SIM-PBK K-12

ARCHITECTURAL AND
ENGINEERING SERVICES
FOR FIRE ALARM REPLACEMENT
SIERRA UNIFIED SCHOOL DISTRICT ◼ JANUARY 27, 2021
                                                    SIM-PBK.com
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
COVER L ETTER/LETTER
1

        OF IN TEREST
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
JANUARY 27, 2021                Mr. Craig Barnes
                                Sierra Unified School District
                                33220 Lodge Road
                                Tollhouse, California 93667

                                RE: A RC HITECTURAL AND ENGINEERING SERVICES FOR FIRE
                                    ALARM REPLACEMENT

ARCHITECTURE                    Dear Mr. Barnes and Selection Committee:
                                On behalf of the entire SIM-PBK team, we would like to thank the Sierra Unified School District
ENGINEERING                     for your consideration of our firm’s qualifications. SIM-PBK is excited for the opportunity
                                to collaborate with Sierra Unified School District to provide architectural and engineering
FIRE PROTECTION
                                services for your replacement of the entire Fire Alarm Systems at the Sierra Jr. High School and
PLANNING                        Sierra High School campus. SIM-PBK is recognized as leaders in educational architecture,
                                we have assisted hundreds of educational clients in providing construction documents for
INTERIORS                       fire alarm systems and upgrades for educational facility projects and public facilities for
                                over 40 years. We are currently providing disrict-wide fire alarm replacement services for
MECHANICAL
                                numerous school districts in California. Our firm key team members (Principal-in-Charge,
ELECTRICAL                      Project Manager, and Project Architect) and our Fire Alarms Systems Engineer/Mechanical
                                Engineer specializing in fire alarm systems are located just 40 minutes from the Sierra Jr.
PLUMBING                        High and Sierra High School campuses. Through this response, we will demonstrate our
                                experience and qualifications to assist Sierra USD in replacing and upgrading your fire alarm
TECHNOLOGY                      systems. Why SIM-PBK:

                                  ◼   Our firm has been deeply rooted in the Central Valley, for over 33 years with 42 local
                                      team members who are focused on K-12 facilities.

                                  ◼   Our approach remains the same whether we are doing a small modernization project for
                                      a small school district or a large education center for a larger district; we listen to the
                                      district's needs and try to maximize the dollars spent. Many of our recent projects are
                                      for small or one school districts such as Sunnyside Union Elementary School District,
                                      Monson-Sultana School District, Burrel Union Elementary School District. These
                                      districts receive the same attention as our larger districts clients such as Fresno Unified
                                      School District, Clovis Unified School District and Central Unified School District. We
                                      are here to serve you for the long run.

                                  ◼   We approach every project collaboratively and view ourselves as mutual partners in the
                                      process and work with your stakeholders every step of the way.

                                  ◼   We work with integrity through an inclusive, transparent process that are in the very best
                                      interest of the District and the community. We will work the State Fire Marshal and state
                                      and local agencies, including DSA, OPSC, CDE throughout the process of your project.

                                We look forward to the opportunity of continuing a successful relationship with you and
                                your District and are committed to serving the needs of your students, your staff, and your
                                community. If you should have any questions regarding our statement of qualifications,
                                please don't hesitate to call (559) 448-8400.

                                Respectfully,

                                Jeff Berrios, AIA,
                                Principal
                                jberrios@sim-pbk.com

SIM-PBK ◼ 7790 N. PALM AVENUE ◼ FRESNO, CALIFORNIA 93711 ◼ P. 559 448 8400                                          SIM-PBK.com
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
TABLE OF CONTENTS
2
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
TABLE OF CONTENTS

1   C OVER LETTER/LETTER OF I NTEREST
    pp. 01

2   TABLE OF CONTENTS
    pp. 02

3   C ONSULTANT DATA " ATTACHM ENT 2
    pp. 03 - 28

4   B I LLI NG RATES AND REI M BURSABLE
    E XPENSES " ATTACHM ENT 3"
    pp. 29 - 31

5   INSURANCE REQUI REM ENTS
    pp. 32

6   E QUAL EM PLOYM ENT OPPORTUNI TY (E E O )
    C ERTI FI CATI ON " ATTACHM ENT 4"
    pp. 33

7   WORKER'S COM PENSATI ON I NSURANC E
    C ERTI FI CATI ON " ATTACHM ENT 5"
    pp. 34
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
CONSULTANT’S DATA
3
     “ATTACHMENT 2”
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

CONSULTANTS DATA "ATTACHMENT 2"

                                              ATTACHMENT 2 – CONSULTANT QUESTIONNAIRE
                             The Consultant shall furnish all the following information accurately and completely for
                             the Consultant and each of the proposed staff. Failure to comply with this requirement
                             may cause rejection of the Consultant's qualifications. Additional sheets may be attached
                             if necessary. "You" or "your" as used herein refers to the Consultant and/or any of its
                             owners, officers, directors, shareholders, parties or principals.

                             If the same information is provided elsewhere in your qualification and qualification
                             materials, then please clearly identify such in the following questions.

                             Please be advised that the District may request verbal or written clarifications, additional
                             information, an interview or presentation at any time regarding this questionnaire.

                             SECTION A - GENERAL INFORMATION

                             (1)        Consultant name, address and contact information:

                                        SIM-PBK
                                        ________________________________________________________________

                                        7790 N Palm Avenue
                                        ________________________________________________________________

                                        Fresno, CA 93711
                                        ________________________________________________________________

                                        Contact - Jeff Berrios
                                        ________________________________________________________________

                                        ________________________________________________________________

                             (2)                  559.448.8400		 Facsimile:_________________
                                        Telephone:_________________        559.448.8467
                                                                     jberrios@sim-pbk.com
                                        Email and Internet Addresses:___________________________ SIM-PBK.com

                             (3)        Type of business entity: (check one)

                                        Individual _____         Partnership _____                       X
                                                                                            Corporation _____

                              (4)       Names and titles of all principals/officers of the Consultant:

                                        Name                                       Title                          Phone Number

                             John Smith
                             _______________                              Partner
                                                                          ________________                        559.448.8400 ext. 101
                                                                                                                  _______________

                             Jeff Berrios
                             _______________                              Principal
                                                                          ________________                        559.448.8400 ext. 109
                                                                                                                  _______________

                             Raleigh Sullivan
                             _______________                              Principal
                                                                          ________________                        559.448.8400 ext. 113
                                                                                                                  _______________

                             Bryan Sassano
                             _______________                              Principal
                                                                          ________________                        559.448.8400 ext. 106
                                                                                                                  _______________

                             Rafael Ferreria		                            Principal		                             559.448.8400 ext. 118
                                    Sierra Unified School District RFQ for Architectural / Engineering Services            Page 13 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                    ◼   JANUARY 27, 2021                               03
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

         (5)        Please list any applicable certifications and licenses and their associated numbers:
                    John Smith - C-15885, Jeff Berrios - C-32578, Raleigh Sullivan - C-37577,
                    ________________________________________________________________
                    Bryan Sassano - C-28922
          (6)       Have you or any of your principals ever conducted similar services under a
                                                                                  No
                    different name or certification or different license number? _____.
                    (a)       If yes, give Consultant name, address and certification or license number.
                                    N/A
                              Name __________________________________________
                              Address ________________________________________
                              License No. (if any) _______________________________

          (7)       How many years has Consultant been in business under its present business
                    name?
                           33
                    __________________________________________________

          (8)       How many years of experience does Consultant have providing similar services?
                    33
                    __________________________________________________

          (9)       For how many public agencies has Consultant provided similar services?
                    Over 1,500 public agencies which includes school districts and higher education.
                    __________________________________________________

          (10)      Please list the public agencies, including any school districts that Consultant has
                    provided similar services for:
                    __________________________________________
                    Maple Elementary School District Golden Valley Unified School District

                    Clovis Unified School District                           Chawanakee Unified School District
                    __________________________________________
                    Fresno Unified School District Hilmar Unified School District

                    Sanger Unified School District                           Dublin Unified School District
                    __________________________________________
                    Caruthers Unified School District

                    Central Unified School District
                    __________________________________________
                    Madera Unified School District

          (11)      Please attach a short history of the Consultant including whether it is local,
                    national, or international business entity, as well as approximate number of
                    employees. Also provide the number of offices and locations.
                    Please see attachment on page 08.

                Sierra Unified School District RFQ for Architectural / Engineering Services                   Page 14 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                      04
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

           (12)      Identify Architectural and Engineering Services performed for other school districts
                     in accordance parameters described above. Please refer to answer on page 06.

           (13)      Describe how Consultant has successfully provided Architectural and Engineering
                     Services such as those described herein.   Please refer to answer on page 06.

           (14)      Describe the unique or innovative programming approaches utilized on previous
                     projects.                                 Please refer to answer on page 06.

          SECTION B - LEGAL

           (15)      Have you or any of your principals been in litigation or arbitration of any kind on a
                     question or questions relating to similar services involving a school or community
                                                                       No
                     college district during the prior five (5) years? _____.

                     (a)       If yes, provide the name of the public agency and briefly detail the dispute:

                               N/A
                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

           (16)      Have you ever had a service agreement terminated for convenience or cause in
                     the prior five (5) years? No
                                               _____.

                     (a)       If yes, provide details including the name of the other party:

                               N/A
                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

                Sierra Unified School District RFQ for Architectural / Engineering Services                Page 15 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                   05
ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE ALARM REPLACEMENT - SIM-PBK K-12 SIERRA UNIFIED SCHOOL DISTRICT JANUARY 27, 2021
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

12. Identify Architectural and Engineering Services performed for
other school districts in accordance parameters described above.

Fire Alarm Replacement/Upgrade Services include; Schematic
Design,       Preliminary       Cost      Estimate,        50%       construction
documents, 95% construction documents, final cost estimate,
100% construction documents, DSA submittal, DSA backcheck
submittal, bid package, record drawings (as-builts).

13. Describe how Consultant has successfully provided Architectural
and Engineering Services such as those described herein.

We have successfully provided services by working closely with
maintenance and facility staff members; meet with facilities staff to
identify location of key components and existing issues; determine
what does exist for existing plans and documents (staff and previous
projects); collect and review any service records that are available
from staff.

14. Describe the unique or innovative programming approaches
utilized on previous projects.

Our unique approaches include:
  ◼   Contact DSA for any existing plans

  ◼   Contact existing designers for plans

  ◼   Contact original installers for record drawing plans

  ◼   Contact current service companies for any plans or records

  ◼   Field work (boots on the ground)

  ◼   Identify existing system locations and document those
      locations

  ◼   Verify existing building layout and determine document
      discrepancies, if any, from the plans

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021   06
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

          (17)       Is Consultant, owners, and/or any principal or manager involved in or is Consultant
                     aware of any pending litigation regarding professional misconduct, bad faith,
                                                            No
                     discrimination, or sexual harassment? _____.

                     (a)       If yes, provide details:

                               N/A
                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

          (18)       Is Consultant, owners, and/or any principals or manager involved in or aware of
                     any pending disciplinary action and/or investigation conducted by any local, state
                                         No
                     or federal agency? _____.

                     (a)       If yes, provide details:

                               N/A
                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

                               ___________________________________________________________

          (19)                                                               Yes
                     Does Consultant maintain errors and omissions coverage? _____.

                     If so, please provide a current copy of the declaration page showing the maximum
                     liability or policy value.

          (20)       Will Consultant comply with all District, local, State and Federal legal requirements,
                     regulations and laws? Yes
                                           _____.

          SECTION C - ADDITIONAL INFORMATION

          (21)       Please provide any other information that may assist the District in ascertaining
                     your qualifications, capability and customer service under any resultant
                     agreement.

               Sierra Unified School District RFQ for Architectural / Engineering Services                 Page 16 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                   07
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

           SECTION D – CONFLICT OF INTEREST

           (22)      Have you ever had any direct or indirect business, financial or other connection
                     with any official, employee or consultant of the District? Identify any conflict of
                     interest in (a):

                     (a)       Please elaborate and discuss any potential, apparent or actual conflict of
                               interest:
                               SIM-PBK   and our employees and consultants to do not have any conflicts of interest
                               ___________________________________________________________
                               with the District.
                                ___________________________________________________________

                                ___________________________________________________________

                                ___________________________________________________________

                     I certify and declare under penalty of perjury under the laws of the State of
                     California that the foregoing Consultant Questionnaire pages one though four is
                     true and correct.

                     Executed this 27          January
                                   ____ day of ____________________,   21 at ____________,
                                                                     20__,   Fresno

           State of California
                    __________________________

           SIM-PBK
           ___________________________                                                  _________________________
           Company Name                                                                 Signature

           Principal
           ___________________________                                                  Jeff Berrios
                                                                                        _________________________
           Title                                                                        Print Name

                Sierra Unified School District RFQ for Architectural / Engineering Services                   Page 17 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                      08
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

DESCRIPTION OF CONSULTANT

PROFESSIONAL HISTORY                                                                                       LOCATION OF OFFICE
In 1987, John Smith, David Iwanaga and John Milhous established Smith Iwanaga                              SIM-PBK
Milhous Architects (S.I.M. Architects). The three partners set out to establish a new                      7790 N Palm Avenue
kind of architectural firm – a company that combined the art of innovative design                          Fresno, CA 93711
with the efficiency of meticulous project management. Thanks to our founders’
collective talent, wide-ranging experience, proven project management and the                              LEAF Engineers
support of a dedicated team, we have fulfilled that vision. Today, we have earned                          895 W Ashlan Avenue
a reputation for unsurpassed architectural innovation, business integrity and client                       Clovis, CA 93612
satisfaction. Our process is unique, adding a personal element to the disciplined
pursuit of quality.                                                                                        NUMBER OF YEARS IN BUSINESS
                                                                                                           33
In 2017, S.I.M. Architects merged with PBK Architects, resulting in a dynamic team
known as SIM-PBK. The SIM-PBK team started working together in 2014. Since                                 NATURE OF WORK PERFORMED
partnering, our team has developed a strong professional relationship, servicing                           Architecture
clients throughout the state of California. Together we are able to offer Sierra                           Engineering
Unified School District an immense level of expertise and local industry experience.                       Planning
Our team’s collective talent, wide-ranging experience, proven project management                           Interiors
and dedication allows us to provide the Sierra USD with the over-the-top client                            Fire Protection
service that we are known for.                                                                             Mechanical
                                                                                                           Electrical
Our Fresno office employs 42 local staff members . We have 250 team members
                                                                                                           Plumbing
through California and 550 team members nationwide. We have the staff and
                                                                                                           Technology
resources to serve Sierra Unified School District with the service you require to
complete your upcoming projects.

Regardless of size, location, or schedule, each project benefits from personable,
comprehensive architectural design services. Our competence is demonstrated by
our long history of repeat clients. SIM-PBK has the resources and experience to
ensure that all current projects, as well as SUSD's projects, are executed to the
highest industry standards, within the proposed timeline.

SIM-PBK's process for delivering multiple concurring projects within the client's
proposed schedule relies on in-house resources and our practiced ability to
scale teams to meet milestones. Our team creates a comprehensive design team
coordinated by leadership that offers clients a single point of contact.
Our process for successful project delivery consists of:
  ◼      Weekly internal staffing meetings

  ◼         Clear communication throughout all phases of the project

  ◼         Weekly and bi-weekly meetings between delivery team

  ◼         Issuance of weekly Friday Reports

  ◼         Developing and maintaining a project schedule

We are ready to begin your project immediately with work performed from our local
Fresno office.

FIRE ALARM EXPERTS. The SIM-PBK team is a unified full-service team. Our
team is comprised of experienced architects and a Fire Alarm System Experts,
Garen Lencioni, who has over 20 years of experience, Larry Myers, who has over
30 years of experience designing fire alarm systems. The diverse talent of our
teammates, combined with the firm’s highly collaborative design process, enables
SIM-PBK to provide qualified programmers, planners, architects, engineers, and
designers regardless of project scope or geographic location.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                 09
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

JEFF BERRIOS A I A
PRINCIPAL

                                                           Jeff has more than 30 years of project management experience in the architecture
                                                           and construction industry. His experience includes facility surveys, planning,
                                                           design, preparation of contract documents and construction of educational
                                                           facilities ranging from additions and renovations to new facilities. In addition, Jeff
                                                           possesses extensive knowledge of cost estimating with various construction types.
                                                           Jeff is currently working on a master plan with Sierra Unified School District.

E D U CAT I O N                                            EXPERIENCE                                      Facilities master Plan
Bachelor of Architecture                                   Sierra Unified School District                  Campus Catering Office Building
California Polytechinic State                              Long Range Facilities Master Plan
University, San Luis Obispo,                                                                               Fresno County Office of
                                                           Hilmar Unified School District                  Education*
R E G I ST R AT I O N S                                    High School CTE                                 Violet Heintz Rehabilitation School
California Architect:                                      New Elementary School                             Remodel
License No. C-32578
                                                           Clovis Unified School District*                 Kerman Unified School District*
A F F I L I AT I O N S                                     Oraze Elementary School                         CTE Auto Shop Building
AIA (American Institute of                                 Buchanan High School                            CTE Building Trades
Architects), Board of Directors                              Modernization                                 District Office
ACE (Architecture Construction                             Kastner Intermediate School
Engineering) Mentoring Program,                              Administration Building Remodel               Fresno Unified School District*
Mentor                                                     Alta Sierra Intermediate School                 Hoover High School Classroom
Fresno USD ROP Construction                                  Modernization                                   Building
Technology Advisor                                         Garfield Elementary School                      Hoover High School Aquatics
Clovis USD Citizens bond oversight                           Modernization                                   Center
committee                                                  Alta Sierra Intermediate School                 Turner Elementary School
                                                             Modernization                                   Administration and Classroom
                                                           Garfield Elementary School                        Building
                                                             Modernization
                                                           Copper Hills Elementary School                  Modesto City School District*
                                                             Modernization                                 Enochs High School
                                                           Liberty Elementary School                       Gregori High School
                                                             Modernization
                                                           Century Elementary School                       Tulare Joint Union High School
                                                             Modernization                                 District*
                                                           Valley Oak Elementary School                    Mission Oak High School
                                                             Modernization
                                                           Tarpey Elementary School                        Torrance Unified School District*
                                                             Modernization                                 Walteria Elementary School
                                                           Dry Creek Elementary School                       Modernization
*Experience with previous firm                               Modernization                                 Woods Elementary School
SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                      10
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

JASON DOMOTO C D T
SENIOR PROJECT MANAGER

                                                           Jason Domoto has been working in the architectural industry for over 20 years. As
                                                           an accomplished senior level professional with extensive knowledge of building
                                                           analysis, building codes, and construction administration procedures, he ensures
                                                           that project documents are completed in accordance with the owner’s program
                                                           requirements and construction standards.

C E R T I F I CAT I O N S                                  EXPERIENCE
Construction Documents                                     Exeter Unified School District                  Reef-Sunset Unified School
Technology Certification                                   Lincoln Elementary 8 Classroom                  District
                                                              Building                                     Reef-Sunset Middle School Shade
                                                           Rocky Hill Elementary Restroom                    Structure
                                                                                                           Reef-Sunset Middle School
                                                           Sunnyside Union Elementary                        Modernization
                                                           School District
                                                           Sunnyside Elementary Modernization              Hilmar Unified School District
                                                                                                           Hilmar High School CTE
                                                           Caruthers Unified School District
                                                           Caruthers Elementary Modernization,             Mendota Unified School District
                                                              Phase 1                                      Mendota High School Relocatables
                                                           Caruthers Elementary Modernization,             Mendota Elementary Relocatables
                                                              Phase 2                                      Mendota Junior High School
                                                           Caruthers Ag MPR Relocatable                      Reloctables
                                                           Caruthers Elementary Relocatable
                                                              Classroom                                    Central Unified School District
                                                           Caruthers MARC High School                      Central High School Relocatables
                                                              Relocatable
                                                           Caruthers High School Gym Fascia                Fresno County Superintendent of
                                                           Caruthers Elementary Three                      Schools
                                                              Relocatables                                 Kermit Koontz Career Technical
                                                           Caruthers High School Gym                         Education Center
                                                              Bleachers                                    Kermit Koontz Career Technical
                                                                                                             Education Center Modernization
                                                           Sanger Unified School District                  Kermit Koontz Educational Center
                                                           Jackson Elementary Multi-Purpose                  Multi-Purpose Room
                                                              Room                                         Cyber High School Remodel

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                      11
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

GAREN LENCIONI P E , L E E D                            AP

FIRE PROT ECT ION ENGINEER

                                                      Garen has 20 years of experience in mechanical and fire protection engineering. He
                                                      has been responsible for the design of hundreds of projects in a variety of applications
                                                      and has expertise in HVAC, plumbing, fire sprinklers, energy analysis, LEED, and
                                                      commissioning. Garen's understanding of building systems and knowledge of system
                                                      types allows him to have detailed understanding of how the system and building will
                                                      operate. Garen will over see all details of the firms projects from start to finish.

E D U CAT I O N                                       EXPERIENCE
Master of Science
Fire Protection Engineering,                          Dinuba USD                                           California State University-Fresno
California Polytechnic State                          Dinuba High School Modernization -                   North Gym Phase Two and South Gym
University, San Luis Obispo                              Fire Alarm System Modification and                  Remodel
Bachelor of Science                                      Design                                            Ag. Grant Program
Business Administration,                              Addicott Elementary School                           Duncan Locker Remodel and Addition
California State University, Fresno                      Modernization - Fire Alarm System                 Agriculture Restroom Remodel
                                                         Modifications.                                    McKee Fisk Restroom Remodel
Management Development for
Entrepreneurs Program – Certificate                                                                        Chiller Replacement
                                                      Fresno USD
Program, UCLA                                                                                              Duncan Building Addition
                                                      Ventura and 10th Modernization - Two
R E G I ST R AT I O N S
                                                                                                           North and South Gym Remodel of
                                                         Building Fire Alarm Design
Professional Engineer                                                                                        Wrestling Room Phase One
                                                      Fresno High School CTE Building - Fire
California #M33380                                                                                         s
                                                                                                           Public Safety Building Modernization
                                                         Protection Engineering
Nevada #20405                                                                                              McLane Hall Room 276
                                                      Vang Pao Elementary - Fire Protection
Oklahoma #23337
                                                         Engineering                                       City of Fresno
Texas #103331
Washington #44486                                     Municipal Buildings                                  IRS Building Fire Life Safety Evaluation
                                                                                                           Fire Alarm Activation and Suppression
Fire Protection Engineer,
                                                      Bakersville College                                  System
California, FPE 1901
                                                      Fire Sprinkler System Retrofit
LEED® Accredited Professional –
                                                                                                           Nissan North America Distribution
CPD Number 74242
                                                      Mt. San Jacinto College                              Warehouse-Sacramento
Certified in Plumbing Design by                       Menifee Campus Fire Sprinkler                        Fire Evaluation
American Society of Plumbing
                                                         Redesign
Engineers                                                                                                  IRS Fresno
                                                                                                           Six-Story Fire Life Safety Evaluation
                                                      Fresno Pacific College
                                                                                                           and Certification
                                                      Co-Generation Central Plant

                                                      Lamar Consolidated ISD                               Fresno Airport
                                                      Traylor Stadium Code Evaluation                      Server Room - Fire Alarm activation and
                                                                                                           Suppression System
                                                      Navel Air Station Lemoore
                                                                                                           VH Medical Fresno
                                                      Neutra Elementary School - 2 Building
                                                                                                           Building 24 Fire Protection Engineering
                                                      Addition Fire Alarm.
                                                                                                           Mental Health Building Fire Protection
                                                                                                           Engineering
SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                           12
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

LARRY MYERS P E
SENIOR ELECT RICAL ENGINEER

                                                           Larry has practiced electrical engineering in California for more than 42 years. His
                                                           career has focused primarily on K-12, higher education, and institutional projects.
                                                           His skills include not only technical competence but also a deep understanding of
                                                           construction methods, the challenges facing owners and contractors, and the abil-
                                                           ity to keep the big picture firmly in the foreground. He is proud to have forged per-
                                                           sonal relationships with dozens of professionals, owners, and contractors during
                                                           his career.

E D U C AT I O N                                           EXPERIENCE
Masters in Business Administration
St. Mary's College                                         St. Helena Unified School                       Fresno Unified School District
                                                           District*                                       Fresno HS CTE Building
                                                           St. Helena High School New Fire                 Ventura and 10th Administration
R E G I S T R AT I O N
                                                             Alarm System                                    Modernization
Professional Engineer
California: E-11392
                                                           Geyserville Unified School                      Santa Rosa City Schools
                                                           District*                                       Santa Rosa MS Modernization
A F F I L I AT I O N S                                     Geyserville High School New Fire                Montgomery HS Modernization
IEEE                                                         Alarm System                                  Piner HS Modernization
                                                                                                           Steele Lane Elementary School
                                                           Healdsburg Unified School                         Modernization
                                                           District*                                       Lawrence Cook MS Modernization
                                                           Healdsburg High School New Fire                 Santa Rosa Ag Barn and Classroom
                                                             Alarm System
                                                                                                           Thermallito Elementary School
                                                           Solano County Main Jail*                        District
                                                           New Fire Alarm System                           TLC Pre-School Relocation
                                                                                                           Popular Ave ES Modernization
                                                           College of the Redwoods*                        Sierra ES Portables
                                                           New Fire Alarm System
                                                                                                           Santa Barbara City College*
                                                           Dinuba Unified School District                  Food Service Building
                                                           Dinuba High School Modernization                Modernization
                                                                                                           New Learning Resource Center
                                                           Cayucos Elementary School
                                                           District                                        Merced Irrigation District*
                                                           Cayucos Elementary School                       Sakata Seed Woodland
                                                             Classroom Addition                            Innovation Center

                                                           San Juan Unified School District                Cal-EPA Building*
                                                           Littlejohn ES Modernization                     Data Center
*Completed with previous firm
SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                     13
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

NICK WEIL P E
ELECT RICAL ENGINEER

                                                           Nick has 8 years of electrical engineering experience. He has worked on a variety of
                                                           projects and will help lead the electrical team from start to finish for the electrical
                                                           design for power, distribution, lighting and T-24 energy compliance on projects.
                                                           Nick is also maintains a Construction Documents Technology (CDT) certification
                                                           and is involved in developing project specifications.

E D U CAT I O N                                            EXPERIENCE

Bachelor of Science                                        Dublin Unified School District                  Santa Rosa City Schools
Electrical Engineering                                     Dublin High School                              Cook Middle School
San Fransisco State University                                                                             Steele Lane Elementary School
                                                           Modesto City Schools                            Piner High School
                                                           Johansen High School Weight Room
R E G I ST R AT I O N S
                                                                                                           Fowler Packing
Professional Engineer
                                                           Mendota Unified School District                 IRS Mail Sorting and Call Center TI
California #E-21794
                                                           Mendota High School HVAC
                                                                                                           Sacramento, CA
A F F I L I AT I O N S
                                                           Thermalito Union Elementary                     Newman Center Church Facility
IEEE                                                       School District
Certified Construction Documents                           Poplar Avenue Elementary School
Technologist

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                         14
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

RONALD DE LA CRUZ
ELECT RICAL ENGINEERING PROJECT MANAGER

                                                          Ronald has an extensive background in the design and management of electrical
                                                          engineering systems for numerous projects. Ronald’s expertise covers all aspects
                                                          of design including engineering systems for high-rise office buildings, medical
                                                          facilities, convention centers, casino’s and educational facilities.

E D U CAT I O N                                            EXPERIENCE
Mapua Institute of Technology
Bachelor of Engineering                                    Fontana USD                                     Jourdanton ISD
                                                           District-Wide Fire Alarm Upgrade                Early Childhood Center

                                                           Orange USD                                      Alvin ISD
                                                           District-Wide Fire Alarm Upgrade                CTE Renovation

                                                           El Segundo USD
                                                                                                           Barbers Hill ISD
                                                           El Segundo High School
                                                                                                           Eagle Multi-Purpose Facility
                                                           El Segundo Middle School
                                                                                                           Spring 2016 Improvement
                                                           Richmond Street Elementary School
                                                           Administration Building
                                                                                                           Clear Creek ISD
                                                           Center Street Elementary School
                                                                                                           Second District Stadium
                                                           Library Building
                                                                                                           Clear Brook High School Additions
                                                           Center Street Elementary School
                                                                                                           & Renovations
                                                           Media Center Upgrade
                                                                                                           Clear Lake High School Rebuild
                                                                                                           Project
                                                           Palm Springs USD
                                                                                                           Seabrook Intermediate School Addi-
                                                           District-Wide Modernizations which
                                                                                                           tions & Improvements
                                                           include Fire Alarm Upgrades
                                                                                                           Clear Creek High School Additions
                                                                                                           & Renovations
                                                           Santa Rosa City Schools
                                                                                                           Clear Brook High School Outside
                                                           District-Wide Fire Alarm Upgrades
                                                                                                           Air Upgrades
                                                           Corpus Christi ISD
                                                                                                           Conroe ISD
                                                           Corpus Christi High School MEP
                                                                                                           Irons Junior High School
                                                           Services
                                                                                                           McCullough Junior High School
                                                           Baker Middle School AV
                                                                                                           Additions & Renovations
                                                           South Park Middle School LEED
                                                                                                           Powell Elementary School Additions
                                                           South Park Middle School MEP
                                                                                                           & Renovations
                                                           Services

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                   15
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

DESIGN CAPACITY AND METHODOLOGY
OUR TEAM                                                                                  LEAF is recognized by the AABC Commissioning Group
                                                                                          as a well-qualified provider of commissioning services. The
Engaging the right people is the cornerstone of any successful
                                                                                          LEAF team members are committed to innovation and high-
project. Our experienced leadership team, located in Fresno
                                                                                          performance solutions is demonstrated by a long history of
less 40 minutes from Sierra Jr. High School and Sierra High
                                                                                          successful, long-term, and on-call projects.
School, is able to offer comprehensive, timely, cost-effective
delivery of your project. We are your experienced home                                    APPROACH TO MEET THE DISTRICT’S GOALS
team, your neighbor, and we can leverage the resources of a
                                                                                          Methods of Team Organization, Communication &
successful company.
                                                                                          Scheduling
                                                                                          LEAF will work strategically, along with SIM-PBK, to kick
Fire Alarm Systems Design Consultant                                                      off the project with a visual site inspection.   The initial
LEAF Engineers, established in 2002. The has grown to a staff
                                                                                          assessment will be used to build and finalize a detailed
of 80+ and has successfully completed over 1,500 projects for
                                                                                          schedule (with milestones) for SUSD’s approval. Once a
150 different clients across seven states.
                                                                                          time/milestone schedule is created for the project, critical
                                                                                          decisions and milestones will be identified and commentary
LEAF’s core business includes fire protection, mechanical,
                                                                                          created for accountability. Progress will be tracked, and if
electrical, and plumbing, technology consulting engineering,
                                                                                          the schedule appears to be slipping, we will work closely
and low voltage. The firm also offers LEED consulting services,
                                                                                          with SUSD’s project manager to resolve decision impasses.
energy modeling services, third-party energy code compliance
                                                                                          This schedule will be our guide throughout the project to
services, energy audits, and the production of sustainable-
                                                                                          ensure timely deliverables are met. Schedule adherence is
designed buildings with low utility consumption and extensive
                                                                                          of paramount importance to SIM-PBK/LEAF, as we know
automation for ease of operation. Their expertise spans many
                                                                                          delays cost money and can create issues among all team
building types including educational, industrial, corporate,
                                                                                          members. Our proposed team has a track record for meeting
healthcare, sports, and institutional with licensed engineers
                                                                                          schedules by their careful coordination and planning, and
in California and many other states across the nation. Their
                                                                                          by always maintaining open communication with the team
working facilities range from one million square feet to a
                                                                                          members.
few thousand feet, signifying our ability to complete any size
project, small or large.
                                                                                          We will maintain constant communication with all disciplines
                                                                                          throughout the project to monitor the progression of the
                                                                                          work in order to ensure that all disciplines have sufficient
                                                                                          support staff to complete each of the scheduled milestones.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                           16
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

If outside consultants are utilized, we will meet with them on                           Once the construction phase begins, we will assign a full-time
a weekly basis to ensure they are on schedule.                                           construction services manager to the project site. For all fire
                                                                                         alarm systems, Garen Lencioni, Fire Protection Engineer, will
If time is lost on the schedule, or we foresee that an adjustment                        serve as field representative. Garen will monitor site activity
is possible, the following schedule recovery options are                                 during the construction phase. Garen will be responsible
considered:                                                                              for ensuring construction is being completed in accordance
◼     Increase staff allocated to the project                                            with local, state, and federal guidelines and ordinances in
◼     Absorb contingency float built into the schedule                                   addition to SUSD's guidelines, budget, and schedule.

The next priority in the project will be the budget and scope                            DESIGNING TO BUDGET
confirmation. Once we have a budget and scope confirmed,
                                                                                         SIM-PBK is keenly aware of school district challenges and
we will use it to continuously vet the project to ensure it is not
                                                                                         community accountability related to construction projects
exceeded. LEAF has developed a cost database as a resource
                                                                                         and facility expenditures. We will proactively work with
used to assist us in identifying the potential cost issues early
                                                                                         SUSD to minimize maintenance and operational expenses;
on.
                                                                                         provide cost-effective designs that maximize building
                                                                                         program accomplishments and educational objectives; and
Design Philosophy/Methodology
                                                                                         develop options and priorities within the project to assure
Our team approaches each design challenge as a unique
                                                                                         budget adherence.
opportunity.        SIM-PBK/LEAF will work with SUSD to
                                                                                         SIM-PBK understands that designs must be cost effective.
ensure that all code items are met and that any additional
                                                                                         We take cost issues very seriously and follow procedures at
safety measures that are recommended are reviewed with
                                                                                         the beginning of the design process to ensure that the budget
SUSD and included if the cost:benefit to SUSD allows
                                                                                         is accurately estimated and effectively met, especially with
it.     Collaborative discussion with SUSD and stakeholders
                                                                                         “design-not-to-exceed” budgets. Our in-house cost and
including administration, construction management, facilities
                                                                                         constructibility managers work closely with contractors
and maintenance staff will allow SIM-PBK/LEAF to meet
                                                                                         and clients to monitor cost and budget in a systematic and
short-term and long-term goals for SUSD.
                                                                                         continuous manner.

Our team encourages the free exchange of ideas. We firmly
believe a project’s success is dependent upon the abilities of
everyone involved to maintain a respectful and collaborative
working environment. Projects thrive when a working group is
dedicated to work continuously with the planning and design
team in developing project knowledge and understanding of
the basis of decisions. All suggestions brought by SUSD staff
will be explored and imputed once vetted and discussed.

Coordination of Design, Construction Documents and
Construction Administration
Building upon all information generated during the previous
phases, the SIM-PBK/LEAF team will prepare a complete
and coordinated set of construction documents. The LEAF
team will submit the documents in-house through the quality
control team which will ensure continuous coordination
between all project team members and SUSD.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                             17
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

SIM-PBK’s procedure for budgeting, cost planning, cost                                      COLLABORATIVE APPROACH WITH DSA AND
monitoring, and cost estimating includes:                                                   CALIFORNIA STATE REGULATIONS AND CODES
  ◼   End of program verification, a cost model (based on
                                                                                            We have personal, respected relationships with DSA and
      budgets/historical data) establishes targets for each
                                                                                            a long history of engaging DSA early in the process to
      program element and building system throughout each
                                                                                            gain consensus. These relationships are especially critical
      phase.
                                                                                            in today’s post-bond environment and ensure that DSA
  ◼   Agreed-upon budget continuously monitored through                                     is part of the solution to minimize schedule delays and
      computer-assisted project management programs.                                        potential additional costs.

  ◼   Cost for individual items are progressively monitored
                                                                                            SIM-PBK is located at the seat of state government
      using value engineering and life cycle analysis as
                                                                                            in Sacramento, just an exit away from all the key state
      necessary.
                                                                                            agencies, with whom we have built trusted and valuable
  ◼   In addition to the continuous reappraisal of costs, formal                            relationships that consistently benefit our educational
      estimates are prepared and updated at each stage of                                   clients. You will get hands-on, real-time service and quality
      the design process. Normal milestones include 25%,                                    through our roofing experts, along with an unmatched
      50%, 95%, and 100%. Over the past five years, we                                      depth of resources and unparalleled expertise.
      have consistently been successful in designing within
      established project budgets. Approximately 83 percent of
      our work is from repeat clients, and SIM-PBK recognizes
      that in order to maintain the strong relationships we have
      built over the years, we must adhere to our clients’ budget
      requirements.

Quality Assurance
As an integral part of the construction team, our job is
to make sure all team members know and perform their
expected tasks. This is accomplished by proactively directing
communication and workflow so that every team member
has the opportunity to perform their duties correctly and
efficiently. The communication protocol established at the
beginning, and accountability amongst the team is mutually
agreed upon. In a collaborative meeting, team members
review the drawings and specifications to establish a thorough
understanding of the project goals. Everyone on the team
agrees to the schedule and commits to meeting the project
deadlines. SIM-PBK and the team of consultants understand
the importance of being accessible and willing to help solve
job site dilemmas. Ultimately, this team approach to building
means more success to the District and the Community.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                              18
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

EXPERIENCE
In the past five years, SIM-PBK has done over $800 million                                   CLOVIS UNIFIED SCHOOL DISTRICT
dollars in school projects.                                                                  Contact Person: Denver Stairs
                                                                                             Position: Assistant Superintendent
SIM-PBK has been designing schools for more than three                                       Address: 1450 Herndon Ave., Clovis, CA 93611

decades and is well equipped to work with the diversity                                      Telephone Number: (559) 327-9265

of educational systems. We are committed to the design
                                                                                             CENTRAL UNIFIED SCHOOL DISTRICT
of learning environments of the very highest standards,
                                                                                             Contact Person: Joseph Martinez
translating the best modern teaching/learning standards
                                                                                             Position: Director of Facilities
into applicable settings. We build relationships through
                                                                                             Address: 4605 N. Polk Ave., Fresno, CA 93722
active, hands-on, senior level involvement in the development                                Telephone Number: (559) 275-9560
of innovative, functional, cost effective solutions. Our
experience working with campus end-users and interpreting                                    MADERA UNIFIED SCHOOL DISTRICT
their needs, combined with our knowledge of current                                          Contact Person: Rosalind Cox
design trends and technological advances in K-12 building                                    Position: Director of Facilities Planning and Construction
design, provides the intelligence necessary to ensure the                                    Management
development of state-of-the-art facilities.                                                  Address: 1902 Howard Rd Madera, Ca 93637
                                                                                             Telephone Number: (559) 675-4548

First, and perhaps most importantly, our team knows how
                                                                                             MERCED CITY SCHOOL DISTRICT
to listen. We understand that a single client is composed
                                                                                             Contact Person: Dr. Ken Testa
of several constituencies (facilities staff, administrators,
                                                                                             Position: Facilities Director
students) that promote different (and sometimes conflicting)
                                                                                             Address: 2105 Wardrobe Avenue
concerns. Our team is experienced at articulating the
                                                                                             Telephone Number: (209) 385-6332
relationships and comparative merits of differing points
of view while nurturing an attitude of collaboration and
teamwork. Accordingly, our team approaches each project
without preconceived solutions, and provides open-minded,
imaginative solutions to your project and goals. Bringing
these qualities together with our experience allows us to
focus on the development of a high-quality solution for your

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                            19
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

MAPLE ELEMENTARY MODERNIZATION
MAPLE ELEMENTARY SCHOOL DIST RICT

                                                                          FIRE LANE

SIZE
                                                                                        BUS DROP OFF

                                                                                                                                                                                       BASKETBALL
                                                                                                                                                                RR

                                                                                                       KINDER                       CLASSROOMS

                                                                                                                         3      4         5        6    ENT.

10,328 sq. ft.
                                                                                                              TK

                                                                                                                                                                                                                        SOFTBALL
                                                                                                       KINDER                PLAY             PLAY
                                                          FRESNO AVENUE

                                                                                                        PLAY

                                                                                                                                     PLAY
                                                                                                              CR
                                                                                        DROP

                                                                                                                    1
                                                                                                                                                                                                         CINDER TRACK
                                                                              PARKING

                                                                                                              CR

NUMBER OF HOURS OF
                                                                                                                    2

                                                                                                              LIB
                                                                                                                                                                           FIRE LANE
                                                                                        OFF

                                                                                                                        AMPHITHEATER                            CR 7
                                                                                                       ADMIN

SERVICE
                                                                                                                                                                                                    LJ

                                                                                                                             STAGE                              CR                                                            FOOTBALL
                                                                                                                                                                     8
                                                                                                                                                                RR
                                                                                                       ENTRY
                                                                                                                              STAGE

1,642
                                                                                                       SIGN

                                                                                                                                              CR

                                                                                                                                                               SHADE
                                                                                        DROP

                                                                                                       PLAZA
                                                                                                                                                               STRUCT
                                                                                                                                                   RR
                                                                                                                                    MPR
                                                                                                                                                   RR
                                                                                        OFF

                                                                                                                                                                                             HJ
                                                                                                                        ST          KIT            ST

D SA C LO S E O U T STAT U S
                                                                                                           STAFF                                                                                                               BASEBALL
                                                                                                                                      YARD
                                                                                                          PARKING

TBA - In Progress
                                                                                                                                                          WATER
                                                                                                                                                          TANK
                                                                                                                                                                         SHOT
                                                                                                                                    WAREHOUSE

                                                                                                                                                                                                                                    S C A L E

                                                                                                                                                                                                           50’          25’    0’      50’      100’   150’

                                           MAPLE ELEMENTARY SCHOOL
C O N TAC T                                MAPLE ELEMENTARY SCHOOLD DISTRICT - SITE PLAN

Maple ESD                                             The Maple Elementary School Modernization had a unique beginning. The original
29161 Fresno Avenue                                   architect was unable to complete the project; therefore, SIM-PBK was recruited to
Shafter, CA 93263                                     finish the project in order for the District to receive their funding. The project consists
Julie Boesch
                                                      of demolition of all existing classrooms, administration and replacing all classrooms,
(661) 746-4439
                                                      administration and library with new modular constructed AMS facilities purchased

SERVICES PROVIDED                                     and installed under an existing piggyback agreement. Install new restroom facility,
Full architectural services                           seismic retrofit of the multi-purpose building, converting existing library in multi-
                                                      purpose building into a classroom, install new site, campus-wide electrical system,
                                                      install new campus-wide fire alarm system.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                                                                          ◼         JANUARY 27, 2021                                                                                      20
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

PINEDALE ELEMENTARY MODERNIZATION
CLOVIS UNIFIED SCHOOL DIST RICT

SIZE
35,000 s.f.

NUMBER OF HOURS OF
SERVICE
2,000

D SA C LO S E O U T STAT U S
Complete

LO CAT I O N
Fresno, CA                                            This major modernization project included a complete interior remodel of all the
                                                      classrooms, as well as new construction of a multi-purpose building and a new
C O N TAC T                                           kindergarten wing. The classrooms received new carpets, new suspended acoustical
Clovis USD                                            ceilings, new casework and sink, new paint, new HVAC, lighting and technology
1450 Herndon Avenue
                                                      systems. The new kindergarten wing included two classrooms, a teacher workroom
Clovis, CA 93611
                                                      and two restrooms. The interior finishes were bright and cheery, and able to stand up
Denver Stairs
                                                      to the young students. The exterior architectural design blends comfortably with the
(559) 327-9260
                                                      rest of the campus while making a quiet but substantial claim of its own. The multi-
SERVICES PROVIDED                                     purpose building was relocated from its previous location to a new location where
Full architectural services                           it now anchors the campus along with the administration, library and kindergarten
                                                      buildings. The multi-purpose areas are comprised of a cafeteria, stage, kitchen, teacher
                                                      break room, custodian office and storage areas. The cafeteria is a designed to be an
                                                      event venue first, with a performance type stage, lighting and sound systems followed
                                                      by a place to eat secondarily. The students and teachers are particularly proud of the
                                                      eagle logo laser cut into the VCT flooring.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                   21
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

TEMPERANCE-KUTNER ELEMENTARY MODERNIZATION
CLOVIS UNIFIED SCHOOL DIST RICT

SIZE

66,761 s.f.

NUMBER OF HOURS OF
SERVICE
206

D SA C LO S E O U T STAT U S
Complete

LO CAT I O N
Clovis, CA                                           Temperance-Kutner is one of the oldest campuses in the Clovis Unified School District.
                                                     Its original administration wing dated back to the 1940’s. The modernization project
C O N TAC T                                          included a total interior remodel of all classrooms and restrooms as well as a new
Clovis USD                                           3,400 s.f. administration building. The classroom scope included a new HVAC system,
1450 Herndon Avenue
                                                     new energy efficient lighting, new suspended acoustical ceilings, new casework,
Clovis, CA 93611
Denver Stairs                                        new technology, and new doors and hardware. Campus wide ADA access was also
(559) 327-9260                                       implemented. The new administration building was carefully located so as to connect to
                                                     the back of the campus for efficiency, safety and functionality. Its location also provides
SERVICES PROVIDED                                    a new “face” to the community. The architectural vocabulary was chosen to sensitively
Full architectural services                          blend with the older portions of the campus while communicating to the community
                                                     the importance of 21st Century learning. One of the highlights of modernizing this
                                                     campus was bringing the aspect of the old forward. A school bell from the original
                                                     administration wing was refurbished and installed in a new bell tower.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                     22
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

 Project Name /                          Schedule Project                               Description
 Contact                                          Cost
 Santa Rosa City Schools
 Maria Carrillo High School              S: 6/2017           $1,950,000                 The scope included complete MEP and fire alarm consulting
 Mechanical Replacement                  F: 5/2019                                      engineering services for HVAC equipment replacement of
 Project                                                                                eighty-three (83) rooftop units replaced in several campus
                                                                                        buildings consisting of a combination of constant volume and
 Mike Braff
                                                                                        variable volume packaged dx rooftop units with gas heat, and
 Director of Facilities                                                                 fire alarm interconnection for emergency shutdown for fans
 P: 707-528-5301                                                                        greater than 2,000 cfm. Also, separate building area system
 E: mbraff@srcs.k12.ca.us                                                               served by central station variable air volumes units were
                                                                                        replaced with new units. Structural reinforcement provided as
                                                                                        necessary at all curb openings.
  Clovis Unified School District
 Center for Advanced                     S: 5/2019           $1,223,000                 LEAF provided evaluation of existing HVAC system and fire
 Research and Technology                 F: 8/2019                                      alarm consulting engineering for the 66,000 SF single building
 Denver Stairs                                                                          campus to correct outside air delivery system, cooling issues
 1450 Herndon Avenue                                                                    and system control issues for the facility jointly owned by Clovis
                                                                                        and Fresno Unified School Districts. Working and coordinating
 Clovis, CA 93611
                                                                                        between both districts and the campus director allowed us to
 P: 559-327-9265
                                                                                        determine several proposed solutions and then work with the
                                                                                        budget to get a scope of work within the budget that provides
                                                                                        the best solution.
 Windsor Unified School District
 Proposition 39 Energy                   S: 2/2016           $1,240,000                 The scope included a complete MEP and fire alarm engineering
 Conservation Project                    F: 3/2019                                      services for HVAC equipment. HVAC systems consisted
 Lois Standing                                                                          of packaged DX rooftop units with gas heat and fire alarm
 Billing and Purchasing                                                                 interconnection for emergency shutdown. Also, separate
 P: 707.837.7708                                                                        building area systems were served by the replacement of
 E: lstandring@wusd.org                                                                 ground source heat pumps under Proposition 39 Funds.

 City of Fresno Airports Division
 Fresno Airport                          S: 2016             $525,000                   The scope included a complete evaluation of the existing HVAC
 Administration Building                 F: 2017                                        system was performed. After recommendations were reviewed
 HVAC Modernization Project                                                             with the owner design was performed on the selected HVAC
 Richard L. Madrigal
                                                                                        renovations. Scope of work included electrical and fire alarm
 P:559-621-4500
                                                                                        upgrades and structural calculations for the HVAC upgrades.
                                                                                        As the prime contact holder We provided all coordination of sub
                                                                                        consultants and handled the City Building department submittal
                                                                                        and review. Additionally, bidding and construction services were
                                                                                        provided through completion of the project.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼    JANUARY 27, 2021                                               23
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

CHANGE ORDER DATA

Change Order Control
SIM-PBK takes the approach to proposed change orders very seriously. One of our primary responsibilities will be to deliver
a project that adheres to Sierra Unified School Districts budget. The best way to diminish change orders is with quality
construction documents. However, contractor and owner-initiated proposed changes are a natural part of the construction
process. When proposed change requests are presented by the owner or the contractor, we make it our responsibility to review
the proposed change in conjunction with the approved project scope, budget and schedule. It is critical that the team weigh
the importance of the proposed change along with any available contingency dollars in order to properly weigh the benefit to
the project. SIM-PBK commonly employs a contingency allowance in order to provide cushion for unforeseen circumstances
that might affect final cost. This allowance is reserved strictly for unforeseen items that are absolutely necessary to fulfill all
project requirements.

Upon receipt of a change request, the SIM-PBK team will discuss the time frame with Sierra USD prior to processing a change
order proposal. It will be necessary for the entire team to heavily scrutinize any proposed changes that are issued beyond the
optimum time frame given the obvious potential negative impacts to the project budget and schedule. The team will make a
definitive decision and approve a delayed change order only if the project contingency and schedule can accommodate the
proposal.

CHANGE ORDER EXAMPLES

                                                                                               Owner        Architect      Contractor        Total
 Project                                             Cost Estimate        Bid Amount
                                                                                               Initiated    Initiated       Initiated         CO

 Virginia Lee Rose Elementary                         $27,396,301         $26,168,997        $992,252.44   ($171,971.31)   ($34,667.83)   $759,537.23

 Ridgeview Middle School                              $38,960,368         $36,247,285         $1,184,671    $354,794        $211,047       $1,750,511

 Kermit Koontz CTEC                                   $4,600,000          $4,900,000           $15,000      $32,000          $9,200        $56,620

 Merced STEAM Center                                  $3,500,000           $4,046,557          $50,000      $100,000        $29,500        $179,484

 Jackson ES Multi-Purpose Room                         $7,200,000          $8,452,743         ($35,000)     $32,000          $9,500        ($6,842)

 Pinedale Elementary School Modernization              $1,700,000          $2,083,557           31,373        4015           ($8,769)       $26,619

 Temperence Kutner Elementary School
                                                      $6,500,000          $6,468,028               -             -              -              -
 Modernization

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                                                24
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

CUSTOMER SERVICE COMMITMENT
SIM-PBK was founded on a culture that prioritizes client
service, professional integrity, and continuous growth
as our fundamental values within a well-defined set of
core ideologies. These values require that SIM-PBK staff
continuously demonstrate the most responsive service to
any client request or problem — we never settle for simply
satisfying a client in our solutions to design and construction
challenges but constantly seek to exceed expectations every
time. We regularly seek feedback from our clients to ensure
that this is occurring at all levels of the firm.

We know our success is determined exclusively by our
clients, and it's because of this that we aim to consistently
meet their expectations. Every aspect of our firm, from
selection of personnel to design methods and construction
services, has been strategically planned to respond to the
specific needs of our educational clients. Our team operates
on a die-hard “can-do” business philosophy that emphasizes
SIM-PBK’s strongest cultural characteristic: to go above and
beyond the call of duty to ensure that our clients receive the
best possible service in the industry.

LOCAL BUSINESS PARTICIPATION
SIM-PBK/LEAF Engineers are local to the County of Fresno.
SIM-PBK maintains a business license in the City of Fresno
and LEAF Engineers in the City of Clovis. We are rooted in
the Central Valley and use local consultants and businesses
as much as possible.

LITIGATION
SIM-PBK has not been terminated for default, litigation
settled, or judgments entered within the last five years or
had any criminal convictions for false claims within the last
five years.

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021   25
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

ADDITIONAL INFORMATION

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021   26
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021   27
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021   28
BIL L IN G RATES AN D
4

    REIMBU RS ABLE EXPEN SES
        “AT TACH MEN T 3”
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

BILLING RATES AND REIMBURSABLE
EXPENSES "ATTACHMENT 3"

              ATTACHMENT 3 – FEE SCHEDULE AND REIMBURSABLE EXPENSES
               Fee proposal shall include the percentage of construction cost that shall be
               billed for projects when the method of compensation is determined to be by
               percentage of construction cost.
                           Size                       Construction Cost                        Percentage of Architect's Fee
                Small Projects                  Under $100,000                                   15%

                                                $100,000 - $500,000                              1 2%

                                                $500,000 - $1,000,000                            11.5%

                                                $1,000,000 - $3,000,000                          11%

                Medium Projects                 $3,000,000 - $5,000,000                          10%

                                                $5,000,000 - $7,500,000                          9%

                                                $7,500,000 - $10,000,000                         8%

                Large Projects                  Greater than $10,000,000                         7%

             REIMBURSABLE EXPENSES

             Consultant(s) shall list the reimbursable expenses, if any, on a unit cost basis.

                   Reimbursable Expense                                                         Unit Cost

                   24 x 36 Pri n t                                                         $ 1.0 0 / She e t

                   8 ½ x 11 Pri n t                                                        $ 0.15 / She e t

             The only reimbursements that will be paid to consultants shall be for actual cost of
             incidental materials and services authorized by the District. Reproduction of bidding
             documents shall be coordinated with the District printing vendor. Travel expenses and
             mileage are non-reimbursable.

                  Sierra Unified School District RFQ for Architectural / Engineering Services                    Page 18 of 21

SIM-PBK ◼ RESPONSE TO SIERRA UNIFIED SCHOOL DISTRICT                                ◼   JANUARY 27, 2021                         29
P ER F O R M A N C E I N S PI R E D D E S I G N ◼ I N C O M P A R A B L E SERVICE

            BILLING RATES

                                                                       X Yes
             Do rates include travel charges?                                                   No

                                            Job Title                                        Hourly Rate    Daily Rate
                                                                                                           (min - max)

             Principal in Charge               				                                         $225.00/hour
             Design Director		                           			                                $215.00/hour
             Senior Project Manager                      			                                $205.00/hour
             Senior Project Architect       			                                             $205.00/hour
             Project Manager		                			                                           $185.00/hour
             Project Architect		              			                                           $180.00/hour
             Project Leader / Technical Leader 		                                           $150.00/hour
             Project Coordinator		                 		                                       $130.00/hour
             Architectural Intern / Designer        		                                      $115.00/hour
             Intern			                        			                                           $90.00/hour
             Senior Project Designer          			                                           $200.00/hour
             Project Designer		               			                                           $185.00/hour
             Design Leader		                  			                                           $140.00/hour
             Designer II			                         		                                      $135.00/hour
             Designer			                            		                                      $110.00/hour
             Senior Educational Facilities Planner 		                                       $230.00/hour
             Facilities Planner		             			                                           $185.00/hour
             Senior Construction Administrator 		                                           $210.00/hour

                                                                                             J a nua ry 2 7, 2 02 1
                                                                                             __________________________
                                                                                             Effective Dates of Rates

                                       Signature

            NOTE: All licensed professionals in responsible charge of the work MUST be directly employed by the
            responding Consultant and NOT employed as a Sub-Consultant. Consultant will propose an all-inclusive
            hourly fee for all Services describe in the RFQ. Consultant's proposed fee should include and account for
            all direct labor costs, fringe benefits, insurance, overhead, profit, and all other expenses the Consultant will
            incur in providing Services. All other Services not included herein shall be negotiated as required.