New Project @ Sg.Besi/Kuchai Lama

Page created by Joel Nunez
 
CONTINUE READING
New Project @ Sg.Besi/Kuchai Lama
New Project @
Sg.Besi/Kuchai Lama
New Project @ Sg.Besi/Kuchai Lama
Project Facade
New Project @ Sg.Besi/Kuchai Lama
Location
New Project @ Sg.Besi/Kuchai Lama
-   Park & Ride Station
Nearby Ammenities   -
                    -
                        Pedestrian Bridge Link from building for crossover
                        Covered walk-way by developer from link bridge to MRT Station*
New Project @ Sg.Besi/Kuchai Lama
Aerial View on Project Site
New Project @ Sg.Besi/Kuchai Lama
Site Photos

 View from Sg Besi Expressway – from TBS   View from KL - Sban Expressway
New Project @ Sg.Besi/Kuchai Lama
MRT Route & Stations

                         2 Stations to
                       Bandar Malaysia
                       HSR to Singapore
New Project @ Sg.Besi/Kuchai Lama
High Speed Rail – From Bandar Malaysia to Singapore
New Project @ Sg.Besi/Kuchai Lama
Bandar Malaysia
New Project @ Sg.Besi/Kuchai Lama
Bandar Malaysia
Development Overview
Developer

Land Size              3.3 acres

Land Tenure            Freehold

Land Title             Commercial Title

Location               Lot 26479, Lebuhraya BESRAYA, Mukim Petaling, Wilayah Persekutuan, Kuala Lumpur

Types of Development   Residential Development (Serviced Apartments)

Completion Date        48 months from SPA Date (Estimated: Q2, 2022)

Building Composition   Residences A
                       Basement 1: Carpark
                       Ground Floor: Lobby
                       Level 1 – 7 : Carpark
                       Level 8 : Communal / Facilities Floor
                       Level 9 – 41 : Serviced Residences

                       Residence B
                       Basement 1: Carpark
                       Ground Floor: Lobby
                       Level 1 – 7 : Carpark
                       Level 8 : Communal / Facilities Floor
                       Level 9 – 41 : Serviced Residences
                                                                       Multi Tier Security Checkpoint
Development Overview
Project Component   Serviced Apartments
                    TOWER A
                          Type       Built-Up (sqft)          Units   Rooms & Bathrooms
                            A              850                165         3 + 2 Bath
                            B              650                 99         2 + 2 Bath
                           B2              650                 33         2 + 2 Bath
                          Total                               297
                    TOWER B
                          Type       Built-Up (sqft)          Units   Rooms & Bathrooms
                            A              850                163         3 + 2 Bath
                            B              650                131         2 + 2 Bath
                           B3              650                 28         2 + 2 Bath
                          Total                               322
                       Sub-Total                              619

Maintenance Fees    Estimated at RM0.35psf (Including Sinking Fund)

Expected GDV        RM331 millions
Location – Accessibilities & Amenities
Infrastructure         Public Transport
                       - 400m Taman Naga Emas MRT Station Line 2 (Completion 2021)
                       - 4.6km TBS (Terminal Bersepadu Selatan) (Interchange Station)
                                 (KLIA Express, ERL, KTM Komuter, Petaling Line LRT,
                                 East Bound Bus) 4.6km

                       Highway
                       - 50m   Lebuhraya Sungai Besi
                       - 2km   Lebuh Baru Pantai (NPE)
                       - 3.6km Lingkaran Tengah (MRR2)
                       - 4.2km Lebuh Shah Alam
                       - 4.7km Lebuhraya Kuala Lumpur – Putrajaya (MEX)
                       - 6.7km BESRAYA EXPRESSWAY
                       - 8km   Lebuhraya Hubungan Timur – Barat

Schools & Educations   Tertiary Educations
                       - 5.8km UCSI University
                       - 4.6km International Medical University
                       - 6.1km SMK Bukit Jalil
                       - 7.0km UKM Medical Molecular Biology Institute
                       - 7.2km APIIT (Asia Pacific University of Technology & Innovation)
                       - 8.2km Technology Park Malaysia College 8.2km
Location – Accessibilities & Amenities
Schools & Educations   Secondary Educations
                       -2.4km SMK Desa Petaling
                       - 7.0km SMK Seri Mulia

                       Primary Institutions
                       - 1.2km Sekolah Kebangsaan Salak South
                       - 2.3km Sekolah Rendah (A) & Tadika Islam Kuchai
                       - 2.8km Sekolah Kebangsaan Desa Petaling
Amenities              Shopping Mall& Leisure
                       - 6.5km Pearl Suria @ Old Klang Road
                       - 7.7km Mid Valley Megamalls
                       - 7km   South City Plaza
                       - 9.5km The Mines Shopping Complex
                       - 9.5km MyTown Shopping Complex
                       - 9.7km Ikea Cheras
                       - 9.8km Kuala Lumpur City Centre
                       - 10km Pavilion

                       Hypermarket
                       - 3.6km GIANT Hypermarket
                       - 4.6km AEON BIG

                       Hospitals & Medical Centre
                       - 6.6km Taman Desa Hospital
                       - 8.1km Pantai Hospital Cheras
                       - 10km Pusat Perubatan UKM
                       - 12.8km Columbia Asia Hospital
                       - 15.6km Hospital Serdang
Unique Selling Points
1. Freehold
2. Excellent location
3. Excellent accessibility and connectivity
4. Developer workmanship reputation
   (Track Record: CIDB QLassic Score 80%)
5. Award Winning Consultant (Landscape Architect – Inchscape)
5. Matured township with high population catchment                   Grand Entrance Lobby
7. Grand design with reasonable pricing
8. Property Management system & Multi- Tier Security System (24hours
    security guardhouse, access card system, CCTV surveillance)
9. Sharing Concept (Tools Library & Mini Books Library)
10. Building Water Filtration system
11. 400m to MRT Line 2 – Taman Naga Emas Station
12. Pedestrian Bridge direct connect to the carpark level
CIDB Qlassic – 80% Achiever
   Construction Industry Development
    Board (CIDB) Malaysia awarded only 43
    developers and contractors who gained
    more than 80% score based on the
    Quality Assessment System in
    Construction (QLASSIC) in 2017
   The recognition of the high-achieving
    construction industry players is also part
    of CIDB’s efforts to transform the local
    construction sector by encouraging
    industry players to enhance the
    workmanship quality in construction.
Nearby AirBnb rates
Nearby AirBnb rates
Communal Floor

                    Garden Library

                 Infinity Swimming Pool
Floor Plan
Floor Plan
Floor Plan
Floor Plan
Heated Jacuzzi & Pool Side Deck                             Lift Lobby & Waiting Lounge

                          Car Park Design and Full Lighting Features
Development Pricing
   For Bumi
        For 650sf: Price starts from RM375,000 @ RM576psf
        For 850sf: Price starts from RM488,000 @ RM573psf
   For Non-bumi
        For 650sf Price starts from RM384,000 @ 590psft
        For 850sf: Price starts from RM499,000 @ RM586psf
   RM500 increase per floor
   Highest unit and lowest unit will be lowest in value
   25th and 28th floor will be highest in value
   Difference between highest and lowest value is just RM 7000 – Rm 8000
   Tandem car park will increase RM15,000 (T symbol at price chart)
   Split Car Park / Side by Side will increase RM24,000 – RM26,000 (D symbol at price chart)
   Price difference between Tower A & Tower B is around RM10,000.
Market Research

Project Information
Project Name                 The Suites Starz                               The Ritz Communities             The Leafz                               Central Residence
Developer                    CM M C Sdn Bhd                                 PolyRitz JV Debao Property Dev   Exsim Development Sdn Bhd               Yuk Tung Land Sdn Bhd
Distance From Site           450m                                           700m                             600m                                    200m
Land Area                    2.0 Acres                                      3.23 Acres                       3.3 Acres                               4.2 Acres
Land Tenure                  Freehold                                       Leasehold                        Freehold                                Freehold
Title Type                   Service Apartment                              Condominium                      Service Apartment                       SOHO & Commercial
Launch Date                  Q1 2017                                        Q4 2017                          N/A                                     N/A
Completion Date              Q1 2020                                        Q4, 2021                         Completed 2015                          Completed 2016
Type of Development          Residential Development                        Residential Development          Residential Development                 Residential Development
Total Units                  346 Units                                      1,128 Units                      643 Units                               365 Sam& 526 SOHO
                             25 Storey                                      56 Storey                        22 Storey                               27 Storey
Storey

Units per Floor              Tower A : 12 Units/Flr Tower B : 9 Units/Flr   14 - 16 units per floor          10 units per floor                      8 units per Floor
Lifts                        3 Lifts per Block                              9 Lifts                          10 Lifts                                3 Lifts
                             900sqft (2+1 Room)                             800 sf (3 Room + 2 Bath)         750 sqft (1 Room + 1 Bath)              560 sf (2 Beds + 1 Bath)
                             1200sqft (3 Room + 1 Bath) Dual Key            800 sf ( 3 Room + 2 Bath)        800 sqft (3 Room + 2 Bath)              565 sf (1 Bed + 1 Bath)
                             1523sqft (3 Room + 1 Bath) Duplex                                               1025 sqft (2 Room + 2 Bath)             731 sf (2 Beds + 2 Baths)
                                                                            ** 2 Different Layout            1259 sqft (2 Room + 2 Bath)             855 sf (2 Beds + 2 Baths)
Types of unit                                                                                                1409 sqft (3 Room + 2 Bath)             1041 sf (3 Beds + 2 Baths)
                                                                                                             1430 sqft (3 Room + 2 Bath)             1123 sf (3 Beds + 2 Baths)

Pricing                                                                                                      Subsales Transacted Price               Subsales Transacted Price
Gross Selling Price   M in Nil                                              Nil                              June 2017 : RM 670, 000 (RM 654 psf)    Apr 2017 : RM 594,000 (RM 675 psf)
                      M ax Nil                                              Nil                              M ay 2017 : RM 635,000 ( RM 620 psf)    M ar 2017 : RM 450, 000 ( RM 617 psf)
                                                                                                             M arch 2017 : RM 655,000 (RM 639 psf)   Feb 2017 : RM 440,000 (RM 602 psf)
Nett Selling Price    M in   RM 706, 715 (RM 785 psf)                       Nett Price
                      M ax   RM 1, 035, 640 ( RM 680 psf)                   RM 300,000 (RM 375 psf)
Sales Rate            %      85%                                            35%                              100%                                    98% Sold (10 units left)
Occupancy Rate        %      N/A                                            N/A

Rental Yield
M onthly                     Nil                                            Nil                              RM 1500 - RM 3300                       RM 1400 - RM 3200
DEVELOPER PROFILE

About Us
This year, 2018, marks the new us! Construction, which used to be our main area of business, now ably supports our property
development activity.
Why we decided to move from construction to development is, our expertise in property construction has empowered us to build
even more quality products to achieve a higher level of customer satisfaction.
We are continually working hard to deliver far better homes. We want our customers to feel proud buying properties developed
by us and to feel a sense of belonging as a community.
We are driven by a passion for innovation and embrace harmony between human habitation and nature in our projects through
architecture to improve the quality of life and liveability.

Going Forward
Our young and go-getter team aims to achieve greater heights as a reputable and reliable developer.
In the next five years, our target is to be a Top 10 developer in Malaysia, and in the next 10 years, to become one of the
international market players.
DEVELOPER PROFILE

Why We Can Do It
We believe we have what it takes to be a credible developer of quality products. We can achieve this as our construction
division is already a CIDB (QLassic) 80% Scorer. Not many construction companies in the country have such a track record.
Underpinned by our strong teamwork, nothing can stop us from realising our goals and ambitions.
We aspires to influence the industry to develop products with heart and soul. At the same time, we are able to provide a
sustainable living environment to communities/customers as well as generate capital appreciation for our property investors.
We want to consistently deliver high quality products and services at reasonable prices. We go all out for excellence and
innovation to enhance our customers’ living environment.
Our initiatives include regularly carrying out research and innovation studies for new concepts to be incorporated into our
property development projects.

Our Corporate Culture
We always put our customers first as we want them to grow together with us and optimise their return from investment.
We value our employees as they are assets to the company. We provide a conducive work environment and treat each
employee with respect as well as reward and recognise their success. This is to ensure that everyone works as a team.
We maintain mutually beneficial partnerships with our partners, contractors and suppliers.
We believe in conducting business in a fair, honest and ethical manner to ensure our continuous successful partnership towards
satisfying our customers’ expectations and at competitive costs without compromising quality.
CONSTRUCTIONS DIVISION PORTFOLIO

1. The Wharf Residence @ Taman Tasik Prima Puchong by Bolton (RM209,000,000.00)
2. De Centrum @ Bangi by Protasco Bhd (RM142,800,000.00)
3. ALMYRA Residence @ Bandar Putra Mahkota, Bangi by (RM169,000,000.00)
4. PR1MA @ Putrajaya by Government (RM173,500,000.00)
5. Seasons Garden @ Wangsa Maju by SCP GROUP (RM310,108,133.00)
6. Conezion @ Putrajaya by (RM320,000,000.00)
7. KL Traders Square @ Gombak by SCP GROUP (RM850,000,000.00)
8. Parkhill @ Bukit Jalil by (RM450,000,000.00)
9. The Henge Residence @ Kepong by Aset Kayamas (RM503,000,000.00)
10. The Societe @ Sri Hartamas by SCP GROUP(RM24,915,041.00)
11. The Havre @ Bukit Jalil by Aset Kayamas (RM357,500,000.00)
THANK YOU
You can also read