WATTLE RANGE COUNCIL STRATEGIC PLAN 2018-2021
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
CONTENTS PUBLIC CONSULTATION Mayors Message 1 Council welcomes feedback and comments in relation Elected Members 2 to the Community Strategic Plan. Features of Wattle Range Council 2 Council undertook three Vision + Values 4 public meetings at Beachport Council Strategic Plan 5 Visitor Information Centre on 26 June 2017, Penola Visitor Council Planning Framework 5 Information Centre on 27 June 2017, Millicent Civic & Community Engagement 6 Arts Centre on 28 June 2017. How We Have Structured the Plan 7 Comments and feedback were addressed to the Chief Themes & Objectives 8 Executive Officer, Ben Gower Theme 1 - Community Vibrancy & Presentation 10 and may be made via the following methods: Theme 2 - Economic Prosperity 12 • Council’s website Theme 3 - Environmentally Sustainable 14 www.wattlerange.sa.gov.au Theme 4 - Asset & Infrastructure Sustainability 16 • Email council@wattlerange. sa.gov.au Theme 5 - Organisational Excellence 18 • Facebook Funding & Resourcing the Plan 20 • By mail to PO Box 27 Millicent SA 5280, or • Delivered in person to Council’s offices at Millicent, Penola or Beachport. Submissions closed for Council’s Strategic Plan on 14 July 2017.
MAYOR’S MESSAGE On behalf of Council, I take Without question our natural pride in presenting the assets and environment Council’s Strategic Plan 2018- provides us with the lifestyle 2021. that so many of us enjoy The Plan strives to represent and protecting this into the the interests of the entire future is key to Wattle Range Wattle Range community achieving its vision. Likewise, and will act as a blueprint for these natural assets and what we will aim to achieve the environment creates in the ensuing 4 years. business, industry and job opportunities. Council has The development process of in recent times benefited the Plan has been inclusive from these opportunities Peter Gandolfi and we thank the community and I am certainly buoyant MAYOR for their input and passion about future prospects and in contributing to the capitalising on more of these development of the Plan. opportunities into the future. The Vision - Wattle Range With this said, economic 1. Community Vibrancy & a ‘Great Place to Live and development opportunities Presentation Work’, sums up what the will continue to be a strong Council and community 2. Economic Prosperity focus for the life of the believe is the most important plan. This priority came as 3. Environmentally aspiration for our area. We a result of the consultative Sustainable are certainly lucky to live process, where economic 4. Asset & Infrastructure in such a diverse area, with development and job Sustainability coastal access to the west creation opportunities were of the Council area, the recognised as the highest 5. Organisational Excellence eastern area bounded by priority by the community. Supporting the themes are a the Coonawarra wine region, list of objectives, strategies and bountiful and prosperous After analysing the community input into the and actions that I look primary producing areas forward to progressing over throughout. plan the following were determined as the five (5) key the life of the Plan. themes / goals for Council: Wattle Range Council Strategic Plan 2018-2021 1
COUNCILLORS ABOUT WATTLE RANGE Wattle Range Council comprises a Mayor and 11 Wattle Range has been rated Councillors representative of four Wards. The Council is as the No. 1 Net Primary elected for a four year term and meets on a monthly basis. Producing Area in Australia*. Strategically located between Melbourne and SORBY ADAMS WARD Adelaide and situated near to Mount Gambier. The area is serviced by two main highways and major infrastructure traverses the Council area with the main Cr. Rob Dycer Cr. Dale Price SEGAS pipeline located in the Deputy Mayor east of the Council area and a gas spur line services the Snuggery industrial area near KINTORE WARD Tantanoola. The Council area is carbon negative with large areas of forestry and large rainfall supplies the plentiful Cr. Kevin McGrath Cr. Peter Dunnicliff underground aquifers. Bordered by the sea in the west and the Coonawarra RIDDOCH WARD wine district to the east with bountiful primary producing land in between. Wattle Range provides a unique lifestyle and diverse Cr. Dean Burrow Cr. Robert Thornett economic opportunity. CORCORAN WARD Cr. John Drew Cr. Glenn Brown Cr. Gwenda Lawlor * Regional Australia Cr. Sharon Cox Cr. Dennis Muhovics Institute 2014
Population Townships Primary Total Area 11,500 13 Production Value 394,602 Ha $221m Coonawarra Furner / Hatherleigh / Penola Wine District Rendelsham Heritage Trail Potatoes, Onions, Beachport & Southend Cereal Crops, Wheat, Mary MacKillop Vegetables Crayfishing Barley Canola Recreational Fishing Seed Coastal Drive & 4WD Beef, Lamb Tourism Wool Woakwine Cutting Cut Flowers Coonawarra Furner PENOLA BEACHPORT RIDDOCH WARD KINTORE Hatherleigh WARD Kalangadoo Nangwarry Rendelsham Canunda Mt Burr National Park Southend SORBY Tantanoola ADAMS WARD Caves MILLICENT Windfarms Nangwarry Tantanoola Timber, Dairy, Millicent Glencoe Museum Wattle Range - Principal Office Kalangadoo Commercial & Industrial CORCORAN Timber Mill, Cherries, Precincts, Museum WARD Apples, Stone Fruits Tantanoola / Snuggery Glencoe Mt Burr Paper Mill, Cut Herbs, Glasshouses, Beef, Lamb, Cropping, Nurseries, Dried Powdered Milk Factory, Forestry Broadacres, Historical Dried Kelp Products Grazing Shearing Shed Wattle Range Council Strategic Plan 2018-2021 3
VISION Wattle Range a great place to live and work. VALUES TRUST TEAMWORK FUN TRUST - The glue that binds TEAMWORK - The FUN - The importance of us together as a community. cornerstone of high enjoying what we do and Doing what we say we are performing organisations. how we do it should never be going to do and being honest Embracing the diversity of underestimated. Having fun and transparent in both our thoughts and experiences at work builds stronger teams intentions and actions, helps that exist within a team and enhances relationships. build trusted relationships. generates a broader range Recognising and celebrating of innovative ideas and leads our successes - no matter to better decision making. how big or small they are Individuals perform better - encourages the right when they are a valued behaviours in the workplace member of a team. They are and ultimately enhances our more confident, they have performance. more fun and they are more productive. We become more resilient when we know someone is watching our back, and we are more likely to cope under stressful or difficult circumstances.
COUNCIL COUNCIL STRATEGIC PLANNING PLAN FRAMEWORK The Council Strategic The Wattle Range Council Funding the Council Strategic Plan is a core document Strategic Plan forms an Plan is critical to its success for guiding Council’s integral part of Council’s and the Long Term Financial future direction. The plan ‘planning framework’. Plan provides the mechanism takes into consideration The Council Strategic Plan to assess whether the Council’s strategic integrates the future asset Council Strategic Plan can planning framework and management requirements be funded. Once in place both the communities for Council, whilst the Council Strategic Plan priorities and external integrating external priorities in conjunction with the Long considerations such as the recognised from community Term Financial Plan become State Strategic Plan. engagement, local township the guiding documents for As detailed under and state government plans. the formulation of the Annual Section 122 of the Local Business Plan and Annual Government Act 1999, Budget, which is ultimately Council’s Strategic Plan reported upon in the Annual covers a period of 4 years Report. from 2018-2021. Asset Management Plans Government Long Term Policy/Plans Financial Plan & Community Engagement COUNCIL STRATEGIC PLAN Annual Annual Report Budget Annual Business Plan Wattle Range Council Strategic Plan 2018-2021 5
COMMUNITY ENGAGEMENT Public Community Consultation COUNCIL Township Plans 30 days Public STRATEGIC Extensive Community Input Consultation including public PLAN • Penola • Coonawarra meetings • Millicent (in draft) • Rendelsham (in draft) • Beachport (pending) Staff Youth Community Survey Survey Survey Survey Survey Survey Responses: Responses: Responses: 74 255 334 The strategic planning From the consultative Overwhelmingly the process commenced in process the highest priorities community responded that, January 2016 and has raised were: lifestyle, the environment had considerable direct and natural assets of the • Increasing job opportunities and indirect community area coupled with the and job creation for our input. In total Council primary producing and youth received 663 responses agriculture opportunities from a combination of the • Securing businesses and were the Council’s greatest Community, Youth and industry and developing strength. Protection of these Staff surveys combined with opportunities to attract new natural assets was seen as considerable involvement businesses and industry paramount to maintaining of the community in the • Improving appearance and this advantage. development of the township general amenities of the All information provided was plans. towns analysed and associated The consultation was • Council infrastructure, strategies have been designed to reach a broad developing and or developed and incorporated demographic and a cross maintaining our assets and within this plan, where section of the community, to sustaining them into the practicable. inform the planning process. future
HOW WE HAVE STRUCTURED THE PLAN The Wattle Range Council THEMES SUPPORTING STRATEGIC Strategic Plan sets out what The themes are the main DOCUMENTS Council aims to achieve over areas of focus for the Council Many strategic documents the next four years and gives and relate directly to the and long-term plans directions and targets in the achievement of Council’s support each of the themes. future management of our vision to make Wattle Range These documents provide region. ‘A great place to live and information, direction The plan is structured using work’. and specific actions the following elements: OBJECTIVES for the achievement of organisational strategies and These are measurable steps goals. that are used to achieve the themes. SERVICES STRATEGIES Council dedicates significant resources to the provision THEME A number of strategies are of traditional services to listed for each theme. These the community and these strategies are the means services are essential to meet in which Council aims to the objectives of the plan. achieve its objective and key themes. ACTIONS The key actions identified are instrumental to the OBJECTIVE achievement of the strategies within the Plan. STRATEGY ACTION Wattle Range Council Strategic Plan 2018-2021 7
THEMES & OBJECTIVES The Wattle Range Council Strategic Plan has five main THEME ONE themes that cover all aspects Community Vibrancy & Presentation of Council’s business. Objective: Invariably the themes Generate and support community vibrancy are interrelated and in through advocacy and maintenance of community services and enhanced public collaboration the five themes facilities. will drive Council’s ability to achieve its vision. THEME TWO Economic Prosperity Objective: A sustainable and prosperous economy that supports local businesses and industry and creates employment and prosperity for the region. THEME THREE Environmentally Sustainable Objective: Protect the natural assets and infrastructure of the region by leveraging additional environmental programs that will protect the environment for future generations. THEME FOUR Infrastructure & Asset Sustainability Objective: Provide functional, safe, fit for purpose assets that meet the changing needs of the community. THEME FIVE Organisational Excellence Objective: A great place to work where innovation and efficiency is expected and customers are our focus. Wattle Range Council Strategic Plan 2018-2021 9
THEME ONE: Community Vibrancy & Presentation OBJECTIVE ACTIONS • Finalise the Open Space Plan for the Millicent Generate and support community Domain and develop a hierarchy and Open vibrancy through advocacy and Space Plan for all parks and gardens. maintenance of community • Incrementally complete the Penola Town services and enhanced public Square project. facilities. • Procure, rehabilitate and develop the Millicent Railway Lands precinct. • Update the Community Land Register and STRATEGIES identify opportunities to develop Crown lands. 1.1 Enhance public space areas including • Expand the existing street lighting network parks, public places, car parking, street and retrofit existing lights with energy efficient lighting and streetscapes to provide LED. vibrant, attractive areas. • Review current car parking allocations and 1.2 Through appropriate planning, identify additional requirements. develop vibrant, presentable townships throughout the Wattle Range area. • Develop township plans for all towns in the Council area. 1.3 Provide sustainable, vibrant community • Undertake general Development Plan facilities. Amendments for Penola and Beachport. 1.4 Advocate and where possible collaborate • Develop a tree management plan to assist for the expansion of healthcare, in the appropriate management of trees and education, transport, community and visual amenity of townships. welfare services throughout the Wattle Range area. • Review and continually improve the library services, ensuring it continues to provide 1.5 Support community events that are a quality service that meets the changing sustainable and provide longer term community requirements and expectations. benefit to the community & visitors. 1.6 Promote and support the establishment of strong, sustainable clubs and volunteer organisations throughout the Wattle Range area.
SERVICES PROVIDED • Optimise the utilisation of the Millicent and • Community Development Penola art galleries. • Parks & Gardens • Review, rationalise and develop a playground maintenance and renewal plan that is aligned • Childcare to community needs. • Library • Develop a register of “shovel ready” projects • Planning / Development Services that are identified by Council or the • Road Maintenance and Construction community. • Volunteer Management • Advocate for continued funding and support for healthcare, education, transport and • Art Galleries welfare services for the Council area. • Encourage community responsibility for events SUPPORTING DOCUMENTS and support where appropriate these events through the provision of Council services. • Community Township Plans • Advocate for consolidation of sporting • Open Space Plan clubs into multi-user facilities and star club • Community Lands Register accreditation. • Wattle Range Development Plan • Continue the expansion and implementation of the electronic volunteer matching program. • Development Plan Amendments • Strategic Directions Report • Regional Public Health & Wellbeing Plan Wattle Range Council Strategic Plan 2018-2021 11
THEME TWO: Economic Prosperity OBJECTIVE ACTIONS • Advocate for investment into key A sustainable and prosperous infrastructure such as energy alternatives and economy that supports local mobile telecommunication towers. businesses and industry and • Develop an industrial land plan and a master creates employment and plan for a primary producing hub at Snuggery. prosperity for the region. • Increase planning compliance reviews and development of planning policies such as outdoor dining and home based businesses. STRATEGIES • Investigate a scheme that incentivises main 2.1 Support and advocate for improved street business owners to upgrade shop infrastructure that enhances and creates facades. economic and business opportunities. • Develop an international inward investment 2.2 Through appropriate planning, develop plan and continue annual international and opportunities to expand economic and national economic/investments initiatives. business opportunities throughout Wattle • Conduct a feasibility study into the Range. development of a tier 3 service kill abattoir facility within the area. 2.3 Expand on current inward investment opportunities, maximising business and economic creation opportunities for the Council area. 2.4 Strengthen and support the professional and economic growth of local businesses and job creation opportunities for the area. 2.5 Promote Wattle Range as a tourism destination through provision of appropriate tourist facilities and advocacy.
SERVICES PROVIDED • Facilitate economic development forums and • Economic Development a local professional development network group for upcoming professionals. • Visitor Information Centres • Develop strategies to assist business through • Saleyards times of duress and emergencies. • Planning / Development Services • Invest in traineeships that will retain • Building Surveyor opportunities for youth in the Council area. • General Inspectorate • Review Council’s accreditation of the South Australian Tourism Industry Council (SATIC). SUPPORTING DOCUMENTS • Promote tourism by developing a tourism plan for Wattle Range and explore sites to expand • Economic Development Strategy Council’s policy on recreational vehicle (RV) • Strategic Directions Report friendly campsites. • Community Township Plans • Wattle Range Development Plan • Development Plan Amendments • State Strategic Plan Wattle Range Council Strategic Plan 2018-2021 13
THEME THREE: Environmentally Sustainable OBJECTIVE ACTIONS • Develop a Council specific Climate Adaptation Protect the natural assets and Plan and contribute to the Regional Limestone infrastructure of the region Coast Climate Adaptation Plan. by leveraging additional • Implement the Rivoli Bay Action Plan for environmental programs that will renewal of coastal infrastructure including groynes and lobby the State Government to protect the environment for future construct a new groyne near the Beachport generations. Jetty. • Undertake further planning that investigates options for improved management of coastal STRATEGIES erosion and impacts on the Beachport 3.1 Protect Council's natural assets through Township. proactive planning in climate adaptation • Participate in environmental projects and and structured infrastructure replacement lobby for increased funding and resources and enhancements. to be allocated to environmental projects in 3.2 Maintain strong and positive relationships Wattle Range. with Federal and State Government departments, advocating for increased investment in coastal and environmental protection within the Council area. 3.3 Minimise the financial impact of Waste Management on the community and provide a service that meets the current and future needs of the community.
SERVICES PROVIDED • Lobby State Government agencies to • Environmental Management minimise the impact of coastal erosion as a result of outflows from the Southend drain • Environmental Health and Investigate / implement improvement • Waste Management strategies to the flow and health of Lake George. SUPPORTING DOCUMENTS • Review the waste management strategy including a review of the waste disposal • Limestone Coast Climate Adaptation Plan voucher system, kerbside collection service • Rivoli Bay Study boundaries, options for regional collaboration and investigate options for kerbside green • Community Lands Register waste disposal including composting. • Community Township Plans • Design, construct and relocate the waste • Wattle Range Development Plan transfer station at Beachport. • Climate Adaptation Plan • Lobby the State Government to limit the • Lake George Study financial and resourcing impact of proposed waste management reforms including • State Strategic Plan increases to the solid waste levy. • Strategic Directions Report • Development Plan Amendments • Regional Public Health & Wellbeing Plan Wattle Range Council Strategic Plan 2018-2021 15
THEME FOUR: Infrastructure & Asset Sustainability OBJECTIVE ACTIONS Provide functional, safe, fit for • Develop and review biennially asset management plans for all main asset purpose assets that meet the categories. changing needs of the community. • Develop management plans for cemeteries, swimming pools/lake and airfields. STRATEGIES • Biennially review and update the Airfield 4.1 Create a sustainable stock of assets, with Emergency Management Plan. appropriate long term asset planning and • Review existing plant and equipment stock optimal use. and investigate new technology opportunities 4.2 Plan and provide for a safe local road to enhance efficiency and effectiveness. network that meets the future and current • Review and implement operation, irrigation needs of our community. and monitoring plans for all Community 4.3 Advocate for safe and trafficable network Wastewater Management Schemes. of State Roads. • Update the Regional Transport Plan to include local significant roads that have high or 4.4 Plan for and optimise Council’s stock of proposed high future traffic usage. building assets whilst meeting the future and current needs of community. • Review and update the Roadside Vegetation Plan. 4.5 Plan and provide for the expansion and replacement of Council’s stock of • Review re-sheeting techniques including the footpaths, walkways and trails to meet use of stabilising agents to improve unsealed the future and current needs of our road longevity. community. • Prepare a quarries report that evaluates material locations and quality for use on local roads. • Review and update the rolling program of road dust mitigation for rural residents. • Advocate and lobby the Federal and State governments for the completion of the Penola Bypass.
SERVICES PROVIDED • Advocate and lobby State Government for the • Asset Management upgrade of the following roads and highways; • Road Construction & Maintenance Mile Hill, Kangaroo Flat, Hatherleigh, Wattle Range, Millicent/Mount Burr and Kalangadoo • Footpath Construction & Maintenance Roads, Princes and Southern Ports Highways. • Cemeteries • Conduct a comprehensive review of the • Halls ongoing maintenance requirements for the Library, Civic & Arts Centre. • Building Maintenance • Review, improve, retrofit and rationalise • Stormwater Council’s halls to improve community • Community Wastewater Management patronage and functionality. Schemes • Review and implement future expansion • Kerb & Gutter Construction & Maintenance requirements for the main Council Offices. • Swimming Pools/Lake • Conduct a review of current public toilet • Public Toilets facilities and identify opportunities for expansion, improvement and rationalisation. • Airfields • Assess the future requirements for the Millicent Engineering Depot including options to co locate the engineering administration SUPPORTING DOCUMENTS office. In addition review and rationalise the • Asset Management Strategy requirements for multiple engineering depots • Regional Transport Plan across the Council area. • Community Township Plans • Continue the scheduled removal of asbestos from Council buildings and review the cleaning • Community Lands Register services contract for all facilities. • Asset Management Plans • Pursue funding opportunities with the aim of • Roadside Vegetation Plan constructing a walking/cycling trail within the rail corridor between Penola and Coonawarra. • State Strategic Plan • Asbestos Register Wattle Range Council Strategic Plan 2018-2021 17
THEME FIVE: Organisational Excellence OBJECTIVE ACTIONS A great place to work where • Pursue and implement information technology solutions such as Business Intelligence (BI) innovation and efficiency is reporting, NBN and mobility solutions that expected and customers are our enable greater analysis, operating efficiency and improve the delivery of general and focus. financial reporting and resilience of the information technology network. STRATEGIES • Facilitate the implementation of electronic 5.1 Streamline operational decision making development applications and electronic rates processes through technology based notices. improvements. • Conduct a review of Council’s enterprise software ‘Synergysoft’ and whether it can be 5.2 Govern in a responsible and responsive enhanced, optimised for use or replaced. way. • Transition the organisation to a fully compliant 5.3 Increase community input into Council electronic records management system. decision making, through adoption of quality Community Engagement • Undertake a review of Council’s rates revenue principles and practices. model system. • Strengthen Council’s risk management 5.4 Optimise Council operation of businesses framework through development and review and assets, to ensure value for money is of Councils internal controls, implementation returned to the community. and review of the Business Continuity Plan 5.5 Ensure Council has the right people to and deployment of a cloud based and mobile succeed in delivering outcomes. friendly risk management reporting system. • Review Council’s governance structure by undertaking an Elector Representation Review. • Prepare for the Local Government Elections and develop the training and induction for the newly elected Council. • Manage and update Council’s policies, procedures and delegations of authority as per the nominated review cycles and review the function of all Section 41 Committees of Council and assess their continuing need. • Implement the internal process changes required as a result of changes to the Development Act and the proposed regionalisation of the Development Assessment Panel.
SERVICES PROVIDED • Implement a social media profile and continue • Advocacy and Council Leadership to improve the Council’s website ensuring it • Community Engagement remains relevant to community needs. • Human Resourcing • Develop a customer service charter which details response times for correspondence and • Governance customer queries and appropriate standards • Customer Service for issue resolution. • Financial Management • Review Council’s corporate branding principles and templates to ensure consistency. • Risk & Work, Health & Safety • Investigate options to transfer ownership • Emergency Management of non-essential assets to an alternative • Administration organisation (public or private) and reinvest capital into other key infrastructure projects. • Undertake a financial sustainability review SUPPORTING DOCUMENTS of the Millicent Saleyards including the • Council Strategic Plan investigation to lease portions of the saleyards to increase utilisation of the facility. • Asset Management Plans • Review current Council operations and • Annual Business Plan investigate the potential for consolidation of • Policies & Procedures service delivery. • Community Engagement Guidelines • Develop a management plan for the Southern • Strategic Directions Report Ocean Tourist Park that concentrates on its long term financial sustainability. • State Strategic Plan • Develop a long term action plan for the • Local Government Act Southend Caravan Park for the sustainability • Long Term Financial Plan of the park and investigate options for private investment into an alternate site. • Risk Management Plan • Strengthen Council’s human resources • Business Continuity Plan framework through the implementation of an • Internal Controls online reporting tool that delivers performance development reviews, training registers, • Customer Service Charter succession planning and online induction to • Community Lands Register staff contractors and volunteers. • Community Township Plans • Development Act Wattle Range Council Strategic Plan 2018-2021 19
FUNDING AND RESOURCING THE PLAN The following is a list of key financial performance indicators that have been adopted to ensure that Council’s Strategic Plan is long term financially sustainable and target ranges have been set to provide financial parameters to each of the indicators. OPERATING SURPLUS KPI Explanation An operating surplus (or deficit) arises when operating income Councils Target exceeds (or is less than) operating expenses for a period To achieve an (usually a year). A Council’s long-term financial sustainability operational surplus. is dependent upon ensuring that, on average over time, its expenses are less than associated income. Strategic Plan 2018-2021 Forecasted Results - Operating Surplus (Deficit) Operating Actual 3rd Budget 1st 2nd 3rd 4th Update Year Year Year Year 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $,000 $,000 $,000 $,000 $,000 $,000 Income 22,512 24,355 24,545 24,899 25,384 25,951 Expenditure 20,951 23,943 24,094 24,701 24,745 25,219 Surplus (Deficit) 1,561 412 451 198 639 732 Above Target Below Target Operating Surplus $000 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Operating Surplus (Deficit) Ratio Target
FUNDING AND RESOURCING THE PLAN OPERATING SURPLUS RATIO KPI Explanation The operating surplus ratio is the operating surplus (deficit) Councils Target expressed as a percentage of operating income. A positive To achieve on average ratio indicates the percentage of operating income available over time an operating to help fund proposed capital expenditure. surplus ratio of between 0% - 10%. Strategic Plan 2018-2021 Forecasted Results - Operating Surplus Ratio Operating Actual 3rd Budget 1st 2nd 3rd 4th Update Year Year Year Year 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $,000 $,000 $,000 $,000 $,000 $,000 Surplus (Deficit) 1,561 412 451 198 639 732 Income 22,512 24,355 24,545 24,899 25,384 25,951 Surplus (Deficit) 6.9% 1.7% 1.8% 0.8% 2.5% 2.8% Ratio Above Target Below Target Operating Surplus Ratio 12% 10% 8% 6% 4% 2% 0% 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Operating Surplus (Deficit) Ratio Lower Target Upper Target Wattle Range Council Strategic Plan 2018-2021 21
FUNDING AND RESOURCING THE PLAN NET FINANCIAL LIABILITIES RATIO KPI Explanation Net financial liabilities equals total liabilities less financial Councils Target assets (excluding equity accounted investments in Council To achieve a Net businesses). The net financial liabilities ratio is calculated by Financial Liabilities Ratio expressing net financial liabilities at the end of a financial between 0% - 100% of year as a percentage of operating income for the year. If the operating income. ratio falls, over time, this indicates that the Council’s capacity to meet its financial obligations from operating income is strengthening. Strategic Plan 2018-2021 Forecasted Results - Net Financial Liabilities Ratio Actual 3rd Budget 1st 2nd 3rd 4th Update Year Year Year Year 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $,000 $,000 $,000 $,000 $,000 $,000 Net Financial 6,352 4,041 4,580 5,727 5,330 4,152 Liabilities (NFL) Income 22,512 24,355 24,545 24,899 25,384 25,951 NFL Ratio 28 % 17% 19% 23% 21% 16% Above Target Below Target Net Financial Liabilities Ratio 120% 100% 80% 60% 40% 20% 0% 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Operating Surplus (Deficit) Ratio Lower Target Upper Target
FUNDING AND RESOURCING THE PLAN ASSET SUSTAINABILITY RATIO KPI Explanation This ratio indicates the extent to which existing non-financial Councils Target assets are being renewed and replaced, compared with To achieve an Asset the asset renewal and replacement expenditure identified Sustainability Ratio as warranted in a Council’s infrastructure and asset between 85% - 105% management plan (I&). It is calculated by measuring of the asset renewal & capital expenditure on renewal or replacement of assets for replacement expenditure a period, divided by the optimal level of such expenditure optimised in the proposed in a Council’s I&. “I&’s”. Strategic Plan 2018-2021 Forecasted Results - Asset Sustainability Ratio Actual 3rd Budget 1st 2nd 3rd 4th Update Year Year Year Year 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $,000 $,000 $,000 $,000 $,000 $,000 Capital Renewal 3,647 3,797 4,128 4,753 4,818 4,885 Expenditure I& 3,881 4,127 4,463 5,280 5,343 5,409 ASR Ratio 94% 92% 92% 90% 90% 90% Above Target Below Target Asset Sustainability Ratio 120% 100% 80% 60% 40% 20% 0% 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Asset Sustainability Ratio Target Upper Target Wattle Range Council Strategic Plan 2018-2021 23
UNIFORM PRESENTATION OF FINANCES The Uniform Presentation The statement is a useful A Net lending result reduces of Finances is a high level comparative document for a Council's accumulated level summary of both operating benchmarking purposes with of net financial liabilities and capital investment other Councils as well as an where as if a Net borrowing activities for Council. informative document that (bracketed) result occurs assists Council in determining it adds to the level of net the net movement in its net financial liabilities. financial liabilities annually. Uniform Presentation of Finances Actual 3rd 1st 2nd 3rd 4th Budget Year Year Year Year Update 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $,000 $,000 $,000 $,000 $,000 $,000 Net Outlays from Operations Operating Income 22,512 24,355 24,545 24,899 25,384 25,951 Less Operating Expenses 20,951 23,943 24,094 24,701 24,745 25,219 Operating Surplus / (Deficit) 1,561 412 451 198 639 732 Less Net Outlays on Existing Assets Capital Expenditure on Renewal 3,647 3,797 4,128 4,735 4,818 4,885 and Replacements of Existing Assets Less Depreciation, Amortisation 4,626 4,842 4,852 4,841 4,885 4,907 and Impairment Less Sale of Replaced Assets 156 212 223 164 169 216 Total Net Outlays on Existing (1,135) (1,257) (947) (251) (236) (238) Assets Less Net Outlays on New and Upgraded Assets Capital Expenditure on New and 1,387 1,715 2,407 1,864 1,197 660 Upgraded Assets Less Amounts specifically 741 664 430 350 350 350 received for New and Upgraded Assets Less Proceeds from Sale of 189 109 - - 400 400 Surplus Assets Total Net Outlays on New & 457 942 1,977 1,514 447 (90) Upgraded Assets Net Lending / (Borrowings) 2,239 727 (578) (1,065) 429 1,060
CONCLUSION Upon assessment of the Whilst Councils debt levels It is envisaged that major key financial indicators, the are expected to peak at 23% investment on key projects strategies and activities Net Financial Liabilities in such as the Millicent Railway included within this Plan are 2019, Council has capacity Lands and the development able to be funded over the to increase debt and fund of the Coonawarra Rail Trail life of the Plan. this over the Plan’s period of will help generate additional When evaluating the impact operation. investment into the area that to Council’s key financial will generate returns for the indicators it is clear that Council for years to come. Council will continue to meet its targets for Operating Surplus, Operating Surplus Ratio, Net Financial Liabilities and Asset Sustainability Ratio. Wattle Range Council Strategic Plan 2018-2021 25
Principal Office Beachport Civic Centre Millicent Road George Street Beachport SA 5280 Millicent SA 5280 Phone 08 8735 8029 Phone 08 8733 0900 Fax 08 8735 8309 Fax 08 8733 4999 Penola Engineering Office All correspondence to: 27 Arthur Street Davenport Street PO Box 27 Millicent SA 5280 Penola SA 5277 Millicent SA 5280 Email council@wattlerange.sa.gov.au Phone 08 8737 2391 Phone 08 8733 0901 Website www.wattlerange.sa.gov.au Fax 08 8737 2206 Fax 08 8733 4472
You can also read