ONTARIO MINING & EXPLORATION - Ontario ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
ONTARIO MINING & EXPLORATION D IRECTORY AND RE SOURCE GUID E 2021 PM#40787580 A N O F F I C I A L P U B L I C AT I O N O F T H E O N TA R I O P R O S P E C T O R S A S S O C I AT I O N W W W. O N TA R I O P R O S P E C T O R S . C O M
Strike Copper Corp. (“SCC”) is a junior resource exploration company, currently • Current demand trends indicate there will be a 10 million tonne Strike Copper Corp. focused on defining and monetizing the copper supply deficit by 2028. www.strikecoppercorp.com historical Copper, Gold, Silver, Zinc, and 82 Richmond St. East, Suite 401 • Recent and historical exploration Nickel mineral exploration potential on its Toronto, ON M5C 1P1 results suggest Sungold has the Sungold property in the Shebandowan potential for significant quantities of C: 416-315-6490 Gold Camp in Northern Ontario. copper, gold, zinc and other mineral Company Highlights resources. O: 647-350-6122 • Proven management and advisory team • Sungold is adjacent to an NI 43-101 E: elbourne007@gmail.com with significant exploration, engineering, proven 3.2 million Au resource project financing and permitting experience. (recently acquired by Goldshore Resources Inc. in a $57m This is not a general solicitation; any • Strong and growing (long term) demand for transaction). investment is only open to copper (Sungold’s primary resource) due to accredited or other eligible its use in electric vehicles and other green investors. energy solutions.
SITE INVESTIGATION SERVICES • Full-service geotechnical drilling • Monitoring installations • In-situ testing • All access: remote, heli, amphibious We lead safety / We are quality / We are professional / We add value Mudbaydrilling.com A member of the ConeTec Group of Companies. ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 3
ONTARIO MINING & EXPLORATION Ontario Mining & Exploration Directory and Resource Guide 2021 is published for The Ontario Prospectors Association (OPA). DIRECTORY AND RESOURCE GUIDE 2021 941 Cobalt Crescent Thunder Bay, ON P7B 5Z4 Contents Phone: (807) 622-3284 Toll Free: (866) 259-3727 Message from Ontario Prospectors Association, Garry Clark................. 6 Fax: (807) 622-4156 www.ontarioprospectors.com Message from the Minister of Energy, Northern Development and Mines, Greg Rickford .............................................. 6 Published by: MediaEdge Publishing Ontario Mining Operations 2021 ............................................................................................. 7 Gold Mines ..................................................................................................................................................... 8 mediaedgepublishing.com 33 South Station Street Other Metal Mines ............................................................................................................................... 18 Toronto, ON M9N 2B2 (866) 480-4717 Major Industrial Mineral Producers ................................................................................. 22 531 Marion Street Winnipeg, MB R2J 0J9 Gemstone and Mineral Specimen Mines ................................................................... 26 (866) 201-3096 Fax: (204) 480-4420 Lime and Specialty Limestone Producers ................................................................ 28 Publisher: Robert Thompson Trap Rock Producers ....................................................................................................................... 29 Editor: Elyce Mankewich Sales Executives: Pat Johnston, Brick Producers ..................................................................................................................................... 30 Kristine Dudar, Nolan Ackman Design Specialist: Cement Producers’ Quarries.................................................................................................... 30 Marisa Giesbrecht Dimension Stone and Specialty Aggregate Producers ............................... 31 President: Kevin Brown Senior Vice President: Corporate Offices of Companies with Metal Mines in Ontario............ 36 Robert Thompson Directory, Business Management: Advanced Mineral Projects in Ontario 2021............................................................. 37 Michael Bell Branch Manager: Nancie Privé Companies Actively Exploring in Ontario................................................................... 38 Publication Mail Agreement #40787580 DigiGeoData Publishes the Shining Tree/Gowganda Exploration All rights reserved. The contents Activity Map ............................................................................................................................................. 44 of this publication may not be reproduced by any means, in Index to Advertisers ......................................................................................................................... 46 whole or in part, without the prior written consent of the association. Marketplace .............................................................................................................................................. 46 Ontario Mining & Exploration Directory & Resource Guide 2021 is printed on 10% post-consumer FSC certified paper using soya based inks. When necessary to mail an issue in an enclosure, we use an environmentally-friendly, 100% oxo-degradable poly-wrap. 4 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
OPERATING ENGINEERS TRAINING INSTITUTE OF ONTARIO TRAINING TOMORROW’S WORKFORCE Tower and Mobile Crane • Excavator • Dozer Tractor-Loader-Backhoe • Concrete Pump • Grader Pipeline • Drill Rig • Commercial Truck Driver INTERNATIONAL UNION OF OPERATING ENGINEERS B M Mike Gallagher USINESS P Joe Redshaw ANAGER LOCAL 793 RESIDENT 2245 Speers Road • Oakville • ON • Canada • L6L 6X8 • 1-877-793-4863 • www.oetio.com • www.iuoelocal793.org In 2020, we are proud to have enabled Canadian jobs and supported worthy charities during a very uncertain time. 50 Flow-Through Financings in 2020 | Thank you to our partnering issuers: • Amex Exploration • Colorado Resources • Halo Exploration • Orford Mining • Anaconda Mining • Eskay Mining • Harte Gold • Palladium One Mining • Argonaut Gold • Fireweed Zinc • Kodiak Copper • QMX Gold • Auramex Resources • Fokus Mining • KORE Mining • Radisson Mining • Azimut Exploration • Fury Gold Mines • Labrador Gold • Renforth Resources • Banyan Gold • Galway Metals • MacDonald Mines Exploration • Rockhaven Resources • Benz Mining • GFG Resources • Magna Terra Minerals • Seabridge Gold • BMEX Gold • Golden Planet Mining • Matador Mining • Sitka Gold • Canada Nickel • Golden Ridge Resources • McEwen Mining • Tudor Gold • Canterra Minerals • Goliath Resources • Monarch Gold • TDG Gold • Cartier Resources • Granite Creek Copper • Moneta Porcupine Mines • Vanadium One Iron • Cassiar Gold • GT Gold • O3 Mining For more information about PearTree Flow-Through Donation Financing opportunities, please visit peartreecanada.com or contact our team directly: Lisa Davis, LL.B, ICD.D Gary J. Baschuk Ricky Chan, CPA, CA, CFA Danny Mah, CFA Eliza Dinale, LL.B, LL.M CEO, PearTree Securities Managing Director, Mining Managing Director, Mining Managing Director, Energy Director, Legal Services lisa.davis@peartreecanada.com & Senior Geologist ricky.chan@peartreecanada.com danny.mah@peartreecanada.com eliza.dinale@peartreecanada.com gary.baschuk@peartreecanada.com ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 5
MESSAGE FROM ONTARIO PROSPECTORS ASSOCIATION, GARRY CLARK D uring these uncharted times, our concerns in front of MENDM staff expansions of known projects the Ontario Prospectors virtually, which has been a new and continuing. The largest concern Association is still trying different way of doing business. that we see is a lack of people and to keep Ontario as one of equipment, especially with travel the best jurisdictions to explore! The campaign of Save Canadian concerns across provincial and The challenges over the last year Mining, which is led by Terry Lynch, regional lines. have definitely been different than is making progress to impede the The pandemic situation has put a lot anyone has experienced, though short selling of stocks that has of stress both mentally and physically with cooperation with the Ministry been hindering orderly trades of on all of us, but we will succeed of Energy Northern Development exploration companies since 2012. through this and keep finding new and Mines (MENDM) staff we have The OPA was incredibly happy to be deposits in our province. Mineral had some success helping explorers asked to work on this project and prices are at record levels and it thanks Terry for his leadership. in Ontario continue as an essential seems that the investing public is service without jeopardizing claim In general, looking across the focused back on exploration and tenure. The OPA has participated with province, exploration is doing very development companies, which is numerous claim managers to keep well with new discoveries and refreshing to see. MESSAGE FROM THE MINISTER OF ENERGY, NORTHERN DEVELOPMENT AND MINES, GREG RICKFORD D espite one of the most measures in place, while others proud to say all five projects are challenging years in recent contributed to the fight against creating good jobs and economic history, Ontario’s mineral COVID-19 by donating meals, N95 opportunities for people in the north. exploration and mining masks, gloves and medical supplies. I sector has proven to be one of our want to thank the entire mining industry Our government will continue to work province’s greatest success stories. for its rapid and compassionate hard – alongside our partners at the response to the pandemic. Ontario Prospectors Association Our province is fortunate to be home (OPA) – to ensure prospectors and to a vast wealth of mineral resources, Our mining and prospecting and that is why our government communities have long been a catalyst the mineral exploration industry continues to eliminate red tape and for creating jobs in Northern Ontario have a strong voice in Ontario, across build a competitive tax framework and will continue to play a vital role in Canada and around the world. We to support this critical industry. And the province’s economic recovery. are taking measures to increase as a leader in mineral exploration competitiveness and support an and production, Ontario consistently It takes years and significant capital for attractive investment climate so the ranks among the top ten jurisdictions an exploration project to transition to sector can continue to grow, thrive in the world for exploration spending. a producing mine, and our government and create good-paying jobs. has been proud to help several While the COVID-19 pandemic projects move forward in the last two It is an exciting time for mineral disrupted the course of regular years. Harte Gold’s Sugar Zone Mine, exploration and development in business within the sector, I am Evolution Mining’s Cochenour Mine and Newmont’s electrified Borden Ontario. As we continue down the optimistic about the future of mining in Ontario. Mine have started production, with path to economic recovery, we look IAMGOLD’s Côté Gold Mine project to a brighter future in supplying the Mining companies moved quickly and Argonaut Gold’s Magino project world with critical minerals that will to put enhanced health and safety given the green light to proceed. I am power the technology of tomorrow. 6 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
. SU PE RIO Cobalt R Ontario Mining Ontario Operations 2021 Mining Operations 2021 Sault Ste. Marie 23 22 24 Sudbury North Bay Number of Mines in Ontario Metal Mines 31 Otta MINE LOCATIONS Gold Mines Base Metal Mines 20 9 8 Numbers relate locations to Iron Mines 1 names in charts Number of Mines in Ontario Platinum Group Metal Mines 1 Metal Mines Non-Metal Mines 25 9 Metal Mines 31 Major Industrial Mineral Operations 1 9 7 L. HUR Total Mines 40 Industrial Mines/Quarries Gold Mines 20 Base Metal Mines 9 ON Iron Mines 1 Platinum Group Metal To ro nto Mines R I O 1 Attawapiskat Non-Metal 2 Mines L . O N TA 9 13 Major 3 Industrial Mineral Operations 9 Total Mines 40 4 15 4 Red Lake London Moosonee Windsor 9 E RIE Kenora 5 L. Attawapiskat 5 26 14 13 Marathon 19 21 17 16 2 Thunder Bay Timmins 1 7 9 8 10 18 11 20 12 6 6 Kirkland L. S Wawa 3 Lake UP ER IOR Cobalt Moos lt See Sauon te. Marie 24 Red Lake 23 22 Sudbury North Bay GOLD MINES Ottawa MINE LOCATIONS 8 Numbers relate locations to 1. Bell Creek Mine Pan American Silver Corp. – Lake Shore Gold Corp. names in charts Metal Mines 25 1 7 L. HUR 2. Black Fox Mine McEwen Mining Inc. Industrial Mines/Quarries 3. Borden Mine Newmont Corp. – Porcupine Gold Mines ON Toronto IO 4. Cochenour Mine Evolution Mining Ltd. – Red Lake Gold Mines 2 L . O N TA R 3 5. Detour Lake Gold Mine Kirkland Lake Gold Ltd. 5 6. Eagle River Mine26 Wesdome Gold Mines Ltd. 4 London 7. Hollinger Mine Mar–aPorcupine Newmont Corp. thon Gold Mines Windsor 8. Holloway – Holt Mine 19 Ltd. – Holt Complex Kirkland Lake Gold 21 517 9 E RIE 16 2 L. Thunder Bay Timmins 1 7 9 8 9. Hoyle Pond Mine Newmont Corp. – Porcupine Gold Mines 10 18 11 10. Island Gold Mine Alamos Gold Inc. 20 12 6 6 Kirkland 11. Macassa Mine Kirkland Lake Gold Ltd. L . SWesdome Gold Mines Ltd. Wawa 3 Lake 12. Mishi Gold Mine UP ER Corp. IRON MINES 13. Musselwhite Mine IOR Newmont Cobalt 25. Tomclid Iron Mine Ferromin Inc. 14. Rainy River Mine New Gold Inc. 15. Red Lake Mine Evolution Mining Ltd. – Red Lake Gold Mines PLATINUM GROUP METAL MINES Impala Platinum Holdings Ltd. 16. Sugar Zone Mine Harte Gold Corp. 26. Lac des Iles Mine Sault Ste. Marie 24 – Impala Canada Ltd. 17. Taylor Mine Kirkland Lake Gold Ltd. – Holt Complex Sudbury MAJOR INDUSTRIAL MINERAL OPERATIONS 18. Timmins West Mine Pan American Silver Corp. – Lake Shore Gold Corp. 23 22 North Bay Blue Mountain Operations 1. Covia Holdings Corp. 19. Williams Mine Barrick Gold Corp. (nepheline syenite) 20. Young – Davidson Mine Alamos Gold Inc. 2. Goderich Brine Field (salt) Compass Minerals Canada Corp. BASE METAL MINES 3. Goderich Mine (salt) Compass Minerals Canada Corp. Ottawa MINE LOCATIONS 8 21. Kidd Creek Numbers Mine relate locations to Glencore PLC – Glencore Canada Corp. 4. Hagersville Mine (gypsum) CGC Inc. names in charts 5. Ojibway Mine (salt) K+S Windsor Salt Ltd. 22. Sudbury Operations: McCreedy West Mine KGHM International Ltd. Metal Mines 25 6. Penhorwood Mine (talc) Imerys Talc 1 7 L. HUR Sudbury Operations Industrial Mines/Quarries 23. Coleman Mine, Copper Cliff North Mine, Vale S.A. – Vale Canada Limited 7. St. Lawrence Mine (wollastonite) Canadian Wollastonite Creighton Mine, Garson Mine, Totten Mine 8. Tatlock Quarry (calcium carbonate) OMYA Canada Inc. ON Sudbury Operations: 24. Glencore PLC – Sudbury Integrated Nickel Operations Fraser Mine, Nickel Rim South Mine 9. Windsor Brine Field (salt) ntoSalt Ltd. K+S Windsor Toro IO 2 L . O N TA R 3 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 7 4
GOLD MINES BELL CREEK MINE (TIMMINS OPERATIONS) BLACK FOX MINE (BLACK FOX COMPLEX) Pan American Silver Corp. – Lake Shore Gold Corp. McEwen Mining Inc. • gold producer • underground • gold producer • underground Mailing Address 3160 Florence Street, PO Box 1067 Mailing Address 2839 Hwy 101 East, PO Box 605 South Porcupine, ON P4N 7H9 Matheson, ON P0K 1N0 Tel: (705) 269-4344 Tel: (705) 273-1077 Website www.panamericansilver.com Fax: (705) 273-1097 Mine Manager David Bernier Website www.mcewenmining.com Production Rate 4,458 tonnes per day (Bell Creek and Mine Manager Peter Mah, Chief Operating Officer Timmins West mines combined), 5,000 Production Rate 645 tonnes per day (mine), 2,000 tonnes tonnes per day (mill capacity) per day (mill capacity) Production 2017 – 167,000 (Bell Creek and Timmins Production 2017 – 66,733 ounces of gold West mines combined) 2018 – 48,889 ounces of gold 2018 – 167,500 (management projection 2019 – 35,693 ounces of gold for Bell Creek and Timmins West mines 2020 – 37,500 ounces of gold combined) (management projection) 2019 – 143,770 (Bell Creek and Timmins 2021 – 30,000 ounces of gold West mines combined) (management projection) 2020 – 148,400 (Bell Creek and Timmins Resources 9,267,000 tonnes at 5.00 g/t containing West mines combined) 1,491,000 ounces of gold (Measured and 2021 – 153,450 (management projection Indicated – Apr 2020) for Bell Creek and Timmins West mines 886,000 tonnes at 6.59 g/t containing combined) 187,000 ounces of gold Resources 17,200,000 tonnes at 3.02 g/t containing (Inferred – Apr 2020) 1,670,500 ounces of gold (Measured and Opened 2009 (open pit, closed 2015), 2011 Indicated – Jun 2020) (underground) 5,000,000 tonnes at 3.27 g/t containing Employment 257 529,300 ounces of gold (Inferred – Jun Notes The Black Fox Complex is comprised of 2020) the Black Fox and former Stock mines Opened 2012 and the Black Fox-Stock mill. Black Employment Approximately 680 employees at Fox Complex also includes the Froome, Timmins Operations (Voluntary Tamarack and Grey Fox deposits. temporary layoffs have been offered Development of the underground access during the pandemic) ramp at Froome continued in 2020 and Notes Ore from the Bell Creek and Timmins remains on track for first ore production West mines is processed at the Bell in Q2-2021 with commercial production Creek Mill. In March 2020, Lake Shore in Q4-2021. The Froome Deposit is Gold offered its employees voluntary expected to be in production for 2.5 temporary layoffs in response to the years. McEwen plans to accelerate COVID-19 pandemic. In 2020 during development of the Grey Fox Project to COVID-19, the Timmins West and Bell coincide with the completion of mining at Creek mines continued to operate at 90 the Froome deposit. In September 2020, per cent of capacity. Reduced operating a US$10 million flow-through financing capacities on account of COVID-19 was completed, provided for exploration protocols and adjustments being made activities in the Timmins region over the to the mining methods at the Timmins next 1-2 years. The initial focus is on two Bell Creek mine reduced gold production. high-potential targets, Stock West and The company spent US$0.3 million on Whiskey Jack. A drill program was started projects at Timmins, primarily related to in September 2020 at Whiskey Jack in purchasing equipment and materials for the Grey Fox area, part of the Black Fox an expansion of operations, which was Complex, whereby visible gold is showing delayed due to the COVID-19 pandemic. in six of the nine new drill holes logged Pan American also notes that some of the to date. McEwen plans to complete a sustaining capital projects planned for preliminary economic assessment on the 2020 will be carried over into 2021 as a expansion potential for the Fox Complex result of COVID-19. In 2021, Pan American in Q1-2021. Silver will also drill test the Wetmore project near Bell Creek. 8 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
GOLD MINES Production 2019 – 155,000 ounces of gold BORDEN GOLD MINE (PORCUPINE MINES) (management projection for Red Lake Newmont Corp. Gold Mines operations combined) • gold producer • underground, open pit 2020 – 27,428 ounces of gold (reported Mailing Address 4315 Gold Mine Road, PO Box 70 actual for Red Lake Gold Mines South Porcupine, ON P0N 1H0 operations combined) Tel: (705) 235-6589 Resources 22,760,000 tonnes at 7.77 g/t Fax: (705) 235-6551 containing 5,687,000 ounces of gold Website www.newmont.com (Measured and Indicated for Red Lake Mine Manager Marc Lauzier, Mine General Manager, Gold Mines operations combined – Dec Porcupine Mines Operations 2019) Production Rate 9,600 tonnes per day (Porcupine Mines 25,330,000 tonnes at 6.49 g/t Operations combined), 9,979 tonnes per containing 5,287,000 ounces of gold day (mill capacity) (Inferred for Red Lake Gold Mines Production 2019 – 223,000 ounces of gold (since operations combined – Dec 2019) the completion of the acquisition of Opened 1919 the mine site as part of the Newmont Employment 750 employees and contractors Goldcorp transaction for Porcupine (approximate figures for Red Lake Gold Mines Operations combined) Mines Operations combined) 2020 – 325,000 ounces of gold Notes Cochenour achieved commercial (management projection for Porcupine production in April 2019. Production Mines Operations combined) comes from the old Cochenour mine 2021 – 360,000 ounces of gold (guidance and the new Upper Cochenour Zone. for Porcupine Mines Operations During Q3-2020, production at the combined) mine was affected by a forest fire Resources 301,400,000 tonnes at 1.05 g/t that resulted in a brief temporary containing 10,170,000 ounces of gold suspension of operations. Evolution (Measured and Indicated – Dec 2019 for is working towards achieving Porcupine Mines Operations combined) 1,200 metres of underground mine 109,200,000 tonnes at 0.74 g/t development per month at Red containing 2,610,000 ounces of gold Lake. Six underground drill rigs are (Inferred – Dec 2019 for Porcupine Mines conducting a resource definition and Operations combined) exploration drilling program onsite, Opened 2019 with 6,078 metres drilled in 35 holes at Employment 800 employees, 445 contractors Cochenour during the quarter. Drilling (approximate figures for Porcupine six long step-out holes (totalling Mines Operations combined) 3,238m) at Cochenour targeting new Notes Porcupine operations include the Hoyle discoveries returned strong results Pond, Hollinger and Borden Lake Mines with the best intersections of 1.27m as well as the Dome Mill. All production grading 11.72g/t Au from 265.75m from the Porcupine mines report to the (Thor) and 0.31m grading 627.75g/t Au Dome Mill for refining. In 2020, Gold from 273.95m (Voss). production increased four per cent, primarily driven by higher ore grade mined from Borden, which achieved commercial production in the fourth quarter of 2019. US$25 million in development capital expenditures are planned at Porcupine Mines in 2021. COCHENOUR GOLD MINE (RED LAKE GOLD MINES) Evolution Mining Ltd. • gold producer • underground Mailing Address 17 Mine Road, Bag 2000 Balmertown, ON P0V 1C0 Tel: (807) 735-2077 • Ground • Ground VLF VLF Surveys Surveys • No • No permit permit or or cutcut lines lines required required • Ground VLF Surveys • No permit or cut lines required Fax: (807) 735-2765 •• Ground Inversion VLF • Inversion Surveys Modeling Modeling • ••Geological No permit Geological or cut lines required Consulting Consulting • Inversion Modeling • Geological Consulting Website www.evolutionmining.com.au • •Prospecting • ProspectingInversion • Prospecting • Max • Max •Modeling MinMin •Min MPP • MPP Max • •MPP Geological Probe Probe Consulting • Magnetometer •Probe Magnetometer • Magnetometer Mine Manager Kirsty Liddicoat, General Manager, Red • Historical •• Historical ProspectingVLFVLF Data •Data Max • Historical VLF Processing Processing Min & Modelling & Probe Modelling Data• Processing MPP • Magnetometer & Modelling Lake Operations • Historical VLF Data Processing & Modelling Production Rate 1,557 tonnes per day (Red Lake Gold P: 705.946.6054 P: 705.946.6054 l C:l 705.943.9399 C: 705.943.9399 P: 705.946.6054 l E:l superiorexploration@yahoo.ca l C: 705.943.9399E: superiorexploration@yahoo.ca l E: superiorexploration@yahoo.ca Mines Operations combined) www.superior-exploration.ca www.superior-exploration.ca www.superior-exploration.ca P: 705.946.6054 l C: 705.943.9399 l E: superiorexploration@yahoo.ca www.superior-exploration.ca ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 9
GOLD MINES DETOUR LAKE MINE EAGLE RIVER MINE Kirkland Lake Gold Ltd. Wesdome Gold Mines Ltd. • gold producer • open pit • gold • underground Mailing Address 86 2nd Street, PO Box 1325 Mailing Address 93 Mission Road, PO Box 1520 Cochrane, ON P0L 1C0 Wawa, ON P0S 1K0 Tel: (647) 847-2089 Tel: (705) 856-2721 Fax: (705) 272-2558 Fax: (705) 856-7173 Website www.kl.gold Website www.wesdome.com Mine Manager Duncan King, Vice President, Canadian Mine Manager Jean-Guy Leclair, General Manager, Operations Eagle Division Production Rate 63,445 tonnes per day (mine), 69,100 Production Rate 538 tonnes per day (mine), 970 tonnes tonnes per day (mill capacity) per day (mill capacity) Production 2017 – 571,463 ounces of gold Production 2017 – 50,996 ounces of gold 2018 – 621,128 ounces of gold 2018 – 67,315 ounces of gold 2019 – 601,566 ounces of gold 2019 – 88,617 ounces of gold 2020 – 530,000 ounces of gold 2020 – 87,560 ounces of gold (management projection) 2021 – 96,000 (management 2021 – 700,000 ounces of gold (guidance) projection) Resources 592,650,000 tonnes at 1.01 g/t Resources 1,566,000 tonnes at 13.13 g/t containing 19,262,000 ounces of gold containing 661,000 ounces of gold (Measured and Indicated – Dec 2019) (Measured and Indicated – Dec 2019) 43,900,000 tonnes at 0.90 g/t containing 403,000 tonnes at 12.30 g/t containing 1,273,000 ounces of gold (Inferred – Dec 159,000 ounces of gold (Inferred – Dec 2019) 2019) Opened 2013 Opened 1995 Employment 800 employees, 200 contractors Employment 220 Notes Exploration work at Detour Lake is Notes Eagle River Complex includes the ongoing and the company was targeting Eagle River Mine and the Mishi mine 70,000 m by the end of 2020. The and mill. In April 2020, the company Company plans to increase the number temporary suspended operations due of drills to between 10-12 drills early in to COVID-19. In Q2-2020, the company 2021. Drilling is in support of an updated gradually restarted operations at mineral reserve estimate as well as the reduced capacity. The program that completion of a new production plan. The was planned for 2020 on expanding company is targeting to complete the the Falcon zones at Eagle River current US$50-million-dollar exploration consists of 72,000 m of underground program at Detour Lake by the end of exploration drilling, 47,000 m of 2021 and releasing a new mine plan in definition drilling and 33,500 m of 2022. Approximately US$165 million in surface drilling. In 2020, drilling growth capital expenditures in 2021 are extended the Falcon Zone over 1 km planned at Detour Lake. Other planned down plunge and is interpreted to projects include mill improvements, connect with Zone 7, currently being increased tailings capacity, completion mined underground. The high grade of an assay lab and other enhancements 300 East Zone has now been extended to site infrastructure. from the 750 m level to the 1,400 m level. The company forecasted $16 million to be spent on exploration program at Eagle River in 2021. Growth Capital is budgeted to range between $22 and $26 million, which includes surface exploration, transition to electric underground equipment, Falcon Zone development and completion of the ventilation upgrade. Total metres drilled in 2021 are budgeted to range between 164,000 and 174,000 m for five underground and three surface drill rigs. 10 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
2021 – 360,000 ounces of gold (guidance GOLD MINES HOLLINGER MINE (PORCUPINE MINES) Newmont Corp. for Porcupine Mines Operations • gold producer • open pit combined) Resources 301,400,000 tonnes at 1.05 g/t Mailing Address 4315 Gold Mine Road, PO Box 70 containing 10,170,000 ounces of gold South Porcupine, ON P0N 1H0 (Measured and Indicated – Dec 2019 for Tel: (705) 235-6589 Porcupine Mines Operations combined) Fax: (705) 235-6551 109,200,000 tonnes at 0.74 g/t Website www.newmont.com containing 2,610,000 ounces of gold Mine Manager Marc Lauzier, Mine General Manager, (Inferred – Dec 2019 for Porcupine Mines Porcupine Mines Operations Operations combined) Production Rate 9,600 tonnes per day (Porcupine Mines Opened 2014 Operations combined), 9,979 tonnes Employment 200 (approximate) per day (mill capacity) Notes The Porcupine operations include the Production 2017 – 272,000 ounces of gold Hoyle Pond, Hollinger and Borden Lake (Porcupine Mines Operations Mines as well as the Dome Mill. The combined) Hollinger Mine is expected to operate 2018 – 259,000 ounces of gold until the first quarter of 2023. On July (Porcupine Mines Operations 20, 2020, Newmont terminated the combined) the environmental assessment of the 2019 – 223,000 ounces of gold (since proposed 70,000 tpd Century Project. the completion of the acquisition of Based on Newmont’s 2021 outlook, the mine site as part of the Newmont Porcupine is expected to benefit Goldcorp transaction for Porcupine from higher grades at the Borden and Mines Operations combined) Hollinger mines in 2022 before Hollinger 2020 – 325,000 ounces of gold begins to ramp down in 2023. (management projection for Porcupine Mines Operations combined) THE ESG REPORTING SOFTWARE DRIVING INVESTMENT DOLLARS GEOPHYSICAL SERVICES TO YOUR COMPANY. - INDUCED POLARIZATION ONYEN – ESG - Magnetic & VLF REPORTING MADE EASY. - EM MaxMin - EM Pulse - Gravity - GPS - Compilation - Interpretation Pierre Simoneau, M.Sc. P.Geol Ontario Regional Manager Ontario 807-707-7585 Member APGO, NWOPA, OGQ, AIGNB psimoneau@geosig.ca sales@onyen.com 778.840.7104 Quebec 418-877-7382 geosig@geosig.ca onyen.com www.geosig.ca ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 11
GOLD MINES HOLLOWAY–HOLT MINE (HOLT COMPLEX) HOYLE POND MINE (PORCUPINE MINES) Kirkland Lake Gold Ltd. Newmont Corp. • gold producer • underground • gold producer • underground Mailing Address Highway 101 East, Box 609 Mailing Address 4315 Gold Mine Road, PO Box 70 Matheson, ON P0K 1N0 South Porcupine, ON P0N 1H0 Tel: (705) 567-4862 Tel: (705) 235-6589 Fax: (705) 567-4863 Fax: (705) 235-6551 Website www.klgold.com Website www.newmont.com Mine Manager Duncan King, Vice President, Canadian Mine Manager Marc Lauzier, General Mines Manager, Operations Porcupine Mines Operations Production Rate Holloway Area: 450 tonnes per day Production Rate 9,600 tonnes per day (Porcupine Mines (capacity) Operations combined), 9,979 tonnes Holt Area: 2,366 tonnes per day per day (mill capacity) (mine), 3,000 tonnes per day (mill Production 2017 – 272,000 ounces of gold capacity) (Porcupine Mines Operations Production Holloway Area: combined) 2017 – 287 ounces of gold 2018 – 259,000 ounces of gold 2018 – 942 ounces of gold (Porcupine Mines Operations 2019 – 20,000 (management combined) projection) 2019 – 223,000 ounces of gold (since Holt Area: the completion of the acquisition of 2017 – 66,677 ounces of gold the mine site as part of the Newmont 2018 – 67,770 ounces of gold Goldcorp transaction for Porcupine 2019 – 113,952 ounces of gold (Holt Mines Operations combined) Complex operations combined) 2020 – 325,000 ounces of gold 2020 – 29,391 ounces of gold (Holt (management projection for Porcupine Complex operations combined) Mines Operations combined) 2021 – Not available 2021 – 360,000 ounces of gold Resources Holloway Area: 2,452,000 tonnes (guidance for Porcupine Mines grading 4.20 g/t, containing 328,000 Operations combined) ounces of gold (Measured and Resources 301,400,000 tonnes at 1.05 g/t Indicated – Dec 2018) containing 10,170,000 ounces of 5,479,000 tonnes grading 4.10 g/t, gold (Measured and Indicated – Dec containing 729,000 ounces of gold 2019 for Porcupine Mines Operations (Inferred – Dec 2018) combined) Holt Area: 10,473,000 tonnes grading 109,200,000 tonnes at 0.74 g/t 4.10 g/t, containing 1,385,000 ounces containing 2,610,000 ounces of gold of gold (Measured and Indicated – Dec (Inferred – Dec 2019 for Porcupine 2018) Mines Operations combined) 8,523,000 tonnes grading 4.70 g/t, Opened 1985 containing 1,286,000 ounces of gold Employment 800 employees, 445 contractors (Inferred – Dec 2018) (approximate figures for Porcupine Opened Holloway Area: 2009 Mines Operations combined) Holt Area: 2010 Notes The Porcupine operations include the Employment Holloway Area: 116 (estimate) Hoyle Pond, Hollinger and Borden Holt Area: 168 Lake Mines as well as the Dome Mill. Notes The Holt Mill processes ore from Approximately 60 per cent of the gold the Holloway-Holt and Taylor Mines. from Porcupine Mines comes from Production guidance in 2020 includes the Hoyle Pond underground mine. 29,391 ounces of production at Holt In 2020, a 20,000 m drill program Complex, where operations were was expected to be completed on the suspended as a precaution against Hoyle Pond Extension. COVID-19, effective April 2, 2020, and put under temporary care and maintenance until further notice. A strategic review is underway to assess a potential restart of the operations. Newmont has invested US$75 million to acquire an option on certain mineral rights at the Holt Mine. The strategic alliance between Newmont and Kirkland Lake Gold will focus on the areas mineral exploration potential. 12 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
GOLD MINES ISLAND GOLD MINE MACASSA MINE Alamos Gold Inc. Kirkland Lake Gold Ltd. • gold producer • underground • gold producer • underground Mailing Address 15 Goudreau Road, PO Box 456 Mailing Address 1350 Government Road West, Dubreuilville, ON P0S 1B0 PO Box 370 Tel: (705) 884-1608 Kirkland Lake, ON P2N 3J1 Fax: (815) 797-0166 Tel: (705) 567-5208 Website www.alamosgold.com Fax: (705) 568-6444 Mine Manager Austin Hemphill, General Manager Website www.klgold.com Production Rate 979 tonnes per day (mine), 1,200 Mine Manager Evan Pelletier, Vice President, Kirkland tonnes per day (mill capacity) Lake Operations Production 2017 – 98,800 ounces of gold Production Rate 857 tonnes per day (mine), 2,200 2018 – 105,800 ounces of gold tonnes per day (mill capacity) 2019 – 150,400 ounces of gold Production 2017 – 194,273 ounces of gold 2020 – 135,000 ounces of gold (revised 2018 – 240,126 ounces of gold guidance) 2019 – 241,297 ounces of gold 2021 – 137,500 ounces of gold 2020 – 183,038 ounces of gold (guidance) 2021 – 237,500 ounces of gold Resources 4,522,000 tonnes at 10.05g/t (guidance) containing 1,399,000 ounces of gold Resources 5,249,000 tonnes at 18.90 g/t (Measured and Indicated – Dec 2019) containing 3,183,000 ounces of gold 5,392,000 tonnes at 13.26 g/t (Measured and Indicated – Dec 2019) containing 2,298,000 ounces of gold 1,185,000 tonnes at 16.00 g/t (Inferred – Dec 2019) containing 611,000 ounces of gold Opened 2007 (Inferred – Dec 2019) Employment 341 employees, 217 contractors Opened 2002 Notes Ore from Island Gold Mine is Employment 900 processed at the nearby Kremzar Mill. Notes Construction of the 5,450-foot #4 The Phase III Expansion of Island Gold shaft at Macassa began in 2018. to 2,000 tonnes per day is underway, Phase 1 of the new shaft is expected which is expected to increase output to be completed in 2022 and result 72 per cent to 236,000 ounces a year in increased hoisting capacity to from 2025. The project should also 4,000 tpd and production of 330,000 reduce all-in sustaining costs 30 per ounces. A phase 2 shaft expansion cent to US$534 per ounce and double is also being planned to the 7,000 the mine life to 16 years. Island Gold’s foot level, planned to be completed exploration budget of US$25 million by the end of 2023 and will result in for 2021 includes 27,500 m of on mine production of 400,000 ounces per site surface drilling and 52,000 m year. Growth capital expenditures at of underground drilling. A regional Macassa is targeted at US$90 million, exploration program, including 25,000 with the #4 shaft project expected m of drilling, is also planned for 2021. to account for US$60 million and the Capital spending at Island Gold is remainder related to mine ventilation expected to be US$125 million in 2021, upgrades and mill improvements. reflecting the ramp up of spending Exploration guidance for 2021 is on the Phase III Expansion project estimated at US$47.5 million at including detailed engineering and Macassa. shaft construction work. ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 13
GOLD MINES February 2020, primarily from MISHI MINE surface stockpiles. Underground Wesdome Gold Mines Ltd. mine development and rehabilitation • gold producer • open pit of the underground conveyor following the fire in March 2019 Mailing Address 93 Mission Road, PO Box 1520 continued in early 2020. The mine Wawa, ON P0S 1K0 was placed on care and maintenance Tel: (705) 856-2721 in response to COVID-19 in March Fax: (705) 856-7173 2020. Newmont reported that mine Website www.wesdome.com was fully operational by September Mine Manager Jean-Guy Leclair, General Manager, 2020. The company remains focused Eagle Division on completing a 5,000 tpd raise bore Production Rate 110 tonnes per day winze at the mine. Musselwhite is Production 2017 – 7,985 ounces of gold expected to increase production in 2018 – 4,310 ounces of gold 2021 and to deliver steady production 2019 – 3,072 ounces of gold throughout 2022-2023. 2020 – 2,718 ounces of gold 2021 – 2,500 (management projection) Resources 116,000 tonnes at 2.82 g/t containing 10,500 ounces of gold (Measured and RAINY RIVER MINE Indicated – Dec 2019) New Gold Inc. 3,182,000 tonnes at 2.10 g/t containing • gold producer • underground, open pit 212,000 ounces of gold (Inferred – Dec 2019) Mailing Address 5967 Highway 11/71, PO Box 5 Opened 2012 Emo, ON P0W 1E0 Employment 40 (approximately) Tel: (807) 482-0900 Notes Eagle River Complex includes the Eagle Website www.newgold.com River Mine and the Mishi mine and mill. Mine Manager Suresh Kalathil, General Manager In April 2020, the company temporarily Production Rate 32,178 tonnes per day (mine), 24,096 suspended operations due to COVID-19 tonnes per day (mill) and resumed production in Q3-2020. Production 2017 – 37,047 ounces of gold Production levels in 2020 was not 2018 – 227,284 ounces of gold significantly impacted by COVID-19. By 2019 – 253,772 ounces of gold Q4 2020, Mishi stockpile contained over 2020 – 228,919 ounces of gold 40,000 tonnes of ore and is planned to be 2021 – Not available milled in 2021. Resources 100,698,000 tonnes graded at 1.41 g/t gold and 3.52 g/t of silver, containing 4,549,000 ounces of gold and 11,384,000 ounces of silver (Measured MUSSELWHITE MINE and Indicated – Dec 2019) Newmont Corp. 3,479,000 tonnes graded at 1.77 g/t • gold producer • underground gold and 2.42 g/t of silver, containing 198,000 ounces of gold and 268,000 Mailing Address PO Box 7500 ounces of silver (Inferred – Dec 2019) Thunder Bay, ON P7B 6S8 Opened 2017 Tel: (807) 928-2200 Employment Approximately 800 employees and Fax: (807) 928-2067 500 contractors Website www.newmont.com Notes The Rainy River Mine temporarily Mine Manager Don Burke, Mine General Manager suspended operations for two weeks Production Rate 2,317 tonnes per day (mine), 4,500 due to COVID-19 in March 2020. The tonnes per day (capacity) company’s Intrepid Zone decline Production 2017 – 236,000 ounces of gold resumed in August. In the latter 2018 – 205,000 ounces of gold part of Q4-2020, drilling permits 2019 – 44,500 ounces of gold (estimated) were received and an exploration 2020 – 95,000 ounces of gold drilling program was planned for (management projection) the northeast trend area, located 2021 – 200,000 ounces of gold approximately 18 km northeast of (management projection) the Rainy River Mine. The 8,000 m Resources 16,300,000 tonnes at 5.57 g/t containing drilling campaign has been designed 2,920,000 ounces of gold (Measured and in two phases and will test previously Indicated – Dec 2019) identified high-priority targets. 3,200,000 tonnes at 4.37 g/t containing 440,000 ounces of gold (Inferred – Dec 2019) Opened 1997 Employment Approximately 700 employees Notes Processing activities resumed in 14 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
RED LAKE GOLD MINE (RED LAKE GOLD MINES) (Inferred for Red Lake Gold Mines GOLD MINES Evolution Mining Ltd. Operations combined – Dec 2019) • gold producer • underground Opened 1949 Employment 750 employees and contractors Mailing Address 17 Mine Road, Bag 2000 (approximate figures for Red Lake Balmertown, ON P0V 1C0 Gold Mines Operations combined) Tel: (807) 735-2077 Notes Operations at Red Lake include the Fax: (807) 735-2765 Red Lake and Campbell areas, the Website www.evolutionmining.com.au Cochenour mine, and the Campbell Mine Manager Kirsty Liddicoat, General Manager, and Red Lake processing plants. Red Lake Operations During Q3-2020 production was Production Rate 1,557 tonnes per day (Red Lake Gold affected by a forest fire that resulted Mines Operations combined) in a brief temporary suspension of Production 2019 – 155,000 ounces of gold operations. Evolution is working (management projection for Red Lake towards achieving 1,200 m of mine Gold Mines Operations combined) development per month. An updated 2020 – 27,428 ounces of gold (reported resource statement is expected in actual for Red Lake Gold Mines February 2021. The prefeasibility Operations combined) study is expected in Q2-2021. 2021 – 130,000 ounces of gold (management projection for Red Lake Gold Mines Operations combined) Resources 22,760,000 tonnes at 7.77 g/t containing 5,687,000 ounces of gold (Measured and Indicated for Red Lake Gold Mines Operations combined – Dec 2019) 25,330,000 tonnes at 6.49 g/t containing 5,287,000 ounces of gold YOUR CRUSHER YOUR CRUSHER SPECIALISTS SPECIALISTS SINCE 1965 SINCE 1965 Manufacturers of the Birdsboro-Buchanan line of Jaw Crushers Manufacturers of the Birdsboro-Buchanan Complete service line ofEquipment and repairs to all Mining Jaw Crushers Complete The only service and Crusher Blake Type repairs to all Mining Equipment Manufacturer to offer a Hydraulic Toggle! The only Blake Type Crusher Manufacturer to offer a Hydraulic Toggle! PR ENGINEERING P R E NL G I MI IN TEE DE R I N G LIMITED 249 Toronto Avenue, Oshawa, Ontario, Canada L1H 3C2 T: Oshawa, 249 Toronto Avenue, 905.579.9721 Ontario, Canada L1H 3C2 www.prengineering.com T: 905.579.9721 www.prengineering.com P R E N G I N E E R I N G 15 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 P IRM I E L T ENDG I N E E R I N G LIMITED
GOLD MINES Opened 2015 SUGAR ZONE MINE Employment 60 Harte Gold Corp. Notes The Holt Complex includes the Taylor • gold producer • underground mine, Holloway-Holt mine and Holt mill. Mailing Address 113 Tukanee Lake Rd Ore from the Taylor mine is processed White River, ON P0M 3G0 at Holt mill. In April 2020, Kirkland Lake Tel: (416) 853-0002 Gold suspended operations and placed Fax: (807) 822-2398 Taylor mine on care and maintenance. Website www.hartegold.com On July 16, 2020, the Holt and Taylor Mine Manager Dan Gagnon, General Manager mines (Holt Complex) were suspended Production Rate 490 tonnes per day (mine), 800 tonnes until further notice. per day (mill capacity) Production 2019 – 27,316 ounces of gold 2020 – 25,649 ounces of gold TIMMINS WEST MINE (TIMMINS OPERATIONS) 2021 – 62,500 ounces of gold (guidance) Pan American Silver Corp. - Lake Shore Gold Corp. Resources 4,243,000 tonnes at 8.12 g/t containing • gold producer • underground 1,108,000 ounces of gold (Measured and Indicated – Apr 2019) Mailing Address 1515 Government Road South 2,954,000 tonnes at 5.88 g/t containing Timmins, ON P4R 1N4 558,000 ounces of gold (Inferred – Apr Tel: (705) 269-4344 2019) Fax: (705) 268-1794 Opened 2019 Website www.panamericansilver.com Employment 85 employees, 45 contractors Mine Manager David Bernier Notes A temporary shutdown in March Production Rate 4,458 tonnes per day (Bell Creek and 2020 due to COVID-19 led Harte to Timmins West mines combined), 5,000 reduce annual production guidance. A (mill capacity) feasibility study is ongoing to evaluate an Production 2017 – 167,000 (Bell Creek and Timmins expansion of the site to 1,200 tpd, with West mines combined) results expected in Q1-2021. In 2020, 2018 – 167,500 (management projection infill drilling targeted both the Sugar for Bell Creek and Timmins West mines Zone from underground and Middle combined) Zone from surface with two drill rigs. 2019 – 143,770 (Bell Creek and Timmins The company is currently mining ore West mines combined) from the Sugar Zone North and South 2020 – 152,000 (management projection areas. Ramp development to the Middle for Bell Creek and Timmins West mines Zone continued for the quarter and the combined) Company expects to open the Middle 2021 – 121,274 (estimate for Bell Creek Zone for initial ore production by H2- and Timmins West mines combined) 2021. Resources 17,200,000 tonnes at 3.02 g/t containing 1,670,500 ounces of gold (Measured and Indicated – Jun 2020) 5,000,000 tonnes at 3.27 g/t containing TAYLOR MINE (HOLT COMPLEX) 529,300 ounces of gold (Inferred – Jun Kirkland Lake Gold Ltd. 2020) • gold producer • underground Opened 2011 Mailing Address Highway 101 East, PO Box 609 Employment Approximately 680 employees at Matheson, ON P0K 1N0 Timmins Operations (Voluntary Tel: (705) 567-4862 temporary layoffs have been offered Fax: (705) 567-4863 during the pandemic) Website www.klgold.com Notes Ore from Timmins West Mine is Mine Manager Duncan King, Vice President, Canadian processed at the Bell Creek Mill. In Operations 2020 during COVID-19, the Timmins Production Rate 600 tonnes per day West and Bell Creek mines (together Production 2017 – 50,764 ounces of gold “Timmins”) have continued to operate 2018 – 58,633 ounces of gold at 90 per cent of capacity. In March 2019 – 52,500 ounces of gold 2020, Lake Shore Gold offered its (management projection) employees voluntary temporary layoffs 2020 – 29,391 ounces of gold (Holt in response to the COVID-19 pandemic. Complex operations combined) In April 2020, Pan American reduced 2021 – Not available its throughput by 10-20 per cent at Resources 1,577,000 tonnes at 4.90 g/t containing Timmins in response to COVID-19 250,000 ounces of gold (Measured and breakout. Pan American also notes that Indicated – Dec 2018) some of the sustaining capital projects 1,988,000 tonnes at 5.30 g/t containing planned for 2020 will be carried over 337,000 ounces of gold (Inferred – Dec into 2021 as a result of COVID-19. 2018) 16 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
WILLIAMS MINE (HEMLO MINE) YOUNG–DAVIDSON MINE GOLD MINES Barrick Gold Corporation Alamos Gold Inc. • gold producer • underground, open pit • gold producer • underground Mailing Address PO Bag 500 Mailing Address Highway 566, PO Box 187 Marathon, ON P0T 2E0 Matachewan, ON P0K 1M0 Tel: (807) 238-1041 Tel: (705) 565-9800 Fax: (807) 238-1019 Fax: (705) 565-2387 Website www.barrick.com Website www.alamosgold.com Mine Manager Adam Foulstone, General Manager Mine Manager Luc Guimond, General Manager Production Rate 5,436 tonnes per day (mine), 11,500 Production Rate 5,317 tonnes per day (mine), 7,500 tonnes per day (capacity) tonnes per day (capacity) Production 2017 – 196,000 ounces of gold Production 2017 – 200,000 ounces of gold 2018 – 171,000 ounces of gold 2018 – 180,000 ounces of gold 2019 – 213,000 ounces of gold 2019 – 188,000 ounces of gold 2020 – 223,000 ounces of gold 2020 – 140,000 ounces of gold 2021 – 255,400 ounces of gold (revised guidance) (management projection) 2021 – 197,500 ounces of gold Resources 42,800,000 tonnes at 2.29 g/t (guidance) containing 3,100,000 ounces of gold Resources 48,984,000 tonnes at 2.76 g/t (Measured and Indicated – Dec 2019) containing 4,343,300 ounces of gold 9,100,000 tonnes at 3.50 g/t (Measured and Indicated – Dec 2019) containing 1,000,000 ounces of gold 1,360,000 tonnes at 2.40 g/t (Inferred – Dec 2019) containing 105,000 ounces of gold Opened 1985 (Inferred – Dec 2019) Employment Approximately 700 employees Opened 2012 (open pit), 2013 (underground) Notes In 2020, a 4,500 m surface drilling Employment 630 employees, 136 contractors program commenced at the C Zone Notes In July 2020, Alamos Gold completed to test the down-plunge extension the lower mine expansion and of mineralization. District scale commissioned the Northgate shaft, exploration continues to test newly which is expected to increase discovered mineralization in the production to 8,000 tpd in 2021. Blackfly area west of the C Zone. $7 million has been budgeted for COVID-19 caused a delay in the ramp- exploration at Young-Davidson in up of the underground development. 2021. The 2021 program includes 2020 production guidance was not 23,000 m of underground drilling affected by COVID-19 at Hemlo. and 3,000 m of surface drilling. The focus of the underground exploration drilling program will be to expand mineralization in five target areas identified within proximity to existing underground infrastructure. In addition, 3,000 m of surface drilling is planned to test near- surface targets to both the east and west along strike from the Young- Davidson Mine. For weather equipment that works as hard as you do We’re serious about the weather 807 807 807 807 807 PO Box 900, Ignace, ON P0T 1T0 (807) 934 8403 | www.signalweather.ca ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 17
OTHER METAL MINES KIDD CREEK MINE LAC DES ILES MINE Glencore PLC Impala Platinum Holdings Ltd. - Impala Canada Ltd. • zinc, copper, lead, silver, cadmium, indium, • platinum group metals • underground, open pit sulphuric acid • underground Mailing Address PO Box 10547 Mailing Address 11335 Highway 655 North, PO Bag 2002 Thunder Bay, ON P7B 6T9 Timmins, ON P4N 7K1 Tel: (807) 622-8833 Tel: (705) 264-5200 Fax: (807) 622-7437 Fax: (705) 267-8709 Website www.nap.com Website www.glencore.com Mine Manager Bryan Wilson, General Manager www.kiddoperations.ca Production Rate 6,000+ tonnes per day (underground), Mine Manager Mark Furlotte, General Manager, Kidd 12,000 tonnes per day (mill) Operations Production 2017 – 208,923 ounces of palladium, Production Rate 7,900 tonnes per day (capacity) 12,267 ounces of platinum Production 2017 – 39,900 tonnes copper, 72,400 2018 – 242,686 ounces of palladium, tonnes zinc, 2,271,000 ounces of silver 16,368 ounces of platinum 2018 – 33,600 tonnes copper, 65,900 2019 – 227,500 ounces of palladium, tonnes zinc, 1,893,000 ounces of silver 0 ounces of platinum (management 2019 – 33,500 tonnes copper, 67,600 projection) tonnes zinc, 1,654,000 ounces of silver 2020 – 208,000 ounces of palladium, (estimate) 18,000 ounces of platinum (management 2020 – 36,800 tonnes copper, 62,200 projection) tonnes zinc, 1,701,980 ounces of silver 2021 – 190,000 ounces of palladium, (estimate) 18,000 ounces of platinum (management 2021 – 33,210 tonnes copper, 59,500 projection) tonnes zinc, 2,025,497 ounces of silver Resources 67,900,000 tonnes at 2.25 g/t palladium, (estimate) 0.21 g/t platinum, 0.16 g/t gold, NA Resources 8,600,000 tonnes at 1.80% copper, 4.00% copper and NA nickel (Measured and zinc and 48.00 g/t silver (Measured and Indicated – Jun 2020) Indicated – Dec 2019) 12,000,000 tonnes at 2.49 g/t palladium, 3,500,000 tonnes at 2.00% copper, 0.21 g/t platinum, 0.13 g/t gold, NA 7.00% zinc and 60.00 g/t silver (Inferred – copper and NA nickel (Inferred – Jun Dec 2019) 2020) Opened 1966 Opened 1993 (open pit), 2006 (underground) Employment 850 (employees and contractors) Employment Approximately 500 employees and Notes The company is currently mining the contractors 9,600-foot level with the shaft extending Notes Ore from Lac des Iles Mine is shipped to to a depth of close to 10,000 feet. The Vale’s Sudbury operations for smelting. Kidd Creek Mine is expected to produce 2020 production was impeded by the through to 2023. In H1-2020, copper COVID-19 pandemic which led to a six- concentrate production decreased week closure. The company reported by 16 per cent while silver production being at 75 per cent of capacity at year- increased by 34 per cent. There was no end. The mine is expected to produce at change in zinc production compared to 90 per cent capacity in Q1-2021. H1-2019. 18 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
OT H E R M E TA L M I N E S MCCREEDY WEST MINE 118,467 tonnes copper, 161,773 tonnes KGHM International Ltd. nickel, 68,867 ounces platinum, 93,977 • nickel, copper, platinum, palladium • underground ounces palladium and 29,707 ounces gold (Sudbury Operations Total Measured and Mailing Address 23 McCreedy West Mine Road, Indicated – Dec 2014) Levack, ON P0M 2C0 4,594,000 tonnes at 1.16% copper, Tel: (705) 966-3021 1.43% nickel, 0.41 g/t platinum, 0.58 g/t Fax: (705) 966-3017 palladium and 0.16 g/t gold containing Website www.kghm.com 53,095 tonnes copper, 65,529 tonnes Mine Manager Thomas H A Hopkins, General Manager nickel, 59,897 ounces platinum, Production Rate 2,425 tonnes per day (capacity) 84,942ounces palladium and 24,338 Production 2017 – 1,100 tonnes nickel, 9,400 tonnes ounces gold (Sudbury Operations Total copper, 38,000 ounces of precious Inferred – Dec 2014) metals Opened 2004 2018 – 900 tonnes nickel, 7,400 tonnes Employment 208 workers (estimate) copper, 30,500 ounces of precious Notes McCreedy ore is processed at Vale’s metals Clarabelle Mill in Sudbury. Total precious 2019 – 0 tonnes nickel, 4,200 tonnes metals production in H1-2020 was higher copper, 37,300 ounces of precious metals by 2.7 thousand troy ounces (+15%) (estimate) due to the higher content of these 2020 – 2,200 tonnes nickel, 0 tonnes minerals in extracted ore. In H1-2020, copper, 2,000 ounces of precious metals US$3 million was spent on the Victoria (estimate) project, including among others securing 2021 – 2,200 tonnes nickel, 0 tonnes existing infrastructure and project copper, 2,000 ounces of precious metals terrain. Exploratory work was continued (estimate) at Victoria project, aimed at increasing Resources 12,972,000 tonnes at 0.91% copper, knowledge of the orebody. 1.25% nickel, 0.17 g/t platinum, 0.23 g/t palladium and 0.07 g/t gold containing MPX provides airborne geophysical surveys via fixed-wing and helicopter platforms. A variety of survey equipment, including fixed-wing magnetics + VLF, is available at MPX which can be custom configured to optimize your project needs. Experienced professionals, competitive pricing, and on-demand service available. Contact us today to learn more. (905) 947-1782 info@mpxgeo.com www.mpxgeo.com Edenvale Aerodrome – Hanger B, 5195 Highway 26 E. RR# 2, Stayner ON ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021 19
OT H E R M E TA L M I N E S COLEMAN MINE SUDBURY OPERATIONS – VALE Mine Manager Brent Salem Coleman Mine, Copper Cliff North Mine, Production Rate 1,102,000 tonnes per year Creighton Mine, Garson Mine, Totten Mine Opened 1992 Vale S.A • nickel, copper, cobalt, platinum group metals, gold, silver, COPPER CLIFF NORTH MINE sulphuric acid, liquid sulphur dioxide • underground Mine Manager Colin Pegues Production Rate 644,000 tonnes per year Mailing Address 18 Rink Street Opened 1886 Copper Cliff, ON P0M 1N0 Tel: (705) 682-4211 CREIGHTON MINE Fax: (705) 682-5319 Mine Manager John Ryan Website www.vale.com Production Rate 613,000 tonnes per year Production Rate 40,000 tonnes per day (Clarabelle Mill Opened 1902 capacity) GARSON MINE Production 2017 – 61,900 tonnes nickel, 98,300 Mine Manager Rick Filion tonnes copper, 840 tonnes cobalt, Production Rate 641,000 tonnes per year 485,000 ounces of gold, 214,000 ounces Opened 1907–1986; 1994 (reopened) of palladium, 144,000 ounces platinum, 0 ounces of silver TOTTEN MINE 2018 – 50,600 tonnes nickel, 72,300 Mine Manager Stephanie Bleker tonnes copper, 520 tonnes cobalt, Production Rate 669,000 tonnes per year 477,000 ounces of gold, 218,000 ounces Opened 2014 of palladium, 135,000 ounces platinum, 0 ounces of silver 2019 – 50,800 tonnes nickel, 92,800 SUDBURY OPERATIONS – GLENCORE tonnes copper, 495 tonnes cobalt, Fraser Mine, Nickel Rim South Mine 480,000 ounces of gold, 182,000 ounces Glencore PLC of palladium, 148,000 ounces platinum, 0 • nickel, copper, cobalt, platinum group metals, ounces of silver sulphuric acid • underground 2020 – 54,105 tonnes nickel, 92,316 tonnes copper, 612 tonnes cobalt, 73,460 Mailing Address 6 Edison Road rhodium, 92,916 ounces of gold, 247,900 Falconbridge, ON P0M 1S0 ounces of palladium, 176,592 ounces Tel: (705) 693-2761 platinum, 1,093,049 ounces of silver Fax: (705) 966-6530 (estimate) Website www.glencore.com, www.glencore.ca 2021 – 75,072 tonnes nickel, 114,478 Production Rate 6,670 tonnes per day tonnes copper, 612 tonnes cobalt, 7,870 Production 2017 – 22,928 tonnes nickel, 40,427 rhodium, 92,916 ounces of gold, 282,500 tonnes copper, 480 tonnes cobalt ounces of palladium, 234,147 ounces 2018 – 22,806 tonnes nickel, 38,831 platinum, 1,300,819 ounces of silver tonnes copper, 477 tonnes cobalt (estimate) 2019 – 22,806 tonnes nickel, 38,831 Resources 58,100,000 tonnes at 1.38% nickel, 1.75% tonnes copper, 477 tonnes cobalt copper, 0.04% cobalt, 1.26 g/t platinum, 2020 – 26,640 tonnes nickel, 31,450 1.52 g/t palladium, 0.47 g/t gold tonnes copper, 418 tonnes cobalt (Measured and Indicated – Dec 2019) (estimate) Employment Nearly 4,000 (Vale Sudbury Operations 2021 – 29,032 tonnes nickel, 28,263 total workforce) tonnes copper, 418 tonnes cobalt Notes Vale Ontario Operations include five (estimate) active mines, the Clarabelle Mill, the Resources 26,300,000 tonnes at 2.09% nickel, Copper Cliff Smelter and Copper Cliff 2.33% copper, 0.05% cobalt, 1.04 g/t Nickel refinery as well as a cobalt refinery palladium, 0.85 g/t platinum (Measured in Port Colborne. In July 2020, Vale took the and Indicated – Dec 2020) Superstack off line as it transitioned to a 34,000,000 tonnes at 0.90% nickel, new system. Work at Vale’s $750 million 2.20% copper, 0.02% cobalt, 1.00 g/t Copper Cliff Deep mine expansion is palladium, 0.80 g/t platinum (Inferred – expected to be completed by 2021. Vale is Dec 2020) currently conducting a feasibility study for Employment 1,300 employees, 500 contractors a phase 2 expansion of Copper Cliff Deep (approximate) that would incorporate additional deposits Notes Glencore’s Sudbury Integrated Nickel from the Kelly Lake area into the mine. Operations consist of the Nickel Rim South and Fraser underground mines, the Strathcona Mill and the Falconbridge Smelter. Glencore’s matte production from the Falconbridge Smelter is shipped to the company’s Nikkelverk refinery in Norway for refining. The Nickel Rim 20 ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2021
You can also read