NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason

Page created by Roy Gallagher
 
CONTINUE READING
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
NWP models
                     @
           Icelandic Met. Ofce
                 14. June 2018

Bolli Pálmason
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
Two main models used at IMO

                                   ●
                                       Global model
                                   ●
                                       Horizontal resolution of
                                       approx. 9 km
                                   ●
                                       Vertical resolution 137
                                       levels (top at 0.01 hPa)
                                   ●
                                       Medium range 10 day
                                       forecast

                              HARMONIE
                                 HARMONIE-AROME
                              Limited Area Model (LAM)
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
ECMWF progress until 2010
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
ECMWF pioneers in 4D-Var data assimilation
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
ECMWF Ensemble forecasts

The ECMWF Ensemble Prediction System (EPS) provides a practical tool for
estimating how small diferences could afect the forecast. The ECMWF weather
prediction model is run 51 times from slightly diferent initial conditions. To take
into account the efect of uncertainties in the model formulation, each forecast
is made using slightly diferent model equations.
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
Sandy visits New York in autumn 2012
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
ECMWF forecasts Sandy to come ashore
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
IMO became ECMWF full member in 2011
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
HIRLAM/ALADIN: Cooperation of countries in Europe
NWP models Icelandic Met. Ofce - June 2018 Bolli Pálmason
Limited Area NWP model domains
HARMONIE-AROME: AROME and SURFEX

AROME:
●
  Non-hydrostatic convection-permitting
●
  Horizontal resolution of 2.5 km
●
  65 vertical model levels, top at 10 hPa
●
  Lowest ML at ca. 12 m over ground

SURFEX:
●
  Surface and soil processes
●
  Stand alone or coupled to atmosphere
●
  Interaction Soil-Biosphere-Atmosphere
  (ISBA) force restore
●
  Tiles: sea, lake, urban and nature (soil
  and vegetation)
●
  Coupled to AROME
  ●
     Atmosheric forcings from lowest
     model level (12m)
  ●
     Radiative properties and surface
     fuxes back to AROME

  DOI: http://dx.doi.org/10.1175/MWR-D-16-0417.1
HARMONIE @ IMO – Main milestones
 ●
     First semi-operational run in 2011 - Cold start each cycle (ECMWF glaciers)
 ●
     Surface DA in autumn 2012          - Seasonal snow accumulation and melt
 ●
     Tuning of 10 m windspeeds 2013 - Big improvements in scores
 ●
     Fix T2m cold bias over lakes 2013 - Obvious errors removed
 ●
     Physiography database (PGD) upgrade starts in autumn 2014 in
     collaboration with Agricultural University of Iceland (best vegetation and
     soil databases)
 ●
     Major operational upgrade autumn 2015:
     ●
        Bigger domain - fx spin-up problems of convective precipitation over sea
     ●
        Upgraded PGD - land cover / sand & clay / topography
     ●
        Snow on glaciers – start snow-year with 10 tons of snow on top of glaciers
     ●
        Cycle 38 of HARMONIE-AROME
     ●
        Became the ICRA-2016 setup
HARMONIE setup for Iceland

         IMO operational HARMONIE model
         Version: 38h1.2 running on ECMWF cca/ccb
         Domain: 500x480x65. Top at 10 hPa
         Horizontal res.: 2.5 km. Coupled hourly with EC-HRES
         Dynamics: Non-hydrostatic. Physics: Arome
         Surface DA: Canari + OI_Main. Around 230 SYNOP obs.
         Upper-Air DA: None – Blending mode. Run: 66h/4 times a day
         SURFEX model for surface and soil processes
HARMONIE (2.5 km) - Orography
Avg. windspeed Dec. 2015 – scat/scores
ECOCLIMAP-I/II for Iceland
New PGD: Corine and AUI maps used

                           ●
                               Three databases joined into new
                               ECOCLIMAP-II for Iceland
                           ●
                               Corine 2006/2012
                           ●
                               AUI Soil map used for non-veg.
                               areas
                           ●
                               Finally all vegitation over-written
                               with the best veg. map from AUI.
                           ●
                               AUI → Agricultural Uni. of Iceland
ECOCLIMAP-II Iceland – Land cover database upgrade
Comparison old -> new

     Soildepth          Veg. Fr.   LAI
New vs old PGD verifcations for July 2012

   T2m                         MSLP

   F10m                        RH2m
Cooperation with DMI started 2015
New EcoClimap-II binary maps complete – June 2016

                         ●
                             Greenland ice sheet extent reduced in
                             new ECOCLIMAP-II (glacier cover type
                             turned into rocks)
                         ●
                             Data from Greenland Mapping Project
                             (GIMP*) used
                         ●
                             Many improvements over Iceland
                         ●
                             Went operational in IGA autumn 2016

                         (*) https://bpcrc.osu.edu/gdg/data/gimpdem
Current HARMONIE-AROME domains

                             IGB

                            harmonie

            IGA
Harmonie: Rain and snow
Siglufjörður 27-28. Aug 2015 – Extreme precip.
HARMONIE: 48h Accumulated precipitation
Siglufjörður acc. precip. compared to observed
Precip verifcations: +6-30 & +30-54 h. (acc. 24h)
ICRA-2016: Iceland reanalysis

Iceland reanalysis (ICRA-2016) project done in 2015-16.
HARMONIE-AROME (cy38h1.2) at 2.5km resolution over the smaller
previous domain. The new physiography used. The whole ERA-Interim
period covered (1979-2017) and still being updated. Model in forecast
mode and run 4xday with surface DA and selected 6-12h forecast
felds make the main reanalysis dataset.
IMO article: http://www.vedur.is/media/vedurstofan-utgafa-2017/VI_2017_005_rs.pdf

Average annual precipitation                 Average snow on ground on May 1
(1981-2010)                                  (1981-2010)
Storm February 21 2018
Harmonie 2.5 km orography
Harmonie 750 m orography
Harmonie 750 m wind forecast
Harmonie 2.5 km vs. 750 m
Snowdrift index valid at 14Z Feb. 3 2018
Vegagerðin observed snowdrift in the N and NV
The end

          Thank you!

              ?
You can also read