                   familiar with the bidding documents, including all Addenda. The failure or omission of any
                   bidder to receive or examine any form, instrument, or document shall in no way relieve any
                   bidder from any obligation in respect to their bid.

1.10 SCHEDULE
     A.         The project schedule is intended to occur as follows:
                1.   Commencement of work upon notice to proceed (plus/minus June 15th or earlier with
                      district permission). Completion by August 15th 2021.
      B.        The Contractor, in full cooperation of School Officials, shall coordinate the development of a
                construction schedule with complete coordination with the School District Calendar; final
                schedule must be approved by the School District.
      C.        The School Department reserves the right to authorize and begin work earlier then indicated
                above at no extra cost to the school district. Early scope activity that does not impact school
                occupancy or existing contract work may be approved for commencement of construction in
                specific approved areas as early as June 15th 2021 with written approval & notice to proceed

Colin P. Lindberg, Architect                          00 0210 - 2                INSTRUCTIONS TO BIDDERS
Site Improvements                                                                                     Bid Set
Charlotte Central School                                                                     January 29, 2021

            from owner. These activities may include site preparations, excavation, demo and exterior utility
            work all for which has no impact on school operation and function.
      D.    Contractor, prior to site mobilization, shall anticipate adequate time and effort for preliminary
            exploratory demolition, field survey verification, and other miscellaneous project and prep work
            as required to anticipate and align the project schedule as required to meet the district schedule
            requirements and expectations.

1.11 ASSESSMENTS AND TAXES
      A.    Exemption from Sales Tax: The Sales and Compensating Use Taxes of the State of Vermont
            and of cities and counties do not apply to purchases and sales of material and supplies pursuant
            to the provisions of this contract. These taxes are not to be included in bids. This exemption
            does not, however, apply to tools, machinery, equipment, or other property leased by or to the
            Contractor or a Subcontractor or to materials and supplies of a kind which will not be
            incorporated into the completed project.
      B.    Other Assessments and Taxes: Each bidder shall include in his base bid proposal all other costs
            and liabilities other than that excluded in paragraph A above for the amounts assessed under any
            sales, consumer use, or other similar tax, any assessment or taxes upon the wages and salaries
            paid to employees of the Contractor and his Subcontractors under the Contractor, or any other
            taxes assessed by the Federal, State, or Local Governments.
      C.    Bidder is responsible to ensure tendered bid is in conformance with all federal, state and local
            tax rules and regulations for work performed under contract with the Champlain Valley School
            District.

   1.12 INTERPRETATIONS
      A.    If bidder for proposed work is in doubt as to true meaning of any part of Contract Documents,
            submit written meaning of any part of Contract Documents, submit written request to
            Architect/Engineer for interpretation. Bidder submitting request is responsible for its prompt
            and actual delivery. Interpretations will not be made orally. Architect is not responsible for any
            other explanations or interpretations which anyone presumes to make.
      B.    Submit written request for interpretation to Colin P. Lindberg, 208 Flynn Avenue Suite 2B,
            Burlington, VT 05401, or by electronic mail to randy@colinlindberg.com. Request must be
            received by date as indicated on document 00 0200 Notice to bidders.
      C.    All interpretations or supplemental instructions will be in form of written addenda prior to date
            fixed for opening of bids. Copy of such addendum will be posted as indicated in notice to
            bidders (section 00 0200) under availability of documents. Contractor shall ensure retrieval of
            all issued addenda. Failure to receive or obtain such addendum does not relieve bidder from any
            obligation under the bid as submitted. Addenda are a part of the Contract Documents.

   1.13 WITHDRAWAL OR REVISION OF BID
     A.     Bids may be withdrawn or revised prior to scheduled time for bid opening, under following
            terms:
            1.    Bidder may, without prejudice to himself, withdraw Bid after it has been deposited,
                  provided request for such withdrawal is received in writing or by telegram, before time set
                  for opening. Telephonic communications are not acceptable for such request.
            2.    After bid opening, no bid may be withdrawn for period of 90 days.

   1.14 IRREGULAR BID
      A.    Bids are considered irregular and may be rejected for the following reasons unless otherwise

Colin P. Lindberg, Architect                      00 0210 - 3               INSTRUCTIONS TO BIDDERS
Site Improvements                                                                                     Bid Set
Charlotte Central School                                                                     January 29, 2021

            1.    If form furnished is not used or is altered.
            2.    If there are unauthorized additions, conditional bids, or irregularities of any kind which
                  may tend to make Bid incomplete, indefinite, or ambiguous as to its meaning.
            3.    If bidder adds any provisions reserving the right to accept or reject any award, or to enter
                  into Contract pursuant to an award.
            4.    If unit or lump sum prices contained in bid schedule are obviously unbalanced either in
                  excess of, or below, reasonable cost analysis values.
            5.    If bidder fails to insert alternate and unit prices for every item indicated.
            6.    If bidder fails to complete bid in any other particulars where information is requested so,
                  Bid may be properly evaluated.
            7.    If form furnished is faxed.
            8.    If Bond or Non-collusive bidding certificate is not used.
      B.    Owner reserves the right to reject any or all Bids and to waive irregularities or informalities as
            may be deemed in Owner's interest.

   1.15 PRIORITY OF ALTERNATE BIDS
      A.    Post bid submission; alternate bids are to be selected by owner with considerations to both
            budget and other district priorities as determined by owner.
      B.    The owner reserves the right to accept or reject any alternates in any order or combination,
            unless other wise specifically provided in the bidding documents.

1.16 METHOD OF AWARD
      A.    Contract award shall be to the lowest responsible bid conforming to the specifications.
      B.    The lowest responsible bid shall be determined by the sum of the base bid and accepted
            alternates.
      C.    The owner reserves the right to select a contractor when the two lowest responsible bids are
            within one percent of each other.
      D.    The owner reserves the right to reject any bid found not to be responsible or conforming to
            specifications or to reject all bids.

1.17 LETTER OF INTENT TO AWARD
      A.    Upon issuance of letter, by owner, of intent to award contract, bidder may not withdraw bid for
            period of 90 days from dated letter of intent to award.

1.18 EQUIVALENT PRODUCTS & SUBSTITUTIONS DURING THE BID
      B.    Refer to document 00 8100, Special Conditions and substitutions, part 1.04.
                                          END OF DOCUMENT

Colin P. Lindberg, Architect                      00 0210 - 4               INSTRUCTIONS TO BIDDERS
Site Improvements                                                                                       Bid Set
Charlotte Central School                                                                       January 29, 2021

                                            DOCUMENT 00 3100
                                               BID FORM
Date __________________
This Bid is for all work associated with Contract Documents for the following project:
                                Charlotte Central School – Site Improvements
                               408 Hinesburg Road – Charlotte, Vermont 05445

Bid of _______________________________________________________ (hereinafter called "Bidder") a *
______________________ organized and existing under the laws of the State of ______________________,
and doing business as ** __________________________________________________________________.

* Insert corporation, partnership, or individual, as applicable.
** Insert trade or business name.

     To: Champlain Valley School District
         5420 Shelburne Road
         Shelburne, Vermont 05482

           Attn: Chris Giard
                 Maintenance Supervisor

Gentlemen:
The Bidder, in compliance with the notice to bidders document and having thoroughly examined all
documents, being familiar with location, site and area of proposed work and with all conditions surrounding
construction of proposed project including availability of materials and labor, hereby proposes to furnish all
labor, materials, tools, equipment, machinery, equipment rental, services, and to construct all work stated in
accordance with contract documents at prices stated below. These prices are to cover all expenses incurred
in performing all obligations and required work as is intended in the contract documents, of which this bid
form and all its supplementary components is a part.

Bidder, if awarded a contract, hereby agrees to commence work under this contract on or before
_________________, 2021 in written "Notice to Proceed" of Owner and to fully complete project within
___________________ consecutive calendar days thereafter. (Bidder fill in)

Bidder, if awarded a Contract, agrees to commence and complete all work in accordance with established
schedules approved by Owner.

Successful bidder agrees to provide performance and payment bonds written by surety acceptable to Owner.
Made in favor of Owner as oblige.

BASE BID - FOR CONTRACT:

Bidder agrees to perform all renovation work as described in the Contract Documents; for the Lump Sum of
(Show amounts in both words and figures. In case of discrepancy, amount shown in words will govern.)

_________________________________________________________dollars.

($____________________________________________)
Colin P. Lindberg, Architect                        00 3100 - 1                                    BID FORM
Site Improvements                                                                                                Bid Set
Charlotte Central School                                                                                January 29, 2021

Bidder understands that Owner reserves the right to reject any or all Bid/Tenders and to waive any informalities or
irregularities therein.

Upon notice of acceptance of this Bid/Tender, bidder will execute Contract Agreement and deliver properly executed
Performance and Payment Bonds to Owner within 10 days.

ACKNOWLEDGMENTS:

Bidder acknowledges receipt of all issued addenda:                                                  
Submission of Bid Security (document 00 0210 part 1.04):                                            
Submission of Non-Collusive Bid Form (document 00 0210 part 1.06):                                  

If awarded a contract, bidder's surety will be:
_______________________________________________________________________.
                                     Respectfully submitted,
Signature if an Individual:          _____________________________
Doing Business as:                   _____________________________
Business Address:                    _____________________________
If a Partnership:             _____________________________
By: __________________________            Member of Firm
   __________________________             Member of Firm
Business Address              _____________________________
If a Corporation:             _____________________________
By: _________________________            Title: ______________________
Business Address:             _____________________________
Telephone Number:             _____________________________

                                                  END OF DOCUMENT

Colin P. Lindberg, Architect                           00 3100 - 2                                         BID FORM
Site Improvements                                                                                   Bid Set
Charlotte Central School                                                                   January 29, 2021

                                          DOCUMENT 00 4100
                                               BID BOND
                                        A.I.A. DOCUMENT A310

PART 1 - GENERAL

1.01 DESCRIPTION

        A. Use of American Institute of Architects Document: A310 Bid Bond, February 1970 Edition, is
        hereby made a part of the bidding requirements and by this reference thereto is made part hereof.

        B. Provide properly executed Bid Bond with Bid.

                                         END OF DOCUMENT

Colin P. Lindberg, Architect                     00 4100 - 1                                    BID BOND
Site Improvements                                                                       Bid Set
Charlotte Central School                                                       January 29, 2021

                                       DOCUMENT 00 4200
                               NON-COLLUSIVE BIDDING CERTIFICATE

PART I - GENERAL

1.01    DESCRIPTION

        A.    Use of the following document: NON-COLLUSIVE BIDDING CERTIFICATE, is hereby
              made a part of the Bidding Requirements.

                                       END OF DOCUMENT

Colin P. Lindberg, Architect               00 4200 - 1   NON-COLLUSIVE BIDDING CERTIFICATE
Site Improvements                                                                                        Bid Set
Charlotte Central School                                                                        January 29, 2021

                               NON-COLLUSIVE BIDDING CERTIFICATION

     BY SUBMISSION OF THIS BID, BIDDER AND EACH PERSON SIGNING ON BEHALF
OF BIDDER CERTIFIES, AND IN THE CASE OF JOINT BID, EACH PARTY THERETO
CERTIFIES AS TO ITS OWN ORGANIZATION, UNDER PENALTY OF PERJURY, THAT TO
THE BEST OF HIS/HER KNOWLEDGE AND BELIEF:

        [l] The prices of this bid have been arrived at independently, without collusion, consultation,
communication, or agreement, for the purposes of restricting competition, as to any matter relating to such
prices with any other Bidder or with any competitor,

         [2] Unless otherwise required by law, the prices which have been quoted in this bid have not been
knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening,
directly or indirectly, to any other Bidder or to any competitor, and

        [3] No attempt has been made or will be made by the Bidder to induce any other person, partnership
or corporation to submit or not to submit a bid for the purpose of restricting competition.

                                                               (Signed)

                                                                                                            Title

                                  RESOLUTION – for corporate bidders only

       RESOLVED that                                                be authorized to sign and submit the bid or
proposal of this corporation for the following project

                                               (describe project)

and to include in such bid or proposal the certificate as to non-collusion required as the act and deed of such
corporation, and for any inaccuracies or misstatements in such certificate this corporate bidder shall be liable
under the penalties of perjury.

The foregoing is a true and correct copy of the resolution adopted by
corporation at a meeting of its board of directors held on the                      day of
        , 20     , and is still in full force and affect on this                    day of
        , 20     .

(SEAL OF THE CORPORATION)

                                                                                                       Secretary

Colin P. Lindberg, Architect                     00 4200 - 2        NON-COLLUSIVE BIDDING CERTIFICATE
Site Improvements                                                                                      Bid Set
Charlotte Central School                                                                      January 29, 2021

                                           DOCUMENT 00 5100
                                             AGREEMENT
                                              A.I.A. A101

PART 1 - GENERAL

1.01 DESCRIPTION

          A.    Use of the following American Institute of Architects document: A105, Standard Short
                Form of Agreement Between Owner and Contractor, 2017 edition, is hereby made a
                requirement of the Contract Documents and by this reference thereto is made part thereof.

1.02 SUBMITTALS

        A.      Properly executed Performance Bond, prior to start of work, but not later than date set for
                Preconstruction Conference nor later than 10 days after Notice to Proceed.

                                          END OF DOCUMENT

Colin P. Lindberg, Architect                      00 5100 - 1                                  AGREEMENT
Site Improvements                                                                                      Bid Set
Charlotte Central School                                                                      January 29, 2021

                                          DOCUMENT 00 6100
                                         PERFORMANCE BOND
                                            A.I.A. A312-1984

PART 1 - GENERAL

1.01 DESCRIPTION

        A.      Use of the American Institute of Architects document: A312 Performance and Payment
                Bond, 1984 edition, is hereby made a requirement of the Contract Documents and by this
                reference thereto is made part thereof.

1.02 SUBMITTALS

        A       Properly executed Performance Bond, prior to start of work, but not later than date set for
                Preconstruction Conference nor later than 10 days after Notice to Proceed.

                                          END OF DOCUMENT

Colin P. Lindberg, Architect                      00 6100 - 1                      PERFORMANCE BOND
Site Improvements                                                                                        Bid Set
Charlotte Central School                                                                        January 29, 2021

                                        DOCUMENT 00 6500
                                    CERTIFICATE OF INSURANCE

PART 1 - GENERAL

1.01 DESCRIPTION

        A.      Use of the following American Institute of Architects document: AIA G715 – 1991 edition,
                ACORD Certificate of Insurance 25-S, is hereby made a requirement of the Contract
                Documents.

        B.      Use of the ACORD CERTIFICATE OF LIABILITY INSURANCE document, ACORD 25-
                S, is hereby made a requirement of the Contract Documents.

1.02 MINIMUM INSURANCE REQUIREMENTS

        A.      The General Contractor shall carry adequate insurance, meeting or exceeding the
                requirements as established on the following Insurance document noted as Attachment “A”
                and is hereby made a requirement of the Contract Documents.

1.02 SUBMITTALS

        A.      Properly executed AIA G715 – 1991 edition and ACORD Certificate of Insurance 25-S,
                prior to start of work, but not later than date set for Preconstruction Conference nor later than
                15 days after Notice to Proceed.

                                           END OF DOCUMENT

Colin P. Lindberg, Architect                       00 6500 - 1                CERTIFICATE OF INSURANCE
Site Improvements                                                                                    Bid Set
Charlotte Central School                                                                    January 29, 2021

                                        ATTACHMENT "A"

INSURANCE

The General Contractor shall carry adequate insurance, meeting or exceeding the requirements
as established herein. The Owner shall carry Builder's Risk Insurance.

        Type of                                         Limits of Liability
        Coverage                                        Minimum

        Worker's Compensation                           Statutory

        Employer's Liability                            $100,000 Each Person

        Bodily Injury                                   $1,000,000 Each Person
        Liability                                       $1,000,000 Each Occurrence

        Property Damage                                 $1,000,000 Each Occurrence
        Liability                                       $1,000,000 Agg. Limit

        Type of                                         Limits of Liability
        Coverage                                        Minimum

        Contractual Bodily                              $1,000,000 Each Person
        Liability                                       $1,000,000 Each Occurrence

        Contractual Property                            $1,000,000 Each Person
        Damage Liability                                $1,000,000 Each Occurrence

Automobile Liability and Property Damage Insurance:

A policy covering the use in connection with work covered by the Contract Documents of all
owned, non-owned and hired vehicles bearing, or under the circumstances under which they are
used, required by the Motor Vehicle Laws of the State of Vermont to bear license plates.
Include extraterritorial coverage for all vehicles. Coverage to be not less than:

                Bodily Injury:                          $1,000,000 Each Person;
                                                        $1,000,000 Each Accident;

                Property Damage:                        $1,000,000 Each Accident.

The Bodily Injury Liability and Property Damage Liability insurance above shall be written on
a comprehensive form and shall include, but not limited to, coverage for Premises and
Operations, Products and Completed Operations, removal of "XCU" exclusions, and Broad
Form Property Damage. The Contractual Insurance shall specifically cover and insure the
indemnity set forth above. All of the above-described insurance policies shall contain provisions
that the insurance companies will have no right of recovery or subrogation against the Owner.

                                           END OF ATTACHMENT A

Colin P. Lindberg, Architect                      00 6500 - 2                 CERTIFICATE OF INSURANCE
Site Improvements                                                                                      Bid Set
Charlotte Central School                                                                      January 29, 2021

                                          DOCUMENT 00 8100
                                         SPECIAL CONDITIONS

PART 1 - GENERAL

1.01 SCOPE OF WORK

        A. The work of this project includes the furnishing of all labor, materials, appliances, tools,
           equipment, and the performing of all work in accordance with these specifications and the
           drawings, except for work which is expressly noted herein or indicated on the drawings as not
           included in the project.

        B. The site of the work is located at:

                                         Charlotte Central School
                                         408 Hinesburg Road
                                         Charlotte, Vermont 05445

        C. The Project consists of one contract as follows:

           1. GENERAL - The work includes the following general construction components

                a.      See description of work in section 1.02 Notice to Bidders document 00 0200.

                b.      Site access, security and damage prevention measures (refer to Part 1.09, Building
                        Security & Damage Prevention).

                c.      Contractors shall visit the job site before the Bid and familiarize themselves with the
                        existing conditions pertaining to the Work.

1.02 LAYOUT OF WORK

        A. The Contractor shall lay out the work according to all plans, shop drawings, details, and
           instructions of latest issue.

           1.   Maintain one complete set of up-to-date drawings, specifications, shop drawings, details and
                instructions on the job.

        B. Work shall be laid out plumb, square and true, to exact and correct dimensions. Work incorrectly
           laid out shall be removed and properly built at no extra expense to the Owner.

        C. Work shall be laid out with regard to the work of others so that all work shall fit and form good
           joints.

1.03 CORRELATION OF WORK

        A. Each Contractor, and any Subcontractor requested by the General Contractor shall be required to
           attend regularly scheduled job meetings and special job meetings when called by the Architect.
           Decisions and schedules agreed upon at such meetings shall be binding upon all Contractors and
           Subcontractors present and absent.

Colin P. Lindberg, Architect                      00 8100 - 1                         SPECIAL CONDITIONS
Site Improvements                                                                                     Bid Set
Charlotte Central School                                                                     January 29, 2021

        B. Decisions required from the Architect shall be anticipated by the Contractor to provide ample
           time for inspection, investigation, or detail drawings.

1.04 EQUIVALENT PRODUCTS & SUBSTITUTIONS DURING THE BID

        A. Wherever a material, article, or piece of equipment is identified on the Drawings or in the
           Specifications by reference to the name, trade name, make or catalogue number of any
           manufacturer or supplier, it is intended to establish a standard of quality and/or performance, as
           determined by the Architect, and not to limit competition. Wherever in the Contract Documents
           one or more products are specified, the words "similar and equal to" shall be deemed inserted.

        B. Written requests concerning the use of the proposed substitute must be received by the Architect
           at least 10 days before the time of the bid opening. Written requests shall be accompanied by
           complete specifications and performance characteristics covering the product, together with test
           data and experience records.

        C. When the Architect approves a product proposed by the Contractor and such proposal product
           requires a revision or redesign of any part of the work of this Contract or any other separate
           Contract, all excess costs occasioned by redesign, revisions, or extra work which is required by
           this or other Contracts shall be at the cost and expense of the Contractor proposing the
           equivalent.

1.05 REFERENCE STANDARDS

        A. All documents and publications such as codes, standards, and specifications which are cited in
           the project specification are hereby made a part of the project specification to the same extent as
           if printed and bound herein.

        B. Wherever reference is made to any such document, the Contractor shall comply with the
           requirements of the issue or edition including revisions, amendments and supplements hereto in
           effect on the date of the Notice to Bidders of the Project, except as modified by the Project
           Specification.

1.06 DISCRIMINATION

        A With the acceptance of this Contract, the Contractor assures compliance with all applicable State
          and Federal rules, regulations, executive orders, and legislation relative to equal opportunity
          and/or affirmative action in employment practices.

           1.   National_VII_of_the_Civil_Rights_Act_of_1964 prohibits discrimination in employment on
                the basis of race, color, religion, national origin, or sex.

           2.   Equal_Pay_Act_of_1963 prohibits salary discrimination on the basis of sex.

           3.   Section 504 of the Rehabilitation_Act_of_1973 prohibits discrimination against any
                employee or application because of physical or mental handicap in regard to a job for which
                the individual is qualified.

           4.   Executive_Order_11246, as amended, prohibits discrimination against minorities and
                women and requires employers to take affirmative action with respect to these protected
                groups.

Colin P. Lindberg, Architect                      00 8100 - 2                        SPECIAL CONDITIONS
Site Improvements                                                                                     Bid Set
Charlotte Central School                                                                     January 29, 2021

           5.   Vermont_Fair_Employment_Practices_Act prohibits discrimination on the basis of race,
                color, religion, national origin, sex, ancestry, place of birth, or physical handicap.

        B. In a determination of non-compliance, this Contract may be cancelled in whole or in part and the
           Contractor declared ineligible for further contracts with the Owner.

1.07    LABOR LAWS AND MINIMUM WAGE RATES

        A. Each Contractor and Subcontractor performing work on this project shall take notice that all
           occupations employed under contract shall be paid an hourly wage rate not less than the
           minimum rates required by law and/or applicable ordinance.

        B. It is the contractor’s obligation to inform themselves of all wage requirements and regulations,
           wage reporting procedures and posting requirements of all employee wage awareness signs.

        C. The Contractor shall provide statutory benefits for disability benefits, workmen's compensation,
           unemployment insurance, and social security.

1.08    WORK SITE RESTRICTIONS

        A. Use of intoxicants or the use of other than officially provided and designated facilities, or
           improper conduct, to include foul language, will be grounds for dismissal of any employee.

        B. The use of tobacco products is strictly prohibited on the Owners property, violation of this
           requirement will be grounds for dismissal of any employee without warning or notice.

        C. With exception of law enforcement officers in the performance of his/her duties, the use and/or
           possession of any weapon is strictly prohibited on or within defined proximity limits of the
           Owners property, as governed by law. Violation of the regulation will be grounds for dismissal
           of any employee without warning or notice. This includes sporting and hunting rifles, bows,
           knives and other weapons stored (securely locked or not) in personnel or company pick up trucks
           and automobiles.

        D. Contractors and their employees are required to follow all federal, state and local laws, codes and
           School District Rules all of which are incumbent on the contractor and it’s employees to become
           fully aware.

        E. Contact with students is strictly prohibited. Failure to comply will be grounds for dismissal of
           any employee.

1.09    BUILDING SECURITY & DAMAGE PREVENTION

        A. The General Contractor is responsible to secure and control access to the work site at all times
           throughout the duration of the project. After hour security measures are necessary to prevent
           building access. Additionally, measures are to be taken to prevent damage to existing building
           and property from the elements (Precipitation, Wind etc.)

        B. The General Contractor will be responsible to replace damaged or missing property as a result of
           improper security and environmental prevention measures. The General Contractor will be
           responsible for all job site safety both during and after normal working hours. The job site
           consists of the entire continuous property limits.

Colin P. Lindberg, Architect                      00 8100 - 3                        SPECIAL CONDITIONS
Site Improvements                                                                                        Bid Set
Charlotte Central School                                                                        January 29, 2021

        C. The Contractor shall install approved barriers erected to prevent building and site damage due to
           inclement weather during times the work site is not attended to (ie. After hours and weekends).
           All erected fences and barriers may not impede life safety egress from buildings or other
           enclosed spaces (provide gates and doors as required to prevent access, but allow safe egress as
           required for building occupants).

        D. The Contractor shall submit to owner, for review only, within 10 days of award of contract a
           detailed Security Plan indicating location of fencing, access points, material storage locations,
           security, gates and protection prevention & egress procedures that are to be followed. Owner
           may reject submitted plans and request revised security plan at no additional cost to owner. The
           contractor is obligated to safeguard the site, property and personal safety for the duration of the
           project.

1.10    PRE-CONSTRUCTION, SITE INSPECTION & EXPLORATORY DEMOLITION

        A. The intent of the pre-construction, site inspection (prior to project mobilization) is to expedite the
           submittal process and material delivery to the site.

        B. The General Contractor is responsible to inspect and field verify all existing conditions and
           dimensions as required for coordination of shop drawings and other necessary submittals.

        C. General Contractor shall coordinate with owner an approved schedule for access to site prior to
           mobilization. Contractor shall expect to have access during school vacation periods (and other
           available dates and times as directed by owner) in order to conduct necessary site inspections
           and exploratory demolition.

        D. General Contractor shall patch and repair all affected areas and finishes upon completion of
           exploratory demolition.

1.11    WORK IN CONFINED SPACES

        A. Where applicable, each contractor and subcontractor performing work in confined spaces shall
           meet all local, state & federal rules, regulations, executive orders, and legislation relative to work
           conducted in confined spaces including all necessary employee training and certification where
           applicable.

1.12    BUILDING PERMITS

        A. School department to cover cost of building permit fee.

        B. All other trades are to carry cost for respective permit fees.

1.13    TESTING

        A. Fee’s and cost associated with testing, but required to be coordinated by contractor, to be paid for
           by owner. See specifications where applicable.

1.14    POWER

        A. Utility cost for general power tools and construction equipment at site provided by owner.

Colin P. Lindberg, Architect                       00 8100 - 4                         SPECIAL CONDITIONS
Site Improvements                                                                                   Bid Set
Charlotte Central School                                                                   January 29, 2021

        B. Modifications of existing power service to meet construction needs (if required) to be provided
           by contractor.

        C. Temporary and/or excess project power requirements and cost (if required) to be provided by
           contractor.

1.15    CONSTRUCTION DOCUMENTS

        A. Contractor shall provide construction documents and drawings to all trades and subcontractors as
           required without additional cost to owner.

                                         END OF DOCUMENT