Decommissioning in Brazil - An Overview Raphael Moura, Ph.D - ANP
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Decommissioning in Brazil An Overview Raphael Moura, Ph.D. General Manager for Operational Safety and Environment Webinar, 23 June 2020
Penalties Brazil at a Glance Criteria The Importance of the Oil and Gas Industry ~1.8 USD Trillion 9th GDP (2019) Largest Oil Producer 11 % Oil and Gas Industry Largest in Latin America ~ 50% Energy supply ~ 212 7th million Largest Oil Products Consumer Population (2020) 7th 9 th Largest FDI Destination Largest Economy BRL/USD = 4.03 31/12/2019
Improve Recovery Factor in Accelerate the Pre-Salt Mature Fields & Advance to development New Frontiers (transfer of rights) Pre-Salt Conventional Offshore Revitalize Onshore Attract suitable Players to Exploration and Production compatible E&P environments (transfer of rights & permanent offer) Offshore/Onshore REATE
Life Extension & Decom: Maximizing the Recovery Factor 1% addition in 16% 23% 21% 35% Campos Basin: 985 Mboe New Reserves 1% addition in Campos Basin Campos Basin Brazil World Onshore: Current O&G Recovery Final O&G Recovery Final O&G Recovery Average Final O&G Factor Factor Factor Recovery Factor 200 Mboe Source: ANP (May 2020) New Reserves
Instalations' age x Basis Many ageing facilities in Brazil… 25+ years old installations x Basin 21 + 25 years: 15-25 years: < 15 years 41,8% 14,6% 33% 32% 13 15 - 25 years >= 25 years 10 1 1% 14% 29 7 22 15% 5% 22 9 12 1 3 2 Campos 1 3 2 Camamu- Ceará Campos Ceará Espírito Santo Potiguar Santos Sergipe/Alagoas Espírito Santo Almada >= 25 years 0 21 9 3 10 1 22 Potiguar 15 - 25 years 0 13 1 0 7 0 2 Santos < 15 years 1 29 0 3 12 22 2 Sergipe/Alagoas
20 approved PDIs - Offshore 96 Expected PDIs (2020 – 2030) Field Main installations Basin Voador P-27 Campos Carapiá Roncador Marlim Sul Poços FPSO Brasil FPSO Marlim Sul Santos Campos Campos 12 10 74 Bauna Sul Poços Santos Tubarão Azul FPSO OSX-1 Campos Investment forecast* (2020 – 2024) Pirapitanga Poços Santos Mexilhão Poços Santos Well P&A US$ 3,259,562.00 Cação PCA-01, PCA-02, PCA-03 Espírito Santo Guaiúba Poços Potiguar Equipment Tambuatá Poços Santos withdrawal US$ 1,742,150.00 Salema Branca Poços Potiguar Tartaruga Verde FPSO Cidade de Rio das Ostras Campos Piranema FPSO Piranema Spirit Sergipe-Alagoas Area Recovery US$ 99,428.00 Guajá Poços Potiguar Linguado P-12 Campos Camarão Norte Poços Camamu Others US$ 113,412.00 Espadarte FPSO Cidade do Rio de Janeiro; FPSO Espadarte Campos * US$ 1 = R$ 5 Piraúna P-15 Campos Source: ANP, 19/06/2020 Total: US$ 5.2 Billion
Decommissioning Programme – A single PDI Documents Standardisation Predictability and Stability of Rules Process Celerity
❖ Decommissioning Justification Study: feasibility & economic viability; ❖ Present the comparative assessment of decommissioning options: technical, environmental, societal, economic and safety; ❖ Transparency; ❖ Transfer of Rights: agreement (with the ANP consent) between former and new licensee; ❖ Permanent Offer (onshore): operations transfer: review or execution of the Decom plan; ❖ Corporate Social Responsibility Management System; ❖ Information regarding the marine aids to navigation project (for the Maritime Authority) ❖ Post-decommissioning monitoring plan (for the environmental regulator - IBAMA)
FOR THE END OF THE PRODUCTION Offshore Conceptual PDI Executive PDI (Production) (Production) Conclusion of PDI's Execution RDI Conceptual PDI Executive Onshore PDI (Production) (Production) 0,5a - 5a - 3,5a - 3a - 2a - 1,5a - 1a -0,5a Permanent Offer 90d 180d Facilities PDI Transfer Production Continuity EXPECTED DATE Offer Assignment Decision about facilities to be decommissioned Deadlines from Resolution No. 817/2020 http://www.anp.gov.br/arquivos/seguranca-operacional/descomissionamento/prazos-resolucao-817-2020.pdf
Regulation Technology • 3 technical rules condensed in 1 Many • Life extension • Transparency opportunities • Structural Reliability • Standardised PDIs and RDIs • Environmental Monitoring • Transfer of Rights to create • Cutting Tools • Permanent Offer value! • RD&I • Comparative Assessment • Post-Decommissioning Monitoring Logistics and Infrastructure • Vessels (PSVs, Heavy Lifts etc) • Waste management • NORM detection and management • Shipyards and ports
National Agency for Petroleum, Natural Gas and Biofuels Superintendence of Operational Safety and Environment Av. Rio Branco, 65, 18th floor - Rio de Janeiro, Brazil +55 (21) 2112-8100 General Information: http://www.anp.gov.br/wwwanp/exploracao-e-producao-de-oleo-e-gas/seguranca- operacional-e-meio-ambiente About Decommissioning: http://www.anp.gov.br/exploracao-e-producao-de-oleo-e-gas/seguranca-operacional-e-meio- ambiente/descomissionamento-de-instalacoes
You can also read