Météo-France progress and plans - Cliquez pour modifier le style des sous-titres du masque
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Météo-France progress and Cliquez pour modifier le style du titre plans Cliquez pour modifier le style des C. Fischer (Météo-France) sous-titres du masque Joint ALADIN GA / HIRLAM Council Krakow, 22 November 2017
Outline Operational changes and e-suites in ARPEGE and AROME New applications based on AROME Highlight on AROME R&D : improved versions of the AROME Overseas models Outlook on plans for the NWP systems at MF
ARPEGE recent changes and e-suite CY41T1_op1 : switch to Operations on 8 December 2015 CY41T1_op2 : migration to BULL Phase 2, on 21 June 2016 CY42_op2 : switch to Operations planned on 5 December 2017 – ARPEGE physics: • Implementation of the SURFEX tiled surface scheme – Improvements in the assimilation of satellite radiances: • New : GPM/GMI (US), FY3-C/MWHS2 (China), • Denser : geostationary radiances, IASI (Infrared) • More channels : SEVIRI, IASI • On the whole, the increase of the volume of observational data assimilated is about + 50 % for IASI data and + 30 % in total (of observations assimilated) CY43T2 expected : increased horizontal resolution of ARPEGE ; e-suite to start in spring 2018 – 5 km resolution over Western Europe for deterministic model – 7.5 km resolution for global EPS forecasts (PEARP) – Increased resolution also for the 4D-VAR analysis increments – Observations : humidity observations from Aircraft, VarBC for aircraft data, etc.
ARPEGE e-suite evaluation in progress; ARPEGE indicator (« IP18 ») Globally positive scores w/r to RS and ECMWF analysis Improved diagnostics of wind gusts Changes in forecast behaviour of T2m, RH2m and V10m Change of surface scheme (SURFEX) required to define and code a few conversion rules for some surface fields (LBC data) E-suite due to switch on 28 Nov 2017.
ARPEGE next horizontal resolution (2018) New horizontal resolutions for ARPEGE (about 5km over Western Europe), as well as global EDA and EPS systems
AROME recent changes and e-suite CY41T1_op1 : switch to Operations on 8 December 2015 CY41T1_op2 : migration to BULL Phase 2, on 21 June 2016 CY42_op2 : switch to Operations planned on 5 December 2017 – Same modifications as in ARPEGE for observations – New cloud optical properties (collaboration with HIRLAM/DMI) – Improvements in AROME-OM (Overseas versions of AROME) – Code and system optimizations CY43T2 expected : – Several changes in observations (for ARPEGE) also apply to the AROME- France assimilation – Start assimilation of some European radar data (from OPERA) – Implement an AROME-France Ensemble Data Assimilation and use its data • to initialize the AROME-EPS (initial conditions perturbations) • to compute flow-dependent error variances for the deterministic 3D-VAR
AROME composite score and added value w/r to global models
AROME systems implemented AROME Overseas: five domains in dynamical adaptation from the IFS atmospheric fields and ARPEGE surface fields. In operations since 11 February 2016. AROME-Nowcasting (“AROME-PI”): operational since 21 March 2016; AROME EPS (“PEARO”): in operational suite since July 2016; AROME Ensemble Data Assimilation (AEARO) planned to enter the e- suite AROME-France configuration with CY43T2 in 2018. The AROME EDA will be used to compute the initial conditions perturbations for the AROME-EPS, and would possibly also provide daily flow-dependent forecast error variances for the deterministic 3D-VAR AROME-France assimilation.
AROME Overseas recent improvements - New Sea Surface Temperature initialization, daily updated - Coupling Arome with a 1D ocean mixing layer model (see Figure below) - Ensure a smoother initial time stepping of dynamical adaptation (using « IAU ») - Specifically tuned diffusion of hydrometeors
AROME Overseas recent improvements - New Sea Surface Temperature initialization, daily updated - Coupling Arome with a 1D ocean mixing layer model - Ensure a smoother initial time stepping of dynamical adaptation (using « IAU ») - Specifically tuned diffusion of hydrometeors Forecast Vmax ~ 75 m/s Estimated Vmax ~ 82 m/s Estimated error of timing of cyclone along track ~ 2h
Outlook : short term ARPEGE 5km over Western Europe Introduce an AROME ensemble data assimilation Change from two to four AROME ensemble forecasts per day Work on single-precision runs, with a potential, at least partial, benefit first in AROME ensemble
Outlook : longer term (2019 and beyond) Physics : new surface schemes in SURFEX, new microphysics scheme “LIMA”, etc. Dynamics : continue work on solutions for dynamical core preserving the ability to run long time steps Data Assimilation : EnVar data assimilation, with major contributions to OOPS Observations: improved assimilation of aircraft data, satellite radiances (all-sky), add Lidar winds, more European radar data (OPERA) Renewed surface data assimilation Expect a long lasting effort of recoding the NWP system (OOPS, COPE, ESCAPE aspects) => likely to continue to experience fairly complex common code udpates (phasing) Upgrade of HPC : ~ 2020
Cliquez pour modifier le style du titre Dziękuję za uwagę ! Cliquez pour modifier le style des sous-titres du masque
You can also read