Let’s Keep MWC Moving Forward! 2018 Bond Issue This presentation is to share the concepts leadership and management have identified as needed capital improvements across the city. 2
Bond Issue 2018 Overview Needs Community Benefits Each item identified in this A brief description of the intended presentation will briefly describe benefit for the improvement will the need Midwest City has for the accompany each item in this capital purchase. presentation. 3
Bond Issue 2018 Overview 4 Propositions 19 Projects Four propositions include Parks & Within the 4 propositions, 19 Recreation, Public Safety, City-Wide individual projects are being Street Rehabilitation and Water presented. Should voters approve a System Improvements. Each of the proposition, each project within the 4 propositions will be individually proposition will also be approved. voted upon. 4
Proposition #1 – Streets • Residential Street Rehabilitation • $15,965,000 • 249 Residential Streets are in need of repair based upon city-wide survey • Proposition is to Repair or Repave existing streets • All 6 Wards Included 5
Street Repairs $15,965,000 249 Streets Quality of Life 249 streets have been Smooth streets is a desired identified and specifically benefit for residents within our targeted for this project. community. All 6 Wards Nearly every square mile will receive some type of improvement in this project. All six Wards are included and the “Original Mile” will see significant improvement. 7
Proposition #2 – Water Booster Station • Phase One • $5,560,000 • Updating 60-70 Year Old Water Booster Station & (1) Above Ground Storage Tank 8
Water Booster Station $5,560,000 Aging Unstable Soil Infrastructure The current booster station on Shifting soils have caused Water delivery not only helps Felix was built in the 1940’s numerous cracks and leaks... citizens, but it also ensure and early 1950’s. reliable water pressure for fire hydrants. Above Ground Greenery Quality of Life The current storage is Planting of trees…. These upgrades will ensure underground, this project consistent delivery of water for would build 1 above ground many years to come. This tank. facility serves as the backup to our surface water supply. 10
Proposition #3 –Parks & Recreation • 6 Projects • $21,635,000 • John Conrad Golf Course • New Multi-Purpose Athletic Renovation Facility • Reed Baseball Complex • Mid-America Park Renovation Improvements • Additional Soccer Fields • Town Center Park 11 Improvements
1. John Conrad Golf Course 711 S. Douglas - Renovation & Equipment 12
JOHN CONRAD GOLF COURSE $4,288,000 Irrigation Practice Range New Equipment Good irrigation is the life blood Sub-standard conditions exsist To properly maintain the of a course and the aging for both the driving range and changes new greens mowers, system is in dire need of practice putting green. spray equipment, fairway replacement. The current mowers, and utility vehicles are system is a combination of being proposed. 1970 and 1994 components. Tee Box to Greens Bunkers Premier Eastern Ok The tee surfaces are uneven Existing bunkers are severely County Course and lacking in density and contaminated and no longer These upgrades will make this color. Fairways are weak and offer desired conditions. course the premier public dull and provide less than course for Eastern Ok County. desireable playing conditions. 13
JOHN CONRAD GOLF COURSE Maintenance Equipment Examples 14
2. Reed Baseball Facility 2500 S. Post Rd – Conversion and Updates 15
Reed Baseball Complex $1,648,000 Conversion To allow for younger age players to utilize the facility we are proposing to convert 1of the large fields into 4 small fields. Synthetic Infields To reduce maintenance costs and provide for more play, especially during rainy weather, infields will be made synthetic. 16
3. Soccer Facility 1800 National Blvd - Renovation & Lighting 17
Soccer Facility $824,000 2 New Soccer Fields This project would incorporate two new soccer fields outfitted with full irrigation and full field lighting. Multi-Field Reconfiguration The existing “Multi-Field” will be updated with bright lighting and reliable & effective irrigation. 18
4. Multi-Purpose Athletic Facility 9300 SE 29th – Host a Variety of Youth and Adult Sports 19
Multi-Purpose Athletic Facility New Construction - $5,356,000 State of The Art Multiple Sports; Multi-purpose comve from a Same Field specified design of sports facility built and marked to host Baseball Softball a wide variety of youth and Lacross Football adult sports. Macro & Micro Soccer The lighting and synthetic surfaces allow for more Economic Engine events, at a lower maintenance This facility would supplement cost, with fewer weather other youth sports facilities in delays. the area, and allow for Midwest City to host larger regional tournaments. 20
5. Mid-America Park 1400 N. Midwest Blvd. - Renovation & Equipment 21
Mid-America Park Renovation - $1,648,000 Nature Park All-Inclusive Playground Pond surrounded by a natural Play trail, Labyrinth, and swing playground, interpretive sets. As well as an NCAA signage, and a wood basketball court, sensory garden, boardwalk. and disc golf practice area. Amenities Family & Fitness Quality of Life Sand Volleyball Court Fitness Stations These upgrades will compliment MWC’s Horseshoe Pit Multiple Trails commitment to create a Paved Nature Trail 18 Hole Championship Disc destination to draw citizens Community Garden Golf Course from multiple neighborhoods and create a safe user-friendly 22 park.
6. Town Center Park 200 W. Mid-America –Revitalization of the Original Mile 23
Town Center Park Renovation - $3,542,000 Old Bomber Tower Performance Pavilion Utilizing the land where the Small venues could be hosted former Bomber Tower was to attract concerts, festivals, located, create a destination and special events. for families and events. Quality of Life Greenery These upgrades developed by Planting of shade trees, Ochner Hare & Hare will benches, as well as covered compliment MWC’s areas and whimsical string commitment to revitalizing the lights will make this a original mile. destination many will want to make. 24
Proposition #4 – Public Safety • 11 Projects • $10,490,000 • New Animal Services Center • Fire Hose, Nozzles, Mobile • Police & Fire Radio Air, & Command Vehicle Replacement / Additional • Police/Fire Training Facility Tower Site • (2) Fire Trucks • Fire Station 1 Remodel • Replacement of Tornado • Fire Live Burn Building • (5) Fire Station Exhaust Sirens Removal Systems • Replace Fire Self Contained • 9-1-1 Call Center 25 Breathing Apparatus Equipment Improvements
7. Animal Services Center 2901 Woodside - New Construction 26
Animal Services Center 27
Animal Shelter $2,513,200 State of the Art Upkeep Nearly 200% Increase Will provide better care of A new facility will have less Double the capacity to provide animals. Heated flooring, maintenance and upkeep better care for animals. spacious kennels, & HVAC all to costs. Including daily cleaning help evaporate moisture and and sanitation. cut down on disease. Inviting Visiting Areas Quality of Life An inviting lobby, building, and Indoor/Outdoor visiting areas These upgrades will provide a areas for staff to work in for potential owners to get to better quality of life for the should help adoption rates know the animal. animals until they can be increase. adopted. 28
2901 Woodside Drive 29
8. Police & Fire Joint Training Bldg. 9500 SE 15th - New Construction 30
Police & Fire Joint Training Bldg. $299,495 3500 Sq. FT. State of The Art Nearly 200% Increase Two large rooms to Technology delivery methods 90% more stray dogs and accommodate multiple training will be state of the art in approximately 100% more sessions or meetings delivering training through adoptable dogs. simultaneously. smart boards, projectors, and remote video conferencing. Inviting Accommodations Quality of Life An inviting lobby and facilities ADA compliant, restrooms, These upgrades will provide a for both guests and staff to break room, and large storage better quality of life for the work all day or host week long room. animals until they can be outside training. adopted. 31
9. Fire Trucks Replacement of Aging Equipment 32
Fire Trucks (Ladder & Engine) $1,401,200 Aging Fleet Maintenance Nearly 200% Increase This funding is for a ladder New apparatus has a warranty 90% more stray dogs and truck and fire engine. The ESCI as well as better fuel efficiency, approximately 100% more master study recommendation thus lowering overall adoptable dogs. is to replace fire trucks every ownership costs. 15 years. This would put us on target for that goal. Technology Reliability New equipment means This purchase will launch an meeting the latest standards engine replacement program Capital Improvements for safety, efficiency, and where by the fire department These items will help launch a reliability for both the public can and will systematically full scale capital improvement and firefighters. replace apparatus on a plan for years to come. schedule to keep reliable 33 equipment in service.
10. Burn Building for Fire & Police Tactical Training 9500 SE 15th - New Construction 34
Burn Building & Tactical Training $586,345 Live Burn Training Police & Fire Nearly 200% Increase Training firefighters in a This building can be used for 90% more stray dogs and controlled and live fire both police and fire. Police can approximately 100% more environment is invaluable and use the building for SWAT, adoptable dogs. makes firefighters better hostage, and active shooter trained and safer. scenarios. Multi-Story ISO Points Quality of Life 4 story tower can better Having our own burn building These upgrades will provide a prepare firefighters and police will enable us to conduct the better quality of life for the officers for multi-story required live burn training twice animals until they can be buildings. a year in our own community. adopted. 35
9800 SE 15th 36
11. Self Contained Breathing Apparatus (SCBA) Replacement of Aging Equipment 37
Self Contained Breathing Apparatus (SCBA) $370,800 Out of Compliance Warranty Financial Need Current SCBA’s are two New SCBA’s provide up to a 15 We have been saving $25k a standards out of compliance year warranty thus lowering year for the last few FY’s to with NFPA standards for ownership costs. purchase new SCBA’s, but the health and safety and parts are need has outpaced the ability becoming obsolete. to save quick enough for the purchase. Technology Federal Funding New equipment means We have tried to obtain federal meeting the latest standards funding multiple times and for safety, efficiency, and have been very close, but reliability including the ability to ultimately not successful. track firefighters in a fire. 38
12. Fire Hose, Nozzles, Mobile Air, & Command Vehicle Replacement of Aging Equipment 39
Fire Hose, Nozzles, Mobile Air, Command Vehicle $263,680 Nozzles Hose Mobile Breathing Air Unit We have re-used the same Hose simply wears out and Being able to refill air bottles on a hose nozzles for many years gets holes. We replace fire scene would be a huge time even when we replace sections as needed, but now is saver and potentially life saving apparatus. a great opportunity to replace solution for fire scenes. and purchase higher flow hose. Command Vehicle Capital Improvements Firefighter Safety The current shift commander These items will help launch a asdfas. vehicle is a 2004 and is in dire full scale capital improvement need of replacement. plan for years to come. 40
13. Fire Station 1 / Headquarters Remodel 8201 E. Reno - Remodel of 42 year old facility 41
Fire Station 1 / Headquarters Remodel $576,800 1976 – Solid Structure Although station 1 was built in 1976, it is still a solid concrete structure. The systems and interior layout however are in dire need of updating. 42 years of plumbing, electrical, HVAC, and remodels are needing updating for both the fire station side as well as the office side with includes administration and fire prevention. 42
14. Fire Station Exhaust Removal Health and Safety 43
Fire Station Exhaust Removal Systems $206,000 Cancer Prevention Source Capture 5 Stations in need Studies show that long term This project is for installing Only 1 fire station has an exhaust exposure is directly systems to catch exhaust exhaust removal system in linked to cancer and hazardous (hydrocarbons) at the “source” place. If approved, this funding contaminants embed in gear or tail pipe. would cover the remaining 5 thus having long lasting stations in the same way. exposure potential. Low Maintenance Automatic Firefighter Safety These systems are relatively Most systems are automatic in In the fire service, cancer is a low maintenance with few that they release off the tail real problem and this would be moving parts and/or wear pipe when a firetruck leaves one less exposure risk we have items. the station thus not hindering the opportunity to put in place. or delaying a call. 44
15. Police and Fire Radio Replacement Replacement of Obsolete Equipment 45
Police & Fire Radio Replacement / Additional Tower Site $1,169,200 Obsolete Equipment Self Reliance Mobile & Portable Current radios are obsolete and Owning our radios and Every police car, fire truck, no longer manufactured. Parts infrastructure allows us to police officer, and on-duty are now becoming an issue. make updates, changes, and firefighter would receive new repairs as needed without radios, spare batteries, and relying on a state operated accessories. system . Safer Technology Interoperability A new tower site will give New radios would include Being able to communicate better coverage and bluetooth technology as well with neighboring agencies is redundancy in the event of a emergency buttons alerting 9- important and new radios failure. 1-1 which specific first would meet the P-25 standard responder is in distress. to accomplish this. 46
16. Tornado Sirens (Outdoor Warning Devices) Replacement of Aging Infrastructure 47
48
Tornado Sirens (Outdoor Warning Devices) $288,400 Omnidirectional Additional Sirens Stouter Equipment Upgrades would include a 360 Currently the city has 10 Sirens would be placed on degree siren to alert the public sirens. This would increase concrete towers instead of better. Current sirens only warning devices to 12. These telephone poles. project sound in the direction would also be able to do both the siren is pointing. siren and voice alerts. Stronger Equipment Augmented Funding Interoperability Sirens would be placed on Federal funding will assist with Being able to communicate concrete towers instead of this capital purchase by with neighboring agencies is utility poles. 8 of the 10 current providing nearly $100,000 on important and this system sirens are 18 years old. top of the requested $360,500. would meet the P-25 standard in doing so. 49
17. Public Safety Technology Improvements 9-1-1 100 N. Midwest Blvd - Upgrading of Equipment 50
Public Safety Technology Improvements 9-1-1 $716,880 9-1-1 Software Mobile Devices Stouter Equipment Upgrades to 9-1-1 software Aging devices that receive Sirens would be placed on would enable more efficient critical life saving dispatch concrete towers instead of dispatching abilities as well as information from 9-1-1 need telephone poles. improved response time for updating for both Police and first responders. Fire. Mobile Ticket Writing Behind the Scenes Interoperability Mobile ticket writing would Hardware and datacenter Being able to communicate bring Police into the 21st infrastructure would be with neighboring agencies is century for electronic citations. updated to allow for high important and this system availabilty, growing storage would meet the P-25 standard demands, & fail over in doing so. capabilities. 51
52
A “G.O.” Bond is a General Obligation Bond Funding is Projects are 50%+ Voter paid back Grouped into Approval through different Required property Propositions taxes 53
Bond Overview 1) Bonds Are Sold 2) Funding Received 3) Repaid over 25 years Depending on the Bond funds are dispersed Repayment of the bond propositions approved by to the city in relation to the occurs over a 25 year the voters, the bonds are propositions approved and period. This repayment is sold incrementally over a in the order of necessity as done through a millage on period of time (not all at seen by city planners. property taxes within once). The funds are then Midwest City. used to make capital improvements for infastructure and quality of life such as street repairs, parks, fire trucks, and public safety to name a few. 54
Bond Issue 2018 Overview City of Rose Fiscal Mid-Del Midwest Oklahoma State Total Year Schools City County College Millage 7/1/2017 68.54 0.92 23.28 19.15 111.89 7/1/2016 70.64 0.96 23.81 19.65 115.06 7/1/2015 71.03 5.18 23.72 19.88 119.81 Trend of Tax Rates on Major 7/1/2014 70.32 5.44 23.58 20.33 119.67 Taxing Units* 7/1/2013 64.96 5.78 23.87 17.02 111.63 Midwest City, Oklahoma 7/1/2012 66.55 6.09 23.97 17.10 113.71 7/1/2011 64.64 6.62 24.06 17.18 112.50 7/1/2010 65.60 6.81 24.27 17.32 114.00 *Average per $1,000 of Net Assessed Valuation 7/1/2009 65.83 7.24 24.79 17.34 115.20 7/1/2008 65.05 7.29 23.18 17.30 112.82 Average 67.32 5.23 23.85 18.23 114.63 55
Bond Issue 2018 Overview First Year Cost of Proposed GO Bonds Assessed This chart is based on current market conditions with no Market Net Assessed Property Tax growth in valuation projected Value Value Monthly Cost and an 11% assessment ratio. $50,000 $4,500 $3.56 The chart shows the first year $100,000 $10,000 $7.92 millage for the proposed $150,000 $15,500 $12.27 issues of 9.5 mills. Then bonds anticipated to be issued over $200,000 $21,000 $16.63 the next two years to keep the $250,000 $26,500 $20.98 levy at max for the Midwest City sinking fund of 10.00 mills total. 57
Property Tax Impact Example Net Assessed Minus (1,000) $8.25/Month Value of Home Homestead 10 mills increase in $100,000 Exemption property taxes $100,000 Minus (1,000) .001 $99/ Year 59