C.I.T.A MODERN METHODS OF CONSTRUCTION SERIES - 2020 Cogent Associates
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
AGENDA • Cogent Associates – Who we are • Modern Methods of Central Bank HQ Google HQ Construction • Definition • History • Latest Developments • Some comparisons Google, Bolands Mill Shelbourne Hotel • Decisions Factors For Developers & Designers • Conclusion Adamstown SDZ SIG
INTRODUCTION TO COGENT • Founded in 1999 in Dublin • MBO in Q2 2016 • Currently employ c.50 staff • Construction consultancy services for all types of clients and organisations • Services delivered in Ireland and throughout EMEA
RECENT DCC – 2 D Panelised EXPERIENCE • 2 D Panelised D&B for DCC • Students Accommodation Bathroom pods Montpellier Hill – Precast and DCC 2 D Panelised Bathroom pods Google HQ • True 3 D Volumetric for Hotel Project Cardiff Lane- • Timber Frame Construction (several Techrete and unitized glazing housing schemes) facade • Insulated Concrete Forms (Housing Scheme) • Techrete Façade Panels Cluid Sruthan Google, Na Saili-Bolands Killarney Mill- Shelbourne Hotel ICF • Precast Structures • Traditional Cavity Wall Construction • In-situ Reinforced Concrete • Steel and Composite Floors • Modular 3 D Housing Cluid Fortfield- Tralee- Timber Aldi – Precast walls AdamstownFrame SDZ SIG
In-Situ Reinforced MODERN METHODS OF CONSTRUCTION - DEFINITIONS concrete 3 D Modular – Volumetric 2 D Panelised Precast Steel and Precast Slab Steel and Composite Floor ICF Steel and composite Twin Wall floor In-Situ Reinforced Concrete In-Situ Post –Tensioned Reinforced Concrete In-Situ Columns and Beams and Pre-cast Slabs Timber Frame Cross Laminated Timber Buildings Insulated Concrete Form (ICF) 3D Printing Steel and Precast 3D Volumetric Precast Twin Wall CLT
NOT SO NEW… 3 D Modular over 100 years old– The House that Came in the Mail 1908 In-situ reinforced concrete since 1853 Precast Concrete Since 1900’s Steel and concrete composite since late 1880’s Timber frame – Since the beginning of time Habitat 67 Montreal ICF – Evolve from 1940 to 1960 HISTORY from timber based forms to foam blocks 3D Printing – Only a few years old, not yet mature, in development 1910 Woolworth Middle Ages Building - Building Britany
REST OF THE WORLD Most countries looking at improving construction methodology and attempting to replicate a “Fordism” approach with assembly line productivity and quality APPEARANCE Increased Flexibility from previous solutions MATERIAL TECHNOLOGY Components available now for example unitised façade panel. RECENT DESIGN TECHNOLOGY Modular houses factory - DEVELOPMENT 3D and BIM Japan S DESIGN STANDARDISATION BIM Regulation Value UK – 44 Storey high 101 Singpore – 40 Storey high George Street Croydon
PROGRAMME COMPARISON FROM GREEN FIELD START ON SITE TO OCCUPATION – INCLUDES ALL SITE WORKS Timber Frame: Three scheme completed recently or completing in the next 3 months: • Redwood Tralee: 17 Houses – 47 weeks – Equates to one house every 14 working days • Pairceanna na Glas - Dingle: 20 Houses – 54 weeks – Equates to one house every 14 working days • Fortfield Tralee: 15 units – 52 weeks – Equates to one house every 17 working days – Irish Water delays Traditional Cavity Wall – 2 Schemes Housing completed • Sleaty Street Carlow: 26 units – 58 weeks – Equates to one house every 11 working days SOME • Friary Walk Callan: 15 Units – 67 weeks – Equates to one house every 22 working days – developer prioritised other works in the development PROGRAMME ICF: One Scheme – almost complete EXAMPLES • Sruthan na Saili – Killarney – 83 units – 78 weeks- Equates to one house every 5 working days. Timber Cavity Wall– Frame– 14-20 10-22 Days Days ICF – 5 Days
Site Material Design s Perform Labour ance ALL FACTORS ARE INTERLINKED Decision Risk Consent Value Cost Procure Time
THE SITE : Location (historic areas etc.) Shape, Orientation, Adjacent Sites, Infrastructure Venacular/Context LOGISTICS Opportunity to bring artic trucks SITE Cranes and lifting equipment space Critical to offsite construction Accessibility – route to the site
MASSING Set Backs Balconies Recesses Cantilevers Transfer Structures GRIDS Structural Constraints DESIGN & Slab Span and Wall Height will dictate structural options available CONSENT PERFORMANCE Longevity – DOE/DCC looking for 60 years life cycle/ warranties Flexibility – possible change to design or use Quality Performance –Factory environment higher quality Where is it manufactured? BcAR & Certification- Façade Treatment and Statutory Consent requirements STATUTORY AUTHORITIES Perception associated with some solutions – High Rise modular or timber structure- fire risk, behaviour under fire conditions etc..
COST Capital Cost sensibility– End User- Social& Affordable/ PRS/Hotel/ Build to Sell different priorities (Cost and Density/ etc.) Operational Cost Life Cycle Cost Developer’s cost and time to market – programme ASSET VALUE Asset Value- Perceptions- Is higher quality leading to a premium price, is it recognised as a higher quality product? PROGRAMME COST & TIME Solution needs to be identified at concept stage Is modular faster? • On site? Yes • Overall? Potentially not –still needs design time – Procurement would take longer – overlap between design and construction not entirely feasible Other factors can influence the programme more significantly (type of planning process) OVERALL – THE COST/PROGRAMME/ PERFORMANCE OPTIMUM SOLUTION IS PROJECT DEPENDENT
PROCUREMENT: Some solutions require part or full Design and Build contracts Direct to manufacturers or through a Main Contractor? • Site works capability Competition (In Ireland approximately 8-9 firms currently offering 3D volumetric or a mixture of 2D and 3D solution) PROCUREMENT Usually leads to a 2 Stage Tender & RISK Will the resources and materials be available at reasonable prices RISK TRANSFER If D&B- Risk transfer- Risk premium- more information for tender is better Main factors should be defined (Statutory consent etc.) If Employer’s Design or part design – Some Risk remains with employer.
Other Factors for Off Site Construction
WORKPLACE CONSIDERATIONS Factory Vs Site- Accommodation – Opportunity Transport Shift work possible TRADES & WORKFORCE CONSIDERATIONS WORKING Consistent work ENVIRONMENT & Local Community Employment WORKPLACE Factory specific labour CONSIDERATION Ethics and corporate governance S
HEALTH & SAFETY Better controlled in Factory setting ENVIRONMENTAL CONSIDERATION Carbon Footprint – Holistic approach needed including trades travel to their place of work. Reduce Waste HEALTH AND Less Temporary Infrastructure SAFETY & Where is it manufactured should be taken into consideration ENVIRONMENT
MATERIALS Local Availability of material • Brick • Concrete • Timber CERTIFICATION Ancillary Certificates Insurances & Warranties MATERIALS, CERTIFICATION ROBOTICS AND ROBOTICS Factory process offers the opportunity for increased use of robotics
Conclusion
CHOSING THE RIGHT SOLUTION No one-size fits all solution. Case by Case – location and project scope. OFF SITE MANUFACTURING Embracing of Standardisation • efficiencies, • higher quality and • decreased costs Increase R&D around the world on developing solutions Increase opportunity for BIM/3D modeling, integrated 3D models to CONCLUSION to be used for factory bespoke production (i.e. each building is unique but can be made of a set of individual standard components assembled in a unique way in the factory and brought to site) Raw Materials Available Domestically
THANK YOU