2022 UPDATED REPORT - California Trout

Page created by Janet Ayala
 
CONTINUE READING
2022 UPDATED REPORT - California Trout
2022 UPDATED REPORT
2022 UPDATED REPORT - California Trout
FOREWORD
California has more than 1,400 large dams and tens of
thousands of smaller impoundments on its rivers and
streams. These dams have created barriers to fish
movement, altered natural seasonal flow patterns in                                                  Foreword by Ted Grantham,
rivers, and are a primary cause of native fish population                                            Professor of Cooperative
                                                                                                     Extension, UC Berkeley and
declines in the state. While dams will continue to play
                                                                                                     former CalTrout/PPIC Fellow.
an essential role in managing water in California, many
aging dams have outlived their functional lifespan. These
include dams with sediment-filled reservoirs, those with
non-functional hydropower facilities, and those at risk
of failure, threatening downstream communities and
ecosystems. The removal of such dams has the potential
to bring substantial environmental benefits, while also
supporting the economic and recreational activities
associated with free-flowing rivers.

However, the removal of dams is time consuming,
expensive, and can be politically charged. That is why a
science-based approach for prioritizing dams for removal
is critical. In this report, CalTrout has identified 5 dams
that are ripe for removal. The selection of these dams
was informed by the review of past scientific studies,
understanding of their impact on salmon and steelhead,
awareness of their regulatory context, and sustained
engagement with the communities in which of the dams
are located. By strategically pursuing opportunities for
dam removal where economic, social, and environmental
interests strongly align, CalTrout offers a model for
restoring the health of the state’s rivers for the benefit
of fish and people.

Left: ‘Undam the Klamath’. Photo: Dominic Bruno. Cover: Copco #1, Klamath Dams. Photo: Dave Meurer
2022 UPDATED REPORT - California Trout
INTRODUCTION
The 1930s to the 1960s was an era of large-scale                  California Trout’s 2022 Top 5 California Dams Out Report        Dams that are part of the State Water Project or federal                                               “By strategically pursuing
hydroelectric dam building across the United States. The          highlights five dams that are ripe for removal and that must,   Central Valley Project were not considered for inclusion in
construction of these dams was important for electricity          for the health of the ecosystem and communities around          this report due to their vital role in California’s water supply                                        opportunities for dam removal
production and flood control, but today, many have outlived       them, come out. The five dams were selected by analyzing        system. Similarly, dams designed to protect people and
their useful lifespans. We have now entered a new era in          information found in several studies to assess the overall      property from catastrophic floods also were not considered.                                            where economic, social, and
which we must reevaluate the utility of aging infrastructure–     benefits that removing the dam would present to native fish,                                                                                                            environmental interests
and take down those dams that are no longer useful or safe.       water, and people.                                              The report highlights removal opportunities, such as dam
                                                                                                                                  license renewal or new funding opportunities to support the                                             strongly align, CalTrout offers
Dam removal is far from unprecedented. Between 1912 and           Dams were selected based on the following criteria:             removal process, and status of work being conducted to that
2020, 1797 dams were removed in the United States. In             • The dam blocks access to habitat for salmon and               end. It also identifies partners involved in removal efforts                                            a model for restoring the
1999, the dam removal movement began with the removal of            steelhead species listed as critical or high concern in       and provides opportunities for the public to take action on
                                                                                                                                                                                                                                          health of the state’s rivers for
Edwards Dam in Maine. In 2011, the giant Elwha River dams           the State of Salmonids II Report (written by UC Davis and     behalf of each dam listed.
in Washington state came down. In 2015, the 106-foot tall           California Trout scientists).                                                                                                                                        the benefit of fish and people.”
San Clemente Dam on the Carmel River was removed. The
                                                                  • The dam no longer serves its original purpose, whether                                                                                                               - Ted Grantham, Professor of Cooperative Extension, UC Berkeley
removal of these dams, and others that have outlived their
                                                                    generating hydroelectric power, increasing water supply,                                                                                                               and former CalTrout/PPIC Fellow
useful lifespans, can have tremendous benefits for fish
                                                                    or managing flood control, and may now pose a public
populations, watershed health, and people.
                                                                    safety threat.

Water supply and storage in California are crucial today in the   • A dam removal opportunity is present.
face of extreme drought and widespread wildfires. However,        • The primary purpose of the dam is not flood control or
maintaining a large number of dams and their subsequent             water supply for people.
reservoirs is not always the best option.

In some California watersheds, when large dams were built
following the construction of smaller dams, this created                       KLAMATH DAMS
a redundancy: more storage space than water exists in
these watersheds. In this situation, more water is lost to
                                                                           REDDING       BATTLE CREEK DAMS
evaporation from the reservoir surfaces than would be lost
if the water storage were concentrated to fewer reservoirs.                SCOTT DAM
This means that, for some watersheds, the most effective                             CHICO

way to supply and store water is to decommission some of
those dams.
                                                                                       SACRAMENTO

Instead of focusing solely on dams, there are many other
options for water storage. Recycling water, including                          SAN FRANCISCO

treated sewage, graywater, or stormwater can help meet
non-potable needs such as irrigation and fire protection.
Groundwater recharge is another water supply solution.

Many dams in California do provide benefits to Californians
including flood control, water supply, and hydroelectric                                             BAKERSFIELD
power. However, the dams included in this report have
                                                                                                    MATILIJA DAM
been carefully selected as dams that have outlived their
functional lifespans. The cost of leaving these dams in                                                    RINDGE DAM
place far outweighs the ecosystem and economic benefits                                                    LOS ANGELES

of removal.                                                                                                    IRVINE

                                                                                                                                                                                                                        CalTrout begins work on Eagle Canyon barrier removal. Photos: Pusher

                                                                                                                                                                                                                        Sources for Introduction: 1. https://watershed.ucdavis.edu/files/biblio/Null%20et%20al_JEMA_
                                                                                                                                                                                                                        Optimizing%20the%20dammed.pdf 2. https://www.kcet.org/redefine/5-reasons-dam-removal-still-
                                                                                                                                                                                                                        makes-sense-despite-the-drought 3.https://www.americanrivers.org/threats-solutions/restoring-
                                                                                                                                  Top: Eagle Canyon Dam. Photo: Damon Goodman. Above: Scott Dam. Photo: Darren Mierau   damaged-rivers/dams-wont-solve-water-needs/

4                                                                                                                                                                                                                                                                                                                   5
2022 UPDATED REPORT - California Trout
Copco #1, Copco #2, Iron Gate and J.C. Boyle (in Oregon) are four                            POTENTIAL FOR REMOVAL
                                                aging hydroelectric dams on the mainstem Klamath River, which flows
                                                through parts of Southern Oregon and Northern California. Removal                            All the pieces are in place for these
                                                of the dams has been the subject of national attention for nearly two                        dams to be removed by 2023 pending
                                                decades. Over 40 organizations, irrigation districts, and many tribes                        the license transfer. Funding for the
                                                support taking the dams out. Tribal leadership has been a central                            projects is set, with up to $450 million
                                                component of the dam removal effort. The Yurok, Karuk and Klamath                            secured from PacifiCorp ratepayers
KLAMATH DAMS                                    River Tribes have led the effort to restore part of their cultural heritage                  and the state of California through
                                                                                                                                             the 2014 Proposition 1 Water Bond.
                                                and subsistence fishing for salmon and lamprey.
                                                                                                                                             An independent group of expert
                                                                                                                                             consultants have assessed whether
OWNER: Klamath River Renewal
Corporation upon federal license transfer
                                            THE PROBLEM                                           CURRENT SITUATION                          existing funding is sufficient for KRRC
(likely July 2022)
                                                                                                                                             to complete the dam removal project.        KLAMATH DAMS
                                            The Klamath dams block salmon and                     A non-profit organization, the Klamath     The consultants determined that the
COMPLETED: 1922 (Copco #1), 1925            steelhead from reaching more than                     River Renewal Corporation (KRRC), was      KRRC’s methodology and approach to
(Copco #2), and 1964 (Iron Gate)
                                            300 miles of spawning and rearing                     formed in 2016 to take ownership of        assessing costs and risk is generally
LOCATION: Klamath River - the 4th dam,      habitat in the upper basin. Historically,             four PacifiCorp-owned dams (Copco          sound and it is likely that there will be
JC Boyle, is located in Oregon              the Upper Klamath-Trinity Rivers                      #1, Copco #2, Iron Gate and JC Boyle),     sufficient funding within the cost cap
FISH SPECIES AFFECTED: 7 species            spring-run Chinook salmon was the                     for the purpose of overseeing the dam      of $450M to complete the project.
including: Upper Klamath-Trinity Rivers     most abundant run on the river. Today                 removal process. That work will include
spring-run Chinook salmon, SOS II status:   less than 3% remain, in large part                    restoring formerly inundated lands         Removing the Klamath dams will be
CRITICAL; Southern Oregon/ Northern         because they cannot access historical                 and implementing required mitigation       the largest dam removal project in the
California Coast coho salmon, SOS II        habitat in the Upper Klamath Basin.                   measures in compliance with all            United States, restoring river health
status: CRITICAL; Klamath Mountains                                                                                                          and fish abundance and providing
                                            The four dams have been in a perpetual                applicable federal, state, and local
Province summer steelhead, SOS II                                                                                                            social justice to tribal people who have
                                            Federal Energy Regulatory Commission                  regulations. PacifiCorp will continue to
status: CRITICAL                                                                                                                             relied on salmon for subsistence for
                                            (FERC) relicensing process since                      operate the dams until FERC approves
SIZE: Iron Gate H 189 ft./L 540 ft.,        2000, originally started by then-owner                a license transfer to KRRC. KRRC is        thousands of years.
Copco #1 H 250 ft./L 415 ft., Copco #2
                                            PacificCorp.                                          currently working to secure permits,
H 63 ft./L 278 ft.
                                                                                                  develop deconstruction plans, secure
CAPACITY: Iron Gate 58,000 acre ft.,        While there is broad support for the
                                                                                                  bids for the work of removing dams
Copco #1 60,000 acre ft., Copco #2          removal of these defunct dams, there
                                                                                                  and restoring the lands under the
73 acre ft. (diversion dam)                 is some local opposition to the project,
                                                                                                  reservoirs, and contract with a design-
STAKEHOLDERS: Yurok Tribe, Karuk            including from landowners around
                                                                                                  build firm to run the majority of the
Tribe, Klamath Tribes, Trout Unlimited,     the current reservoirs and some local
                                                                                                  deconstruction project.
American Rivers, Pacific Coast Federation   ranchers and farmers.
of Fisherman’s Association, Northern
                                                                                                  One important remaining step is the
California Federation of Fly Fishers,
                                                                                                  transfer of the FERC license from
Salmon River Restoration Council,
                                                                                                  PacifiCorp to KRRC. This is currently
Sustainable Northwest, state and federal
                                                                                                  pending before FERC and is expected                                                                   TAKE ACTION
agencies, CalTrout, and more
                                                                                                  to be completed by summer of 2022.                                                                • Subscribe to the Klamath River Renewal
LAND ACKNOWLEDGEMENT: The Klamath                                                                                                                                                                     Corporation newsletter on their website
dams are on the ancestral tribal lands of
                                                                                                                                                                                                      klamathrenewal.org
the Yurok, Karuk, Klamath, Shasta, and
Hoopa Tribes                                                                                                                                                                                        • Follow KRRC on Facebook for the latest
                                                                                                                                                                                                      updates facebook.com/klamathrenewal
                                                                                                                                                                                                    • File a comment with FERC to support
                                                                                                                                                                                                      removal of the Klamath Dams using
                                                                                                                                                                                                      FERC’s eComment system

                                            Top: Copco #1. Above: Copco Lake. Photos: Mike Wier   Iron Gate Dam. Photo: Mike Wier            Iron Gate Dam. Photo: Mike Wier

6                                                                                                                                                                                                                                      7
2022 UPDATED REPORT - California Trout
Scott Dam is one of two dams that make up the Potter Valley                           from the Department of Fish and
                                                 Hydropower Project. The Project, owned by PG&E, consists of Scott                     Wildlife to assess the feasibility of
                                                 and Cape Horn dams, two reservoirs, a diversion tunnel that sends                     removing Scott Dam and Cape Horn
                                                                                                                                       Dam. From an engineering standpoint,
                                                 water south to the Russian River watershed, and a powerhouse.
                                                                                                                                       removal of both dams is very doable and
                                                 The Federal Energy Regulatory Commission (FERC) license for the
                                                                                                                                       we will continue to advocate for their
                                                 Project expires on April 14, 2022, and will not be renewed. PG&E
                                                                                                                                       removal in the License Surrender process.
                                                 will thus likely be directed by FERC to prepare a Surrender and
SCOTT DAM                                        Decommissioning Plan for the Project.                                                 We enter this next phase more
                                                                                                                                       informed about this complicated
                                                                                                                                       project. We remain committed to
OWNER: Pacific Gas & Electric (put up for
auction in September 2018 then withdrawn;
                                               THE PROBLEM                                 In 2019, CalTrout teamed up with            working with Congressman Huffman
                                                                                           Round Valley Indian Tribes, Sonoma          and other stakeholders in this process
FERC license application withdrawn in                                                      Water Agency, Humboldt County, and          so that we can return fish to the
January 2019)
                                               Fish populations in the Eel River are
                                               severely depressed. Although the Eel        Mendocino County Inland Water and           upper Eel River basin. The FERC
COMPLETED: 1921                                                                            Power Commission to file a Notice           License Surrender process provides
                                               River once boasted some of the best
LOCATION: Upper Mainstem Eel River             salmon runs in California, the river’s      of Intent to take over the project and      a unique opportunity to restore the
FISH SPECIES AFFECTED: California Coast        salmon and steelhead populations            implement a Two-Basin Solution.             Eel River and hold PG&E accountable                                           SCOTT DAM
Chinook salmon, SOS II status: HIGH;           are all listed as threatened under                                                      to remove unwanted and aging water
Southern Oregon/Northern California Coast      the Federal Endangered Species              The Two-Basin Solution, supported by        infrastructure.
coho salmon, SOS II status: CRITICAL;          Act. Water quality throughout the           Congressman Jared Huffman, sought
                                                                                           to maintain winter diversion of water
Northern California summer steelhead,
SOS II status: CRITICAL; Northern California
                                               Eel River is listed as impaired under
                                                                                           from the Eel River to the Russian River,
                                                                                                                                       POTENTIAL FOR REMOVAL
                                               the Clean Water Act for excessive
winter steelhead, SOS II status: MODERATE
                                               sedimentation and high temperatures.        while restoring migratory access
                                                                                                                                       Our recently completed Feasibility
SIZE: Height: 138 ft, Length: 850 ft           The river’s mainstem and estuary are        for fish to prime habitat above Scott
                                                                                                                                       Study, www.pottervalleyproject.
CAPACITY: Total designed capacity:             also negatively affected by habitat loss    Dam. The coalition worked together,
                                                                                                                                       org, has demonstrated the best path
80,600 acre ft. Forms Lake Pillsbury           from agricultural land conversions, the     following FERC procedures, to identify
                                                                                                                                       forward for the Potter Valley Project
                                               introduction of non-native pikeminnow,      and reference studies that support the
STAKEHOLDERS: PG&E, Sonoma Water,                                                                                                      that meets the needs of water users
                                               and poor water quality.                     plan and also find funding to complete
Mendocino County Inland Water and Power                                                                                                and conservation interests, as well as
Commission, Round Valley Indian Tribes,
                                                                                           relicensing.
                                                                                                                                       enhancing the ecological resilience
Humboldt County, Wiyot Tribe, CalTrout,        The 63 ft tall Cape Horn Dam has a                                                      of the Eel River. From analyzing the
Friends of the Eel River, Trout Unlimited,     poorly functioning fish ladder; the         Unfortunately, the $18 million of funding
                                                                                                                                       water supply needs to evaluating fish
The Nature Conservancy, Russian                130 ft Scott Dam, which creates Lake        needed was not able to be raised, in
                                                                                                                                       passage technologies, these Studies
Riverkeepers, California Hydropower            Pillsbury, has no fish passage and thus     large part because PG&E was unwilling
                                                                                                                                       have provided the necessary pieces for
Reform Coalition                               blocks 150 miles of potential salmon        to help. At a crossroads, in January of
                                                                                                                                       a negotiated settlement among all the
LAND ACKNOWLEDGEMENT: Scott Dam                and steelhead rearing habitat. Scott        2022, the coalition informed FERC it
                                                                                                                                       interested parties and PG&E.
is on the ancestral lands of the Round         Dam is the largest barrier to native        would no longer be submitting a Final
Valley Indian Tribes and the Wiyot Tribe       salmonid habitat in the Eel watershed       License Application by April of 2022
                                                                                                                                       While the removal of Scott Dam and
                                               and throughout the entire north coast.      and were effectively withdrawing their
                                                                                                                                       modification of Cape Horn Dam will
                                                                                           Notice of Intent to take over the Potter
                                                                                                                                       provide the foundation for major
                                                                                           Valley Project. FERC is now expected
                                                                                                                                       improvements to our imperiled fish
                                                                                                                                                                                                                           TAKE ACTION
                                               CURRENT SITUATION                           to initiate a License Surrender process
                                                                                                                                       populations in the Eel River, all of                                              • Support CalTrout’s Reconnect
                                                                                           with PG&E that will lay out a project                                                                                           Habitat Initiative
                                                                                                                                       the participating parties will need
                                               With PG&E’s decision to withdraw from       decommissioning plan.
                                                                                                                                       to work together to find a solution                                               • Visit pottervalleyproject.org for more
                                               relicensing the project CalTrout and
                                                                                                                                       that accelerates this outcome in                                                    information
                                               others recognize a unique opportunity       Now, CalTrout is pivoting to work on
                                                                                                                                       time to save these fish. As with many                                             • Subscribe to CalTrout’s newsletter to
                                               to steer the future of the Eel River        the License Surrender process. And,
                                                                                                                                       conservation efforts of this scale,                                                 receive updates on the project
                                               toward robust fisheries and a healthy       while no longer seeking to take over
                                                                                                                                       resolving the fate of PG&E’s Potter
                                               watershed. We also recognize the            the license, the past two years have
                                                                                                                                       Valley Project in a timely manner to
                                               opportunity to reverse the long-lasting     been extremely informative in helping
                                                                                                                                       benefit the environment will also
                                               impacts to Native American Tribes from a    achieve our goal of getting fish into
                                                                                                                                       improve the long-term water security
                                               century and a half of habitat degradation   the Upper Eel River. Our Two-Basin
                                                                                                                                       for Russian River water interests.
                                               and overharvesting impacts.                 Partership received a $1 million grant
Scott Dam. Photo: Kyle Schwartz                                                                                                                                                    Scott Dam. Photo: Kyle Schwartz

8                                                                                                                                                                                                                                                           9
2022 UPDATED REPORT - California Trout
Matilija Dam, located in the Ventura River watershed on                              Ventura County also is in the process of
                                                 Matilija Creek north of Ojai, is a concrete arch dam built in                        finalizing funding awards with the State
                                                 1947. Infamous for the scissors painted on the dam by graffiti                       Coastal Conservancy and the Wildlife
                                                                                                                                      Conservation Board to fully fund final
                                                 artists in 2011 that have become an iconic symbol for dam
                                                                                                                                      designs to update Camino Cielo. This
                                                 removal, it was originally designed for water storage and
                                                                                                                                      part of the project will replace an
                                                 flood control.
                                                                                                                                      undersized box culvert with a full span

MATILIJA DAM                                                                                                                          bridge, achieving similar ecologic and
                                                                                                                                      community benefits as the Santa Ana
                                                                                                                                      Bridge replacement.

OWNER: Ventura County Watershed
Protection District
                                               THE PROBLEM                                 CURRENT SITUATION                          POTENTIAL FOR REMOVAL
COMPLETED: 1947                                The reservoir behind Matilija Dam           Spanning 20 years of effort, a broad       With no uncertainty, Matilija Dam is
LOCATION: Ventura River                        is nearly completely clogged with           coalition of community groups and          set to come down; with each of the
                                               sediment, significantly reducing            resource agencies have advocated for       construction projects downstream,
FISH SPECIES AFFECTED: Fish species                                                                                                                                                                            MATILIJA DAM
affected: Southern California steelhead,       storage capacity to the point that the      Matilija Dam removal, working together     we are creating the pathway to achieve
SOS II status: CRITICAL, federally listed      dams is rendered non-functional. With       to develop a comprehensive strategy to     total dam removal. Removing Matilija
endangered species                             no fish ladder or bypass structure          restore the Ventura River.                 Dam will restore a free-flowing river
SIZE: 168 ft, Length: 620 ft,                  present, it is a complete barrier to the                                               from the headwaters to the ocean,
Total designed capacity: 7,018 acre ft.        migration of endangered Southern            Today’s Matilija Dam Ecosystem             re-establish access for steelhead
                                               California steelhead. The dam also          Restoration Project will cost millions     trout to required habitat, revitalize a
CAPACITY: Currently less than 500 acre ft.
                                               causes degraded water quality, an           of dollars and lacks dedicated funding,    healthy, native ecosystem, and expand
Projected capacity by 2020: 0 acre ft.
                                               altered flow system, and a disorder         a major impediment to action. Other        opportunities for outdoor recreation.
STAKEHOLDERS & PARTNERS:                                                                                                              Ventura County made the decision
                                               to the sediment flows going to              factors, such as determining an
Ventura County Watershed Protection
                                               the lower watershed, the estuary,           appropriate release strategy for all the   in 1998 to officially remove the dam.
District, California Department of Fish
                                               and beaches, which they need to             sediment build-up, needing to modify       In March 2016, a removal plan
and Wildlife, Matilija Coalition, Patagonia,
CalTrout, State Coastal Conservancy,           replenish themselves. Matilija Dam has      downstream roads, levees, and bridges,     was approved.
Surfrider Foundation, National Marine          impounded approximately 8 million           and impacts from the Thomas fire on
Fisheries Service, Wildlife Conservation       cubic yards of sediment; the physical       the surrounding landscape, have all        The removal plan will use two bore
Board, Pew Charitable Trust, Resource          condition of the dam continues              added to the challenges of the dam         holes at the base of the dam to
Legacy Fund, Ojai Valley Land Trust            to deteriorate.                             removal undertaking.                       remove and transport the impounded
LAND ACKNOWLEDGEMENT: Matilija Dam                                                                                                    sediment. This concept represents
is on the ancestral lands of the Chumash       Historically inhabiting the Ventura         In 2021, however, we saw immense           a “natural transport” alternative
Tribe including the Barbareño Band of          River watershed, Southern California        progress. With funds from California       that concentrates the downstream
the Chumash Tribe and the Barbareño/           steelhead are an incredibly important       Department of Fish and Wildlife            movement of the built-up sediment
Ventureño Band of Mission Indians              species because they evolved in             (CDFW), construction began to replace      during the first storm events that
                                               seasonally disconnected river systems       Santa Ana Bridge, a downstream             follow. This alternative will minimize
                                               and are an adaptable species, able to       structure that must be modernized          ecological impact downstream and
                                               survive in warmer waters than other         before the river can be set free.          lower the overall project cost by                                                          TAKE ACTION
                                               steelhead populations. With only an         The new bridge will improve the ability    reducing the need to truck material                                                      • Sign and support the Southern Steelhead
                                               estimated 500 individual species            to transport the sediment, while also      in and out of the reservoir. In 2020,                                                      Petition for endangered status listing
                                               remaining, this unique life history trait   expanding fish migration opportunities     Ventura County was awarded $5 million
                                                                                                                                                                                                                               • Help expand the Matilija coalition by
                                               makes them a particularly valuable          for Southern steelhead at a critical       from the Wildlife Conservation Board
                                                                                                                                                                                                                                 signing on as a group or individual at
                                               population to protect in the face of        location and providing greater flood       to fully fund securing Final Designs                                                       www.matilijadam.org
                                               climate change and shifting weather         flows passage. This pre dam removal        and engineering approval. Current
                                                                                                                                      projections estimate that once the                                                       • Vote for Natural Resource Funding and
                                               patterns. Removal of Matilija Dam will      work is moving forward and on-                                                                                                        contact your local representative
                                               reconnect access for steelhead to their     schedule for completion in 2022.           bore holes are opened, complete dam
                                               important prime habitat, 17 miles in                                                   removal and a free-flowing river will be
                                               fact of spawning, rearing, and foraging                                                achieved in 2 to 5 years.
                                               locations above the dam.

Matilija Dam. Photo: Mike Wier                                                                                                                                                   Matilija Dam from above. Photo: Bernard Yin

10                                                                                                                                                                                                                                                                 11
2022 UPDATED REPORT - California Trout
The 100-foot-tall Rindge Dam in Malibu Creek is located in the Santa               Approximately 76,000 cubic yards
                                                Monica Mountains, about three miles upstream from Southern                         of sediment would be placed along
                                                California’s Malibu coastline. Construction of the concrete dam                    the Malibu shoreline and nearshore
                                                                                                                                   areas. The remaining sediment will be
                                                and spillway structure was completed in 1926 on the Rindge family
                                                                                                                                   transported to a local landfill.
                                                property and provided water for irrigation and household use in Malibu.
                                                The reservoir filled entirely with sediment by the 1940s, and the dam
                                                was decommissioned in 1967. It was purchased shortly thereafter by                 POTENTIAL FOR REMOVAL
RINDGE DAM                                      California State Parks and is now part of Malibu Creek State Park.
                                                                                                                                   The Malibu Creek Ecosystem
                                                                                                                                   Restoration Study Final Integrated
                                                                                                                                   Feasibility Report was completed
OWNER: California Department of Parks
and Recreation
                                            THE PROBLEM                                CURRENT SITUATION                           in November 2020 and signed by
                                                                                                                                   Commanding General Scott Spellmon                                               RINDGE DAM
COMPLETED: 1926                             Rindge Dam has altered the natural         The removal of Rindge Dam represents        in December 2020. The design phase of
LOCATION: Malibu Creek                      geomorphic, riparian, and aesthetic        a unique opportunity for systemic and       the project will begin in 2022. The 2021-
DECOMMISSIONED: 1967                        character of Malibu Creek. The dam         sustainable ecosystem restoration           2022 California State Budget allocates
                                            has trapped over 780,000 cubic             in highly urbanized Southern                $12.5 million for CDPR to advance
FISH SPECIES AFFECTED: Southern
                                            yards of sediment that was naturally       California. Rindge Dam was deemed           planning, design, and technical studies
California steelhead, SOS II status:
CRITICAL, federally listed endangered       destined for the coastline, where it       obsolete due its lack of function as        leading to removal of the dam. Over
species                                     would support beach nourishment            a water storage facility and has been       the next four years, CDPR will lead the
                                            and reduce coastal erosion. After          the subject of removal planning             design phase of this project, which will
SIZE: Height: 100 ft.
                                            the reservoir behind Rindge Dam            for decades.                                include additional technical studies;
CAPACITY: 600-acre ft. completely filled    completely filled with sediment less                                                   dam removal design; environmental
with sediment
                                            than 30 years after its construction,      While there is little disagreement          permitting; and public outreach and
STAKEHOLDERS: California Dept of            it was decommissioned 54 years ago.        about the need to remove Rindge Dam,        education.
Parks and Rec, Santa Monica Mountains                                                  progress has been incremental given
National Recreation Area, Santa Monica      The lower three miles of Malibu Creek      the science and engineering                 Trucking the impounded sediment to
Mountains Resource Conservation District,
                                            below Rindge Dam are designated            complexities of the project. The dam        its end destination is a particularly
City of Malibu, Mountains Restoration
                                            critical habitat for the federally         removal process was formalized when         complex piece of the project.
Trust, California Trout, Surfrider, Army
Corps of Engineers, National Marine
                                            endangered Southern California             the U.S. House of Representatives           Approximately one-third, or 276,000
Fisheries Service, California Department    steelhead. The dam is a barrier to         commissioned the “Malibu Creek              cubic yards, of the impounded
of Fish and Wildlife, Las Virgenes          Southern California steelhead and          Ecosystem Restoration Feasibility           sediment would be trucked to Ventura
Municipal Water District                    blocks their access to high-quality        Study” in 1992, which requested a           Harbor, placed on barges, and
LAND ACKNOWLEDGEMENT: Rindge Dam
                                            spawning and rearing habitat.              solution to improve the Malibu Creek        deposited along the Malibu shoreline
is located on the ancestral lands of the    Moreover, Rindge Dam prevents              watershed and Malibu shoreline. The         or nearby areas that have been
Santa Ynez Band of Chumash Indians and      steelhead from accessing more than 18      U.S. Army Corps of Engineers and            sediment-starved since Rindge Dam
the Gabrielino-Tongva Indian Tribe          miles of historic spawning and rearing     California Department of Parks              was built. The remaining two-thirds
                                            habitat in Malibu Creek and tributaries.   and Recreation co-led this study
                                                                                       to evaluate ecosystem restoration
                                                                                                                                   of the sediment would be deposited                                           TAKE ACTION
                                                                                                                                   at a local landfill. The timeframe
                                                                                       opportunities to improve aquatic and                                                                                   • Sign and support the southern
                                                                                                                                   to transport all the sediment is
                                                                                       riparian ecosystem habitat connectivity                                                                                  steelhead petition for endangered
                                                                                                                                   estimated eight years due to seasonal
                                                                                       and restore more natural sediment                                                                                        status listing
                                                                                                                                   construction and daily trucking
                                                                                       transport to the coast.                     restrictions. The estimated total                                          • Attend public meetings about
                                                                                                                                   cost of the LPP is $279 million, with                                        the project
                                                                                       The Locally Preferred Plan (LPP) was        significant cost savings if sediment                                       • Contact federal and state legislators
                                                                                       selected as the preferred alternative for   transport costs can be economized.                                           with support for Rindge Dam
                                                                                       dam removal. The LPP calls for the                                                                                       removal
                                                                                       removal of the concrete arch dam and
                                                                                       spillway; removal or modification of
                                                                                       eight smaller upstream fish passage
                                                                                       barriers; and removal of ~780,000 cubic
                                                                                       yards of impounded sediment.
                                            Malibu Creek. Photo: Bernard Yin                                                                                                   Rindge Dam. Photo: Mike Wier

12                                                                                                                                                                                                                                                 13
2022 UPDATED REPORT - California Trout
The project was originally developed to support the power demand of                  The hatchery is currently reliant on
                                                  mineral extraction in Shasta County including Iron Mountain Mine near                water delivery from the Battle Creek
                                                  Redding. The drainage was seen as an ideal drainage for hydropower                   Hydroelectric Project. CalTrout in
                                                                                                                                       collaboration with USFWS, BOR and
                                                  generation due, in part, to its spring-fed water supply. The project
                                                                                                                                       others are working together to find
                                                  included 8 low-head dams within anadromous reaches, an additional 4
                                                                                                                                       ways to secure the water supply needs
BATTLE CREEK                                      dams outside of the anadromous habitat, and a complex network of 20
                                                  diversion canals and pipelines.
                                                                                                                                       of Coleman Hatchery independently

DAMS                                                                                                                                   from the project and paving the way
                                                                                                                                       for improved fisheries in Battle Creek.

OWNER: Originally built by Keswick Power
Company and now owned by Pacific Gas
                                               THE PROBLEM                                 CURRENT SITUATION
& Electric (PG&E)
                                               Historically, Battle Creek was home to      There is new hope on the horizon
COMPLETED: Hydroelectric development           a diverse assemblage of anadromous          to provide volitional passage to all
began in the early 1900’s with the first
                                               and resident fishes adapted to its          historical fish habitats in Battle Creek
power produced in late 1901. PG&E acquired                                                                                                                                                                                        BATTLE CREEK DAMS
                                               specific hydrology and habitats. North      and restore it’s natural hydrograph.
the facility in 1919 and the fifth and final
powerhouse was added in 1980
                                               Fork Battle Creek is spring-fed with        PG&E was in the process of renewing
                                               water originating from the flanks of Mt.    a federal (FERC) hydropower license
LOCATION: Battle Creek, tributary to the
                                               Lassen and provided ideal spawning,         before its expiration on July 31st,
Sacramento River near Red Bluff, CA
                                               holding and rearing habitats for winter-    2026. Over 2 decades of planning and
FISH SPECIES AFFECTED: Central Valley          run Chinook salmon. This run or ecotype     restoration efforts were underway to
spring-run Chinook salmon, SOS II status:      is unique to California and is one of the   balance the needs of native fishes
CRITICAL; Central Valley winter-run Chinook
                                               most endangered salmon.                     with hydropower generation.
salmon, SOS II status: CRITICAL; Central
Valley steelhead, SOS II status: MODERATE
                                               The South Fork Battle Creek                 In 2020, PG&E filed notice of its intent
SIZE: 12 to 56 feet in height                  hydrograph is storm driven and has          to not file an application for a new
CAPACITY: Water storage capacity totals        deep holding pools that provide             license and no other party filed a notice
3,827 acre-feet (range by reservoir from       habitats for spring-run Chinook             of intent to assume responsibility
15 to 1,827 acre-feet)                         salmon which are listed as threatened       of the project, which will likely lead
STAKEHOLDERS: Battle Creek Watershed           on the Endangered Species Act.              to decommissioning. Restoration
Conservancy, U.S. Bureau of Reclamation,       Anadromous steelhead trout, Pacific         efforts have now pivoted to preparing
U.S. Fish and Wildlife Service, NOAA           Lamprey and a host of native resident       for project decommissioning and             Top: Eagle Canyon Dam. Above: North Fork feeder dam.
Fisheries, California Department of            fish species reside in the drainage.        maximizing the benefit for native fishes.
                                                                                                                                       Photos: Damon Goodman

Fish and Wildlife, PG&E, California Bay-       The construction of the Battle Creek
Delta Authority, California State Water
Resources Control Board, FERC, The
                                               Project virtually eliminated access to      CalTrout is a member of a team that is      POTENTIAL FOR REMOVAL
                                               42 miles of anadromous habitat              leading the way to restore Battle Creek.
Nature Conservancy, California Wildlife
Conservation Board, Greater Battle Creek
                                               as well as connectivity for resident        In 2021, CalTrout and others completed      There is a high likelihood that
Watershed Working Group and CalTrout           fish populations.                           a project on North Fork Battle Creek        anadromous fish access could be
LAND ACKNOWLEDGEMENT: The Battle
                                                                                           to restore access to 4 miles of winter-     restored to Battle Creek. This will                                                                            TAKE ACTION
Creek Dams are on the ancestral lands of                                                   run Chinook Salmon habitat. This            include multiple dam removals.
                                                                                                                                                                                                                                                  • Subscribe to CalTrout’s newsletter to
the Yana Tribe and the Paskenta Band of                                                    project created a foundation for future     Removal of several dams are already
                                                                                                                                                                                                                                                    stay up to date on project developments
Nomlaki Indians                                                                            progress in Battle Creek and other          underway through the Battle Creek
                                                                                           rivers in California.                       Salmon and Steelhead Restoration                                                                           • CalTrout’s expansion into the Battle
                                                                                                                                       Project. The first dam removal                                                                               Creek watershed is funded by our
                                                                                                                                                                                                                                                    50th Anniversary Impact Fund.
                                                                                           The USFWS Coleman National Fish             occurred in 2010 with the removal of
                                                                                                                                                                                                                                                    Support this work by donating today
                                                                                           Hatchery is the largest federal Chinook     Wildcat Dam on the North Fork which
                                                                                                                                                                                                                                                    to CalTrout’s Impact Fund
                                                                                           Salmon production facility in the           opened miles of anadromous fish
                                                                                           lower 48. Coleman’s fish production         habitat. Efforts are now in progress
                                                                                           compensates for the loss of production      to initiate the removal all dams in
                                                                                           in the Sacramento River caused by           the South Fork as well as provide
                                                                                           extensive hydropower and water              passage beyond the remaining North
                                               Coleman Dam. Photo: Damon Goodman           delivery infrastructure.                    Fork Dams.                                             North Fork feeder dam. Photo: Damon Goodman

14                                                                                                                                                                                                                                                                                   15
2022 UPDATED REPORT - California Trout
THE RECONNECT HABITAT INITIATIVE
Reconnecting Habitat is one of California                    ABOUT CALIFORNIA TROUT
Trout’s five key initiatives in its effort                   Founded in 1971, California Trout
                                                             is a non-profit conservation and
to return native fish to resilience. The
                                                             advocacy organization that is
initiative focuses on giving salmon and                      dedicated to solving California’s
steelhead access to diverse habitat by                       complex resource issues while
removing barriers and getting obsolete                       balancing the needs of wild fish
                                                             and people.
DAMS OUT. Dams and barriers block
migration upstream to high quality habitat                   The organization focuses
and restrict migration of juvenile fish to                   on science-based, scalable
                                                             solutions to California’s most
the ocean.                                                   complex water management
                                                             challenges. CalTrout has six
We are working to remove barriers and get                    regional offices throughout the
                                                             state with headquarters in
obsolete dams out to give native salmon
                                                             San Francisco.
and steelhead access to the clean, cold
water of their native spawning and rearing                   Donate today to
habitats once again.                                         reconnect California
                                                             rivers and get DAMS
With over 15 projects in four regions across
                                                             OUT. Scan the QR
California, CalTrout values our Reconnect
                                                             code below.
Habitat work and we hope you will aid us
in this work by supporting the initiative
today. Together, we can get DAMS OUT.

To learn more visit caltrout.org.

                     Ensuring healthy waters and resilient
                     wild fish for a better California.
2022 UPDATED REPORT - California Trout
You can also read