Session C EnBW’s offshore wind projects in Germany › Stefan Kansy director new projects, power generation Bremerhaven, September 03, 2020
EnBW at a glance Number 3 utility in Germany1 Active in all relevant RE technologies 5.5 M 23,000 13 GW 878MW onshore wind in 179 MW PV in operation customers employees generation portfolio operation Turnaround achieved 1y earlier than planned Ambitious 2025 build-out targets €19b €2.4b 2.0GW+ 2.5GW onshore wind 700 PV MW revenue Adj. EBITDA offshore wind Electricity Sales Renewable Trading/ Transmission/ Generation procurement distribution Sales Energies Gas Generation Import contracts/ Storage Trading/portfolio Transport/ Sales Grids & Trading infrastructure management distribution 1. Figures 2019 PAGE 2
EnBW is undergoing substantial structural change 2,4 2,4 Profit shares 2020 Generation & 0,3 -80% 15% Trading 1,2 0,7 +250% Renewable 30% Energies 0,2 Grids 1,0 +25% 40% 0,8 Retail 0,4 +100% 15% 0,2 Adjusted EBITDA in bn.€ 2012 Target 2020 3
4 OWFs in operation, 1 in development & project pipeline in Taiwan 945 MW Own engineering & O&M 25% of ~2 GW Installed capacity 2015 Sites with EIA in Taiwan Office in Hamburg 900 MW O&M harbors in Emden & Barhöft OW subsidiaries in Centralized control center for all RE in Barhöft Taiwan: EnBW Asia-Pacific In development US: EnBW North America France: VALECO EnBW He Dreiht: ~900 MW Barhöft EnBW Hohe See: 497 MW Rostock EnBW Albatros: 112 MW — 71+16 = 87 x Siemens SWT 7.0-154 on monopile foundations — Commissioned in 2019 Hamburg — Shareholders: EnBW (~50.1%) & Enbridge Inc. (~49.9%) EnBW Baltic 1: 48.3 MW EnBW Baltic 2: 288 MW Emden — 21 x Siemens SWT 2.3-93 — 80 x Siemens SWT 3.6-120 — Commissioned in 2011 — Commissioned in 2015 — Shareholders: EnBW (~50.1%) & — Shareholders: EnBW (~50.1%) & 19 municipal utilities (~49.9%) Macquarie, PGGM and ÄvWL (~49.9%) in operation in operation / recently commissioned development stage PAGE 4
OWP Hohe See & Albatros Offshore Wind Portfolio der EnBW in Deutschland 11
OWF Hohe See & Albatros 12
OWP Hohe See & Albatros Offshore Wind Portfolio der EnBW in Deutschland 13
OWF He Dreiht – a next level challenge developing a subsidy free OWF location Hohe See / › exclusive economic zone / German North Sea, Albatros adjacent to OWF Hohe See und Albatros › 90 km distance to coast, 63 km2 area Hohe See/Albatros He Dreiht technology & site conditions › 900 MW capacity › WTG on monopiles He Dreiht › no OSS required Hamburg › 39-40 m water depth, homogeneous sands › 10,1 m/s wind speed Emden grid connection in development in operation › direct connection to 900MW BorWin5 (TenneT) › grid connection in 2025 project time schedule › FID beginning 2023 (early works prior to that) › commissioning in 2025 › 25 years of operation 14
OWF He Dreiht – project time schedule development & implementation 2020 2021 2022 2023 2024 2025 permit ITT-phase FOU design WTG IAG FOU/WTG T&I FOU production design / certification FID production installation FOU IAG WTG commissioning assumed grid connection partnering development implementation til FID til COD 15
OWF He Dreiht - selected challenges financial and technical implications › financial implications of a zero-subsidy bid: −full market exposure - no conventional PF −(aligning) assumptions re wholesale electricity prices −PPA markets – maturity, appetite/liquidity › technical aspects: −XXL-MP as foundations for next generation → T&I, noise mitigation −assumptions re global blockage effect −66kV direct connection of OWF to TSO converter 16
He Dreiht – grid connection conventional setup vs. 66kV direct connection conventional setup 66kV direct connection (e.g.OWF Hohe See) (OWF He Dreiht) 66 kV AC 66 kV AC EnBW 155 kV AC ÜNB EnBW ÜNB DC DC 17
Nezzy² - floating offshore wind turbine generator
technical conception of nezzy²
by mounting 2 nezzy² motivation WTG reduction of height weights loads
development steps 2016 2018 2018 2020 2021/22 nezzy 1:36 nezzy 1:10 nezzy² 1:36 nezzy² 1:10 nezzy² 1:1 in Cork, Ireland in Kure, Japan in Cork, Ireland in Lower Saxony (Lake) in China und Baltic Sea
Thank you & stay healthy. 22