SCIENCE AND
                                                                               TECHNOLOGY
156 STCEES 12 E rev. 1 bis
Original: English

               NATO Parliamentary Assembly

                                 SUB-COMMITTEE
                                                 ON
         ENERGY AND ENVIRONMENTAL SECURITY

          NUCLEAR ENERGY AFTER FUKUSHIMA

                                            REPORT

                             PHILIPPE VITEL (FRANCE)
                                   RAPPORTEUR

International Secretariat                                                                 November 2012

                Assembly documents are available on its website, http://www.nato-pa.int
156 STCEES 12 E rev. 1 bis                                     i

                                              TABLE OF CONTENTS

I.     INTRODUCTION ......................................................................................................... 1

II.    THE FUKUSHIMA NUCLEAR ACCIDENT .................................................................. 2
         A. JAPAN’S TRIPLE CATASTROPHE ............................................................................... 2
         B. FAILURES, CHALLENGES, AND RECOMMENDATIONS ............................................ 4

III.   NUCLEAR ENERGY OUTLOOK: AN UPDATE ON STATUS AND TRENDS ............. 6
         A. GLOBAL ENERGY STATUS AND TRENDS ................................................................. 6
         B. GLOBAL NUCLEAR ENERGY TRENDS ....................................................................... 8
         C. THE POLITICS OF NUCLEAR ENERGY SINCE FUKUSHIMA................................... 11

IV.    NUCLEAR TECHNOLOGY: AN UPDATE ON DEVELOPMENTS ............................ 15

V.     CONCLUSION AND POINTS FOR DISCUSSION .................................................... 19

BIBLIOGRAPHY ................................................................................................................ 20
156 STCEES 12 E rev. 1 bis                       1

I.   INTRODUCTION

1.     In 2011, the disaster at the Japanese Fukushima Daiichi nuclear power station shocked the
world like only the nuclear accidents at Three Mile Island (1979) and in Chernobyl (1986) had
before. The Fukushima accident has been catastrophic, but not on the same scale as the
Chernobyl disaster. So far, no casualties caused by radiation exposure have been reported, and
many experts believe that the long-term health impacts will be comparatively minor. According to
experts from the US National Council on Radiation Protection and Measurements, the risk of
getting cancer for those exposed would increase by about 0.002%, and the risk of dying from
cancer would rise by 0.001% (Landers & Johnson, 2012). Others, however, say that the effects of
radiation on human health are still unknown in many important respects and could be more severe.
Indeed, near Fukushima many people will receive low levels of radiation for very long periods of
time. Also, radioactivity in concentrations above the Japanese regulatory limits have been detected
in some food produced in affected areas. Consequently, there is a risk of exposure for Japanese
citizens. Currently, for example, rice planting has been prohibited on 10,500 hectares around
Fukushima (Asahi Shimbun, 2012). Moreover, according to the latest official food monitoring data,
1.3% of samples taken in Japan were found to be above the provisional regulation values for
radioactive caesium (International Atomic Energy Agency, 2012, June 28). Radioactive pollution of
the marine environment has also occurred in the direct vicinity of the nuclear power plant, but to
date, no long-term impact is expected. The economic impact of the nuclear accident alone is
difficult to calculate. Before the earthquake and tsunami, the Tohoku region, which was most
affected, produced about 2.5% of the total Japanese economy. The impact of the earthquake in
terms of damaged capital stock was US$ 204 billion, equivalent to 4.0% of Japan’s total stock. In
sum, even though the Fukushima accident may not have been as catastrophic as first thought, it
could still alter the world’s nuclear future just as much as Chernobyl did.

2.      Nuclear power is a legitimate subject for the NATO PA, in part because of its evident links
with energy and environmental security. It is therefore essential that the Science and Technology
Committee (STC) examines the Fukushima nuclear accident and its consequences and once
again takes a closer look at the status and trends of nuclear energy. Already in 2011, the STC
followed these issues closely. At the 2011 Spring Session, the committee extraordinarily invited the
Japanese Parliamentary Observer Delegation, to underline the NATO Parliamentary Assembly’s
commitment to stand by this indispensable partner. A speaker also updated the committee on the
accident and its effects. Furthermore, these issues were extensively discussed on committee
visits.

3.    The last report on nuclear energy by the STC was released in 2009, in the form of the Report
of the Sub-Committee on Energy and Environmental Security (STCEES). At the time, many
believed that a ‘nuclear renaissance’ was underway, spurred by the growth in global energy
demand, the challenges of energy security, and the efforts to avert catastrophic climate change,
combined with improved international and national safety regulations and nuclear energy’s
increasing cost effectiveness. This report, prepared for the Annual Session in Prague, Czech
Republic, revisits some of the issues discussed in the 2009 report. It has been amended on the
back of discussions which took place at the Spring Session in Tallinn, Estonia in May 2012 and
updated as a result of events since.

4.     Fundamentally, what is the debate? Do we still trust nuclear energy as an essential source of
energy, after Fukushima again showed the risk of this technology, or do we believe that we should
invest in other energy technologies, especially renewable energies? The debate is eminently
political because it has large consequences for the organisation of our societies. For example,
nuclear energy requires a centralized energy policy, managed by the state and its scientists and
specialists, and controlled by independent organs. In contrast, renewable energies can be
operated with decentralized management. Another question concerns our model of energy
consumption. More humans on Earth, more activities, more technologies (like communication
156 STCEES 12 E rev. 1 bis                        2

networks) require energy, but until now economic growth has always meant increases in
production and in consumption of energy. Can we find a model that puts an end to this trend?

II.   THE FUKUSHIMA NUCLEAR ACCIDENT

A.    JAPAN’S TRIPLE CATASTROPHE

5.    On 11 March 2011, an earthquake with a magnitude of 9.0 occurred about 70 kilometres off
Japan’s northeast coast. It was the most powerful earthquake in the country’s recorded history,
causing a massive tsunami. Between 15 and 30 minutes after the earthquake, waves that reached
30 metres in height in some locations crashed into Japan’s main island, overwhelming existing
seawalls, devastating entire communities, and leading to the nuclear disaster at Fukushima
Daiichi.

6.    The Fukushima Daiichi plant was one of the oldest nuclear power stations in Japan, having
started commercial electricity generation in 1971. With its six reactors capable of generating about
4.7 GW of electrical power, it was among the 25 largest nuclear power plants in the world. The
complex was built on the coastline to provide easy access to large amounts of seawater used to
cool the reactors. The plant’s operator, the Tokyo Electric Power Company (TEPCO), had
designed the plant to withstand a tsunami with waves of up to 5.7 metres in height (revised from
3.1 metres in 2002). The waves hitting the shore in the wake of this particular earthquake were
over 13 metres high, however, and in some locations they reached up to 17 metres above sea
level when hitting the plant.

7.    At the time of the earthquake, only three of the six reactors were operating. The others were
undergoing routine maintenance. When the earthquake hit, all three operating units shut down as
designed. After a shutdown, the temperature and pressure in a reactor needs to be lowered in a
controlled fashion. Before the tsunami hit, this worked in two of the reactors, but, for reasons still
unknown, the temperature and pressure dropped too rapidly in the third reactor.

8.     When the tsunami reached the reactors, 11 out of 12 emergency diesel generators failed.
Since the earthquake had already knocked out the external power to the nuclear plant, this soon
led to complete power failures, so-called ‘station blackouts’, in all but one reactor (which was one
of the reactors shut down for maintenance). The three reactors operating before the tsunami hit
began to lose the capability to cool their nuclear cores, and the water in these reactors started to
boil, exposing the fuel rods. Partial meltdowns of the nuclear fuel were the result. When this was
detected, the main objective was to avoid further damage to the fuel rods, so that they would not
penetrate their containment chambers. As a response, on 12 March 2011, plant operators started
venting the reactors and pumping sea water into the units.

9.    These measures to lower the temperature and pressure in the reactors resulted in the
release of radioactive material into the air. The Japanese government estimated that the amount of
radiation released into the atmosphere was about 15% of the amount released during the
Chernobyl accident. In addition, at least 100,000 but perhaps up to 300,000 tons of contaminated
water leaked into the sea. Most of this water was only lightly radioactive, however. In fact, most of
it was dumped into the sea on purpose in order to avoid other problems.

10. During the early days of the crisis, hydrogen, which was produced through a reaction
between the exposed fuel rods and the water steam, also produced a series of explosions in three
reactors. Despite these adverse conditions, operators continued to pump water into the reactors,
and on 21 March 2011, they managed to reconnect external power to the plant. All of these actions
prevented the complete meltdown of the nuclear fuel.
156 STCEES 12 E rev. 1 bis                        3

11. On 17 April, TEPCO published a first initial roadmap for managing the nuclear accident,
which aimed at stabilizing cooling conditions in the reactors and fuel pools as well as at mitigating
the release of radioactive materials. Following the roadmap, alternative cooling systems had been
installed in four of the reactors by 10 August, leading to a stabilization of water temperature. By
mid-November, the release of radioactive materials was under control, and one month later,
Japan’s Prime Minister Yoshihiko Noda announced the end of the nuclear crisis.

12. Japan has now begun to tackle the longer-term challenges of the nuclear accident. The
Japanese authorities believe that a final settlement will take at least four decades to complete. In
the next few years, the latest action plan, the Roadmap towards Settlement of the Accident at
Fukushima Daiichi Nuclear Power Station, foresees the following steps (Government-TEPCO
Integrated Response Office, Nuclear Emergency Response Headquarters, 2011):

-     improvement of cooling system reliability;
-     treatment of contaminated waters;
-     decreasing of radioactive discharge;
-     waste management and decontamination at the site; and
-     removal of spent fuel rods from storage pools in the affected reactors.

13. Once these steps have been completed, a new roadmap will be developed in order to begin
the removal of the melted fuel rods. This will be done under difficult radiological conditions and will
necessitate extensive use of robots.

14. Even though the last roadmap has been positively received, the announcement that the
situation has been stabilized was criticized by some experts who argue that the Fukushima
complex is still vulnerable to large aftershocks (Tabuchi, 2011). Indeed, radioactive leaks and a
steep rise in temperature in one reactor were reported in the beginning of February 2012. Although
the situation was brought under control shortly after, Japan’s Environment and Nuclear Crisis
Minister, Goshi Hosno, recognised the need “to consider matters in an even more careful way”
(United Press International, 2012).

15. The consequences of the nuclear accident for the inhabitants in the affected zones have
been massive. The high levels of radiation in the area surrounding Fukushima led the Japanese
government to evacuate the population within 20 km of the station. At the height of the evacuation,
over 170,000 people were displaced in addition to the 320,000 people who had already been
displaced by the earthquake and tsunami. At the one-year anniversary of the accident, more than
62,000 inhabitants of the Fukushima area were still unable to return to their homes (Oda, 2012).

16. The Japanese government aims to have cleaned up the areas around Fukushima two years
after the accident, in order to enable residents to return home, but some experts consider this to be
unrealistic. For example, the government is planning to replace much of the topsoil from an area
covering 930 square miles, an area roughly the size of Luxemburg, an effort which the IAEA
(International Atomic Energy Agency) thinks impractical. At present, the lack of a storage site with
enough space for the contaminated dirt has stalled the cleanup. According to the government, the
cleanup could exceed US$ 257 billion (Saoshiro, 2011).

17. Of course, inside the evacuated zone radioactive levels were unacceptably high, but even
outside this area, unsafe levels have been detected in agricultural land, water, and even in the
food chain. Still, according to the United Nations Scientific Committee on the Effects of Atomic
Radiation, prompt crisis management averted catastrophic consequences. Indeed, no radiation
casualties were reported, and experts expect only a small health impact on the population. One
expert believes that the Fukushima accident could lead to about 1,000 extra cancer deaths in the
affected population (von Hippel, 2011). A new study by two researchers at Stanford University,
estimates that there will be 130 cancer-related fatalities worldwide, with lower- and higher-bound
156 STCEES 12 E rev. 1 bis                       4

estimates of 15 and 1,300 (Ten Hoeve and Jacobson, 2012). However, negative psychological
effects on the population around Fukushima could be considerable unless properly dealt with, he
argues. Ultimately, the long-term effects of the accident are still difficult to estimate.

B.   FAILURES, CHALLENGES, AND RECOMMENDATIONS

18. Japan faced an unprecedented situation, as it was the subject of not merely one, but three
catastrophic events at the same time. It would be unrealistic to expect a flawless crisis response.
Nevertheless, major criticisms of the crisis response and, more importantly, of crisis prevention
measures have been raised against the Japanese authorities and the plant’s operator.

19. During the crisis, a number of human errors were committed. TEPCO initially failed to
recognise the extent of the crisis. According to its own interim report published on
26 December 2011, the company recognised that it had failed to identify a problem in the cooling
system on the day of the tsunami, missing an important opportunity to delay the core meltdown in
one reactor by an earlier injection of water. Furthermore, a delay in venting another reactor caused
a rupture of the so-called ‘wet well’, which contains cooling water for the reactor core. This led to
the release of a considerable amount of contaminated water. Also, the poor co-ordination amongst
national and local authorities and the unwillingness of Prime Minister Naoto Kan’s government to
assume responsibility has been criticised. Indeed, Mr Kan stepped down in August 2011, not least
because of criticisms of his crisis management. Struggles between TEPCO and the government
about who had the necessary authority for certain actions took place, which complicated the crisis
response (Funabashi & Kitazawa, 2012). Indeed, a general lack of leadership, management skills,
and communication failures has been highlighted.

20. Most criticisms have been levelled at the Japanese crisis prevention measures. It is clear
that regulatory policies failed in some critical aspects. As already pointed out, the Japanese
authorities and TEPCO underestimated the maximum height of a tsunami that could hit Fukushima
Daiichi: TEPCO and the Nuclear and Industrial Safety Agency (NISA) failed to recognize the risks
of a large tsunami that occurs approximately once every 1,000 years; TEPCO conducted
inadequate computer modeling for tsunami risks; and NISA did not follow up to review these
simulations (Acton & Hibbs, 2012).

21. Even beyond the failure to recognize the tsunami risks, a lack in additional safety measures
meant that the effects of the tsunami on the power plant were more severe than they could have
been otherwise. One analyst summarizes the six most severe regulatory failures in the following
way (Lyman, 2011):

-    “Station blackouts lasted far longer than regulators assumed.
-    Strategies to prevent core damage or hydrogen explosions were far less successful than
     expected.
-    Lack of accurate or functional instrumentation posed far greater challenges than projected.
-    Restoration of stable core cooling was far more difficult and took far longer than assumed.
-    Management of contaminated cooling water was a much more serious issue than expected.
-    Significant levels of radiation exposure occurred much farther from the release site than
     projected.”

22. A study by the Carnegie Endowment for International Peace argues that one incident, in
particular, should have led to a reconsideration of Japanese safety measures (Acton & Hibbs,
2012): the 1999 flooding incident at a French nuclear plant at Blayais near Bordeaux, which
overwhelmed its sea walls, cut off external power supplies, and led to other safety failures.
European countries reacted by increasing nuclear safety measures. In France alone,
110 million euros were invested. Had Japan, which knew about these safety overhauls, put in
156 STCEES 12 E rev. 1 bis                        5

place similar defences, the Fukushima plant would have stood a better chance of averting the
2011 disaster or at least to reduce its scale.

23. Many underlying reasons for these regulatory failures exist, but a number of reasons have
been highlighted by experts. For one, Japanese authorities, companies, and interest groups had
been building up a myth of the absolute safety of nuclear power for decades, in part to overcome
the anti-nuclear sentiment stemming from the nuclear attacks in the Second World War (Funabashi
& Kitazawa, 2012). However, regulatory governance problems probably weighed even more
heavily (Acton & Hibbs, 2012): the lack of independence on NISA’s part from government agencies
that promote nuclear power as well as from the nuclear industry; the focus on earthquakes to the
detriment of other risks; bureaucratic and professional rigidities; and the failure to utilise local
knowledge. Indeed, the Carnegie study argues that, ultimately, “the Fukushima accident does not
reveal a previously unknown fatal flaw associated with nuclear power. Rather, it underscores the
importance of periodically re-evaluating plant safety in light of dynamic external threats and of
evolving best practices, as well as the need for an effective regulator to oversee this process.”

24. The Japanese authorities have recognized many of these flaws. Tatsujiro Suzuki, the
vice-chairman of the Japan Atomic Energy Commission, has summarised the Japanese
government’s report to the IAEA by pointing out that Japan will improve, and in part has already
improved, crisis prevention and response mechanisms, including the reform of the safety
regulatory infrastructure (Suzuki, 2011). Indeed, the Japanese government planned to launch the
new independent nuclear safety agency under the Ministry of Environment in September 2012.

25. In the summer of 2012, three large-scale investigations into the Fukushima accident were
released: by TEPCO; by the Investigation Committee on the Accident at Fukushima Nuclear Power
Stations of Tokyo Electric Power Company, established by the Japanese government; and by the
Fukushima Nuclear Accident Independent Investigation Committee, set up by the National Diet of
Japan. While they all addressed the issues and problems mentioned above, the tone of their
assessment was very different from each other. While the chairman of the TEPCO committee,
executive vice president Masao Yamazaki, admitted that they did not have the measures in place
to prevent the accident, “all who were related to the nuclear plant could not predict an occurrence of
the event which was far beyond our expectation” (Kobayashi, 2012).

26. The chairman of the government-sponsored inquiry, Yotaro Hatamura, Professor Emeritus at
the University of Tokyo, indirectly criticised both TEPCO and the Japanese authorities, by saying
that “[t]he direct cause of the latest accident can be boiled down to nothing but the fact that
everything was structured and operated on the assumption ‘there would never be complete power
loss for a long time’” (Investigation Committee on the Accident at Fukushima Nuclear Power
Stations of Tokyo Electric Power Company, 2012). He thus offered seven lessons learned from
Fukushima:

-     “Possible phenomena occur. Phenomena that are considered impossible also occur.”
-     “We do not see what we don’t want to see. We see what we want to see.”
-     “Consider every possibility and make full preparations.”
-     “Creating a framework alone does not ensure functionality. Framework can be created, but
      objectives cannot be shared.”
-     “Everything changes; respond flexibly to changes.”
-     “Acknowledge the presence of dangers, and create a culture that encourages straightforward
      discussion about risks”
-     “It is important to acknowledge the significance of making judgments and taking action by
      looking with our own eyes and thinking with our own brain, and to nurture that kind of
      capability.”
156 STCEES 12 E rev. 1 bis                        6

27. Very much in contrast, the Diet-organised committee’s verdict was much more strongly
critical. Its chairman, Kiyoshi Kurokawa of the Tokyo National Graduate Institute for Policy Studies,
argued that the disaster was “profoundly manmade” (Fukushima Nuclear Accident Independent
Investigation Committee, 2012). He argued that the “fundamental causes are to be found in the
ingrained conventions of Japanese culture: our reflexive obedience; our reluctance to question
authority; our devotion to ‘sticking with the program’; our groupism; and our insularity.” Going
forward, it is the Rapporteur’s hope that the many lessons of the Fukushima accident will be learnt
and acted upon with utmost diligence at every level, both nationally and internationally.

III.   NUCLEAR ENERGY OUTLOOK: AN UPDATE ON STATUS AND TRENDS

A.     GLOBAL ENERGY STATUS AND TRENDS

28. After suffering a slowdown in 2009, the world’s primary energy consumption, i.e. the
consumption of energy from natural resources, experienced the strongest shift since 1973 in 2010
(BP, 2011). According to the well-respected BP Statistical Review of World Energy, it grew by
5.1% in 2010 (BP, 2012c). This rebound was fuelled by economic recovery as well as rapid growth
in emerging economies. However, in 2011, the last year for which there is complete data, it grew
by only 2.5%, which is close to the historical average, however. Energy consumption by countries
of the Organisation for Economic Co-operation and Development (OECD) fell from 2010 to 2011
by 0.8% (contrasting with a 3.5% growth from 2009 to 2010). The OECD accounts for 45% of
global consumption today. NATO member states consume roughly 35% of the global share. China
is the largest energy consumer with a share of 21.5%, closely followed by the United States
(18.5%). The region which experienced the largest percentage growth was yet again the Asia
Pacific region, consuming 5.4% more primary energy than in 2010.

29. During 2010, almost all types of primary energy consumption experienced robust growth, but
growth slowed down almost across the board in 2011 (BP, 2011; BP, 2012c). Consumption of oil,
the foremost source of primary energy with a 33.1% share, rose by only 0.7% in 2011, compared
with 3.1% in 2010, losing market share for the twelfth year in a row. Coal consumption experienced
the largest increase since 2003 with 7.6% growth in 2010 and was the only fossil fuel with above-
average growth in 2011 with a growth of 5.4%, accounting for 30.3%. In part, this was due to
increased coal exports from the United States to Europe. Consumption of natural gas, the third
source of energy with 24%, was up by 7.4% in 2010, but grew only by 2.2% in 2011, due to below-
average growth everywhere except in the United States. Still, it is unlikely that the so-called
‘golden age of natural gas’ will stop anytime soon. Production of hydroelectricity grew by 5.3% in
2010, but only by 1.3% in 2011, for a share of 6.4% of the world’s energy consumption. Nuclear
energy consumption, which accounts for 4.9% of the total energy consumption, grew by 2% in
2010, which is the largest increase since 2004. France was responsible for the largest volumetric
increase, with an increase of 4.4%. However, on the back of the Fukushima accident and the
decisions taken in Germany, worldwide nuclear output fell by a record 4.3% in 2011 (BP, 2012b).
Japan’s nuclear output fell by 44.3% and Germany’s by 23.2%. Despite the large increase of fossil
fuel consumption, renewable energies (excluding hydroelectricity) had a record year in 2010, with
consumption growing by 15.5% and reaching an estimated 1.8% share in global energy
consumption (BP, 2011). In 2011, renewable energy growth still rose by an above-average 17.7%
(BP, 2012c).

30. Worldwide electricity generation grew by 6% in 2010, mainly driven by Asia, which accounted
for 54% of the overall increase, but growth slowed in 2011 to 3.1% (BP, 2011; BP, 2012a). Fossil
fuels were still the preferred sources of electricity generation. In 2009 (the last data year available
from the IEA), coal accounted for 40.3% of the world’s electricity output, while natural gas and oil
generated 21.4% and 5.1% respectively (IEA, 2012). Nuclear power provided about 13.4% of
156 STCEES 12 E rev. 1 bis                       7

global electricity generation. Renewable sources and hydropower delivered about 19.8% of world’s
electricity supply.

31. Analysts of global energy trends have noted that events following the Fukushima accident
have shown that global energy markets are becoming increasingly flexible. Even in the wake of the
Fukushima shock to the market, Japan managed to increase energy production, substitute fuels
and trading patterns rather quickly. As Japan switched from nuclear energy to Liquefied Natural
Gas (LNG), LNG was diverted from Europe towards the Asia Pacific region, which was in turn
offset by increased coal exports from the United States, which could easily afford to export the coal
because natural gas production soared as a result of the shale gas boom.

32. In its annual World Energy Outlook, the IEA looked at three scenarios for long-term world
energy trends (International Energy Agency, 2011). First, the New Policies Scenario is based upon
current government energy commitments and plans; second, the Current Policies Scenario is
based upon the assumption that no changes to current policies and measures occur; and third, the
450 Scenario is based upon energy commitments and plans which would keep a fifty-fifty chance
of limiting global temperature change to two degrees Celsius (compared to pre-industrial levels).
The figure and table below show two pictures of the predicted world primary energy demand in the
three scenarios.1 Between 2009 and 2035, the demand for energy will increase by 40% in the New
Policies Scenario; by 50.1% in the Current Policies Scenario; and by 22.5% in the 450 Scenario.
About 90% of the growth in demand will stem from non-OECD countries. In the New Policies
Scenario, the report’s main scenario, the share of fossil fuel consumption will fall by 6 percentage
points by 2035, from about 81% to 75%. Demand for natural gas will experience a continuous
surge, while oil and coal consumption will be more or less stable. Renewable energy, despite
experiencing faster growth than any other energy type, will not meet any fossil fuel consumption
figures. Wind and hydropower will lead the increase in renewable energy, accounting for half of the
new electric capacity installed until 2035. The generation of nuclear power will increase by 70% on
a global level, led by large expansions in China, India, Russia, and South Korea.

Figure 1: World primary energy demand according to three IEA scenarios

1
     The figure and table are taken from the IEA’s World Energy Outlook 2011 (pp. 70-71), with the
     express permission of the IEA.
156 STCEES 12 E rev. 1 bis                       8

Table 1: World primary energy demand by fuel and scenario according to three IEA
         scenarios [in Million Tonnes of Oil Equivalent (Mtoe)]

B.   GLOBAL NUCLEAR ENERGY TRENDS

33. Currently, 435 nuclear power plants are in operation in 30 countries, with an installed electric
net capacity of 370 GW. In terms of plant numbers, the top six countries are the United States (104
reactors), France (58), Japan (50), Russia (33), South Korea (21), and India (20).

34. In the European Union (EU), nuclear power accounts for almost 34% of electricity production,
and in OECD countries it provides 24% (IAEA, n.d.). Half of the countries with nuclear power are
located in Europe, which also accounts for half of world’s nuclear energy production. OECD
countries generate 83.2% of world’s nuclear power. Russia (6.2%), China (3.5%), Ukraine (3.2%),
and Taiwan (1.5%) account for most of the rest. In 15 out of the 30 countries with nuclear plants,
nuclear energy provides for at least one-quarter of their total electricity consumption.

35. Within NATO, fourteen members have nuclear power generation, accounting for 65.8% of
the world’s nuclear power consumption (BP, 2011). The allies with the highest shares of nuclear
energy in their national energy mix are France (74.1%), Slovakia (51.8%), Belgium (51.1%),
Hungary (42%), and Slovenia (37.2%) (Nuclear Energy Institute, 2012). The United States, France,
Germany, and Canada are the largest producers in absolute numbers. Among NATO members
which do not possess nuclear plants, it is notable that Italy gets 10% and Denmark 8% of their
power from nuclear plants outside their borders (World Nuclear Association, 2011).

36. In 2012, there are more reactor units under construction than in any year since 1988. At
present, 16 countries are building 66 new nuclear plants with a total net capacity of over 65 GW.
Most projects are under construction in China (26), Russia (11), India (7), and South Korea (4);
Slovakia, Taiwan, and the Ukraine each have two projects under construction, and Argentina,
Brazil, the Democratic People’s Republic of Korea, Finland, France, Pakistan, and the United
States each have one. In addition, many countries are planning to build new nuclear complexes in
the future, including Bangladesh, Belarus, Indonesia, Iran, Lithuania, Romania, Turkey, the United
Kingdom, the United Arab Emirates, and Vietnam. It is common to encounter construction delays
of 10 years or more, which makes it difficult to assess the real progress on some of these projects
(Schneider, Froggatt, & Thomas, 2011b). Indeed, 12 of the 66 reactors have been listed as under
construction for more than 20 years, and another 35 reactors do not have official start-up dates
(Schneider, Froggatt, & Thomas, 2011a).

37. The average operational age of world’s nuclear plants is 26 years. According to the IAEA,
5% of the world’s nuclear reactors have been in operation for more than 40 years, and 32% for
156 STCEES 12 E rev. 1 bis                        9

more than 30 years (Agence France-Presse, 2012). After Fukushima, the viability of such long
operational lifetime has been questioned in some quarters. However, other countries, such as
France, Spain, and the United States, have granted extensions to nuclear units, which are over
40 years old. The United States, for example, has approved life extension to 66 of its 104 reactors,
from the original 40 years to 60 years (IEA, 2011). Indeed, leading analysts suggest that “the
number of reactors in operation will decline over the years to come (even if the installed capacity
level could be maintained) unless lifetime extensions beyond 40 years become a widespread
standard” (Schneider, Froggatt, & Thomas, 2011a).

38. Nuclear power plants around the world are both owned by private and public enterprises. At
present, the nuclear markets in China, France, India, South Korea, and Russia are almost entirely
controlled by state-owned companies. In other countries such as Germany, Spain, and the
United States, private companies control the nuclear markets. The French public company Areva is
considered the world’s largest nuclear conglomerate. The company has built or is constructing
over 100 reactors worldwide and has about 3.4 billion euros invested in the nuclear business. Next
in the ranking is Hitachi-General Electric Nuclear Energy, a global alliance that merged the nuclear
divisions of two of the largest energy companies of Japan and the United States. Third follows the
leading Russian nuclear company, the state corporation Rosatom, which ensures 40% of world’s
service market on uranium enrichment and 17% of the nuclear fuel market. Other big companies
are EDF, a French private company (although 85% of the stocks are owned by the French
government), which operates 58 reactors in France and, through a subsidiary, eight nuclear power
stations in the UK; the state-owned Korea Electric Power Company, which operates 21 power
plants in South Korea and provides 98% of Korean electricity production; as well as the China
National Nuclear Corporation, which operates China’s 14 nuclear plants.

39. The economics of nuclear power are influenced by a variety of many variables that make
calculations very difficult. Investment costs for building a nuclear plant, for example, vary
significantly from one country to another. Also, nuclear power plant projects need extensive and
complex infrastructure, for example large water supplies and waste management facilities.
Therefore, government subsidies are essential in this regard. On the other hand, it has been
suggested that operating costs for nuclear plants are much lower compared to coal and gas-fired
plants. Operating expenditures of OECD nuclear plants are about a third of those for coal-fired
plants, and between a quarter and a fifth of gas-fired ones. And, furthermore, nuclear fuel costs are
lower. The amount of uranium needed to produce large quantities of electricity is much lower than
the fuel needed for coal and gas fired plants, and it has the advantage of being highly concentrated
and easily transported. According to the US Nuclear Energy Institute, the total fuel costs for a gas-
fired plant are 89%, for a coal-fired plant 78%, and for a nuclear station only about 14%.

40. Currently, the economics of nuclear plants are not favourable. As one analyst underlines,
even before the Fukushima accident, the cost of building nuclear power plants began escalating
due to competition for resources and manufacturing capacity” (Hibbs, 2012). In less than a decade,
so-called overnight cost estimates, i.e. assuming that no interest is incurred during construction,
have risen from US$ 1,200 per KW to US$ 3,000-5,000 per KW. When one includes the cost of
borrowing capital, it has been suggested that a pair of nuclear reactor units costs about US$ 10-15
billion (Hibbs, 2012).

41. Often, estimates of building nuclear plants leaves out key costs, such as waste management
and dismantlement. Indeed, independent, but nuclear-friendly, analysts have suggested that the
industry should factor in all relevant costs in order to give the public more believable estimates.
However, the expenses associated with spent-fuel disposal and decommissioning of nuclear plants
are difficult to measure. So far, no plant has been completely dismantled, and the disposal of
radioactive waste of those in process is still on-going. To eliminate spent nuclear fuel could take as
few as 50 years or as many as 150 years. Estimate of decommissioning costs vary widely as well.
The World Nuclear Association claims that such costs amount to about 9-15% of the initial capital
156 STCEES 12 E rev. 1 bis                       10

investment. In contrast, the Worldwatch Institute suggests that decommissioning could reach
several billion dollars for a large plant. German nuclear companies have made a total of 30 billion
euros in provision for costs related to the cost of dismantling the plants and disposing of
radioactive materials (Reuters, 2012).

42. Perhaps the most interesting question is the price of electricity generated by nuclear power
that the customer has to pay, but this is even harder to calculate and naturally country-dependent.
According to OECD electricity cost projections for 2010, the price for electricity generated by
nuclear power is generally cheaper than coal and renewables prices, but more expensive than gas
(see Table 2). This indicates that nuclear power is cost competitive if there is no direct access to
low-cost fossil fuels, especially natural gas. Indeed, the availability of cheaper natural gas and
renewable energies, in combination with the economic and financial crisis, has meant that the
nuclear industry was very reluctant to invest in new plants in recent years (Heung Chang, 2011).
While the number of construction starts has been on the rise, most other nuclear industry
indicators are negative, which was the case even before Fukushima. As one study suggests,
“[e]ven if reactors can be operated for an average of 40 years, 74 new plants would have to come
on line by 2015 to maintain the status quo, which is impossible given current constraints on
fabricating reactor components” (Schneider, Froggatt, & Thomas, 2011a). The study goes on to
suggest that the post-Fukushima changes away from nuclear in some of the big producing
countries “could accelerate the decline of a rapidly aging industry.” Another expert argues that it is
not Asia, but “Western Europe - which produces about half its electricity with reactors - that may tip
the balance on whether a sustainable global nuclear expansion goes forward” (Hibbs, 2012). As
already mentioned, the IEA operates with the assumption, under the New Policies Scenario, that
nuclear power generation will grow by 70% by 2035 because of construction in China, India and
South Korea. The IAEA, in its Nuclear Technology Review 2012, put forward a low and a high
projection for the growth of nuclear power: “In the updated low projection, the world’s installed
nuclear power capacity grows from 369 gigawatts (GW(e)) at the end of 2011 to 501 GW(e) in
2030, down 8% from what was projected last year [35.8% growth]. In the updated high projection,
capacity grows to 746 GW(e) in 2030, down 7% from last year’s projection [102.2% growth]”
(International Atomic Energy Agency, 2012, August 1). This leads us to answer the question of
how the Fukushima accident has impacted nuclear power policies around the world.
156 STCEES 12 E rev. 1 bis                         11

Table 2:   OECD Electricity Generating Cost Projections for Year 2010 on - 5% discount rate,
           US cents/kWh (World Nuclear Association, 2011)2

Country        Nuclear    Coal       Coal with Carbon Capture and       Combined          On-shore
                                     Storage                            Cycle Gas         Wind
                                                                        Turbine
Belgium        6.1        8.2        -                                  9.0               9.6
Czech          7.0        8.5-9.4    8.8-9.3                            9.2               14.6
Republic
France         5.6        -          -                                  -                 9.0
Germany        5.0        7.0-7.9    6.8-8.5                            8.5               10.6
Hungary        8.2        -          -                                  -                 -
Japan          5.0        8.8        -                                  10.5              -
Korea          2.9-3.3    6.6-6.8    -                                  9.1               -
Netherlands    6.3        8.2        -                                  7.8               8.6
Slovakia       6.3        12.0       -                                  -                 -
Switzerland    5.5-7.8    -          -                                  9.4               16.3
USA            4.9        7.2-7.5    6.8                                7.7               4.8
China*         3.0-3.6    5.5        -                                  4.9               5.1-8.9
Russia*        4.3        7.5        8.7                                7.1               6.3
Electric       4.8        7.2        -                                  7.9               6.2
Power
Research
Institute
(USA)
Eurelectric    6.0        6.3-7.4    7.5                                8.6               11.3

C.    THE POLITICS OF NUCLEAR ENERGY SINCE FUKUSHIMA

43. Japan’s nuclear crisis raised public concerns and anti-nuclear sentiment across the globe,
most notably in OECD and NATO member countries, where public acceptance is crucial to the
continuing reliance on nuclear power. However, more than a year and a half after the Fukushima
accident, it appears that its impact on nuclear policies has been much more limited than expected.
It is clear, nonetheless, that there is no unity within EU or NATO countries, as some choose the
nuclear way as others prefer other sources of energy.

44. Naturally, the Fukushima nuclear accident has massively affected Japanese politics, even
though its longer-term effects are yet unclear. Before the accident, nuclear energy from its
54 reactors accounted for 29.2% of Japan’s electricity production. In August 2012, only two out of
54 reactors were in use because all plants have to be inspected. Indeed, in mid-2012, Japan was
briefly without nuclear power for the first time in 42 years. After the Fukushima crisis Japan
suffered several energy supply shortages which have inflicted serious harm to its already
vulnerable economy (Vivoda, 2011). Indeed, the situation is making Japanese industries less
competitive. According to a series of surveys published by the Japanese Newspaper
Nikkei Shinbun, many corporations are planning to relocate their manufacturing plants offshore
(Aldrich, 2012). As a consequence, Japan’s exports plummeted during 2011, and in January 2012
the authorities announced the country’s first annual trade deficit since 1963 (The Economist,
2012). The first half of 2012 also saw Japan’s largest trade deficit ever, with US$ 37.3 billion.

2
      Based on OECD/IEA data.* Note that “[f]or China and Russia: 2.5c is added to coal and 1.3c to gas as
      carbon emission cost to enable sensible comparison with other data in those fuel/technology
      categories, though within those countries coal and gas will in fact be cheaper than the Table above
      suggests” (World Nuclear Association, 2011).
156 STCEES 12 E rev. 1 bis                       12

45. The Japanese government’s 2010 Basic Energy Plan aimed to build nine new nuclear
reactors by 2020 and at least 14 more by 2030 (de Wit & Keneko, 2011). In the aftermath of the
accident, however, former Prime Minister Naoto Kan said Japan “needs to start from scratch” on its
long-term energy policy (Fackler, May 2011). To that end, on 26 August, a new bill was passed
with the objective of expanding investment in renewable energies (de Wit, 2011). The government
of current Japanese Prime Minister, Yoshihiko Noda, wants to move towards lowering the country’s
reliance on nuclear energy as much as possible as well, but underlines that Japan should restart
nuclear reactors as soon as possible to meet current shortages. Being the world’s fifth largest
energy consumer, the lack of a strong renewable energy sector and the interruption of nuclear
power has led Japan to rely on imported fossil fuels in order to meet its electricity demand.
According to industry analysts, Japanese oil and gas imports will experience annual rises of 8% to
13%. This will, naturally, increase greenhouse gas emissions considerably, lead to a rise in
electricity prices, and decrease the rate of electricity sales (Vivoda, 2011). Indeed, the Japanese
Ministry of Environment estimates that Japan will emit 15% more greenhouse gases in 2012 than
in 1990 (Associated Press, 2012).

46. On 14 September 2012, the new mid-to-long term “Innovative Strategy for Energy and
Environment” was announced, which was elaborated by the Japanese government’s Energy and
Environment Council. The primary objective of the strategy was to formulate new targets for the
country’s energy mix and measures to decrease the countries’ reliance on nuclear energy. After a
country-wide debate about the future of nuclear power in light of the Fukushima disaster, the
Japanese authorities announced that the new policy favoured the zero nuclear option, wishing to
phase out nuclear power by 2040. The core principles of the new strategy are (1) a limit of 40
years of operations for existing nuclear power plants; (2) control of the restarting of power plants
by the newly established independent regulatory agency (which will also implement higher safety
measures); and (3) no new construction of nuclear power plants (Lambrecht, 2012). The aim of the
strategy is to diversify Japan’s energy mix by increasing its reliance on renewable energy (which
should represent up to 30% of the total mix by 2030) and fossil fuels as well as by improving
energy efficiency. However, this controversial energy strategy was not endorsed by the whole
cabinet. The commitment to a complete phase-out and the strategy’s recommendations will
therefore simply be “taken into consideration” and become a starting point for a debate on Japan’s
energy future (Powernews, 2012). Nevertheless, the new energy strategy demonstrates Japan’s
will to invest in renewable energy and draw lessons from the Fukushima disaster. This major
turnaround could be a response to the rising anti-nuclear sentiment in Japan. Today, weekly
protests are staged, including a large-scale demonstration with 75,000 to 200,000 protesters,
depending on the source (Dickie, 2012). Recently, a Pew Research Center poll found that 70% of
the Japanese favour a reduction in reliance on nuclear power (Pew Research Center, 2012).
Furthermore, a Green Party was founded and anti-nuclear politicians have gained in popularity.

47. Besides Japan, the biggest political impact could be felt in Europe. Indeed, just two weeks
after the accident, the European Council called for a complete safety review of all EU nuclear
plants through so-called ‘stress tests’. The stress tests are designed to check the resistance of 143
European reactors to nuclear disasters and “man-made failures and actions”, such as “plane
crashes and explosions close to nuclear plants.” Given the EU’s limited powers of oversight in
nuclear power, national governments conducted the checks voluntarily. Some have criticized that
this has led to an operational bias because often power operators were tasked with the
assessments. On 4 October 2012, the European Commission released the final results of the
stress tests, which confirms the high safety standards of most EU power plants, but expressed the
need for improvements in almost all of them. According to the investigation, not all the IAEA safety
standards and international best practices for safety are implemented in all EU States. The stress
tests recommend numerous specific technical improvements and drew the following
recommendations in light of the Fukushima incident (European Commission, 2012):
156 STCEES 12 E rev. 1 bis                       13

-    “Earthquake and flooding risk. Current standards for risk calculation are not applied in
     54 reactors (for earthquake risk) and respectively 62 reactors (for flooding risk) out of the 145
     checked. The risk calculation should be based on a 10 000 year time frame, instead of the
     much shorter time periods sometimes used.
-    On-site seismic instruments to measure and alert of possible earthquakes should be
     available at every nuclear power plant. These instruments should be installed or improved in
     121 reactors.
-    Containment filtered venting systems to allow safe depressurizing of the reactor containment
     in case of an accident, should be in place. 32 reactors are not yet equipped with these
     systems.
-    Equipment to fight severe accidents should be stored in places protected even in the event of
     general devastation and from where it can be quickly obtained. This is not the case for 81
     reactors in the EU.
-    A backup emergency control room should be available in case the main control room
     becomes inhabitable in case of an accident. These are not yet available in 24 reactors.”

Action plans for the implementation of the recommendations should be available by the end of
2012, and the Commission aims to report on the implementation by June 2014. The Commission
also wishes to present a revision of the current nuclear safety directive in early 2013, as the
European legal framework for nuclear safety was also reviewed as part of the stress tests.

48. Undoubtedly, the biggest change in nuclear policy has taken place in Germany, where an
extensive popular debate on nuclear energy has taken place for decades. Six months before the
Fukushima accident, the German government had released its new 2010 Energy Concept, which
extended the lifetime of nuclear reactors by an average of 12 years. This represented a reversal of
a 2002 decision by a previous government to shut down all nuclear stations by 2021. It should be
noted, however, that even in the 2010 Energy Concept, nuclear energy was seen as a bridge
technology towards ‘the age of renewable energy’. The government as well as big private
companies like Siemens were clearly focused on renewable energy and were investing heavily in
this sector, which is also seen as a source of economic and technological progress. After the
Fukushima accident, the German government decided to re-visit the 2010 Energy Concept, and it
imposed a three-month suspension of operations in eight of its oldest nuclear plants (which was
later made permanent). The government mandated an Ethics Commission on Safe Energy Supply
to examine what future nuclear energy should have in the country. It came to the conclusion that
an exit from nuclear energy was already feasible within a decade. The German government then
decided to shut down all remaining reactors by 2022. Some critics have argued that this step was
ill-advised, but the vast majority of the population and all parties are supporting the nuclear exit.
The nuclear policies approved after Fukushima have indeed made Germany a net importer of
electricity (EurActiv, 2012).

49. Elsewhere in Europe, some changes took place as well. In Italy, a referendum on the return
to nuclear energy (abandoned in 1987) scheduled before the Fukushima accident, was held in
June 2011. The results were overwhelming and perhaps unsurprising: 94.1% of the votes were
against re-launching the nuclear programme. Moreover, Switzerland has decided to phase out its
nuclear plants by 2034, and Belgium has reached an agreement to abandon nuclear power by
2025. The Belgian government has recently announced that the lifetime of one reactor (Tihange 1)
needs to be prolonged to ensure energy security. This should not affect the overall timeline. At the
time of writing, it is still unclear how cracks in the reactor vessels of Doel 3 and Tihange 2, which
were discovered in the summer of 2012, will affect current plans. The reactors remain shut down
for further inspection.

50. Beyond these major decisions, in the 15 NATO member states with nuclear power or with
plans to develop nuclear power, support for nuclear energy has been reaffirmed by governments to
varying degrees. In July 2011, the UK Parliament, for example, voted in favour of nuclear energy,
156 STCEES 12 E rev. 1 bis                       14

with an overwhelming majority of 267 votes for and only 14 against it. The UK plans to build a new
generation of British nuclear power stations, and it is expected to inaugurate the first of a planned
eight reactors by 2018. However, this timeline could be starting to slip, as, for example, EDF has
put construction plans for a reactor at Hinkley Point on hold. At the time of writing, the UK
government is discussing the provisions of a new energy bill, which will be introduced in parliament
in the fall of 2012. A part of the bill is an electricity market reform, where feed-in tariffs should
incentivise companies to invest in low-carbon electricity generation, including nuclear power.
However, there is considerable uncertainty over this mechanism from different sides, which the
government has recognised and is addressing.

51. In France, nuclear power accounts for 74.1% of its electricity production, and it is also the
world’s largest net exporter of electricity. The French stress test has underlined that France’s
nuclear plants are generally safe, but has revealed some vulnerabilities to extreme events.
Government authorities are strengthening safety measures, and the operators are investing heavily
into reinforcements, with EDF, for example, investing 10 billion euros. During the 2012 French
presidential and parliamentary elections the parties laid out their diverging views on nuclear
energy. The two main political parties in particular have different views on nuclear energy. In
February 2012, President Nicolas Sarkozy’s party, the Union for a Popular Movement (UMP)
extended the life of French nuclear plants beyond 40 years, and the party’s policy is to keep
nuclear energy at around 75% of its electricity production over the next decades. In contrast, the
Socialist Party, under the new President François Hollande, proposed, during the 2012 campaigns,
to reduce the share down to 50% by 2025 by substituting nuclear energy with renewable energies
and improving energy efficiency. In terms of the other parties, the Left Front proposes a debate
and referendum on nuclear energy, the Greens (Europe Ecologie Les verts) want an exit in about
20 years’ time, the National Front is suggesting a nuclear exit but only in the long term, and the
Democratic Movement suggests lowering the share of nuclear energy in the national mix as well.
 After the presidential election, the President indicated, at the Environmental Conference that took
place on 14-15 September 2012 in Paris, the main guidelines of his views on the energy transition
including reinforcing the share of the renewables in the energy mix. With regard to nuclear energy,
he only added that the Fessenheim plant would be closed before the end of 2016. More precise
directions remain to be defined.

52. In the aftermath of Japan’s nuclear crisis, U.S. Secretary of Energy stated that the Obama
Administration continues to support the expansion of nuclear power in the United States. Just
11 months after the Fukushima accident, the US Nuclear Regulatory Commission (NRC) approved
the construction of two nuclear reactors in Georgia. This was the first permit issued since 1978,
and the new plant is expected to be operational as soon as 2016. Shortly after, in March 2012, the
construction of two further reactors in South Carolina was approved by the NRC. These reactors
are expected to be operational in 2016 and 2019 respectively. The US Department of Energy’s
long-term goal is to increase nuclear capacity by about 10 GW by 2035, about a 10% increase.
However, the abundance of inexpensive natural gas and the increasing costs of nuclear
construction do not bode well for this long-term goal at the moment. In March 2012, on the basis of
the lessons learned from the Fukushima accident, the US NRC ordered a first set of safety
improvements to be implemented by the operators by the end of 2016. It is also studying two other
sets of safety requirements. Currently, the NRC will not issue final decisions on licensing new
reactors and license renewal applications. This is in reaction to a June 2012 decision by a US
Court of Appeals, which had struck down the Commission’s so-called waste confidence provision.
Until now, the NRC assumed that fuel waste stored at nuclear power plants would be safe for
decades without individually assessing the associated risks, which the court ruled insufficient.
However, this will not affect hearings and other licensing work, and the NRC is currently working
on adapting to the court ruling. It should also be noted that a minor incident at the San Onofre
Nuclear Generating Station occurred in January 2012. Faulty computer modelling meant that
certain tubes broke much earlier than expected, releasing a small amount of radioactive steam
which posed no danger to people or the environment. In the summer of 2012, the repair costs thus
156 STCEES 12 E rev. 1 bis                       15

far amounted to US$ 165 million, and it is unclear when or if the damaged reactors will come
online again (Blood, 2012).

53. Government support also remains strong in Turkey (which plans three reactors), the
Czech Republic, Hungary, and Romania (all three have two new reactors planned or under
construction), Slovenia (which seeks a 20-year life extension for the Krsko nuclear plant), Poland
(which plans to commission its first reactor by 2025), and Lithuania, as well as Slovakia and the
Netherlands. Regarding Lithuania, while the government had re-committed to nuclear power, a
non-binding consultative referendum was held alongside the parliamentary elections on
14 October 2012, where 64.8% of the voters rejected the government’s plans for the construction
of a new nuclear power plant. It remains to be seen how this will affect Lithuania’s nuclear plans. In
Bulgaria, construction of the Belene nuclear power plant was discontinued because of a
disagreement over costs between the government and the investors. However, in late
August 2012, the government has picked Westinghouse to prepare a proposal for a new reactor at
the Kozloduy site, where the country’s two operational reactors are based.

54. China, South Korea, and India, beside Japan the biggest Asian nuclear powers, have not
changed their nuclear policies of substantial expansion. Commitment also remains strong in
countries such as Bangladesh, Belarus, Jordan, the United Arab Emirates, and Vietnam, who all
have substantial nuclear power plans. Peru is the rare exception of a country where nuclear power
plans have been stopped.

55. On the international level, at the 2011 G8 Summit in Deauville, France, the G8 urged the
world “to draw all the lessons” from the Fukushima accident and “noted the necessity to consider
strengthening the Convention on Nuclear Safety [adopted in 1994] and the Convention on Early
Notification of a Nuclear Accident [adopted in 1986], as well as upgrading norms and standards of
nuclear safety.” At the 2012 G8 summit, the G8 Nuclear Safety and Security Group again
addressed the implications of the Fukushima disaster. In particular, the Group welcomed and
endorsed the IAEA’s Action Plan on Nuclear Safety (Action Plan). The IAEA Action Plan was
developed at a 2011 Ministerial Conference on Nuclear Safety and aims “to strengthen nuclear
safety, emergency preparedness and radiation protection of people and the environment
worldwide” (International Atomic Energy Agency, 2011). The Action Plan proposed measures in
12 areas: safety assessments; IAEA peer reviews; emergency preparedness and response;
national regulatory bodies; operating organisations; IAEA safety standards; the international legal
framework; member states planning to start nuclear power programmes; capacity building;
protection of people and the environment; communication and information dissemination; as well
as research and development. Of particular note is that the Action Plan recommends exploring
ways to enhance the implementation of the Convention on Nuclear Safety; the Joint Convention on
the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management; the
Convention on the Early Notification of a Nuclear Accident; and the Convention on Assistance in
the Case of a Nuclear Accident or Radiological Emergency. Member states should also “consider
proposals made to amend the Convention on Nuclear Safety and the Convention on the Early
Notification of a Nuclear Accident.” Progress on the Action Plan was assessed in September 2012
at the IAEA Board of Governors meeting and the General Conference and will be re-assessed at a
Fukushima Ministerial Conference in Nuclear Safety to be held in Fukushima in
mid-December 2012.

IV.    NUCLEAR TECHNOLOGY: AN UPDATE ON DEVELOPMENTS

56. In nuclear power reactor design, one commonly distinguishes four generations. Three of
these generations are operating in the world, and a fourth one is under development. The
prototypes which launched civil nuclear power are referred to as Generation I reactors. These
reactors were not suitable for large-scale electricity production, and only a few units were built.