Table of contents 1. Executive summary ………………………………………………………………………………………..3 2. Justification…………………………………………………………………………………………………….3 2.1 Utility Services Recommendation 2.2 Physical Condition/Functionality of Space 2.3 Total new space requirements 2.4 Equipment list 2.5 Alternative analysis 2.6 Benefits of project 3. Design criteria……………………………………………………………………………….…………....4 3.1 Site Constraints 3.2 Flood Mitigation analysis 3.3 LEED Goal 3.4 Architectural and Mechanical Narrative 3.5 CSU Standards 3.6 CSU Inclusivity Standards 3.7 List of applicable codes 4. Project Schedule, cost estimates, financing………………………………….….…………8 4.1 Project schedule and phasing 4.2 Financing 4.3 Cost estimate with description of methodology employed Appendices a. Utility map b. Site map c. Floor plans d. Elevations e. Foothills Campus Flood Plain f. Budget Estimate 2
Executive Summary The project will construct an approximately 3500 gsf central chilled water plant to replace dispersed chillers at the Infectious Disease Research Center (IDRC) on Foothills Campus. There are currently twelve distributed chillers serving the IDRC complex and ARBL. Due to the nature of the research, all of this equipment is fully redundant (i.e. twice the number of chillers are installed than are needed for cooling). Much of this equipment is at end of life and the remainder will be so within ten years. With the construction of the new CVID building, the University had a choice to install more distributed equipment or transition to a central chilled water plant. Life cycle cost analysis showed that the most cost-effective solution was to make the transition to a central plant. The estimated budget is $6.4M. The project will be financed with funds from the CVID project (in lieu of a chiller/cooling tower for the building), and a loan to be paid back over a period of 5 years from energy savings and annual VPUO maintenance funding. The project is designed and estimated to take 12 months to complete. CSU anticipates a multi-prime delivery method, with multiple bid packages. Justification Utility Services Utility Services recommends abandoning the distributed equipment paradigm for cooling at IDRC. Heating at the IDRC site already follows the central model with excellent results. Distributed equipment with life left in it can be sold to recoup some cost. Finally, retirement of the distributed inventory will allow existing Facilities personnel to maintain the central plant with no change in staffing. Physical Condition/functionality of Existing Space There are currently twelve distributed chillers serving the IDRC complex and ARBL. Due to the nature of the research, all of this equipment is fully redundant (i.e. twice the number of chillers are installed than are needed for cooling). The newest air-cooled equipment at IDRC is nearly halfway through its lifespan and in ten years all of it will need replacement. Estimates are that $950K in CM funds will be necessary to replace the four oldest air-cooled chillers, one of which is currently at reduced capacity due to component failure. New Space Requirements Room type Number Total GSF Chiller Plant 1 3480 Alternative analysis While the first-cost is greater for a central plant than for replacement of the existing distributed chiller inventory, the cost of ownership is dramatically smaller. The following graph illustrates order of magnitude comparisons for 50-year ownership cost. 3
50-YEAR LIFE CYCLE COST ANALYSIS UPDAT E D O C TO BE R 2 0 1 9 Equipment First Cost Replacement Cost Maintenance Cost Utility Cost $100,000,000 $88,800,000 $90,000,000 $80,000,000 $20,600,000 $70,000,000 $60,800,000 $10,600,000 $60,000,000 $50,000,000 $17,400,000 $40,000,000 $8,400,000 $30,000,000 $52,600,000 $20,000,000 $28,600,000 $10,000,000 $5,000,000 $6,400,000 $0 BASE CASE DISTRIBUTED CHILLERS CENTRAL CHILLED WATER PLANT The difference in ownership cost is primarily due to the significant reduction of installed equipment through centralized redundancy and a diversity of peak loads. Central equipment is of higher quality and has a longer useful life. Controlled Maintenance (replacements) over 50 years will be roughly half with a central plant. Centralized equipment requires more maintenance than distributed equipment on a unit by unit basis, however, the central plant has roughly a third of the installed equipment, and thus maintenance dollars are roughly 20% less. There is a reduction in annual energy use (estimated at $25k in today’s dollars) due to higher efficiencies and less equipment. Benefits of the Project In addition to the life cycle cost savings there are intangible benefits as well. Air-cooled chillers are noisy and central plants are quiet. There are neighbors very close to the south of IDRC, with an established history of complaints, including a current complaint being addressed from the Bella Vira development southeast of the IDRC complex. A central plant is more robust better able to respond to growth and load variation. It is simpler and cheaper to modify the central plant than it is distributed equipment. In many cases, growth can be absorbed into the existing central plant capacity due to inherent diversity. Finally, a central plant consolidates the cooling footprint, freeing space for other use and avoiding equipment sprawl. One desire at IDRC, for example, is to consolidate deliveries to the back side of RBL. Removal of chillers will enable that effort. Design Criteria Site Constraints The chiller plant will be outside the secured area of the Judd Harper Complex, to the NW of the cGMP building. 4
Flood Mitigation Analysis Not applicable to anticipated building site. See flood plain map in appendix. LEED Goal The project is waived due to the size of the project and specialized program. The following Sustainable Design Strategies have been considered. Sustainability measures employed in this project will directly affect all buildings connected to it on the Foothills Campus. The replacement of aging air-cooled chillers with connections to a central chilled water system has the potential to reduce energy use for each building on the campus. This approach can also increase the resilience of the campus by including redundant chilled water generation, limiting the negative effects of maintenance downtime and equipment failure. Any future new construction or renovations of buildings on the campus seeking LEED certification (such as the CVID building) can benefit from certain measures taken, including the use of high efficiency chillers, low environmental impact refrigerant, cooling tower makeup water treatment, and ice thermal storage. Increasing the number of points available to a project by connecting to the chilled water plant can give project teams more flexibility in meeting LEED goals. Relevant LEED v4.0/v4.1 credits include: • Water Efficiency Credit 3: Cooling Tower and Process Water Use (LEED v4.1) • Energy and Atmosphere Credit 2: Optimize Energy Use (LEED v4.0/v4.1) • Energy and Atmosphere Credit 4: Grid Harmonization (LEED v4.1) • Energy and Atmosphere Credit 7: Enhanced Refrigerant Management (LEED v4.0/v4.1) Cooling Tower and Process Water Use (LEED v4.1) Under LEED v4.1, projects are allowed to take credit for cooling towers associated with district energy systems. To earn one point, a potable water test must be conducted to measure concentrations of 5
CaCO3, total alkalinity, SiO2, Cl-, and conductivity, then the maximum number of cycles achieved without exceeding these concentrations is calculated to document compliance for one point. One additional point can be achieved by increasing the maximum number of cycles by 25% through water treatment/ maintenance or using a minimum of 20% nonpotable water for cooling tower makeup. Optimize Energy Use (LEED v4.0/v4.1) Projects may take into account the performance of connected district energy systems in the energy model. High efficiency chillers, cooling towers, and pumps can increase the calculated energy savings and contribute to the number of points a project can earn under this credit. Grid Harmonization (LEED v4.1) The use of thermal ice storage may qualify projects for points under Case 3: Load Flexibility and Management Strategies by satisfying the requirements of Peak Load Optimization (reduce on-peak load by at least 10% compared to peak electrical demand) and/or Flexible Operating Scenarios (move at least 10% of peak load by a time period of 2 hours). As this credit is new under LEED 4.1, further research is needed to determine if projects can take credit for strategies used in a district energy system. Enhanced Refrigeration Management (LEED v4.0/v4.1) Projects must take into account any refrigerants used in connected district energy systems to earn the point for this credit, so using low-impact refrigerants in the chillers contributes. Utility Incentive Programs This project is included in Xcel’s Energy Efficient Buildings (EEB) rebate program along with the CVID building. Nexant is the third-party rebate program administrator assigned to this project. Architectural The building will be a premanufactured metal building. Panel colors will be chosen by Facilities Management based on standard manufacturer options. 6
Mechanical Narrative The plant will initially provide chilled water for the new CSU Center for Vector-Borne and Infectious Disease (CVID) only and will be sized to provide chilled water to six existing buildings on the Foothills Campus. The project design will consist of a 3,480 square foot facility centrally located on the Foothills Campus. The facility will house two 600-ton chillers with one 150-ton pony chiller and associated cooling towers, pumps, and equipment as well the required electrical, fire protection, and other support systems. Through a phased approach, the plant will eventually replace a total of 12 associated existing air-cooled chillers that need major repairs and/or replacement. There will also be underground chilled water piping installed running from the new plant to the CVID and stub-outs to serve as attachment points for piping serving the existing buildings mentioned below. • Research Innovation Center (RIC) • Regional Biocontainment Lab (RBL) • CGMP Pharmaceutical Mfg. (CGMP) • Animal Reproduction and Biotechnology Lab (ARBL) • Bio-Environmental Hazards Research Building (BRB) Building Building Building Floor Required Cooling Required Chilled Required Pipe Connection Name Number Area (sf) Capacity (tons) Water Flow (gpm) Diameter (in) Priority CVID 32454 217 342 6 1 BHRB 1424 19447 104 164 4 2 RBL 1426 43941 460 724 8 3 CGMP 1429 0 4 RIC 1428 69755 280 441 6 4 ARBL 1402 34587 215 339 6 5 CSU Standards The CSU Building Construction Standards Manual is available at: http://www.fm.colostate.edu/constr_standards The CSU Standards are to be used as guidelines for design. They are divided into 3 parts for use by Architects and Engineers: the first part is administrative; the second part discusses requirements for design and deliverables at each stage of the design process; the third part consists of the technical standards arranged by CSI division. The Standards are a work in progress, and as such, any question about the applicability of a standard should be discussed with the project manager. The Standards should never be referenced or copied in Contract Documents – the design is expected to embody and conform to the Standards. Contractors are not to be directed to review the Standards as a contract requirement. CSU INCLUSIVITY STANDARDS-not applicable to this project LIST OF APPLICABLE CODES Approved building codes and standards have been adopted by the Office of the State Architect (herein referred to as State Buildings Program (SBP)) and other state authorities, and are identified below as the minimum requirements to be applied to all construction projects at state agencies and institutions of higher education owned facilities. 7
Applicable codes: 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2017 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL FIRE CODE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN 2009 ICC/ANSI A117.1 Project schedule, cost estimates and financing Schedule/phasing The project is designed and estimated to take 12 months to complete. CSU anticipates a multi-prime delivery method, with multiple bid packages. Financing The estimated budget is $6.4M. The project will be financed with funds from the CVID project (in lieu of a chiller/cooling tower for the building), and a loan to be paid back over a period of 5 years from energy savings and annual VPUO maintenance funding. Cost estimate/methodology Cost estimates were developed by Facilities Management staff. CSU standards specify that the A/E document 20% of the construction budget in bid alternates, to cover potential volatility in the construction market as the project progresses. Appendices a. Utility map b. Site map c. Floor plans d. Elevations e. Foothills Campus Flood Plain f. Budget Estimate 8
BIO 1419 MASS BIOMASS 1403 SOLAR PANELS OPERATIONS TRAILER N cGMP Pharm. 1436 MFG. BLDG 1429 1435 R.I.C. BLDG 1428 REGIONAL C BIOCONTAINMENT L O S E / F OF C S L O E F/ OF C O L S E / O F F LABORATORY 1426 1425 SARA 1430 AIDL 1421 1305 COLORADO STATE UNIVERSITY 1424 FOOTHILLS CAMPUS 1423 JUDD HARPER COMPLEX IDA 1432 1422 1433 NO DIG ZONE RADIATION ANIMAL CONTAINER CALL RADIATION CONTROL - EHS 0 50 100 200 Scale: 1"=100'
NORTH 1410 1409 DRIVE EXISTING BSA LifeStructures 999 18th Street, N1625 Denver, CO 80202 NEW GRAVEL DRIVE; ph 303.256.3300 fx 317.819.7288 ADD ALTERNATE - ASPHALT, RE: CIVIL EXISTING ELECTRICAL SWITCH WITH EXISTING BOLLARDS, RE: ELEC PARKING AREA FOR MOBILE T BACKUP GENERATOR, RE: ELEC NEW TRANSFORMER WITH NEW 12" BOLLARDS TO MATCH EXISTING, RE: ELEC ALIGN WITH EXISTING SWITCH CSU DCFC T 20'-1" MOBILE TRAILER T FIRE SEPARA TION 1419 DISTRICT COOLING FOR BIO-MASS THE FOOTHILLS CAMPUS PLANT 1403 CLIENT PROJECT NO. - 191024A BID PACK 01 - CIVIL SITE PACKAGE NEW CHILLED WATER MARK 0 DATE 06-23-2020 DESCRIPTION FOR INFORMATION ONLY (NIC) PLANT 73'-0 1/2" NEW ASPHALT, RE: CIVIL EXISTING CONCRETE GRAVEL, RE: CIVIL TO REMAIN COOLING TOWERS, RE: MECH NEW GRAVEL DRIVE; ADD ALTERNATE - CONCRETE SIDEWALK ASPHALT, RE: CIVIL FUTURE EXPANSION OAD FUTURE R ROAD EXISTING NEW FENCE, RE: CIVIL PROPOSED CHILLED WATER C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt LINES, RE: CIVIL SITE PLAN SITE PLAN - ENLARGED 1 1/16" = 1'-0" 0' 8' 16' 32' DATE JUNE 23, 2020 SCALE: 1/16"=1'-0" BSALS PROJECT NO. 20920002 A1.11 6/24/2020 9:13:21 AM APPROVED Approver Designer Author © BSA LifeStructures Inc. DESIGNED DRAWN
PLAN NORTH OPENING SCHEDULE ARCHITECTURAL SYMBOLS LEGEND OPENING SIZE OPENING CONSTRUCTION FRAME CONSTRUCTION GLASS TYPE XX DETAIL SET ELEVATION ELEVATION NEW COLUMN LINE MATERIAL MATERIAL RATING INACTIVE SIM OPENING # ROOM NAME (MINS.) HEIGHT WIDTH LEAF WIDTH REMARKS 1 SECTION INDICATOR A101 100.1 MECHANICAL ROOM 7' - 0" 4' - 0" 0' - 0" HM A1.2 HM PANIC HARDWARE, CLOSER, THRESHOLD, WEATHERSTRIPPING 100.2 MECHANICAL ROOM 11' - 0" 8' - 0" STEEL INSULATED ROLL UP SERVICE DOOR AREA 100.3 MECHANICAL ROOM 11' - 0" 8' - 0" STEEL INSULATED ROLL UP SERVICE DOOR DETAIL INDICATOR OF 100.4 MECHANICAL ROOM 11' - 0" 8' - 0" STEEL INSULATED ROLL UP SERVICE DOOR DETAIL DETAIL NUMBER 100.5 MECHANICAL ROOM 7' - 0" 4' - 0" 0' - 0" HM A1.2 HM PANIC HARDWARE, CLOSER, THRESHOLD, WEATHERSTRIPPING 1 SIM SIMILAR 100.6 MECHANICAL ROOM 7' - 0" 4' - 0" 0' - 0" HM A1.2 HM PANIC HARDWARE, CLOSER, THRESHOLD, WEATHERSTRIPPING A101 SHEET NUMBER ROOM ROOM NAME DESIGNATION 000 ROOM NUMBER DESIGNATION PLAN NOTE DESIGNATION D C B A 00 000 EQUIPMENT DESIGNATION. 92'-0" REFER TO EQUIPMENT SCHEDULE. 31'-0" 30'-0" 31'-0" FLOOR DRAIN 1 4 A000 2 ELEVATION TAG 37'-6" 3 00 TOILET ACCESSORY FE FIRE EXTINGUISHER - BRACKET MOUNTED 15'-0" GENERAL ARCHITECTURAL NOTES BSA LifeStructures CONCRETE PAD, TYP AT 999 18th Street, N1625 2 ALL DOORS A. ALL LARGE EQUIPMENT TO SIT ON HOUSEKEEPING PADS; Denver, CO 80202 A3.11 COORDINATE SIZE AND LOCATION WITH SPECIFICATIONS AND 7'-0" 11'-5" MANUFACTURER ph 303.256.3300 fx 317.819.7288 A3.01 B. COOLING TOWERS TO SIT ON RAIL SYSTEM WITH FOUNDATION; COORDINATE WITH BUILDING FOUNDATION TO PREVENT 9" BOLLARDS, 1 DIFFERENTIAL MOVEMENT BETWEEN THE SYSTEMS TYP 100.1 5'-0" 3'-0" 7'-7" 8'-0" 6'-0" 8'-0" 6'-0" 8'-0" 12'-3" 3'-0" 100.4 100.3 100.2 3 CSU DCFC FE 0" 1/8" / 12" [No Slope] UTILITY SINK, RE: PLUMBING 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" WORK SURFACE 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/2" / 12" 17'-0" 1/8" / 12" 1/8" / 12" CONCRETE CHILLERS, TYP EQUIPMENT PAD, TYP RE: MECH DISTRICT COOLING FOR 20'-0" 3 A8.01 THE FOOTHILLS CAMPUS 1 CONCRETE EQUIPMENT A3.11 PAD; PAINT SAFETY CLIENT PROJECT NO. - 191024A / 12" 1/8" YELLOW, TYP 10'-0" -2 17/32" BID PACK 01 - CIVIL SITE " / 12 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/8" -2 17/32" -2 17/32" -2 17/32" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" PACKAGE 40'-0" FUTURE -2 13/32" -2 13/32" -2 13/32" 2 6'-8" 2 EXPANSION 1/8" / 12" FE A8.01 MECHANICAL ROOM 32'-0" 100 MARK DATE DESCRIPTION A3.01 4 5/8" / 12" 0 06-23-2020 FOR INFORMATION ONLY (NIC) 1/8" / 12" 2 A3.01 20'-0" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8 " "/ 12 " 1/8 12 "/ 1/8 "/ 12 "/ 12 " " 1/8 12 "/ 12 " "/ " 1/8 1/8 1/8" / 12" 1/8" / 12" FRP COVERED GYP BD OVER 6" MTL CONCRETE STUDS UP TO ROOF; RE: STRUCTURAL EQUIPMENT PAD; FOR HEAD SLIP CONNECTION DETAIL PAINT SAFETY ADD ALT - EXTRUDED PVC PANELS ON YELLOW, TYP FOR FE STUDS INTERIOR PADS 0" FE 1 1 A8.01 5'-0" 2'-5" 6'-5" 100.5 100.6 3 8'-0" 9" BOLLARDS, TYP A3.01 11" 7'-0" 4'-7" CONCRETE SIDEWALK AROUND PERIMETER; SLOPE AWAY FROM BUILDING, RE: CIVIL DOWNSPOUT, TYP CONCRETE FOOTINGS, TYP RE: STRUCTURAL C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt COOLING TOWERS, TYP RE: MECH GRAVEL, RE: CIVIL MAIN LEVEL FLOOR PLAN DATE JUNE 23, 2020 MAIN LEVEL FLOOR PLAN 1 BSALS PROJECT NO. 20920002 1/4" = 1'-0" 0' 2' 4' 8' SCALE: 1/4"=1'-0" A2.01 6/24/2020 9:13:23 AM APPROVED Approver Designer Author © BSA LifeStructures Inc. DESIGNED DRAWN
PLAN NORTH 2 A3.11 CONTINUOUS GUTTER TO DOWNSPOUT SNOW GUARD, TYP BSA LifeStructures 999 18th Street, N1625 Denver, CO 80202 ph 303.256.3300 fx 317.819.7288 PRE-FINISHED METAL ROOF SYSTEM BY PRE-ENGINEERED METAL BUILDING MANUFACTURER CSU DCFC 4" / 12" 1 A3.11 DISTRICT COOLING FOR FUTURE THE FOOTHILLS CAMPUS EXPANSION CLIENT PROJECT NO. - 191024A BID PACK 01 - CIVIL SITE 4" / 12" PACKAGE MARK DATE DESCRIPTION 0 06-23-2020 FOR INFORMATION ONLY (NIC) SNOW GUARD, TYP CONTINUOUS GUTTER TO DOWNSPOUT C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt ROOF PLAN DATE JUNE 23, 2020 BSALS PROJECT NO. 20920002 A2.02 ROOF PLAN 1 1/4" = 1'-0" 6/24/2020 9:13:24 AM 0' 2' 4' 8' APPROVED Approver Designer Author © BSA LifeStructures Inc. SCALE: 1/4"=1'-0" DESIGNED DRAWN
BSA LifeStructures 999 18th Street, N1625 Denver, CO 80202 ph 303.256.3300 fx 317.819.7288 CSU DCFC 3 2 1 D C B A DISTRICT COOLING FOR METAL PANEL COLOR A METAL ROOF SYSTEM BY PRE- ENGINEERED METAL BUILDING CONTINUOUS GUTTER TO DOWNSPOUT THE FOOTHILLS CAMPUS 1 2 A3.11 MANUFACTURER A3.11 FLAT METAL PANEL WALL SYSTEM BY CLIENT PROJECT NO. - 191024A FLAT METAL PANEL WALL SYSTEM BY DOWNSPOUT, TYP PRE-ENGINEERED METAL BUILDING PRE-ENGINEERED METAL BUILDING MANUFACTURER; 12" 4" / 12" MANUFACTURER; BUTLER eSTYLEWALL II OR 4" / BUTLER eSTYLEWALL II OR EQUIVALENT EQUIVALENT BID PACK 01 - CIVIL SITE ROOF EAVE ROOF EAVE 19' - 6" METAL PANEL COLOR A 19' - 6" PACKAGE MOBILE BACKUP GENERATOR, RE: ELEC NEW TRANSFORMER, MARK DATE DESCRIPTION RE: ELEC 0 06-23-2020 FOR INFORMATION ONLY (NIC) BOLLARD BEYOND MAIN LEVEL MAIN LEVEL 0' - 0" 0' - 0" EXTERIOR ELEVATION - SOUTH EXTERIOR ELEVATION - EAST 4 3 1/8" = 1'-0" 1/8" = 1'-0" 0' 4' 8' 16' 0' 4' 8' 16' SCALE: 1/8"=1'-0" SCALE: 1/8"=1'-0" 1 2 3 A B C D RE: MECH AND PLUMBING DRAWINGS FOR ALL ROOF AND METAL ROOF SYSTEM BY PRE- 1 2 WALL PENETRATIONS ENGINEERED METAL BUILDING A3.11 A3.11 CENTER LIGHT OVER DOOR, TYP MANUFACTURER CONTINUOUS GUTTER TO 12" 4" / DOWNSPOUT 4" / 12" NEW TRANSFORMER, RE: ELEC ROOF EAVE ROOF EAVE 19' - 6" MOBILE BACKUP 19' - 6" C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt GENERATOR, RE: ELEC METAL PANEL COLOR A FLAT METAL PANEL WALL SYSTEM BY PRE-ENGINEERED METAL BUILDING FLAT METAL PANEL WALL SYSTEM BY MANUFACTURER; PRE-ENGINEERED METAL BUILDING BUTLER eSTYLEWALL II OR MANUFACTURER; EQUIVALENT BUTLER eSTYLEWALL II OR EQUIVALENT DOWNSPOUT, TYP. EXTERIOR ELEVATIONS METAL PANEL COLOR A MAIN LEVEL MAIN LEVEL 0' - 0" 0' - 0" DATE JUNE 23, 2020 BSALS PROJECT NO. 20920002 A3.01 EXTERIOR ELEVATION - NORTH 2 1/8" = 1'-0" EXTERIOR ELEVATION - WEST 6/24/2020 9:13:30 AM 0' 4' 8' 16' 1 APPROVED Approver Designer 1/8" = 1'-0" Author 0' 4' 8' 16' © BSA LifeStructures Inc. SCALE: 1/8"=1'-0" DESIGNED DRAWN SCALE: 1/8"=1'-0"
BSA LifeStructures 999 18th Street, N1625 Denver, CO 80202 ph 303.256.3300 fx 317.819.7288 1 2 3 1 A3.11 4" / 12" 4" / 12" CSU DCFC ROOF EAVE 19' - 6" DISTRICT COOLING FOR THE FOOTHILLS CAMPUS CLIENT PROJECT NO. - 191024A BID PACK 01 - CIVIL SITE PACKAGE MAIN LEVEL 0' - 0" MARK DATE DESCRIPTION 0 06-23-2020 FOR INFORMATION ONLY (NIC) BUILDING SECTION - E/W 2 3/16" = 1'-0" 0' 4' 8' 16' SCALE: 3/16"=1'-0" A B C D 2 A3.11 ROOF EAVE 19' - 6" C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt MAIN LEVEL 0' - 0" BUILDING SECTIONS DATE JUNE 23, 2020 BUILDING SECTION - N/S 1 BSALS PROJECT NO. 20920002 3/16" = 1'-0" 0' 4' 8' 16' SCALE: 3/16"=1'-0" A3.11 6/24/2020 9:13:34 AM APPROVED Approver Designer Author © BSA LifeStructures Inc. DESIGNED DRAWN
METAL ROOF SYSTEM BY PRE-ENGINEERED METAL BUILDING MANUFACTURER SLIP CONNECTION AT TOP OF WALL, RE: STRUCTURAL TOP OF WALL TO FOLLOW SLOPE OF ROOF FRP FINISH ADHERED TO GYPSUM WALL BSA LifeStructures BOARD; ADD ALT - EXTRUDED PVC PANELS 999 18th Street, N1625 ATTACHED DIRECTLY TO METAL STUDS Denver, CO 80202 ph 303.256.3300 fx 317.819.7288 BLACK PHENOLIC RESIN WORK TOP, TRESPA OR EQUIVALENT BLACK POWDER COATED STEEL BACK SPLASH 6" METAL STUDS 28" DEEP FREE STANDING ADJUSTABLE HEIGHT MOBILE CSU DCFC TABLE FRAME BASE, KEWAUNEE FRP FINISH ADHERED TO GYPSUM WALL ENTERPRISE WORKSTATION OR BOARD; ADD ALT - EXTRUDED PVC PANELS EQUIVALENT ATTACHED DIRECTLY TO METAL STUDS CONCRETE EQUIPMENT PAD 5'-0" 5'-0" 5'-0" DISTRICT COOLING FOR THE FOOTHILLS CAMPUS 3'-0" FRP BASE TRIM AT BASE OF WALL; ALL SIDES, TYP MAIN LEVEL CLIENT PROJECT NO. - 191024A 0' - 0" BID PACK 01 - CIVIL SITE 3 WORK BENCH ELEVATION 1/2" = 1'-0" 2 INTERIOR PARTITION WALL DETAIL 1 1/2" = 1'-0" PACKAGE 0' 1' 2' 4' 0' 6" 1' 2' SCALE: 1/2"=1'-0" SCALE: 1 1/2"=1'-0" MARK DATE DESCRIPTION 0 06-23-2020 FOR INFORMATION ONLY (NIC) 1 FLAT METAL PANEL WALL SYSTEM BY PRE- ENGINEERED METAL BUILDING MANUFACTURER; BUTLER eSTYLEWALL II OR EQUIVALENT EXTRUDED POLYSTYRENE INSULATION BOARD INSTALLED ALONG FOUNDATION WALL AND HORIZONTALLY FOR 24" MIN AROUND PERIMETER OF BUILDING PER METAL PANEL TO FOLLOW SLOPE OF IECC 2018 EXTERIOR CONCRETE SIDEWALK BASE FLASHING CONCRETE SLAB ON GRADE, RE: STRUCTURAL BITUMINOUS DAMPPROOFING MAIN LEVEL EXTERIOR CONCRETE SIDEWALK, RE: CIVIL 0' - 0" FOR ELEVATIONS 2" C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt DETAILS DATE JUNE 23, 2020 BSALS PROJECT NO. 20920002 A8.01 6/24/2020 9:13:35 AM TYPICAL FOUNDATION DETAIL 1 APPROVED Approver Designer 1 1/2" = 1'-0" Author 0' 6" 1' 2' © BSA LifeStructures Inc. DESIGNED DRAWN SCALE: 1 1/2"=1'-0"
BSA LifeStructures 999 18th Street, N1625 Denver, CO 80202 ph 303.256.3300 fx 317.819.7288 CSU DCFC VIEW FROM NORTHWEST 2 NOTE: DISTRICT COOLING FOR PERSPECTIVE DRAWINGS ARE FOR DISCUSSION PURPOSES ONLY AND ARE NOT INTENDED TO BE USED AS A BID OR THE FOOTHILLS CAMPUS CONSTRUCTION DOCUMENT. CLIENT PROJECT NO. - 191024A BID PACK 01 - CIVIL SITE PACKAGE MARK DATE DESCRIPTION 0 06-23-2020 FOR INFORMATION ONLY (NIC) C:\Users\BMcMullen\Documents\20920002-ARCH_BSALS_CENTRAL_v2019_bmcmullen5E89A.rvt PERSPECTIVES DATE JUNE 23, 2020 BSALS PROJECT NO. 20920002 VIEW FROM SOUTHWEST 1 NOTE: AXONOMETRIC DRAWINGS ARE FOR DISCUSSION PURPOSES A10.01 6/24/2020 9:13:42 AM ONLY AND ARE NOT INTENDED TO BE USED AS A BID OR APPROVED Approver Designer CONSTRUCTION DOCUMENT. Author © BSA LifeStructures Inc. DESIGNED DRAWN
FCMaps Legend FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year FEMA Map Panel City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year City Limits 9,027 1,504.5 1: 6,859 Notes 1,143.0 0 571.50 1,143.0 Feet This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this WGS_1984_Web_Mercator_Auxiliary_Sphere map may or may not be accurate, current, or otherwise reliable. City of Fort Collins - GIS
Foothills Chiller Plant cost estimate Project Budget Remarks Professional Services Site Survey, Geotechnical 25,000 Consultants - Architects, Engineers, Vibration, Acoustics 476,900 Commissioning and Advertisements 10,000 FM project development fee 262,295 Independent Code Review, code insp, material tests 13,495 PFA plan review 3,365 Total Professional Services 791,055 Construction construction cost/sf includes chiller plant New Space - 3400 gsf 2,491,525 equipment Site Work Service/Utilities 2,277,475 chilled water piping to buildings Site Improvements/Landscaping 340,000 Subtotal Construction Costs 5,109,000 Equipment & Furnishings Fixed Equipment 0 Moveable Equipment CSU Communications/AV 17,000 $5/sf CSU Notifyer system 6,000 Total Equipment and Furnishings Costs 23,000 Miscellaneous Total Miscellaneous Costs 0 Subtotal Project Cost 5,923,055 Project Contingency Project Contingency 58% 476,900 Total Contingency 476,900 Budget- Occupancy in Jan 2022 $ 6,399,955 This opinion of probable cost is made on the basis of experience, qualifications and best judgement of a professional cost consultant familiar with the construction industry, combined with the professional experience of Facilities Management. FM cannot guarantee that proposals, bids or actual construction costs will not vary from this cost estimate due to market conditions at the time of the bid. COLORADO STATE UNIVERSITY Facilities Planning Design and Construction