Quarterly Operations Summary – July 2020 African Development Bank This document is subject to copyright. This document may be used and reproduced for non-commercial purposes only. Any commercial use, including without limitation reselling, charging to access, redistribute, or for derivative works such as unofficial translations based on this document is not allowed.
Quarterly Operations Summary – July 2020 African Development Bank CONTENTS NOTES ...................................................................................................................................................... 4 PROCESSING STAGES ............................................................................................................................... 5 NEW PROJECTS ........................................................................................................................................ 7 PROJECTS APPROVED ............................................................................................................................ 21 LIST OF SECTORS Agriculture Communications Finance Environment Social Transport Urban Development Water Supply / Sanitation Multi-Sector Power Miscellaneous NOTES 1. The information provided in this publication relates to projects in regional member countries, for which financing has been approved by the Boards of Directors of the Bank Group during the last six months and those which are expected to be submitted to the Boards for approval during the next six months. 2. New projects are listed in the publication after the Bank is satisfied that they are suitable for possible financing. Approved projects will be deleted from this document after two subsequent publications. Projects may also be dropped if a decision is made not to proceed with further processing. 3. If the Government of a borrowing country is the borrower, the name and address of the Department, Ministry or Agency which is expected to implement the project are given. If the Government is not the borrower, the borrower's name is given in capital letters. 4. The titles and descriptions of projects are tentative. 5. Details relating to each project shown in this issue of the publication are based on information available at the end of the quarter under reference. The information will be updated quarterly as project processing advances. 6. The amount of the probable loan is tentative and is subject to review after project appraisal. 7. Reference to "Bank Group" in this publication refers to the African Development Bank (ADB), African Development Fund (ADF) and the Nigeria Trust Fund (NTF). Probable financing is expressed in: UA1. Also "TAF" refers to Technical Assistance Fund loans under ADF. 8. All enquiries regarding information on any project should be referred to the Executing Agency and not to the Bank. 9. For further information please contact the Division Chief in charge of the relevant country. 1 1 UA = 1.375 USD & 1 UA = 1.240 EUR. For more information, please find the following link (Exchange Rates)
Quarterly Operations Summary – July 2020 African Development Bank PROCESSING STAGES financing plan; c) a tentative list of goods and The processing stages reflect phases of the services to be procured; d)the schedule of AfDB’s project cycle. Those stages are described execution and expenditure; e) the disbursement below: methods selected by the borrower; f) the Project identification: AfDB Group works with tentative schedule of disbursements including each borrowing regional member country to the precise information on the account numbers define a medium-term to long-term and correspondence banks; g) the procurement development strategy and operational program methods and dates of bidding announcements; in a document called country strategy paper h) the precise information on the executing (CSP), formerly Economic Prospects and Country agency and the project implementation unit; i) Programming (ECPC) papers. The CSP or CSPAR proposed realistic date for loan signature and taking into consideration an exigency for deadlines for first and last disbursements; j) for performance and results, is aligned to the co-financed projects, respective financing plans, country's own development plan and poverty cross-effectiveness and other miscellaneous reduction goals, and its preparation or planning information. cycle. Board approval: After negotiations with the Project preparation: This phase starts with AfDB government, the loan proposal is submitted to Group’s interest to finance a given project or AfDB's Board of Directors for approval. This programme and includes both in-bank and report is known as the Board Resolution. It is external collection of information and data which posted on the web after Board approval, along will help the Bank’s Experts to appraise the with the associated legal agreements. project. A preparation mission to a country is Loan signing: After Board approval, the multi-disciplinary and usually led by an Expert document is sent to the borrowing country's from a Sector Department. During the Government for cabinet authorization. Following preparation mission Bank Experts review the the authorization from the cabinet, the loan project in line with the country’s CSP, obtain agreement is generally signed by AfDB's existing documentation such as feasibility studies President or Vice-President and the on the project, and cross-check information with Representative of the Government. After loan the authorities of the country. approval a Borrower is allowed a maximum Project appraisal: During project appraisal, AfDB interval of about 90 days to sign the loan or grant Group examines project feasibility through an agreement with the Bank Group. Commitment or appraisal mission. The appraisal mission - in service charges start running on a loan 45 days consultation with the government and other after loan signature irrespective of whether stakeholders - examines the project's technical, disbursement has been made or not. Before financial, economic, technical, institutional, disbursement commences the loan or grant must environmental, marketing, and management be entered into force or declared effective. aspects as well as potential social impact. Loan effectiveness: The loan takes effect once Loan negotiation: After the Senior Management certain conditions agreed to be precedent to first Committee has completed its work and disbursement are met. This is also known as loan recommended the project or programme for effectiveness. In addition to "other conditions" Board approval, a draft project proposal is which may be fulfilled later, the following are submitted to all parties involved including the some of the standard conditions said to be Government for review. Feedback is collected, precedent to first disbursements: a) designate and the Government is then called for authorized signatories for the loan resources; b) negotiation with AfDB. During negotiations, present a legal opinion; c) submit the investment agreement should be reached or reconfirmed on schedule; d) present a list of goods and services the following: a) Objectives and description of the to be procured; e) open and maintain a special project, studies or programmes; b) loan amount project account; f) establish a project in foreign and local costs of the project and the implementation unit; g) any other condition agreed during negotiation as necessary to Page 5/52
Quarterly Operations Summary – July 2020 African Development Bank precede first disbursement. Generally, these stipulated in the loan agreement. AfDB's Legal conditions are limited to the legal requirements Counsel and Project Coordinating Officer review as mentioned above, as well as cross- if the conditions are met, after which the loan is effectiveness of co-financing, and execution of formally declared effective. Normally, loan subsidiary loan agreements. The requirements documents allow 90 days for the loan agreement and deadlines for loan effectiveness are to become effective. Implementation: Project implementation starts Post evaluation: After the project facilities and from the moment the project is declared technical assistance activities are completed, effective. AfDB Group projects are implemented AfDB prepares a project completion report (PCR) by the executing agency according to the agreed or technical assistance completion report to schedule and procedures. The supervision of document the implementation experience. These implementation however enables the Bank Group reports are prepared within 12 - 24 months of the to make sure the physical realization of the completion of the project. project is progressing smoothly and in Page 6/52
Quarterly Operations Summary – July 2020 African Development Bank NEW PROJECTS ANGOLA Finance BURUNDI BANCO MILLENNIUM ATLANTICO S.A Projet d'Appui au Développement Durable ANGOLA" - LINE des Chaines de valeur de l’Agriculture et de ATLANTICO is governed by the Angolan l’Elevage (PADCAE-B) legislation, applicable to its activities and The project aims to intensify agricultural financial operations, as well as to the fulfillment production in a sustainable manner with the of other commitments assumed by goal of reducing food, Department of the Bank. For this: Seeks the constant update Agriculture and rural Affairs, youth on applicable environment and social empowerment, responsible sourcing of and legislation, regulations and of interest to its investments in cocoa. business Status: For Board Approval on 09-09-2020 Status: Approved by the board on 22-02-2020 Estimated total cost: 15.00 million UA. Estimated total cost: 28.08 million UA. Loan amount: 15.00 million UA . Loan amount: 28.08 million UA. Executing agency: Ministère de l'agriculture et Executing agency: Banco Millennium Atlântico de l'Elevage. .S.A. Expense Category: Services, Goods, Works. Expense Category: Services. BENIN CENTRAFRIQUE Agriculture et développement rural Energie PROJET APPUI DÉVELOPPEMENT FILIÈRES PROJET D'APPUI A LA MODERNISATION DE VIANDE et LAIT ET PROMOTION DES L'AEROPORT INTERNATIONAL DE BANGUI- ENTREPRISES D'ÉLEVAGE M'POKO PHASE II (PAMAB 2) Ce projet ambitionne, par une approche Le projet d’Appui à la Modernisation de inclusive, de contribuer à lever les contraintes l’Aéroport de Bangui/M’Poko (PAMAB) a pour susmentionnées et améliorer la contribution objectif de contribuer au relèvement des filières lait et viande à l’économie économique et à la relance des secteurs nationale. Le projet vise la promotion des productifs de la Centrafrique à travers exploitations et entreprises agricoles de l’amélioration de la sécurité et de la sûreté du production intensive de lait et de viande, la transport aérien dans le pays. Le projet se promotion des chaines de valeurs ajoutées justifie donc par le souci de permettre à la RCA, (CVA) lait et viande performantes et dans une approche progressive, de : (i) mettre compétitives. L’objectif sectoriel du projet est aux normes les installations et services du de contribuer à l’accroissement de la sécurité transport aérien à l’aéroport international de alimentaire et nutritionnelle et du volume des Bangui/M’Poko ; (ii) améliorer la sécurité et la recettes d’exportation pour le Benin. sûreté aéroportuaire et renforcer les capacités en matière de sécurité/sûreté au niveau de Status: Pour Approbation le 13-05-2020 cette plate-forme. Estimated total cost: 20 million UA Loan amount: 20 million UA Status: Pour Approbation le 25-03-2020 Executing agency: Ministère de l’Agriculture, Estimated total cost: 8 million UA. de l’Elevage et de la Pêche Loan amount: 8 million UA. Expense Category: Biens, Services Executing agency: Ministère Mines Energie & Hydraulique. Expense Category: Travaux, Services, Biens. Page 7/52
Quarterly Operations Summary – July 2020 African Development Bank Ce projet vise à renforcer la gestion des CENTRAFRIQUE finances publiques et le développement du Energie secteur privé en vue de contribuer à la création FINANCEMENT COMPLÉMENTAIRE PROJET des conditions nécessaires pour une BOALI PHASE II croissance économique stable et inclusive. Le Le projet a pour objectif sectoriel de contribuer programme est structuré autour de trois à l'amélioration des conditions de vie des composantes, (i) l’amélioration de la gestion populations, de supporter le développement des finances publiques; (ii) la promotion de la économique et social de la RCA et de la RDC et compétitivité́et du développement du secteur de renforcer la coopération et l’intégration privé et (iii)le renforcement du développement énergétique régionale. Le projet a pour inclusif. objectif spécifique i) la réhabilitation et le Status: Pour Approbation le 24-06-2020 renforcement des unités de production ; ii) la Estimated total cost: 7 million UA réhabilitation et le renforcement des réseaux Loan amount: 7 million UA interconnectés de transport et de distribution ; Executing agency: Gouvernement de iii) l’accroissement de l’énergie disponible et Centrafrique. l’amélioration de la qualité des services Expense Category: Service d’électricité ; iv) l’accroissement du taux d’accès à l’électricité, et v) la réduction des coûts encore très élevés de l’énergie dans les CHAD deux pays Social PROJET DE PROMOTION DE LA FORMATION Status: Pour Considération le 22-04-2020 DES FILLES ET DE L’ALPHABÉTISATION DES Estimated total cost: 2,5 million UA FEMMES PHASE I Loan amount: 2;5 million UA Le projet vise : (i) l’accroissement de l’offre Executing agency: Ministère des Finances, des scolaire aux niveaux secondaire général et Mines technique pour la scolarisation des filles, et (ii) Expense Category: Travaux, Biens, Services l’amélioration de la qualité de l’éducation et de la formation offertes aux filles et aux femmes adultes à travers notamment une prise en CENTRAFRIQUE compte accrue des questions de genre dans les Finance services éducatifs offerts, le renforcement des PROJET D'APPUI INSTITUTIONNEL À LA filières scientifiques, la diversification des MODERNISATION DES FINANCES PUBLIQUES filières d’études et l’accent sur l’insertion socio- Accompagner les acteurs clés des finances économique des femmes alphabétisées. publiques dans le rétablissement du cycle de bonne gestion financière de l’Etat. Status: Pour Approbation le 27-03-2020 Estimated total cost: 10 million UA Status: Pour Approbation le 24-06-2020 Loan amount: 10 million UA Estimated total cost: 3 million UA Executing agency: Gouvernement du Tchad Loan amount: 3 million UA Expense Category: Travaux, Biens, Services Executing agency: Ministère des Finances, des Mines. Expense Category: CHAD Finance PARE APPUI BUDGETAIRE PHASE II CENTRAFRIQUE L'appui budgétaire vise à renforcer la résilience Multi-Secteur et le bien-être des populations du Tchad, ainsi PROGRAMME D'APPUI BUDGÉTAIRE À LA que la promotion de la croissance durable et COMPÉTITIVITÉ ET LA DIVERSIFICATION inclusive. Il permettra de renforcer la gestion et ÉCONOMIQUE PHASE I la transparence des finances publiques, Page 8/52
Quarterly Operations Summary – July 2020 African Development Bank notamment l'efficacité et l'indépendance du contrôle externe ; assurer l'accès des Status: Approved by the board on 06-05-2020 populations à des services de base dans les Estimated total cost: 73,27million UA. domaines de la sécurité alimentaire, de la santé Loan amount: 73,27million UA. et de la nutrition en lien avec le Plan National Executing agency: GOVERNMENT OF EGYPT de Développement 2017-2021 ; et contribuer à Expense Category: Services. la stabilité macro-économique en promouvant la diversification économique et la création d'emploi. EGYPT Status: Pour Approbation le 24-06-2020 Estimated total cost: 20 million UA. Power, ELECTRICITY AND GREEN Loan amount: 20 million UA. GROWTH SUPPORT PROGRAM (EGGSP) Executing agency: Ministère De l'économie, de PHASE I la Coopération. The main goal of the program is to promote a Expense Category: Services sustainable, competitive and diversified electricity sector for ensuring security of supply and supporting climate change CHAD mitigation and green growth. Social Status: Approved by the Board on 17-06-2020 PROJET DE PROMOTION DE LA FORMATION Estimated total cost: 18,53 million UA. DES FILLES ET DE L’ALPHABÉTISATION DES Loan amount: 18,53 million UA. FEMMES PHASE II Executing agency: Ministry of Electricity and i) Construction et/ou réhabilitation des Renewable Energy. établissements d’enseignement secondaire Expense Category: services général, (ii) dotation en équipements pédagogiques, scientifiques et numériques ainsi que des équipements pour l’enseignement pratique des filières porteurs CONGO d’emploi, (iii) Information et de sensibilisation Finance sur la scolarisation des filles, la santé sexuelle PROJET D'APPUI À LA MODERNISATION DES et reproductive, les mariages et grossesses FINANCES PUBLIQUES précoces, les violences basées sur le genre L’objectif du projet est de contribuer à (VBG), la sécurité et la nutrition (iv) soutien à la l’amélioration de la capacité de mobilisation formation des jeunes filles défavorisées dans des ressources domestiques. Spécifiquement, les établissements cibles du projet et,(vi) il vise à poursuivre la réorganisation des renforcement des capacités et formation. services de l’administration fiscale et d’améliorer l’allocation des ressources ainsi Status: Pour Approbation le 05-09-2020 que l’efficacité de la gestion des finances Estimated total cost: 11 million UA. publiques dans les provinces à travers la mise Loan amount: 11 million UA. en place de la plateforme minimale des Executing agency: Ministère de finances publiques locales. l'Environnement et de l'Eau. Explense Category: Travaux, Biens, Services. Status: Pour Approbation le 07-07-2020 Estimated total cost: 20 million UA EGYPT Loan amount: 20 million UA Food crops Executing agency: Ministère du Plan Et Reconstruction. ASSISTANCE AMIDST COVID-19 OUTBREAK Expense Category: Travaux, Biens, Services Provide food packages to households of informal workers affected by COVID-19. Page 9/52
Quarterly Operations Summary – July 2020 African Development Bank sustainable industrialization that benefits all ETHIOPIA and foster innovation (SDG 9); provide Multi-sector affordable and clean energy (SDG7), and APPROACH FOR STUNTING REDUCTION promotion of decent work and economic PROJECT (MASREP) growth for all (SDG8). The overall goal of Multi Sectoral Approach for Stunting Reduction Project is to end stunting Status: For Board Approval on 25-03-2020 by the year 2030. To achieve the goal the Estimated total cost: 107 million UA. government has put in place twelve strategic Loan amount: 31 million UA. objectives, these are: Improve the health and Executing agency: Expense Category: Works nutritional status of women, children under two and adolescent girls. Ensure 100% access ESWATINI to adequate food all year round, transform Agriculture smallholder productivity and income, ensure MKONDVO-NGWAVUMA AUGMENTATION zero post-harvest food loss, and increase SCHEME FEASIBILITY STUDIES AND DETAILED financial allocation from domestic and external DESIGNS resources. Consists of conducting feasibility studies for the construction of a dam on the Mkondvo Status: For Board Approval on 22-04-2020 River at Mahamba Gorge and the transfer of Postponed to next year water to the Mahosha River (a tributary of the Estimated total cost: 27.00 million UA Ngwavuma River) Loan amount: 27.00 million UA Executing agency: Government of Ethiopia Status: Approved by the board on 30-03-2020 Expense Category: Services, Goods. Estimated total cost: 1.20 million UA. Loan amount: 1.20 million UA. ETHIOPIA Executing agency: Ministry of Agriculture- Cooperatives. Finance Expense Category: services, goods and works COMMERCIAL BANK OF ETHIOPIA - RENEWABLE ENERGY ACCESS FACILITY Scaling up investments in energy, is the African GABON Development Bank Group's top, with the Communications aspirational goal of achieving PROJET CENTRAL AFRICA BACKBONE (CAB) - universal access to energy in Africa by 2025 COMPOSANTE GABON Le projet CAB Gabon fait partie du programme Status: For Board Approval on 01-07-2020 régional CAB (dorsale fibre optique en Afrique Postponed to 2021-2022 Centrale), qui vise à contribuer à augmenter Estimated total cost: 71.40 million UA. l'extension géographique des réseaux large Loan amount: 71.40 million UA. bande et à réduire des coûts de services de Executing agency: communications en Afrique Centrale. Le Expense Category: services Gabon a des coûts de connectivité internationale élevés. GABON Status: Pour approbation le 11-03-2020 Power Estimated total cost: 169 million UA KINGUELE AVAL 34.5 MW RUN OF RIVER Loan amount: 132 million UA HYDRO PROJECT IN GABON Executing agency: Agence Nationale des This project directly contributes to some Infrastructures Numériques et des Fréquences United Nations Sustainable Development (ANINF) Goals (UNSDGs): building a resilient Expense Category: Travaux, Biens, Services infrastructure, promote inclusive and Page 10/52
Quarterly Operations Summary – July 2020 African Development Bank GHANA GHANA Urban Development Power GHANA INFRASTRUCTURE INVESTMENT SREP-MINI GRID AND SOLAR PV NET FUND (GIIF) METERING The establishment of the GIIF is one such The SREP support will lead innovative approach in catalyzing other to increased investments in renewable energy sources of finance by leveraging its capital with including leveraging financing from private sector capital for financing other sources; catalyzing strong private sector infrastructure projects. The establishment of engagement; creating the necessary the Fund further provides the nation with the enabling environment, especially by opportunity to systematically tackle the overcoming the weaknesses and uncertainties complex demands of infrastructure financing in the regulatory and financial environment; and investment. The objective of the GIIF is to supporting gender inclusive development; mobilize, manage, coordinate and provide and engendering an informed and supportive financial resources; to catalyze the community. development of critical infrastructure in Ghana; and to generate a financial return for its Status: For Board Approval on 30-06-2020 shareholders. Estimated total cost: 52 million UA Loan amount: 20 million UA. Status: For Board Approval on 11-03-2020 Executing agency: Government of Ghana. Estimated total cost: 365 million UA Expense Category: Goods, Works, Services Loan amount: 54 million UA Executing agency: Ministry of Finance Expense Category: Goods, Works, Services GUINEA Finance PROJET D’APPUI A LA MOBILISATION DES GHANA RESSOURCES INTERNES ET FORMALISATION Power DES ENTREPRISES (PAMORIFE) ACCESS LNG Floating Storage and L’objectif général du PAMORIFE (Ancien Regasification Unit (FSRU) Project PAGEF) est de contribuer à améliorer la gestion To address its domestic gas supply budgétaire et assurer un meilleur pilotage du requirements, Ghana National Petroleum Programme national de développement Company (GNPC) has signed an agreement économique et social. De manière spécifique, with Rosneft Trading SA (RTSA) for the supply le projet vise à: (i) amélioration du cadrage of 1.7 million metric tonnes per annum macroéconomique ; (ii) amélioration de la (mmtpa) of gas to the Tema region. gestion de la dette publique ; (iii) une meilleure Development of the facilities will eliminate the gestion du patrimoine financier de l’état et des requirement for liquid fuels, resulting in lower projets en PPP ; et (iv) un meilleur cost of electricity generation for Ghana’s fonctionnement de la chaine PPBSE. thermal IPPs and an anticipated reduction in end user tariffs. Status: Pour approbation le 07-05-2020 Estimated total cost: 6 million UA. Status: For Board Approval on 11-03-2020 Loan amount: 6 million UA. Estimated total cost: 107 million UA Executing agency : Ministère Du Plan Et De La Loan amount: 36 million UA Cooperation I. Executing agency: Ministry of Energy Expense Category: Biens, Services. Expense Category: Works, Goods, Services Page 11/52
Quarterly Operations Summary – July 2020 African Development Bank Loan amount: 10 million UA. GUINEA-BISSAU Executing agency: The Government of Agriculture et développement rural Madagascar. PROJET D’AMÉLIORATION DES REVENUS, DE Expense Category: Services, Goods, Works. LA SÉCURITÉ ALIMENTAIRE ET DE LA NUTRITION (PARSAN) MALAWI Ce projet a été élaboré pour aider les Institutional Support groupements d'agriculteurs à renforcer leurs SUPPLEMENTARY FINANCING FOR capacités de production et d'exportation de PROMOTING INVESTMENT AND produits biologiques et du commerce COMPETITENESS IN THE TOURISM SECTOR équitable, dans le but d’augmenter leurs PROJECT. revenus et d’améliorer leur sécurité alimentaire. Create a conducive environment for enterprise Status: Pour approbation le 30-04-2020 development and community participation. Estimated total cost: 12 million UA. Project management. Loan amount: 12 million UA. Executing agency: Gouvernement De La Status: Approved by the board on 30-04-2020 Guinee-Bissau. Estimated total cost: 692.000,00 million UA Expense Category: Services Loan amount: 692.000,00 million UA Executing agency: GOVERNMENT OF MALAWI MADAGASCAR Expense Category: services Power SAHOFIKA HYDROPOWER PLANT PROJECT MALI The Sahofika project development was awarded to the consortium formed by Multi-Secteur companies Eiffage, Eranove, Themis and HIER, PROGRAMME D'APPUI BUDGÉTAIRE 2020 which agreed on 2 December, 2016 with the Ce projet vise à renforcer la gestion des Ministry of Water, Energy and Hydrocarbons of finances publiques et le développement du Madagascar a Project agreement to design, secteur privé en vue de contribuer à la création finance, build, operate and maintain the des conditions nécessaires pour une Sahofika hydro-power project, further to a croissance économique stable et inclusive. Le concession contract to be signed with the programme est structuré autour de trois State. A Malagasy company has been composantes, (i) l’amélioration de la gestion established by the Consortium in this purpose, des finances publiques ; (ii) la promotion de la which is called Nouvelle Energie compétitivité́et du développement du secteur Hydroélectrique. privé et (iii)le renforcement du développement inclusif. Status: For Board Approval on 07-10-2020 Estimated total cost: 72 million UA Status: pour approbation le 15-07-2020 Loan amount: 72 million UA. Estimated total cost: 10 million UA Executing agency: Ministry of Water, Energy Loan amount: 10 million UA and Hydrocarbons. Executing agency: Ministère de l’Economie et Expense Category: Services, Goods, Works. des Finances Expense Category: Services MADAGASCAR MAURITANIA Industry Multi-Sector Industrialization Support Project PROJECT SUPPORT TO IMPROVE THE BUSINESS CLIMATE. Status: For board approval on 10-09-2020 The objective of the Business Environment Estimated total cost: 10 million UA Enhancement Project for Mauritania are to Page 12/52
Quarterly Operations Summary – July 2020 African Development Bank enhance the business climate through strengthening program was set up with improvement in the financial, legal and participatory action research at its core. judiciary sectors, and regulatory environment Reinforcing a health system requires a for business, and the support of measures to customized and comprehensive approach to restructure selected Public Enterprise (PEs). face the complexity inherent to health systems. This will facilitate private sector led growth investment in the economy and improve the Status: For Board Approval on 06-06-2020 services of the PEs that directly impact private Estimated total cost: 3 million UA. sector growth and development. There are two Loan amount: 3 million UA. components to the project. The first Executing agency : Gouvernement de component is for the improving the business Mauritania. climate to foster private sector development. Expense Category: Services. The first component supports Government of the Islamic Republic of Mauritania. MAURITANIA Status: For Board Approval on 25-06-2020 Finance Estimated total cost: 3 million UA FINANCIAL INFRASTRUCTURE Loan amount: 3 million UA MODERNIZATION SUPPORT PROJECT - Executing agency: Gouvernement de SUPPLEMENTARY LOAN Mauritanie. Is considered as a starting point for the Expense Category: Services establishment of the basic infrastructure of the financial sector in Mauritania. The project will contribute to creating the necessary conditions MAURITANIA for a sustained economic recovery, in particular Social by improving the financing of economic AFRICA DISASTER RISKS FINANCING activities to further support the development PROGRAM (ADRIFI) of the private sector, the main engine of The comprehensive programme, open to growth. The project is divided into two main regional member countries, will enhance their components. The first component is aimed at ability to evaluate climate-related risks and modernizing the national payments system costs, respond to disasters and review and setting up an information system at the adaptation measures at both national and sub- Central Bank. The second component, relating national levels. It will also facilitate initial to the modernization of foreign exchange financing for countries in need of support. The operations and strengthening the stability of programme’s initial phase is expected to run the financial sector, will make it possible to from 2019 to 2023. support the implementation of the exchange rate policy through the installation of an Status: For Board Approval on 15-05-2020 interbank market trading room change; and Estimated total cost: 1.50 million UA the establishment of supervision tools for the Loan amount: 1.50 million UA. banking and microfinance sectors, which have Executing agency: Gouvernement de seen significant development in recent years. Mauritanie. Expense Category: Services. Status: Approved by the board on 01-04-2020 Estimated total cost: 0.40 million UA. Loan amount: 0.40 million UA. MAURITANIA Executing agency: The Central Bank of Social Mauritania (BCM). GOVERNANCE AND HUMAN CAPITAL Expense Category: Services. DEVELOPMENT, PHASE I Access to qualitative and equitable healthcare is a major challenge in Mauritania. In order to support the country’s efforts, a health sector Page 13/52
Quarterly Operations Summary – July 2020 African Development Bank forme de société́ anonyme avec Conseil MAURITIUS d’Administration. Son capital social est de 9 Multi-Sector 143 970 000 francs CFA au 30 juin 2018, est COVID_19 CRISIS RESPONSE BUDGET reparti entre quatre (4) institutions financières SUPPORT PROGRAMME (41%) et cinquante-six (56) banques commerciales (59%). Elle a pour mission de The Program is to support national measures refinancer, au profit de ses actionnaires in response to COVID-19, and mitigate its (banques commerciales), les prêts au logement health, social and economic impacts. octroyés par ceux-ci à leur clientèle. Status: Approved by the board 22-05-2020 Status: Approuvé par le conseil le 18-03-2020 Estimated total cost: 14,96 million UA. Estimated total cost: 8 million UA Loan amount: 14,96 million UA. Loan amount: 8 million UA Executing agency: GOVERNMENT OF Executing agency: CRRH MAURITIUS MINISTRY OF FINANCES. Expense Category: Services. Expense Category: Services. MULTINATIONAL MULTINATIONAL (Multinational-Nigeria) Finance Agriculture and Rural Development "AFREXIMBANK" - ADDITIONAL EQUITY MULTINATIONAL - TECHNOLOGIES FOR INVESTMENT AFRICAN AGRICULTURAL TRANSFORMATION The African Export-Import Bank (Afrexim- (2ND FINANCING PHASE) bank) is the foremost pan-African multilateral Technologies for African Agricultural financial institution devoted to financing and Transformation (TAAT) supports Feed Africa by promoting intra- and extra-African trade. providing the needed, proven agricultural and food processing technologies and Status: For Board Approval on 29-04-2020 implementation strategies for inclusion within Estimated total cost: 36.31 million UA. the Bank’s loans to Regional Member Loan amount: 36.31 million UA. Countries (RMCs). TAAT’s approaches revitalize Executing agency: FREXIMBANK and transform agriculture while restoring Expense Category: Services, Goods. degraded and maintaining or strengthening the ecosystems that underpin agriculture, while modernizing and more fully MULTINATIONAL commercializing agriculture. Finance EQUITY INVESTMENT IN SPARK+ AFRICA Status: For Board Approval on 18-03-2020 FUND FOR CLEAN COOKING ENTERPRISES Estimated total cost: 48 million UA Strengthen supply of clean cookstoves and Loan amount: 48 million UA fuels by providing grant capital and enterprise Executing agency: International Institute of capacity building to bridge the “pioneer gap” Tropical Agriculture (IITA) between start-up and investment. Expense Category: Goods, Services Status: For Board Approval on 22-04-2020 Estimated total cost: 7 million UA MULTINATIONAL Loan amount: 7 million UA. Finance Executing agency: Clean Cooking Alliance CAISSE REGIONALE DE REFINANCEMENT Expense Category: Services, Goods. HYPOTHECAIRE DE L’UEMOA (CRRH) La Caisse Régionale de Refinancement Hypothécaire de l’UEMOA (CRRH-UEMOA) est un établissement financier constitué sous Page 14/52
Quarterly Operations Summary – July 2020 African Development Bank MULTINATIONAL _ZAMBIA NAMIBIA Transport Finance NACALA ROAD CORRIDOR DEVELOPMENT ECONOMIC GOVERNANCE AND PROJECT IV SUPPLEMENTARY LOAN COMPETITIVENESS SUPPORT PROGRAMME – SUPPLEMENTAL FINANCING The proposed project will involve rehabilitation The program will continue to focus on of a 75 km road between Liwonde and supporting fiscal consolidation, PFM and Mangochi in Malawi along the Nacala Road public sector efficiency (particularly SOE Corridor as well as establishment of One-Stop- reform) and investment climate reforms Boarder-Posts (OSBPs) between Malawi and geared towards supporting industrialization Mozambique and between Malawi and efforts. The program will create a strong Zambia. The total project cost estimate for platform for policy dialogue and advisory Malawi is UA45.390 million net of taxes. services, with the Bank’s Directorate General Zambia will contribute UA 0.5 million (9%). The South playing a pivotal role. project duration is expected to be 5 years as follows: design review, preparation of bidding Status: Approved by the board on 11-03-2020 documents and tendering (12 months), Estimated total cost: 97 million UA construction period (36 months), and defects Loan amount: 97 million UA liability period (12 months). Executing agency: The Government of Namibia Expense Category: Services Status: Approved by the board 11-10-2019 NAMIBIA Estimated total cost: 8.8 million UA Loan amount: 8.8 million UA Agriculture and Rural Development Executing agency: Road Development Agency. AGRICULTURAL BANK OF NAMIBIA Expense Category: Services, Goods, Works. Agribank contributed N in a co-financing arrangement with the Development Bank of Namibia. The funding was expected to meet NAMIBIA the growing local demand. It is the largest Water supply and Sanitation agro-industry in Namibia and is expected to WATER SECTOR SUPPORT PROGRAMME create 120 direct permanent jobs and The aim of the program is to increase access, approximately 600 throughout the dairy quality, security and sustainability of water industry. supply and sanitation services in Namibia. The program implementation is planned in two Status: For Board Approval on 13-05-2020 phases; The Phase I which is planned to cover Estimated total cost: 29 million UA all the 14 regions of Namibia is scheduled to Loan amount: 29 million UA be implemented in the next 5 years (2020 – Executing agency: The Government of Namibia 2025) and Phase II immediately after the Expense Category: Services, Goods, Works. completion of Phase I. Phase I is intended to address short term, immediate water solutions and Phase II will focus on long term solutions NIGER to the water shortage. Twenty-five sub- projects are proposed under NWSSP. Transport NIGER DIORI HAMANI AIRPORT Status: Approved by the board on 11-03-2020 Les infrastructures de l’Aéroport International Estimated total cost: 93.60 million UA Diori Hamani étaient en effet dans un état de Loan amount: 93.60 million UA dégradation avancée ; la capacité d’accueil de Executing agency: The Government of Namibia l’aérogare en termes d’avions, de passagers et Expense Category: Goods, Works de frets ne répondait guère aux besoins. La rénovation de l’aéroport apparaissait donc comme d’une urgente nécessité. Page 15/52
Quarterly Operations Summary – July 2020 African Development Bank vulnerability of the environment and prevent Status: Pour approbation le 18-03-2020 loss of livelihoods in communities, especially Estimated total cost: 128 million UA for smallholder farmers. Loan amount: 23 million UA Executing agency: Agence Nationale de Status: For Board Approval on 30-04-2020 l'Aviation Civile (ANAC) Estimated total cost: 4 million UA Expense Category: Travaux, Biens, Services Loan amount: 4 million UA Executing agency: ARC Agency Expense Category: Works, Goods, Services NIGER Social NIGER FINANCEMENT ADDITIONNEL PROJET APPUI Agriculture and Rural Development AU DEVELOPPEMENT DE L’ENSEIGNEMENT ET PROJET RENFORCEMENT LA RESILIENCE DE FORMATION (FA/PADEFPT) COMMUNAUTES RURALES A L'INSECURITE L’objectif sectoriel du projet est de contribuer ALIMENTAIRE NUTRITIONNELLE à la scolarisation primaire universelle, et au Renforcer la résilience des communautés qui développement équilibré de l’ensemble du se focalise sur les capacités des individus, des système éducatif. Les objectifs spécifiques sont ménages et des structures communautaires à les suivants : (i) Accroître l’accès, l’équité et la se préparer, à réagir, à anticiper, et à se relever qualité de l’éducation de base ; et (ii) Renforcer des chocs externes. les capacités de gestion du système éducatif. Sur la base de ces objectifs, trois composantes Status: Pour approbation le 30-06-2020 ont été définies : (i) Amélioration de la Estimated total cost: 20 million UA couverture scolaire, de l’équité et de la qualité Loan amount: 20 million UA. de l’éducation de base; (ii) Appui institutionnel Executing Agency: Ministère de l'Agriculture Et ; et (iii) Gestion du projet. L’intervention de l'environnement pertinente de la Banque dans le secteur de Expense Category: Services l’éducation, a contribué directement à la réduction de la pauvreté. NIGERIA Status: Pour approbation le 22-04-2020 COVID619 RESPONSE SUPPORT PROGRAM Estimated total cost: 5 million UA (C19RSP) Loan amount: 5 million UA Executing agency: Unité de Gestion du Projet The goal of the proposed program is to PADEFPT support Nigeria’s efforts at fighting the Expense Category: Biens, Travaux, Services COVID-19 pandemic and protecting its citizens and businesses from the socioeconomic impact of the pandemic. Consistent with the NIGER FGN program/plan to address the crisis, the overall operational objective of the proposed Agriculture and Rural Development operation is to support the implementation of NIGER - AFRICA DISASTER RISKS FINANCING the Government’s “Integrated Policy PROGRAMME (ADRIFI) Framework” comprising critical and The comprehensive program, open to regional complementary measures to attempt to member countries, would like to assess their forestall a decline into a prolonged recession climate and to improve their climate-related to ensure that the country’s healthcare system risks and costs, to respond to disasters at both and social services, fiscal position and national and sub-national levels. It will also economy are sufficiently supported to respond facilitate initial financing for countries in need to and weather the negative impacts of the of support. The improved resilience and COVID-19 pandemic. adaptation of the climate change, as well as Status: Board Approved on 05-05-2020 disaster risk insurance cover, will reduce the Estimated total cost: 500 million US$ Page 16/52
Quarterly Operations Summary – July 2020 African Development Bank Loan amount: 228 million US$ Status: Initial preparation was undertaken but Executing agency: FEDERAL MINISTRY OF reprioritized for COVID-19 Facility FINANCE AND OTHERS For Board Approval on 31-03-2021 Expense Category: Services Estimated total cost: 245 million UA UC Loan amount: 36 million UA Executing agency: Ropeways Transport Limited NIGERIA Expense Category: Goods, Works Agriculture and Rural Development NIGERIA - SPECIAL AGRO-INDUSTRIAL PROCESSING ZONES (SAPZs) NIGERIA The country’s agricultural economy has Water supply and Sanitation historically been characterized by poor yield, YOBE KOMADUGU MULTIPURPOSE DAM high postharvest losses, slow technological PROJECT innovation, and significant deficits in support The Komadugu Yobe Basin is of strategic systems such as infrastructure, productivity- national and international importance as it (i) enhancing inputs, financial backing, supports the livelihood of over 15 million commercial orientation, and effective related people in six Nigerian States and (ii) it policies. To address these issues, Nigeria’s new represents approximately 35% of the Lake agricultural investment framework seeks to Chad Basin and hence its importance as a stimulate private sector investments to drive a transboundary water resource. The Federal market-led agricultural transformation, one Government of Nigeria (through financing by such major investment initiatives being the the AfDB) has prepared the Komadugu Yobe development of Special Agro-Industry Basin Strategic Action Plan (SAP) which is a Processing Zones (SAPZs) aimed at boosting long-term development strategy promoting the rapid development of modern agro- the use of the basin water resources for processing capacity in the country. inclusive and sustainable growth. Status: RDNG in collaboration with SNFI team Status: RDNG in collaboration with SNFI undertake some preparation done but moved undertake some preparation done but moved to July 27 2021 due to COVID-19 constrained to June 24 2021 due to COVID-19 constrained Estimated total cost: 387 million UA For Board Approval on 24-06-2021 Loan amount: 145 million UA Estimated total cost: 250 million UA. Executing agency: Federal Ministry of Loan amount: 73 million UA. Agriculture and Rural Development Executing agency: Federal Ministry of Water Expense Category: Works, Goods, Services Resources Expense Category: Services NIGERIA Transport NIGERIA LAGOS CABLE CAR TRANSIT SYSTEM (LCCT) Finance Development of a cable car ropeway solution NIGERIA FIRST CITY MONUMENT BANK to the commuter congestion in Lagos, Nigeria (FCMB) LTD comprising of three lines using Tri-cable The proposal is for a Thematic Line of Credit detachable grip technology. The civil works (LoC) to FCMB to support the growth of its consist of piling works, construction of tower term lending activities to local and women bases (14 No), and concrete towers (3 No. 150 empowered businesses involved in to 180 m high) erection of steel towers (11 No), transformative sectors of agribusiness, construction of stations (10 No) and associated manufacturing, commerce / trade and infrastructure for the stations. renewable energy. It is expected that up to forty per cent of the LoC proceeds will be channeled to women empowered business in Page 17/52
Quarterly Operations Summary – July 2020 African Development Bank alignment with the Bank’s AFAWA Program. Executing agency: ACCESS BANK PLC FCMB has also indicated commitment to (in Expense Category: Services the process of signing a non-binding letter of interest) participate in the proposed AFAWA program risk sharing mechanism. NIGERIA Status: RDNG in collaboration with SNFI Multi-sector undertake some preparation leading to PAR NIGERIA INNOVATION FUND PROJECT but moved to April 24 2021 due to The project will be anchored by (i) boosting reprioritization for COVID-19 CRF human capital for relevant learning, skills and job creation; (ii) enabling infrastructure For Board Approval on 22-04-2021 through innovation bubs, physical Estimated total cost: 195 million UA infrastructure, virtual infrastructure, data Loan amount: 36 million UA center/sandbox; and (iii) financing Executing agency: infrastructure. Expense Category: Status: For Board Approval on 21-11-2020 Estimated total cost: 214 million UA NIGERIA Loan amount: 73 million UA Urban Development Executing agency: Federal Ministry of Finance FAMILY HOMES FUND AND INTEGRATED And Others SKILLS DEVELOPMENT PROJECT Expense Category: Services The Family Homes Funds is a Social Housing Program initiated by the Federal Government RWANDA to provide inexpensive mortgages for low- income individuals and families across the Agriculture and Rural Development country. MEAT VALUE CHAIN IMPROVEMENT FOR EXPORT COMPETITIVENESS PROJECT Status: following some intense preparation, The aim of characterizing the existing meat the Project had to be moved to Q3 2021 due value chain of Rwanda as well as examine its to headroom constrained. full potential. Materials and Methods: It was For Board Approval on 20-09-2021 carried out in 192 households in six districts in Estimated total cost: 72 million UA Rwanda which engaged in all aspects of the Loan amount: 72 million UA cattle value chain. Executing agency: Nigeria Integrated Social Housing (NISH) Status: Approved by the board on 25-03-2020 Expense Category: Services Estimated total cost: 70 million UA Loan amount: 70 million UA. Executing agency: Government of Rwanda. NIGERIA Expense Category: services, goods. Finance ACCESS BANK REGIONAL TRADE FINANCE RWANDA SUPPORT FACILITY The program seeks to reduce the trade finance Rwanda COVID-19 Emergency Response gap in Africa by “crowding in” global banks and Support Program (PBO) strengthening local Africa Financial Institutions The specific objectives of the programme are that are critical to the promotion of trade on to help contain the spread of COVID 19 and the continent. To this end, greater emphasis is strengthen the Health System, Mitigate the placed on the promotion of regional impact of COVID 19 on the vulnerable through integration and intra-Africa trade. expanding social protection coverage and Status: For Board Approval on 24-06-2020 safeguarding economic resilience against Estimated total cost: 94 million UA COVID 19 shocks. Loan amount: 94 million UA Page 18/52
Quarterly Operations Summary – July 2020 African Development Bank improvement throughout the country;(iii) Status: For Board Approval on 23-07-2020 improvement of the utility’s performance and Estimated total cost: 71 million UA financial sustainability, including improved Loan amount: 71 million UA environment and social management, and Executing agency: Ministry of Finance and governance; (iv) increase electricity access by Economic Planning allowing new connections (households, Expense Category: services, goods, works business and industries) to a more reliable grid; and (v) development of local expertise in hydropower, solar energy and RWANDA energy efficiency, summarizes the Program Multi-Sector components and intended benefits. MUVUMBA MULTIPURPOSE DAM WATER RESOURCES DEVELOPMENT PROGRAM Status: Approved by the board on 25-02-2020 The project will be implemented in two phases. Estimated total cost: 7 million UA The phase one is related to the construction of Loan amount: 7 million UA the dam and hydropower including the Executing agency: GOUVERNEMNT DE SAO feasibility study and detailed design of water TOME AND PRINCIPE. supply components and the detailed design of Expense Category: Services, Goods, Works. irrigation component while the phase II will focus on the implementation of irrigation scheme and construction of water supply SAO TOME facilities and networks. Multi-Sector Status: For Board Approval on 10-09-2020 ECONOMIC REFORM AND POWER SECTOR Estimated total cost: 101.59 million UA. SUPPORT PROGRAM Loan amount: 103.84 million UA. Executing agency: Rwanda Water Resources Enhanced budget credibility, cash Board (RWB) management and expenditure efficiency, Expense Category: Services, Goods, Works. strengthened debt management, enhanced Procurement Plan: ppm muvumba- tax revenue mobilization, improved multipurpose-water-resources-development- business climate. program-phase-1 Status: Approved by the board on 08-01-2020 Estimated total cost: 5 million UA. SAO TOME Loan amount: 5 million UA. Power Executing agency: Ministry of Planning ENERGY TRANSITION AND INSTITUTIONAL Finance and the Blue Economy. SUPPORT PROGRAM (ETISP). Expense Category: Services, Goods. The broad objective of the proposed Program is to ensure sustainable development of STP’s power system and promote green growth by SAO TOME (MULTINATIONAL) supporting the implementation of the LCDP. Disease Control This will involve the diversification of the SUPPORT TO SADC & SAO TOME COVID19 country’s electricity matrix by increasing power RESPONSE generation capacity based on renewable energy, increasing the reliability of power Status: Approved by the board on 23-06-2020 system, and promoting the sustainable and Estimated total cost: 5 million UA. efficient use of electricity. The Programme will Loan amount: 5 million UA. ensure: (i) development of renewable energy, Executing agency: GOUVERNEMNT DE SAO thus reducing the country’s carbon footprint TOME AND PRINCIPE MINISTRY. and dependency on fossil fuels; (ii) Expense Category: Services, Goods. implementation of energy efficiency Page 19/52
Quarterly Operations Summary – July 2020 African Development Bank Les principaux produits attendus du SOUTH AFRICA programme sont : (i) l’atténuation des Water supply and Sanitation impacts POSEIDON WATER PRIVATE EQUITY sanitaires, économiques et sociaux du Poseidon Water uses a Public-Private COVID 19 et (ii) la préservation des Partnership approach to water project emplois, des entreprises ainsi que l’appui à development. The so-called “P3” approach la l’accélération de la relance économique provides a clear framework for assigning post crise COVID 19. roles and responsibilities to those best able to manage various project risks. As the Status: Approved by the board on 03-06- overall project development partner, 2020 Poseidon plays a lead role in identifying and Estimated total cost: 14,32 million UA . optimizing the allocation of risk among all Loan amount: 14,32 million UA . parties. Each contract party is able to focus Executing agency: Ministère du on its area of greatest expertise. Municipal Développement, de l'Investissement et de agencies are able to use their scarce la Coopération Internationale. resources more efficiently, and private Expense Category: Services,goods. project partners earn benefits in line with their project contribution and at-risk capital. SOUTH AFRICA Health Status: For Board Approval on 16-09-2020 COVID-19 Crisis Response Budget Support Estimated total cost: 6.63 million UA Programme Loan amount: 6.63 million UA. Executing agency: Land Agricultural The operation is designed as a Crisis Response Development Bank. Eskom Ltd. Budget Support Operation prepared following Development Bank of Southern Africa a request from the government of South Expense Category: Services, Goods, Works. Africa. SOUTH AFRICA Status: For Board Approval on 22-07-2020 Health Estimated total cost: 210 million UA . COVID-19 Crisis Response Budget Support Loan amount: 210 million UA . Programme Executing agency: The Government of South Africa. The operation is designed as a Crisis Expense Category: Services. Response Budget Support Operation prepared following a request from the TUNISIA government of South Africa. Social PROGRAMME D’APPUI A LA REPONSE COVID- Status: For Board Approval on 22-07-2020 9 PAR L’INCLUSION SOCIALE ET L'EMPLOI – Estimated total cost: 210 million UA . PARISE. Loan amount: 210 million UA . Executing agency: The Government of South Les principaux produits attendus du Africa. programme sont : (i) l’atténuation des impacts Expense Category: Services. sanitaires, économiques et sociaux du COVID 19 et (ii) la préservation des emplois, des TUNISIA entreprises ainsi que l’appui à la l’accélération de la relance économique post crise COVID Social, PROGRAMME D’APPUI A LA 19. REPONSE COVID-9 PAR L’INCLUSION SOCIALE ET L'EMPLOI – PARISE. Status: Approved by the board on 03-06-2020 Estimated total cost: 14,32 million UA . Page 20/52
Quarterly Operations Summary – July 2020 African Development Bank Loan amount: 14,32 million UA . to facilitate mobility, trade and tourism within Executing agency: Ministère du southwestern Uganda. The select national Développement, de l'Investissement et de la roads have the following characteristics: (i) LOT Coopération Internationale. 5a: Kabale-Lake Bunyonyi (7.8km), including Expense Category: Services,goods. Bunyonyi- Kabeho link (7.3km); (ii) LOT 5b: Kisoro-Mgahinga (13km), including Nyarusiza - Muhavura gate (5km). Status: For Board Approval in Sept 2020 RWANDA Estimated total cost: 60 million UA Loan amount: 60 million UA. Industry Enhancing the Quality of Industrial Executing agency: MINISTRY OF WORKS. Policy in Rwanda (EQuIP) Expense Category: Works, Goods, Services. The goal of the project is to contribute towards a more inclusive and sustainable economic growth in Rwanda through more effective UGANDA implementation of industrial policy Industry, Mining & Quarrying interventions that stimulate private sector DEI INDUSTRIES INTERNATIONAL LTD growth. Empower Africa through innovation, research, manufacturing and technology. Status: Approved by FAPA Technical Committee We believe in direct community engagement on 13-08-2020 and excellent service delivery to make an Estimated total cost: 436, 363.64 UA overall positive impact on society. Loan amount: 392, 727.3 UA. Executing agency: Rwanda Development Board Status: For Board Approval in 2021 (RDB). Estimated total cost: 7.90 million UA Expense Category: services, goods. Loan amount: 7.90 million UA Executing agency: Dei Group Ltd. Expense Category: Services, Goods, Works. SOUTH AFRICA Transport ZAMBIA ( MULTINATIONAL) TRANSNET III Provision of Hazardous And General Waste NACALA ROAD CORRIDOR DEVELOPMENT Management Services For The Transnet PROJECT IV SUPPLEMENTARY LOAN Pipelines - Ladysmith Cluster For A Period Of 3 The project is expected to contribute to (Three) Years. improving efficiency along the Nacala Road Corridor. At a regional level, the objective is to Status: For Board Approval on 03-06-2020 contribute to improving road transportation Estimated total cost: 214 million UA . and trade facilitation along the Nacala Road Loan amount: 214 million UA . Corridor. Executing agency: TRANSNET SOC LTD Expense Category: Services, Goods, Works. Status: Approved by the board on 28-02-2020 Estimated total cost: 8.8 million UA. UGANDA Loan amount: 8.8 million UA. Executing agency: Road Development Agency. Transport Expense Category: Services, goods, Works. KABALE-LAKE BUNYONYI/KISORO- MGAHINGA ROADS UPGRADING BOTSWANA / ZAMBIA-KAZUNGULA BRIDGE PROJECT (ZAMBIA SUPPLEMENTARY GRANT) The Uganda National Roads Authority (UNRA) The objective of the project is to improve the is proposing to upgrade a select number of efficiency of transit traffic through the national roads from gravel to paved standard Kazungula border to facilitate and increase Page 21/52