ANNUAL PERFORMANCE PLAN - FOR 2018-2019 NOVEMBER 2017 - AGRISETA
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Contents Part A: Strategic overview....................................................................................................................... 5 1. Situational analysis.......................................................................................................................... 5 1.1. Performance delivery environment .................................................................................... 5 1.2. Organisational environment ............................................................................................... 6 2. Revisions to legislative and other mandates .............................................................................. 7 3. Overview of 2018 budget and MTEF estimates .......................................................................... 8 3.1. Expenditure estimates ........................................................................................................ 8 3.2 Relating expenditure trends to strategic outcome oriented goals ......................................... 12 Part B: Programme and sub-programme plans .................................................................................... 13 1. Programme 1: Administration ...................................................................................................... 13 2. Programme 2: Skills Planning .................................................................................................... 20 3. Programme 3 Learning programmes and projects ................................................................... 32 4. Programme 4: Quality assurance .............................................................................................. 41 Part C: Links to other plans ................................................................................................................... 44 5. Links to the long-term infrastructure and other capital plans...................................................... 44 6. Conditional grants ......................................................................................................................... 44 7. Public entities ................................................................................................................................ 45 8. Public-private partnerships ........................................................................................................... 50 No partnership exist with a public entity.............................................................................................. 50 Annexure A: Technical Indicator Descriptor ......................................................................................... 51 4
Part A: Strategic overview 1. Situational analysis Whilst the AgriSETA Sector Skills Plan (SSP) aims to address wide range of issues in the agricultural sector, in essence it captures the following important realities which have a direct impact on the process of development of such skills in the sector1; The global consensus on commitment to agriculture as a key driver for achieving food security, poverty alleviation and economic growth in Sub-Saharan Africa, calls for new strategies and approaches in Agriculture for development. This commitment will directly encourage development of capacity towards smallholder and emerging farming sector. The sectoral challenges, which include Inter Alia: Equity; Growth and Competitiveness; Environmental Sustainability; and Governance as identified in the Integrated Growth and Development Plan of the Department of Agriculture, Forestry and Fisheries for the period 2011-2031 shape the process of packaging these skills in the sector. The pressure on AgriSETA to balance the disbursement of discretionary funds to AET, NQF 1 and NQF 2 learning programme, due to the fact that the Agriculture relies heavily on unskilled and semi-skilled workers with higher pitched learning in response to technological advances and the increase in the need for skilled agricultural workers; The required efforts of the agriculture sector to change the image of agriculture to attract the youth, to advocate prevalent career and business opportunities in the sector. The continued low success rate of land reform projects need to be factored into discretionary grant funding plans of the AgriSETA. 1.1. Performance delivery environment The need for discretionary grant funded support to deliver on the required learning programmes in the sector outstrips the available resources of the AgriSETA. The Strategic plan has been updated to the National Treasury framework with the following significant changes: AgriSETA identified 4 programmes that will be driven to achieve the organisational goals aligned with the proposed DHET framework for Strategic Plans; Strategic outcome orientated goals were devised for the organisation 5
1.2. Organisational environment The AgriSETA structure is well balanced and is entrenched from Accounting Authority level to the Operational structure. Stability and extensive institutional knowledge however challenges exist to fill vacancies resulting from resignations. The AgriSETA registration that was extended up to 2020 makes the management of talent challenging. National Council of Provinces (NCOP) select committee on education and recreation & national assembly portfolio committee on Higher Education and Training Executive Authority (DHET) AgriSETA Accounting Authority EXCO CEO Standing Comm. Strategic O Operations P E R Programme 1: Programme 2: Programme 3: Programme 3: A Administration Skills Planning Learning Quality Assurance Resources programmes and T projects I O Decent work Quality Assurance N Finance Research A Governance Reporting Rural Qualification L Development and Development Cooperatives ICT Mandatory Grants Human resources Agricultural Youth and career leadership capacity development Public entity partnership development 6
2. Revisions to legislative and other mandates The following legislative mandates are noted: Proposal for the New National Skills Development Strategy (NSDS) and Sector education and Training Authorities (SETAs) The following pending court case should be noted: The court case between Business Unity South Africa (BUSA) and the Minister of Higher Education and Training, BUSA won the court case, currently the mandatory grants are still pitched at 20%. Changes to the Mandatory grants can have a significant impact on the number of employers participating in the mandatory grant process. There have been no significant changes to AgriSETA’s mandates. 7
3. Overview of 2018 budget and MTEF estimates 3.1. Expenditure estimates Table 1: AgriSETA Adjusted Medium term expenditure estimate Programme Audited outcome appropriation R('000) 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1. Administration 31 102 35 958 38 982 44 195 49 103 50232 53 903 56 868 2. Skills Planning 55 196 46 821 54 579 76 083 79 225 75 762 86 122 90 859 3. Learning programmes 168 979 141 922 180 138 209 520 229 416 252 202 255 670 269 732 and projects 4. ETQA - - - - 20 102 20 102 20 102 20 102 21 208 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 255 277 224 701 273 699 349 900 377 846 398 298 415 797 438 666 8
Total Economic classification Current payments 38 357 40 085 40 591 42 566 49 103 50 232 53 903 56 868 Compensation of employees 17 226 11 856 14 166 22 400 20 127 23 916 26 678 28 145 Salaries and wages 16 268 10 360 12 611 21 186 20 127 22 557 25 232 26 620 Social contributions 958 1 496 1 555 1 214 1 359 1 446 1 526 Goods and services 20 686 27 843 25 963 20 166 28 975 26 316 27 225 28 722 Of which 1 0 Agency and support/outsourced services 7 207 7 864 9 286 8 073 8 557 10 003 9 614 10 143 Communication 1 240 649 667 850 901 951 1 012 1 068 Computer services 23 - - - - - - Consultants - 854 266 787 2 337 934 937 989 Contractors - - - - - - - Inventory 319 226 456 700 742 784 834 880 Lease payments 197 62 257 165 - 200 197 208 Repairs and maintenance 167 385 793 416 441 466 494 521 Research and development 261 489 845 700 - - - Training and staff development 113 577 798 800 848 895 951 1 003 Travel and subsistence 2 584 4 171 3 369 3 815 4 044 4 526 4 535 4 784 Other 8 575 12 566 9 226 3 860 8 910 5 325 5 613 5 922 Depreciation 445 385 462 - - - - QCTO 2 195 2 232 3 038 3 205 - - - - Sale of fixed assets - - - - - - - Impairments and Adjustments to Fair Value - - - - - - - Adjustments to Fair value of financial assets - - - - - - - 9
Impairments to non-financial assets - - - - - - - Interest, dividends and rent on land 1 - - - - - - Interest 1 - - - - - - Dividends - - - - - - - Rent on land - - - - - - - Transfers and subsidies 217 092 279 331 243 061 305 705 328 743 348 066 364 100 384 126 Employer Grant (SETAs only) 54 936 137 409 62 923 61 826 66 739 62 505 73 636 77 686 Other government units - 85 016 - - - - - National government - - - - - - - Departmental agencies and accounts - - - - - - - Provinces - - - - - - - Municipalities - - - - - - - National Skills Fund - 85 016 - - - - - Public corporations and private enterprises - 6 061 9 189 - - - - (subsidies and other transfers) Public corporations - - - - - - - Private enterprises - 6 061 9 189 - - - - Households and non-government units 54 936 46 332 53 734 61 826 66 739 62 505 73 636 77 686 Discretionary Grant (SETAs only) 162 156 141 922 180 138 243 879 262 003 285 561 290 464 306 440 Other government units 137 526 141 922 - - - - - National government 109 824 141 922 - - - - - Departmental agencies and accounts - - - - - - - 10
Provinces 27 702 - - - - - - Municipalities - - - - - - - National Skills Fund - - - - - - - Public corporations and private enterprises 24 630 - 180 138 243 879 262 004 285 561 290 464 306 440 (subsidies and other transfers) Public corporations - - - 243 879 - - - Private enterprises - - - - - - - Households and non government units - - - - - - - Higher education institutions - - - - - - - Foreign governments and international - - organisations - - - - - Non-profit institutions - - - - - - - Households - - - - - - - Social benefits - - - - - - - Other transfers to households - - - - - - - Technical reserves (social security funds only) - - - - - - - Tax payment - - - - - - - Outside shareholders Interest - - - - - - - Total Expenditure 255 277 224 701 273 699 349 900 377 846 398 298 415 797 438 666 11
3.2 Relating expenditure trends to strategic outcome oriented goals Creditable institutional mechanisms: this goal will be supported through the implementation of the skills planning programme, focus will be on establishing research capacity and strengthening the sector skills committees. It is expected that the full allocated budget will be spend ; Increased professional, vocational, occupational and workplace learning to create decent jobs: This goal will be supported through the implementation of the skills delivery programme with the focus on addressing the critical skills identified in the updated sector skills plan. The funding of learnerships, bursary and internship programmes will be prioritised; Increased skills levels of cooperatives, NGOs, CBOs in support of Land Reform and rural development.: This goal will be supported through implementation of the skills delivery programme; a renewed focus will be placed on partnership funding and support to rural structures and youth. Funding will be prioritised for learnership and skills programmes; Improved Agricultural education and training systems: This goal will be supported through the implementation of the ETQA programme and a renewed focus of funding will be channelled towards expanding on the RPL programme and towards alignment with the QCTO processes. Increased Mandatory grant participation of levy paying employers: This goal will be supported through the implementation of the skills planning programme, a renewed focus will be placed on the induction of new employers and the capacitation of Skills Development Facilitators (SDFs) Increased participation of Youth in Agriculture: This goal will be supported through the implementation of the skills planning programme focussing on increased participation in career development events Increased Public sector capacity: This goal will be supported through the implementation of the Administration and Skills Planning programmes, focussing funding on the development of agricultural leaders and strengthening the capacity of board structures. 12
Part B: Programme and sub-programme plans 1. Programme 1: Administration 1.1. Purpose: To provide strategic leadership, management and support services to AgriSETA. The programme include the Accounting Authority, CEOs office, General Managers office , Financial Administration; Internal Audit; Risk; Stakeholder Relations, Communication; Information Technology and the Human Resources Department To improve the service delivery of public institutions in the agricultural sector through the following offices: Accounting Authority: Provides leadership, decision-making strategic direction. Office of the CEO: Provides leadership, strategic direction, policy development, decision-making support and financial oversight for AgriSETA. Financial Administration: Provides the department with sound financial services. General Managers office: Provides operational management services. Stakeholder Relations, Communication and marketing: establishes and strengthens intergovernmental and stakeholder relations, manages communication and marketing services. Internal audit, provides auditing services to ensure compliance with policies and procedures Information Technology(ICT), provides hardware and software support to AgriSETA Human Resources department provides Human capital support for AgriSETA to deliver on its mandate 13
Sub programme 1: Finance Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.1 To manage To reduce the internal - - - - 10% 10% 10% 10% AgriSETA control deficiencies reduction reduction reduction reduction finances in reported in the previous alignment AG report by 10%. with PFMA and National Treasury guidelines Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.1.1. Percentage of budget variances and - - - - 10% 20% 30% 40% adjustments reduced 1.1.2. 100% of invoices processed within - - - - 100% 100% 100% 100% PFMA guidelines 1.1.3. All service providers procured and - - - - 100% 100% 100% 100% managed within National Treasury guidelines 1.1.4. Maintain a 90% verification rate with - - - - 90% 90% 90% 90% the asset register 1.1.5. Collection rate of 90% of provincial - - - - 90% 90% 90% 90% levies 14
Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 1.1.1. Percentage of budget variances Annually 10% reduction - - - 10% and adjustments reduced 1.1.2. 100% of invoices processed within Quarterly 100% invoices 100% 100% 100% 100% PFMA processed in compliance with PFMA regulations 1.1.3. All service providers procured and Quarterly 100% of service 100% 100% 100% 100% managed within National Treasury providers guidelines 1.1.4. Maintain an 90% verification rate Quarterly 90% reduction 90% 90% 90% 90% with the asset register 1.1.5. Collection rate of 90% of provincial Annually 90% collection rate 0 0 0 90% levies of provincial levies Sub programme 2: Governance Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.2 To provide strategic To improve - - - - 15% 15% 15% 15% . direction and the improvemen improveme improveme improvemen oversight to AgriSETA governance t of nt of nt of t of for effective and function of the governance governance governance governance function function function function direct facilitation of board by 15% interventions in annually achievement of the organisational goals 15
Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.2.1. Number of board meetings - - - - 4 4 4 4 1.2.2 Number of board sub-committee - - - - 4 4 4 4 meetings 1.2.3. 10% increase in the quality of the - - - - 10% increase 10% 10% 10% increase information that the board receive in quality increase in increase in in quality from board sub-committees quality quality Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 1.2.1. Number of board meetings Quarterly 4 1 1 1 1 1.2.2 Number of board sub- Annually 4 1 1 1 1 committee meetings 1.2.3. 10% increase in the quality of Annually 10% increase in - - - 10% the information that the board quality increase in receive from board sub- quality committees 16
Sub programme 3 : Information Technology(ICT) Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.3. Provision of a To increase the - - - - 10% increase 10% increase 10% 10% increase hard and responsiveness of the increase software ICT solution by 10% solution to annually AgriSETA Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.3.1. 90% of all ICT (hard and software) - - - - 90% resolved 90% resolved 90% 90% resolved related incidents resolved within 24 in 24 hours in 24 hours resolved in in 24 hours hours of first report. 24 hours 1.3.2. ICT solution reviewed annually - - - - 1 1 1 1 Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 1.3.1 90% of all ICT (hard and software) Annually 90% of queries 90% of 90% of 90% of 90% of related incidents resolved within resolved queries queries queries queries 24 hours of first report. resolved resolved resolved resolved 1.3.2 ICT solution reviewed annually Annually 1 0 0 1 0 17
Sub programme 4: Human Resources Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.4. Provision of To increase and - - - - 80% 80% 80% 80% Human Capital maintain the level satisfaction satisfaction satisfaction satisfaction support to of employee AgriSETA satisfaction to 80% annually Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1.4.1. 90% of employees participate in - - - - 90% 90% 90% 90% further career development 1.4.2. 90% of vacant positions filled - - - - 90% 90% 90% 90% 1.4.3. All employees sign performance - 53 100% 100% 100% contracts annually Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 1.4.1. 90% of employees participate in further Annually 90% - - - 90% career development 1.4.2. 90% of vacant positions filled Quarterly 90% 90% of 90% of 90% of 90% of vacant vacant vacant vacant positions positions positions positions filled filled filled filled 18
1.4.3. All employees sign performance Annually 100% 100% - - - contracts annually 1.3. Reconciling performance targets with the Budget and MTEF Table 1: Programme name: Administration Expenditure outcome Adjusted Medium term expenditure estimate Sub Programme: R’000 appropriation R’000 NO DESCRIPTION 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1 Finance 14 361 17 894 19 030 19 638 18 638 19 638 19 638 20 718 2 Governance 2 093 2 192 2 620 2 637 3 081 3 635 4 289 4 525 3 *Information Technology(ICT) 3 572 3 512 4 511 183 193 204,6 216,87 229 4 Human Resources 10 403 11 856 12 625 18 621 23 744 26 754 26 678 28 145 #Youth and Career 5 673 774 196 3 115 - - - 0 Development *Outsourced function 31 102 35 958 38 982 44 195 49 103 50232 53 903 56 868 # Moved to Skills Delivery 1.4. Performance and expenditure trends Finance-During this MTEF this sub-programme will focus on the implementation of the new SCM guidelines Governance- This sub-programme will focus on the continuous development of board sub committees and structures *Information Technology-The management and storage of information will be prioritised through the maintenance of infrastructure and the continuous improvement of information systems Human Resources-The retention of talent and human capital will be prioritised in this MTEF in light of the new SETA landscape. The management and measurement of performance will also be prioritised through the implementation of a new performance management system. 19
2. Programme 2: Skills Planning 2.1. Purpose: To ensure that HRD information is available and to contribute to skills development planning. This programme aims to address the challenges resulting from the lack of institutional mechanisms, to provide credible information and an analysis of the supply and demand for skills, thus informing the skills planning and delivery processes. It also looks at the gap in terms of the capacity to conduct and coordinate professional research, and the dissemination of information. The management of mandatory grants will be done through the skills planning department who is ultimately responsible for achieving the objectives within this programme. Currently AgriSETA has approximately 21 408 registered employers, of which 5 233 pay skills development levies. The SETA has a total of 2 394 registered SDFs (skills development facilitators) throughout the nine provinces, who are either employed by companies or work as freelance consultants for one or more companies. Generally, the mandatory grant system and the submission of the WSPs (workplace skills plans) and ATRs (annual training reports) by companies are working well, at a 73% pay-out rate to employers participating in mandatory grants. However, there are some challenges that need to be addressed in order to maximise the effectiveness of this process. Sub-programme 2.1.: Research Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2017/18 2018/19 2019/20 2020/21 2013/14 2014/15 2015/16 2016/17 2.1. Establish and To establish and enhance a - - - 1 system 1 system 1 system 1 system 1 system maintain a credible credible institutional mechanism for skills mechanism for skill planning planning and delivery and delivery in the in agricultural sector agricultural sector by 2019 20
Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.1.1. Sector skills plans, Annual performance plans and 1 1 1 1 1 1 SSP 1 SSP 1 SSP Strategic plans updated 1 APP 1 APP 1 APP 1 SP 1 SP 1 SP 2.1.2. Research agenda developed and approved No target No target 1 1 1 1 1 1 2.1.3. Number of SSC committees established and 0 1 7 11 SSCs 11 SSC’s 11SSC’S 11SSC’s 11SSC’s strengthened through capacity building sessions 2 2 Meet. 2 Meet . 2 Meet. 2 Meet. and plenaries. Capacity building 1 Plen. 2 plen. 2 Plen. 2 Plen. 1 Plenary Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 2.1.1. Sector skills plans, Annual Annually 1 SSP 1 SSP 1 APP 0 0 performance plan and strategic 1 APP 1 SP 1 SP plans updated 2.1.2. Research agenda developed and Quarterly 1 0 0 1 0 approved 2.1.3. Number of SSC committees Annually 11 SSC’s 0 11 SSC’s 0 11 SSC’s established and strengthened 2 Meetings 1 1 through capacity building sessions 2 Plenary Meetings Meetings and plenaries. 1 Plenary 1 Plenary 21
Sub-programme 2. 2: Reporting Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets performance Plan target 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.2. Improved To increase the - - - - 30% increase 30% increase 30% 30% management of accessibility of increase increase information and Information and knowledge that is knowledge by 30% generated within and outside the AgriSETA to enhance performance and inform the overall strategic planning processes 22
Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.2.1. Number of internal knowledge No Target No Target No Target No Target 4 4 4 4 exchange sessions 2.2.2. Number of performance monitoring No Target No Target No Target No Target 12 12 12 12 sessions facilitated with target holders within AgriSETA 2.2.3. Maintain a 10% Improvement in the No Target No Target No Target No Target 10% 10% 10% 10% validity of reported information improveme improve improve improveme nt ment ment nt 2.2.4. Improve the quality of performance No Target No Target No Target No Target 10% 10% 10% 10% information by 10% through internal improveme improve improve improveme workshops and feedback. nt ment ment nt Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting period Annual target Quarterly targets indicators 2018/19 1st 2nd 3rd 4th 2.2.1. Number of internal Quarterly 4 meetings 1 1 1 1 knowledge exchange sessions 2.2.2. Number of Quarterly 12 meetings 3 3 3 3 performance monitoring sessions facilitated with target holders within AgriSETA 23
2.2.3. Maintain a 10% Quarterly 10% 10% 10% 10% 10% Improvement in the improvement improveme improve improve improv validity of reported nt ment ment ement information 2.2.4. Improve and Quarterly 10% 10% 10% 10% 10% maintain the quality improvement improveme improve improve improv of performance nt ment ment ement information by 10% through internal workshops and feedback. Sub-programme 2.3: Mandatory Grants Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.3 Improved To increase employer - - - - 15% increase 15% 15% 15% Mandatory access to grant increase increase increase Grant information by 15% to Administration enable the maximum number of enterprises in the sector to participate in the National Skills Development Strategy. 24
Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.3.1. Annual revision of the mandatory grant No target No 1 system 1 system 1 system 1 system 1 system 1 system to improve effectiveness; target reviewed reviewed reviewed reviewed reviewed system reviewe d 2.3.2. An increase in the participation of No target No 380 large 361 large 410 large 410 large 410 large 410 employers in mandatory grants; target firms firms firms firms firms large 470 545 500 medium 545 545 firms medium medium firms medium medium 545 firms firms firms firms medium 850 small 1011 small 900 small 1011 1011 firms firms firms firms small small 1011 firms firms small firms 2.3.3. Increasing the payment of mandatory 76% of 76% of 76% of 78% of 78% of grants to 76% annually, grants paid grants paid grants grants grants paid paid paid 2.3.4. Number of SDF’s trained annually as part 30 40 Not 412 SDF’s 50 SDFs 75 SDFs 80 SDFs 85 SDFs of support to employers; reported trained trained trained trained trained 25
Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting period Annual target 2018/19 Quarterly targets indicators 1st 2nd 3rd 4th 2.3.1. Annual revision of Annually 1 system reviewed and 0 0 1 0 the mandatory grant improved system to improve effectiveness; 2.3.2. An increase in the Annually L-Large employer-410 0 410 L 0 participation of M-Medium employer-545 545 M employers in S-Small employer-1011 1011 S mandatory grants; 2.3.3. Increasing the Annually 76% of mandatory grants - _ _ 76% of payment of paid mandat mandatory grants ory to 76% annually, grants paid 2.3.4. Number of SDF’s Annually 75 SDF’s trained annually 0 0 75 0 trained annually as part of support to employers; 26
Sub programme 2.4. Agricultural leadership capacity Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.4. Increase the To increase - - - - 40% 40% increase 40% increase 40% internal and leadership increase increase external skills by 40% to establish leadership sound social capacity to partner effectively governance direct and structures and facilitate the systems. delivery of sector- specific interventions. Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.4.1 Number of learners participating in Not No 25 40 40 40 40 40 Agricultural leadership development reported target programmes 2.4.2. Number of capacity building Not Not 0 1 1 1 1 1 programmes for board standing reported reported committees; 27
Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting period Annual target 2018/19 Quarterly targets indicators 1st 2nd 3rd 4th 2.4.1. Number of learners Quarterly 40 0 0 40 0 participating in Agricultural leadership development programmes 2.4.2. Number of Annually 1 0 0 1 0 capacity building programmes for board standing committees; Sub programme 2.5. Public entity partnership development Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2.5. Increase To increase - - - - 30% increase 30% increase 30% 30% public sector the skills increase increase capacity for levels of beneficiaries improved of public service sector delivery and capacity to provide building appropriate programmes 28
support for by 30% agricultural and rural development Programme performance Audited/Actual performance Estimated Medium-term targets indicators performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 Number of co-funded - - - - 8 8 8 8 2.5.1 projects supported through public entities Number of research - - - - 10 10 10 10 2.5.2. projects established Number of partnerships - - - - 7 7 7 7 with Public Entities in 2.5.3. support of Ministerial Projects Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting Annual target 2018/19 Quarterly targets indicators period 1st 2nd 3rd 4th 2.5.1 Number of co- Annually 8 2 2 2 2 funded projects supported through public entities 2.5.2. Number of research Annually 10 - - 5 5 projects established 29
2.5.3. Number of Annually 7 2 2 2 1 partnerships with Public Entities in support of Ministerial Projects 2.2. Reconciling performance targets with the Budget and MTEF Table 2: Programme name: Skills Planning Medium term expenditure Expenditure outcome Adjusted Sub Programme: estimate appropriation R’000 R’000 NO DESCRIPTION 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 1 Research 241 452 782 1 383 925 1 383 1 383 1 459 2 Reporting - - - - - - - 3 Mandatory Grants 50 815 42 857 49 704 57 656 61 733 57 817 68 562 72 333 4 Agricultural leadership capacity - - - 2 088 1 358 1630 1 630 1 720 Public entity partnership 5 - - - 9 250 9 267 9 250 8 088 8 533 development 7.5% Project Management 4 140 3 512 4 093 5 706 5 942 5 682 6 459 6 814 Total programme budget 55 196 46 821 54 579 76 083 79 225 75 762 86 122 90 859 30
2.3. Performance and expenditure trends Research The priority for the research sub-programme within the MTEF for 2018 will be to establish and strengthen internal research capacity through additional human capital and to re-structure and capacitate the Sector Skills Committee’s to inform the AgriSETA planning process Reporting Within this MTEF the reporting sub-programme will focus on strengthening internal monitoring and verification processes to ensure that credible and reliable information is reported that further enhancing the SETAs capacity to use internal data for planning purposes Mandatory Grants During this MTEF this sub-programme will focus on strengthening data collection through the WSP/ATR process and to increase the current base of employers participating in the mandatory grant process Agricultural Leadership capacity The expenditure focus for this period will be on the development of new and emerging farmers and governance capacity of the AgriSETA accounting Authority Public entity partnership development The expenditure for this reporting period will focus on the establishment of research activities within the Agricultural sector and to support Agricultural structures to improve service delivery. 31
3. Programme 3 Learning programmes and projects 3.1. Purpose: To, through skills development impact on the productivity and profitability of the agricultural sector and to contribute to food security, vibrant entrepreneurship and self-reliance especially for rural economies. Sub programme 3.1: Professional, Vocational, Occupational and Workplace Learning – Decent Work Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2016/17 2020/21 2013/14 2014/15 2015/16 2017/18 2018/19 2019/20 3.1 Increase non- To increase the efficiency - - - - 30% increase 30% 30% 30% increase . academic of beneficiaries/learners in in efficiency increase increase in in efficiency workplace the workplace by 30% 10% increase in efficiency 10% increase based annually and increase in access efficiency 10% in access vocational access to learning 10% increase in learning opportunities by 10% increase access opportunities in annually in access the agricultural sector Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 3.1.1. Number of learnerships, skills and AET LS-1371 LS-586 LS-899 LS-1822 LS-2600 LS-2405 LS-2700 LS-2900 programmes to employed learners; SP-3616 SP-399 SP-3469 SP-2447 SP-2892 SP-2919 SP-2892 SP-3000 AET-1477 AET-931 AET-933 AET -1025 AET -850 AET -830 AET -850 AET -875 3.1.2. Number of commodity organisations Com. Orgs Com. Orgs Com. Commodit Commodity Commodity Commodity Commod supported - 10 20 Orgs 16 y Orgs - 17 Orgs - 20 Orgs - 20 Orgs - 20 ity Orgs - 20 3.1.3 Number of employed learners completing LS-962 LS-331 LS-1249 LS-No LS-1150 LS-1200 LS-1350 LS-1450 learnerships, skills and AET programmes; SP-3455 SP-413 SP-3547 target SP-1152 SP-1350 SP-1445 SP-1445 AET-773 AET-581 AET-519 SP-No AET -425 AET -425 AET -425 AET -435 Target AET –No Target 32
3.1.3. Number of Internship and graduate INT-418 INT-285 INT-268 INT-613 INT-365 INT-400 INT-410 INT-420 placement programmes; G.PL 485 G.PL 361 G.PL 294 G.PL 361 G.PL 370 G.PL 375 G.PL 380 G.PL 385 3.1.5. Number of Internship and graduate INT- No INT-94 INT-138 INT-No INT-125 INT-125 INT-125 INT-125 placement programmes completed; Target G.PL 261 G.PL 41 target G.PL 138 G.PL 138 G.PL 138 G.PL 138 G.PL-No G.PL No Target Target 3.1.6. Number of bursaries to employed and un- Artisan Artisan Artisan Artisan Artisan 235 Artisan 219 Artisan Artisan employed learners and Artisan 131 227 335 201 B(18.1)–125 B(18.1)–120 233 233 Development programmes; B(18.1)–87 B(18.1)–87 B(18.1)9 B(18.1)– B(18.2)-275 B(18.2)- 250 B(18.1)– B(18.1)– B(18.2)- B(18.2)- 5 100 160 200 187 157 B(18.2)- B(18.2)- B(18.2)- B(18.2)- 234 372 275 280 3.1.7. Number of employed and un-employed Artisan 49 Artisan Artisan1 Artisan No Artisan 130 Artisan 130 Artisan Artisan learners completing bursary and Artisan B(18.1)–44 113 75 target B(18.1)–50 B(18.1)–45 130 130 Development programmes; B(18.2)-45 B(18.1)–10 B(18.1)- B(18.1)– B(18.2)-82 B(18.2)-82 B(18.1)–50 B(18.1)–50 B(18.2)-5 Not No target B(18.2)-82 B(18.2)-82 reported B(18.2)-No B(18.2)- target Not reported 3.1.8. Number of HIV and Aids DVD’s Not 570 704 563 850 1000 1000 1000 distributed to create awareness reported Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting Annual target Quarterly targets period 2018/19 1st 2nd 3rd 4th 3.1.1. Number of learnerships, skills and Quarterly LS-2405 LS-600 LS-600 LS-600 LS-605 AET programmes to employed SP-2919 SP-0 SP-0 SP-1460 SP-1459 AET -830 AET-0 AET -276 AET -276 AET -278 learners 3.1.2. Number of commodity organisations Quarterly Commodity Orgs - 20 Com. Org- 0 Com. Org - 8 Com. Org - 8 Com. Org – 4 supported 33
3.1.3 Number of employed learners Quarterly LS-1200 LS-300 LS-300 LS-300 LS-300 completing learnerships, skills and AET SP-1350 SP-0 SP-0 SP-675 SP-675 programmes; AET -425 AET-0 AET -0 AET -212 AET -213 3.1.4. Number of Internship and graduate Quarterly INT-400 0 INT-200 INT-100 INT-100 placement programmes; G.PL 365 GPL-200 GPL-120 GPL- 45 3.1.5 Number of Internship and graduate Quarterly INT-125 INT-0 INT-0 INT-62 INT-63 placement programmes completed; G.PL 138 G.PL-0 G.PL -0 G.PL 69 G.PL 69 3.1.6. Number of bursaries to employed Quarterly Artisan 219 Artisan- 60 Artisan- 60 Artisan- 60 Artisan- 39 and un-employed learners and B(18.1)–120 B(18.1)–0 B(18.1)–40 B(18.1)–40 B(18.1)–40 B(18.2)- 250 B(18.2)-0 B(18.2)-70 B(18.2)-100 B(18.2)-80 Artisan Development programmes; 3.1.7. Number of employed and un- Quarterly Artisan 130 Artisan 0 Artisan 43 Artisan 43 Artisan 44 employed learners completing B(18.1)–45 B(18.1)–0 B(18.1)–0 B(18.1)–0 B(18.1)–45 B(18.2)-82 B(18.2)-0 B(18.2)-0 B(18.2)-0 B(18.2)-82 bursary and Artisan Development programmes; 3.1.8. Number of HIV and Aids DVD’s Quarterly 1000 0 350 600 50 distributed to create awareness 34
Sub programme 3.2. Rural Development Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 3.2. Increased To increase the - - - - 20% increase 20% increase 20% 20% governance and governance of NLPE’s by in governance in governance increase in increase in skills levels of 20% and skills levels of and 30% and 30% governance governance NLPE to create beneficiaries with 30% increase in and 30% and 30% increase in skills levels of increase in increase in stability and an annually. skills levels of unemployed skills levels skills levels environment for unemployed beneficiaries of of economic beneficiaries unemployed unemployed growth. beneficiaries beneficiaries Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 3.2.1. Number of Learnership, Skills LS – 1741 LS – 797 LS – 1263 LS – 1258 LS – 1900 LS – 2000 LS – 2150 LS – 2300 programmes for unemployed learners SP – 5189 SP –1821 SP –1651 SP – 3258 SP – 3900 SP – 2667 SP – 3000 SP – 3440 and support to Rural structures Mentor’s- Mentor’s Mentor’s Mentor’s Mentor’s 30 Mentor’s – Mentor’s - Mentor’s - Not - 30 - 24 - 48 30 35 40 reported 3.2.2. Number of unemployed learners LS – 125 LS – 22 LS – 470 LS – No LS – 768 LS – 800 LS – 840 LS – 900 completing Learnership and Skills SP – 3104 SP – Not SP –Not Target SP – 1750 SP – 2280 SP – 2600 SP – 3000 programmes reported reported SP – No Target 3.2.3. Number of learners entering new venture Not 30 50 27 60 64 70 75 creation programmes reported 3.2.4. Number of learners completing new No target No target 35 No target 40 45 50 55 venture creation programmes set 35
3.2.5. Number of organisations supported 550 241 220 321 220 220 220 220 through learnerships and new venture creation programmes in partnership with NGOs, CBOs, Co-ops 3.2.6. Number of extension officers to be 10 No target 233 56 60 70 80 90 trained Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance indicators Reporting period Annual target Quarterly targets 2018/19 1st 2nd 3rd 4th 3.2.1. Number of Learnership, Skills Quarterly LS – 2000 LS – 0 LS – 670 LS – 665 LS – 665 programmes for unemployed SP – 2667 SP – 0 SP – 0 SP – 661 SP – 2006 learners and support to Rural SRS- 30 SRS- 0 SRS - 5 SRS - 10 SRS - 15 structures 3.2.2. Number of unemployed Quarterly LS – 760 LS – 0 LS – 256 LS – 250 LS – 254 learners completing Learnership SP – 2280 SP – 0 SP – 0 SP – 1140 SP – 1140 and Skills programmes 3.2.3. Number of learners entering Quarterly 64 People 0 10 24 30 new venture creation trained programmes 3.2.4. Number of learners completing Quarterly 45 0 0 0 45 new venture creation programmes 3.2.5. Number of organisations Quarterly 220 0 100 100 20 supported through learnership and new venture creation programmes in partnership with NGOs, CBOs, Co-ops. 3.2.6. Number of extension officers to Quarterly 70 0 10 30 30 be trained 36
Sub programme 3.3: Youth and Career Development Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 3.3. The development To change the perception - - - - 30% increase 30% 30% 30% of an integrated of agriculture as a career in perception increase in increase in increase by 30% by exposing perception perception in career youth to opportunities in perceptio development agriculture and rural n programme development. Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 3.3.1. The development of an integrated career No target No No target No 1 1 1 1 development programme target target 3.3.2. Number of strategic partnerships No target No No target No 2 2 2 2 established for enhancing the capacity of target target youth in agriculture and career development 37
3.3.3. Number of career exhibitions Expo’s 16 Expo’s 8 Expo's 18 expo’s 15 x 15 x 15 x 15 x attended, schools involved and not Exhibit. Exhibit. Exhibit. Exhibit. learners exposed reported Schools Schools 873 x 164 x 100 100 100 100 not not schools schools Schools Schools Schools Schools reported reported Not Not 5 000 x 28887 x 5000x 5000x 5000x 5000x reported reported learners learners learners learners learners learners exposed exposed exposed exposed exposed exposed Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting period Annual target Quarterly targets indicators 2018/19 1st 2nd 3rd 4th 3.3.1. The development of an Annually 1 0 0 0 1 integrated career development programme 3.3.2. Number of strategic Annually 2 0 1 1 0 partnerships established for enhancing the capacity of youth in agriculture and career development 3.3.3. Number of career Quarterly 15 x Exhibit. 0 5 5 5 exhibitions attended, 38
schools involved and 100 Schools 0 35 35 30 learners exposed 5000x learners 0 1500 1500 2000 exposed 3.2. Reconciling performance targets with the Budget and MTEF Table 3 Programme name: Learning programmes and projects Expenditure outcome Adjusted Medium term expenditure estimate PROGRAMME: SKILLS DELIVERY appropriatio n R’000 R’000 N DESCRIPTION 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 O Professional, Vocational, Occupational and 1 128 910 96 816 127 823 117 629 124 909 138 122 140 078 147 782 Workplace Learning – Decent Work 2 Rural Development 27 396 34 462 40 365 80 400 84 419 92 284 93 363 98 498 3 Youth and Career Development - - - - 2 882 2 881 3 054 3 222 7.5% Project Management 12 673 10 644 11 950 11 488 17 206 18 915 19 175 20 230 Total programme budget 168 979 141 922 180 138 209 517 229 416 252 202 255 670 269 732 39
3.3. Performance and expenditure trends Professional, Vocational, Occupational and Workplace Learning – Decent Work The Sector Skills Plan for the 2018 period identified the development of higher level skills in the Agricultural sector as critical and scarce, through Learnerships, Bursaries, internships this programme will provide opportunities for the development of these skills in the Agricultural sector. This sub programme will ensure that the following Occupations amongst others, are addressed as identified in the sector skills plan for 2018: Veterinarians, Agricultural scientists, Farm Managers, Agricultural produce inspectors, Agricultural Engineers, Industrial Machinery Mechanic, Mobile plant operators, operations managers, mixed crop and livestock farm workers, Research and development Managers and Agricultural consultants, implementation will be through Learnerships, skills, internships and bursary programmes. The development of numeracy and literacy skills will also be prioritised to improve these basic level skills for employees. Rural Development During this MTEF this sub-programme will continue to focus on the strengthening and support to youth and co-operative structures to improve food security. Through new venture creation programmes and learnerships mentorship skills capacity will be built to mentor new and up-coming farmers. The development extension services to farming enterprises are seen as a keen initiative to support farmers and ensure longer term sustainability. The development of agricultural leadership will focus on providing the new and emerging farmer with the required competencies to increase the knowledge base increasing competitiveness and improving the overall sustainability of the emerging farming sector. This programme will again in this MTEF leverage on conditional grants to broaden the AgriSETA’s impact in support to Rural structures. This sub programme will ensure that the following Occupations amongst others are addressed as identified in the sector skills plan for 2018: Veterinarians, Agricultural scientists, Agricultural produce inspectors, Agricultural Engineers, Industrial Machinery Mechanic, Mobile plant operators, mixed crop and livestock farm workers, implementation will be through Learnership and skills programmes. Youth and career development-The priority within this sub-programme is to further expand on career development activities and to focus on partnerships to implement an integrated career development strategy 40
4. Programme 4: Quality assurance 4.1. Purpose: To ensure that there are sufficient, high quality skills development institutions serving the agricultural sector Strategic objective Strategic Audited/Actual performance Estimated Medium-term targets Plan target performance 2016/17 2017/18 2018/19 2019/20 2020/21 2013/14 2014/15 2015/16 4.1 Improve To increase the - - - - 30% 30% 30% 30% agricultural responsiveness of education and service providers to training the sector, that systems to be benefit annually more from capacity responsive to building initiatives the needs of by 30% and to the sector enhance the quality of learning programmes . Programme performance indicators Audited/Actual performance Estimated Medium-term targets performance 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 4.1.1. Number of Agricultural Colleges No target 12 15 21 11 11 11 11 (TVET's) supported with capacity building programmes. 4.1.2. Number of occupationally No target 3 7 0 6 6 6 6 directed qualifications developed; 4.1.3. Number of AQP’s supported No target 0 0 3 AQPs 5 AQPs 5 AQPs 5 AQPs 5 AQPs through alignment to the QCTO 4.1.4. Number of RPL projects No target 2 6 6 6 6 6 6 implemented 41
Quarterly targets 2018 Quarterly targets for programme performance indicators: Programme performance Reporting period Annual target 2018/19 Quarterly targets indicators 1st 2nd 3rd 4th 4.1.1. Number of Agricultural Annually 11 Colleges supported 0 4 4 3 Colleges (TVET's) supported with capacity building programmes. 4.1.2. Number of occupationally Annually 6 Qualifications fully developed 0 2 2 2 directed qualifications developed; 4.1.3. Number of AQP’s Annually 5 AQPs currently supported 0 1 2 2 supported through Alignment to the QCTO 4.1.4. Number of RPL projects Annually 6 RPL projects implemented 0 2 2 2 implemented 42
1.2. Reconciling performance targets with the Budget and MTEF Table 4 : Programme name: Quality assurance Medium term expenditure Expenditure outcome estimate Adjusted Sub PROGRAMME: QUALITY ASSURANCE appropriation R’000 R’000 NO DESCRIPTION 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 Enhancing agricultural education and 1 training systems to be more 8 131 8 233 19 148 18 594 18 594 18 594 18 594 19 617 responsive to the needs of the sector 7.5% Project Management 659 667 1 552 1 508 1 508 1 508 1 508 1 591 Total programme budget 8 790 8 900 20 700 20 102 20 102 20 102 20 102 21 208 4.1. Performance and expenditure trends This programme will continue to focus on strengthening the quality assurance function through support to the development of occupational qualifications and the support to assessment quality partners in the implementation of new qualifications. Closer participation and strengthening relations with Sector Skills Committees will be utilised to identify new or emerging occupations. The support to Colleges of Agriculture will continue to ensure that the base for learning programme delivery is broadened. The recognition of prior learning (RPL) programme will be further expanded to respond to the need of the sector. 43
Part C: Links to other plans 5. Links to the long-term infrastructure and other capital plans No Long term infrastructure or capital plans 6. Conditional grants The AgriSETA’s levy base is relatively small in relation to the need expressed for funding of learning interventions annually. The cross subsidization of capacity building programmes and the collaborative approach taken by AgriSETA broadens the impact of projects. The table below reflects the conditional grants currently active: No. Name of Grant Purpose Performance Continuation Motivation Indicator 1 Department of Provision of 4000 Skills Yes The current Labour (UIF) skills to Programmes economic conditions cooperatives in the sector and UIF (drought and beneficiaries climate change) and providing severely affected Training Lay- most farmers and off support to the request for distressed relieve through TLS employers is dire, the number of UIF beneficiaries to be assisted through skills development is still huge. 2 Limpopo IDFC Provision of 40 livestock Yes The need to Nguni cattle mentorship farmers will capacitate Development support to the benefit from indigenous livestock Trust Nguni Cattle the owners with the farmers in programme required skills in Limpopo. order to develop a scientific breeding, pasture and vaccination programmes in line with industry norms 3 Department of Provision of 50 farmers Yes The programme will Rural mentorship will benefit ensure that the Development programmes directly from programme remains (Eastern Cape) to the sustainable in the beneficiaries programme medium term 44
6.2. Public entities No. Name of Public Entity Mandate Output Current Date of Annual Evaluation Budget 1 Department of Rural Rural Training, R400 000 Annually- Development and Development infrastructure March Land Reform support, and 2018 Gauteng linkages. 2 Polokwane Local Rural Governance, R400 000 Annually- Municipality Development Enterprise March Development 2018 and Technical training 3 Regional Land Claims Rural Training, R400 000 Annually- Commission (KZN) Development infrastructure March support, and 2018 linkages. 4 North-West Rural Training, R400 000 Annually- Department of Rural Development infrastructure March 2018 Development and support, and Land Reform linkages. 5 Polokwane Local Rural Training, R400 000 Annually- Municipality Development infrastructure March 2018 support, and linkages. 6 Land Claims Rural Training, R400 000 Annually- Commission Limpopo Development infrastructure March 2018 support, and linkages. 7 Department of Rural Rural Training, R314 005 Annually- Development Development infrastructure March 2018 (Eastern Cape) support, and linkages. 7. Public entities AgriSETA recognises the importance of partnerships to achieve implementation of the Sector strategy. Over a number of years the SETA has worked with various sector stakeholders to implement skills development projects. Some projects are of a short term nature, but many have developed into medium term collaborations that have organically evolved into more meaningful longer term partnerships. This section is in two parts: the one dealing with existing partnerships, setting out their focus and scope; the second setting out a strategy for the development of new partnerships during the period 2015-2020. 45
7.1. Current partnerships Department of Rural Development and Land Reform Gauteng AgriSETA has funded emerging farmers through a budget of R400 000. These farmers were supported by the DRDLR through inputs for production as well as farm capital infrastructure. In total 8 farmers will benefit from the programme. The project will be reviewed and success factors evaluated to extend the project into the next financial year. Polokwane Local Municipality A funding of R 400 000 was approved by AgriSETA to assist farmers to be settled on the municipality’s farm. In total 4 farmers will benefit directly from the project. The proposed intervention covers areas such as Governance Training, Enterprise Development and Technical Training which focus on AgriSETA’s PIVOTAL programmes. The project will be continued based on an evaluation of the current year project. Regional Land Claims Commission (KZN) Funding of R 400 000 was approved by AgriSETA to land restitution projects as identified by the Land Claims Commission in KZN. A total of 8(eight) land restitution projects have been identified to be supported through mentorship programmes and capacity development programmes in governance and general management to ensure compliance to the Communal Property Association Act. The project will be continued based on an evaluation of the agreed deliverables. North-West Department of Rural Development and Land Reform AgriSETA in partnership with North-West Department of Rural Development and Land Reform approved a mentorship programme in the North West Province. One farming enterprise will benefit directly from the partnership. An amount of R400 000 has been approved for this project with the expectation to extend the project into the next financial year. Land Claims Commission Limpopo AgriSETA entered into a partnership with the Land Claims Commission in Limpopo. The project will focus on mentorship support and a budget to the value of R400 000 was approved. This support programme will be geared towards the Gagesho farming project. This project was approved for support by AgriSETA after it received Recapitalisation and Development funding from the Land Claims Commission to the value of R3 000 000. One owner and six full time employees will benefit from the project. The project after evaluation is expected to be extended based on the success of the intervention. 46
7.2. Planned Partnerships Youth The National Rural Youth Service Corps (NARYSEC) has as its focus to develop rural youth. In a joint project some 470 young people have been provided access to agricultural training. This is an important project as it aims to motivate and incentivise young people to work on the land and thereby have a stake in their rural communities rather than gravitate to the towns. It is unclear at this stage how successful the project has been. On the basis of a review the DRDLR and the SETA will determine whether to take the project forward in the longer term. Limpopo Department of Agriculture AgriSETA in partnership with the Limpopo Department of Agriculture will focus on the support to the Comprehensive Agricultural Support Programme (CASP), Revitalisation of Agriculture and Agro- processing value Chain (RAAVC). This partnership is conceptualised in line with the NDP nine point plan given context in the Operation Phakisa programme for Agriculture and Land Reform. Mining Development Agency and UIF AgriSETA in partnership with the Mining Development Agency and the UIF will focus on supporting skills development in mining communities interested in agriculture. The project will further focus of employees that were laid off in the mining sector. The project will be driven through a co-funded model in partnership with UIF, AgriSETA and MDA. Agricultural and TVET colleges Whilst there is no formal partnership in place, there has been a strategy developed in the sector and which informs a range of projects that need to be developed into a formal set of partnerships. The strategy is one of building the capabilities of the 11 Agricultural Colleges to deliver occupational qualifications to the sector. These colleges are in the process of being transferred from DAFF to DHET. There are a number of challenges that need to be addressed including funding models for programmes required in the sector, neglected infrastructure and equipment and the difficulty in establishing long term plans during a transitional period. The establishment of a formal partnership requires engagement with both the Departments (DAFF and DHET) and the SETA will initiate these discussions. It also requires engagement with the CEOs of the colleges and their umbrella body the Association of Principals for Agricultural Colleges (APAC). Working with the 11 colleges does not imply a neglect of either TVET colleges or universities but rather an acceptance that there are specialist colleges that have their own working farms and a long tradition of developing farm managers, and that this sector resource must be valued and retained. The SETA will work with universities to provide support to the 11 colleges and with the TVET colleges to identify learners in agricultural programmes who can be drawn into Agricultural college 47
You can also read