Substructure Technology of Offshore Wind Farm - At the center of the energy transformation

Page created by Alfredo Wise
 
CONTINUE READING
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Substructure Technology
of Offshore Wind Farm
At the center of the energy transformation…
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Business Line

                                             On-Offshore
                             Tubular            Plant      Special Ship

 「SAMKANG M&T」

  On-Offshore
                                   Ship
     Plant      Conversion       Repairing

                                                 「SAMKANG S&C」
                                  2
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Corporate History
       2020.05   First fabricator exporting Jacket type Foundation for OWF in Korea

       2017.12   Designated as Defense Industry Company
                 • Contracted 1,500 ton Maritime Police Patrol Ship

       2017.11   Acquired STX Goseong Offshore & Shipbuilding
                 (Re-named Samkang S&C)

       2016.12   Gold Tower Order of Industrial Service Merit
                 awarded to Chairman Mr. MS Song on Korean 53rd Trade Day

       2014.08   Opened Technical Training & Education Center

       2008.08   Changed Company Name to Sam Kang M&T
                 And Listed on the KOSDAQ

       2000.11   Became Korea’s first fabricator successfully producing
                 Heavy Wall Thickness Pipe

       1999.08   Established Sam Kang Industries in Miryang

                                                     36
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Technical Strength Points
 1.   Advanced workforce with extensive experience in offshore oil & gas field
      - IWE, QM, HSE, Supervisor, PM, Scheduler, Welder, Painter

 2.   Lifting capacity
      - Various Goliath cranes (900T, 800T, 350T, 300T etc.)

 3.   Large workspace for serial production
      - Total 1 Million Square Meter

 4.   Water depth at quayside
      - Ave. 12m

 5.   Painting capacity (4 Blasting & 11 Painting Shop)
      - Blasting shop : 50m x 35m x 18.5m (1)
                        50m x 50m x 17m (1)
                        30m x 45m x 17m (1)
                        25m x 35m x 18.5m (1)
      - Painting shop : 75m x 35m x 18.5m (3)
                        50m x 50m x 17m (5)
                        40m x 35m x 17m (3)

                                                46
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Summary of OWF Track Records
 Ser.                                                                              Description
               Project Name                       Client                                                       Weight (MT)         Duration           Remarks
 No.                                                                              (W1 x W2 x H)

                                                                          4 Leg Jacket: 11m x 11m x 37m
  1           Jeju, Kimnyoung            KHNP (Doosan), Korea                                                     727        May. 2020 – Jun. 2011
                                                                          3 Leg Jacket: 17m x 17m x 38m

                                                                               20m x 20m x 58.6m
  2           TPC, Changhua             TCP (Jan De Nul), Taiwan                                                 16,800      Jan. 2019 – Apr. 2020
                                                                                   21 Jackets

                                                                          Upper Jacket: 25m x 25m x 31m
  3         Changfang & Xidao              CIP (Bladt), Taiwan            Lower Jacket: 31m x 31m x 32m          28,764      Aug. 2020 – Oct. 2022
                                                                           8 Jackets & 46 Upper Jackets

                                                                              32.2m x 32.2 x 80.6m
  4      Greater Changhua 01/02a             Orsted, Taiwan                                                      73,259      Jun. 2019 – Dec. 2021
                                                                                   62 Jackets

                                                                                31m x 31m x 68m
  5          Greater Changhua            Orsted (KFELS), Taiwan                                                   8,440      Jul. 2020 – May. 2021
                                                                                   2 Jackets

                                                                      Foundation of Turbine: 33m x 33m x 60m
          Kunsan, Turbine Demo          Kunsan Industry University     (Suction Bucket: OD9m x L7m – 5ea)
  6                                                                                                               1,300      Nov. 2020 – May. 2021
           Penta-pod foundation            Cooperation, Korea          Foundation of Lidar: 21m x 21m x 48m
                                                                       (Suction Bucket: OD6m x L6m – 3ea)

                                                                                                                                                      Consortium
        Jeju, Development of floating                                                                                                                (IAE, KOEN,
                                        Ministry of Trade, Industry            Floating Foundation
  7      offshore wind power system                                                                               3,500      Jan. 2023 – Feb. 2024     DOOSAN,
                                                and Energy                   (Under the Engineering)
            (National Assignment)                                                                                                                     SAMKANG,
                                                                                                                                                         etc)

                                                                                      5
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Project Track Records
       Taiwan, TPC Changhua Offshore Wind Farm Phase-1

  Developer      Taiwan Power Company(TPC)

  Contractor     Jan De Nul

    Period       2019. 7 ~ 2020. 5

     Field       West Changhua Country in Taiwan(109.2MW)

 Scope of Work   21 Jackets included TP (16,562MT)

                                                            6
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Project Track Records
       Taiwan, Changfang Xidao Offshore Wind Farm

  Developer      CIP (Copenhagen Infrastructure Partners)

  Contractor     BLADT (Denmark)

                 2020. 06 ~ 2021. 05 (8 Jackets)
    Period
                 2021. 04 ~ 2022. 10 (46 Upper Jackets)

     Field       West Changfang Xidao in Taiwan (650MW)

                 • 8 Jackets included TP
 Scope of Work
                 • 46 Upper Jackets

                                                            7
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Project Track Records
       Taiwan, Greater Changhua Offshore Wind Farm (Total 900MW)

  Developer      Orsted

    Period       2019. 12 ~ 2021. 12

     Field       West Changhua Country in Taiwan (900MW)

 Scope of Work   28 Jackets included TP + α (Upscoping)

                                                           8
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Project Track Records
       Taiwan, Greater Changhua OSS Jacket and Pile

  Developer      Orsted

  Contractor     Keppel FELS (Singapore)

    Period       2020. 1 ~ 2021. 5

     Field       West Changhua Country in Taiwan(900MW)

                 OSS Jacket 2 sets (8,440MT) and
 Scope of Work
                 16 Skirt Piles (8,235MT) fabrication

                                                          9
Substructure Technology of Offshore Wind Farm - At the center of the energy transformation
Project Track Records
       Taiwan, Greater Changhua OSS Jacket and Pile

  Developer      Kunsan Industry University Cooperation, Korea

  Contractor     Kunsan Industry University Cooperation, Korea

    Period       2020. 11 ~ 2021. 5

     Field       West off the coast of Kunsan, Korea (5.2MW)

                    Foundation of Turbine: 33m x 33m x 60m
                     (Suction Bucket: OD9m x L7m – 5ea)
 Scope of Work
                     Foundation of Lidar: 21m x 21m x 48m
                     (Suction Bucket: OD6m x L6m – 3ea)

                                                                 10
Major plan

   Key comprehensive Supplier        Preemptive response to future
           for OWF                     growth in OWF foundation
                                                demand

   Top priority HSE system             Responsible supply of OWF
     and sustainable HSE               foundation in APAC region
    improvement activities

                                11
Individually, we are one drop.
       Together, we are an ocean.

Ms. Yumi Ko / yumiko@sam-kang.com
Mr. Sundai Kim / sundai@sam-kang.com
You can also read