CAMPBELL RIVER AIRPORT AIRPORT MASTER PLAN SEPTEMBER 6, 2016 FOR DISTRIBUTION FILE: 704-C31103369-01 Tetra Tech EBA Inc. Oceanic Plaza, 9th Floor, 1066 West Hastings Street Vancouver, BC V6E 3X2 CANADA Tel 604.685.0275 Fax 604.684.6241
AIRPORT MASTER PLAN FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION EXECUTIVE SUMMARY The Campbell River Airport is the gateway to economic development in the City of Campbell River and the region and it is therefore important that the City continue to market the airport to the community and aviation industry and develop airport lands for the economic benefit of the community. The 2007 economic impact analysis showed that for every job at the airport there are another 2.25 jobs that are created through direct, indirect and induced economic factors. It is estimated that in 2013, the economic impact from the airport activities contributed as much as $52.5M to the local economy. As the City encourages new business development at the airport, it is expected that this impact will continue to grow well into the future. In 2010, the City, under a Bylaw, appointed an Airport Authority Commission to manage and operate the airport. City Council is responsible for approving the airport’s annual budget. In 2016, Council and the Airport Authority Commission held a Joint Strategy Workshop resulting in a recommended adjustment to Council’s relationship with the Airport Authority Commission to better align with Council’s vision of the Commission and the Airport operations. TimberWest owns and markets a large tract of land (400 acres) immediately adjacent to the airport. These lands are sold to potential developers and are not subject to airport related fees and charges with the exception of landing fees. To date, four parcels of land have been sold and Sealand Aviation, one of the largest businesses, owns and operates from one of these parcels. These private lands complement the airport lands for a variety of development opportunities. The airport is well served by two airlines, Central Mountain Air and Pacific Coastal, and for the purposes of the master plan a new air service entrant is not anticipated. The forecasts for passenger volumes and aircraft movements used in this plan are relatively conservative (1% low growth and 2.2% high growth). The growth projections are based on the expected population growth and Gross Domestic Product (GDP) forecasts. As part of the plan development, a business opportunity scan was completed and a number of key business opportunities were identified. The opportunities focussed on aviation-related businesses [e.g., hangar construction, air cargo (courier and specialty seafood), manufacturing (specialty parts for aircraft), warehousing and storage, mini-storage, fixed base operators (FBO), flight training, maintenance repair and overhaul (MRO)], opportunities that would focus attention on the airport (e.g., special events) and the development of educational programs that would encourage young persons within the community to pursue careers in aviation. Section 7.0 of the report identifies development opportunities for the airport. Some of the developments are required immediately to address specific constraints; the terminal building vehicle parking lot may need to be expanded to provide additional parking for both short-term and long-term parking. A vehicle parking study is planned for 2016. The main apron at the terminal is constrained during the summer months when commercial and private pilots require parking space for their aircraft. The apron will be expanded to accommodate user’s requirements. The airport has a significant inventory of lands that can be developed. The master plan anticipates a careful development strategy based on demand triggers. As an example, first priority is given to lands that are easily developed. These are lands that already have road access, services and utilities. There is currently approximately 3.0 ha of land meeting this criteria. The next development phase requires the construction of an entirely new development area. The Northwest Development Area is approximately 9 ha in size and is divided into two development phases. Each phase requires the construction of access roads, water and sewer services, utilities and airfield access i AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION (e.g., taxiways). The development area will be developed based on confirmed demand and, once developed, the next phase will only be initiated when the first phase is 70% leased and constructed. For example, Concept A shows eight lots. When six lots are leased, construction would begin on Phase II. There are two concepts shown for this area. The concept differences relate to lot sizes and taxiway access. Determining which concept is preferred will be tied to developer requirements. At present, the fuel facility equipment (e.g., storage tanks, fuel truck, etc.) at the airport is owned by Esso. The airport operates the facility. The airport is currently developing a new Jet A fuel facility and fuel trucks that will be owned and operated by the City. The airport will provide only Jet A, while the provision of Av Gas fuel to aircraft operators may be devolved to private enterprise. It is expected that as the fuel agent, the airport will be able to purchase fuel at a lower wholesale cost. The Master Plan includes three main deliverables: the implementation plan, the business plan and the marketing plan. The implementation plan anticipates a logical and strategic development plan for the airport. In the short-term the following actions are expected: Critical Studies/Reviews 2016 Council – Airport Authority Commission Joint Strategy Workshop; Economic Development/Marketing Implementation Study; Vehicle Parking Study; Logistical Study for Specialty Seafood Transportation; and Update to the 2011 Air Service Demand Analysis. Infrastructure Maintenance and Improvements and Equipment Preparation of applications for federal and provincial funding agencies; Potential expansion of the vehicle parking lot; Expansion of the main apron to facilitate aircraft parking and maneuvering; Construction of an airport-managed and operated Jet A fuel depot with fuel trucks; and Purchase of essential new equipment: Snow Blower, De-icing Unit, Tractor, Mower and Light Pickup. New Development Lease lands north of the Combined Service Building (CSB) and develop lands in the Southeast Development Area; Maximize development in the Central Development Area; At a mid-point over the next 5 years evaluate business interest to determine whether the demand exists for a new development area; ii AirportMasterplan2016-09-06-Final.docx
AIRPORT MASTER PLAN FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION Based on demand begin construction of Phase 1 of the Northwest Development Area including roads, taxiways and services; Lobby for the return of the Canada Border Services Agency (CBSA); Lobby for further Air Tanker Base expansion; Lobby for North Island College Aerospace Program; and Consideration for the potential development of a Motorsports Park. Each of the development planning objectives is tied to demand and the availability of funding assistance. The business plan shows the expected expenses and revenues for the short-term (five year period). The projections used in the plan mirror the projections used for the passenger volume and aircraft movement growth. All of the projections are conservative. The marketing plan includes a series of actions that are required to promote the airport and encourage business development at the airport. Actions include: Targeting the real market – local residents, air operators, charters, strategic partners, local, regional and national businesses. Developing a clear airport product – this involves developing strategies to improve the airport accessibility (signage, access roads, parking) and to make the airport as “hassle-free” as possible. Marketing the airport – this is accomplished through joint efforts with tenants and airport users to advertise and market the airport. This can also include improving websites, attending applicable aviation focusses conferences, participating in aviation organizations, encouraging tourism agencies to promote the airport as the preferred airport, developing a community based volunteer program at the airport, providing services at the airport for pilots and organizing community events. The Airport Marketing Taskforce could oversee these activities ensuring alignment with City branding and the new tourism model. Pricing Strategies – the airport needs to be price competitive with other airports on the Island (particularly Comox and Nanaimo). The Campbell River Airport is a safe, well-maintained airport and with regular maintenance the airport will continue to provide the City of Campbell River and the region with a vital transportation link to the outside world. All of the marketing and business development initiatives identified in the plan will promote the airport within the community and potentially result in business opportunities at the airport that will provide further economic benefit to the broader community through increased employment and business investment. As demonstrated in the airport economic impact assessments, the existing financial benefits to the community count in the tens of millions of dollars and with new business investment the economic impact will continue to grow. The master plan provides a strategic approach to airport development over the next twenty years with a particular focus on the short-term (five-year) period. The plan is designed to focus on those areas where the airport can likely see progress and maximize revenues from airport-related businesses while at the same time promoting overall economic activity in the City of Campbell River and region. iii AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ i 1.0 INTRODUCTION .......................................................................................................................... 1 1.1 Situational Analysis ................................................................................................................................ 1 1.2 Regional Profile...................................................................................................................................... 2 2.0 AIRPORT AUTHORITY COMMISSION ....................................................................................... 3 2.1 Airport Management Structure............................................................................................................... 4 3.0 EXISTING AIRPORT FACILITIES AND INFRASTRUCTURE ..................................................... 6 3.1 Runways ................................................................................................................................................ 6 3.1.1 Runway End Safety Area (RESA) ............................................................................................ 6 3.2 Taxiways ................................................................................................................................................ 7 3.3 Airfield Electrical .................................................................................................................................... 7 3.4 Aprons .................................................................................................................................................... 7 3.5 Air Terminal Building .............................................................................................................................. 7 3.5.1 Airport Security ......................................................................................................................... 8 3.5.2 Canada Border Services Agency (CBSA) ................................................................................ 8 3.6 Combined Service Building (CSB) ......................................................................................................... 8 3.7 Services (Water and Sewer) .................................................................................................................. 9 3.8 Aircraft Services ..................................................................................................................................... 9 3.8.1 Aircraft Fuel............................................................................................................................... 9 3.8.2 Aircraft De-icing ...................................................................................................................... 10 3.8.3 Access Roads ......................................................................................................................... 10 3.8.4 Air Terminal Building Parking ................................................................................................. 10 4.0 STAKEHOLDER CONSULTATIONS ......................................................................................... 11 4.1 Strength, Weakness, Opportunities and Threats Analysis (SWOT) .................................................... 11 5.0 AIRCRAFT MOVEMENTS AND PASSENGER FORECASTS ................................................... 14 5.1 Air Service Demand ............................................................................................................................. 14 5.2 Competitor Airports .............................................................................................................................. 14 5.3 Passenger Growth ............................................................................................................................... 15 5.4 Aircraft Movements .............................................................................................................................. 17 5.4.1 Historical Aircraft Movements ................................................................................................. 17 5.4.2 Projected Aircraft Movements................................................................................................. 20 6.0 AIRPORT OPPORTUNITIES ..................................................................................................... 23 6.1 Situational Analysis .............................................................................................................................. 23 7.0 LAND USE AND DEVELOPMENT PLAN .................................................................................. 28 7.1 Airfield .................................................................................................................................................. 30 7.1.1 Runways, Taxiways and Aprons............................................................................................. 30 7.1.2 Navigational Aids .................................................................................................................... 31 7.1.3 Airfield Electrical ..................................................................................................................... 32 iv AirportMasterplan2016-09-06-Final.docx
AIRPORT MASTER PLAN FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 7.2 Airport Access and Parking ................................................................................................................. 32 7.3 Combined Services Building ................................................................................................................ 33 7.4 Airport Fuel Depot ................................................................................................................................ 33 7.5 North West Quadrant Development Area ............................................................................................ 33 7.6 Central Airport Development Area ....................................................................................................... 35 7.6.1 Air Terminal Building (ATB) .................................................................................................... 35 7.7 South-East Quadrant Development Area ............................................................................................ 37 7.8 Capital Plan Cost Estimates ................................................................................................................ 40 8.0 OPERATIONS AND EXPENSES ............................................................................................... 41 8.1 Historical Revenues and Expenses ..................................................................................................... 41 8.2 Staffing ................................................................................................................................................. 44 9.0 BUSINESS PLAN ...................................................................................................................... 44 9.1 Expenses ............................................................................................................................................. 45 9.2 Revenues ............................................................................................................................................. 45 9.3 Revenues and Expenses Analysis ...................................................................................................... 46 10.0 FUNDING SOURCES................................................................................................................. 50 10.1 Airport Capital Assistance Program (ACAP) ....................................................................................... 50 10.2 Island Economic Coastal Trust ............................................................................................................ 51 10.3 Building Canada Fund – Communities Component ............................................................................ 52 10.4 British Columbia Air Access Program (BCAAP) .................................................................................. 53 11.0 FUTURE AIRPORT MARKETING PLAN ................................................................................... 53 11.1 Assessment of the Airport’s Current Marketing Plan ........................................................................... 53 11.2 Targeting the Real Market ................................................................................................................... 53 11.2.1 Local Residents ...................................................................................................................... 54 11.2.2 Air Operators / Charters .......................................................................................................... 54 11.2.2.1 Scheduled Carriers ................................................................................................ 54 11.2.2.2 Private Air Operators/Charters .............................................................................. 54 11.2.3 Strategic Partners ................................................................................................................... 55 11.2.4 Local, Regional and National Businesses for Land Development Opportunities ................... 55 11.3 Strategies ............................................................................................................................................. 56 11.3.1 Product 56 11.3.2 Promotion................................................................................................................................ 56 11.3.3 Pricing 58 12.0 CLOSURE .................................................................................................................................. 58 12.1 Implementation Plan ............................................................................................................................ 58 12.2 Business Plan ...................................................................................................................................... 59 12.3 Marketing Plan ..................................................................................................................................... 59 REFERENCES .................................................................................................................................... 60 v AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION LIST OF TABLES IN TEXT Table 1-1: Building Permits Issued .................................................................................................................. 2 Table 3-1: Campbell River Airport (YBL) Airport Data ..................................................................................... 6 Table 3-2: Fuel Sales Margins ......................................................................................................................... 9 Table 3-3: Weather History 1981-2010 .......................................................................................................... 10 Table 4-1: Results of SWOT Analysis ............................................................................................................ 12 Table 5-1: Competitor Comparison ................................................................................................................ 15 Table 5-2: Forecast Passenger Volumes ....................................................................................................... 17 Table 6-1: 2014 Commercial Opportunities Scan ......................................................................................... 23 Table 7-1: Project Phasing ............................................................................................................................ 28 Table 7-2: Airfield Capital Costs .................................................................................................................... 31 Table 7-3: ATB Parking Lot and Airside Drive Costs .................................................................................... 32 Table 7-4: CSB Costs ................................................................................................................................... 33 Table 7-5: Fuel Depot Capital Costs ............................................................................................................. 33 Table 7-6: Northwest Quadrant Development Costs .................................................................................... 35 Table 7-7: IATA – ACI Level of Service (LOS) Definitions* .......................................................................... 35 Table 7-8: ATB Capital Costs........................................................................................................................ 37 Table 7-9: Central Aviation Development Costs ........................................................................................... 37 Table 7-10: Capital Cost Estimates................................................................................................................ 40 Table 9-1: Comparison of Airport Charges .................................................................................................... 46 Table 9-2: Historic Operating Expenses and Revenues ($ millions) ............................................................. 46 Table 9-3: Projected Expenses ...................................................................................................................... 47 Table 9-4: Projected Revenues (Low) ........................................................................................................... 48 Table 9-5: Projected Revenues (Medium) ..................................................................................................... 48 Table 9-6: Projected Revenues (High) ........................................................................................................... 48 Table 9-7: Profit/Loss Evaluation 2013 to 2020 (000s dollars) ...................................................................... 49 LIST OF FIGURES IN TEXT Figure 2-1 Airport Management Structure ....................................................................................................... 5 Figure 5-1: Historical Passenger Volumes ..................................................................................................... 16 Figure 5-2: Aircraft Movement Analysis ......................................................................................................... 19 Figure 5-3: Aircraft Trend by Power Plant ...................................................................................................... 19 Figure 5-4: Aircraft Operator Movements ...................................................................................................... 20 Figure 5-5: Monthly Aircraft Movements ........................................................................................................ 20 Figure 5-6: Aircraft Movement Forecasts ....................................................................................................... 22 Figure 7-1 Site Plan ....................................................................................................................................... 29 Figure 7-2: Northwest Development Area Concept A .................................................................................... 34 Figure 7-3: Northwest Development Area Concept B .................................................................................... 36 Figure 7-4: Central Development Area .......................................................................................................... 38 Figure 7-5: Southeast Development Area ...................................................................................................... 39 Figure 7-6: Projected Capital Investment ....................................................................................................... 41 Figure 8-1: Campbell River Airport Historical Expenses ................................................................................ 42 Figure 8-2: Campbell River Airport Historical Revenues ............................................................................... 42 vi AirportMasterplan2016-09-06-Final.docx
AIRPORT MASTER PLAN FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION Figure 8-3: Expense Category Percentages 2013 ......................................................................................... 43 Figure 8-4: Revenue Category Percentages 2013 ........................................................................................ 43 Figure 9-1: Expense and Revenue Forecasts ............................................................................................... 49 APPENDIX SECTIONS APPENDICES Appendix A Excerpts from Campbell River Five Year Marketing Plan (2006) Appendix B Glossary of Terms Appendix C Fees and Charges Comparison vii AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION LIMITATIONS OF REPORT This report and its contents are intended for the sole use of the City of Campbell River and their agents. Tetra Tech EBA Inc. (operating as Tetra Tech) does not accept any responsibility for the accuracy of any of the data, the analysis, or the recommendations contained or referenced in the report when the report is used or relied upon by any Party other than the City of Campbell River, or for any Project other than the proposed development at the subject site. Any such unauthorized use of this report is at the sole risk of the user. viii AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 1.0 INTRODUCTION 1.1 Situational Analysis The City of Campbell River (Salmon Capital of the World) is located on the east coast of Vancouver Island at the south end of the Inside Passage shipping route. The City is home to about 36,000 residents and the Campbell River Airport (YBL) provides a critical transportation link to the outside world. The main runway has recently been extended, the air terminal has been renovated and a new Field Electrical Centre (FEC) has been built, making the airport well poised for future development. For this reason, the City through the Airport Authority Commission has determined the need for an updated Master Plan to guide the airport’s development over the next twenty years. In 2008, the City of Campbell River concluded an agreement with Transport Canada to remove the “Option to Purchase” provision from the transfer agreement. The removal of this provision enabled the airport to guarantee the tenure of ground leases at the airport. The airport is critical to the City’s economic objectives. When corporations are considering potential locations for their businesses and have considered a likely geographical area (e.g. North Vancouver Island), their next step is to determine where best to locate that business. To attract and maintain their employee base businesses must therefore evaluate lifestyle factors; location, size of the community, housing costs, the environment, shopping convenience, the availability of schools, recreational facilities and transportation systems. The airport must identify strategies to differentiate itself from nearby competitor airports. To achieve this objective, the airport must consider opportunities that will increase and diversify its revenues. Increases in revenues from traditional scheduled passenger services may be limited and the opportunity to generate revenue from alternate sources is therefore essential. A large tract of land owned by TimberWest, a large timber and land management company, is located immediately east of Airside Drive, and is currently being marketed for development. These lands, which are approximately 162 hectares, are bound by the Inland Island Highway, Jubilee Parkway, Airside Drive and forested areas to the south. A number of parcels within the TimberWest lands have been sold and are now owned by private landowners. Sealand Aviation, one of the airport’s largest businesses owns and operates from one of the parcels. Airside access to the Sealand property is via Taxiway D. Aviation related development on these lands may complement the City’s plans to develop and lease new lands at the airport. Developers in this area are responsible for their own operations and maintenance costs. Agreements are in effect that will require land owners to rehabilitate Airside Drive as part of the initial agreements between the City and TimberWest. 1 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION The City does not have a large inventory of light to medium industrial land and therefore it is likely development will occur at both the airport and the TimberWest lands. This plan is intended to provide a realistic evaluation of opportunities and an assessment of the capital investment triggers required to maximize expenditures in the future and provide an examination of potential new marketing strategies for the airport. 1.2 Regional Profile The Campbell River Airport is the gateway to economic activity in the region and the City of Campbell River is located in close proximity to major natural resources. In 2007, the City commissioned an economic impact assessment that showed the airport contributed as much as $49M dollars to the local economy. The study showed that for every job created at the airport there were an additional 2.25 jobs created in the region and to some extent province based on direct, indirect and induced economic factors. Using historical provincial Gross Domestic Product (GDP) indicators (2008 to 2013), it is expected the airport’s overall economic impact may now be as much as $53M dollars. This is despite the negative economic impacts of 2008. A recent report1 suggests economic activity within the region is positive. Table 1-1 shows the number of building permits increased in 2010 despite the global economic impacts of 2008. In 2011, there was then a relatively significant decline in permits issued; however, the issuance of building permits has been relatively steady since 2011 indicating a relatively stable economic climate. Table 1-1: Building Permits Issued Year Number of Permits Issued 2009 298 2010 335 2011 257 2012 260 2013 262 2014 234* *to August 2014 The Campbell River Economic Development Corporation Community Profile report identifies major developments that are providing further economic benefits to the region: BC Hydro Campbell River Field Operations Facility – the facility is a $23M office building (28,000 sq. ft.) project, completed in 2014, that included approximately 60 jobs throughout the project construction. North Island Hospitals – the Campbell River Hospital received funding for $266M for the development of a 95 bed health care facility. The Comox Hospital received $301M. Between these two projects, it is estimated that as many as 330 jobs (direct and indirect) would be created during the construction phases. John Hart Generating Station – modernization of the existing station is expected to cost approximately $1B. This project will include a 2.1 km tunnel, a water bypass facility and a new generating station. Completion is expected in 2018 and the construction will provide jobs for approximately 360 workers. BC Forestry Tanker Base is expanding at the airport and will generate further economic benefits to the community as workers move to the area and through increased employment. 1 City of Campbell River, Community Profile, Campbell River Economic Development Corporation. 2014 (DRAFT) 2 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION BC Hydro Dam Seismic Upgrades 2019 – 2023 valued at approximately $400M Private development in the Downtown core valued at approximately $80M Overall, employment in the region is relatively diversified. The top ten industries by employment include: 1. Retail 2. Accommodation and Food Services 3. Manufacturing 4. Health Care and Social Assistance 5. Agriculture, Forestry, Fishing, Hunting 6. Construction 7. Educational Services 8. Transportation and Warehousing 9. Public Administration 10. Processional – Scientific and Technical Services A 2014 report2 by the British Columbia Ministry of Finance stated, “BC’s diverse economy continued its modest pace of growth in 2013, as the province’s real GDP expanded by 2.0% on the year after growing by 1.8% in 2012.” Internationally, the value of BC merchandise increased 6.3% in 2013 following a decline in 2012. Wood product exports increased by 25.5% from 2012 (primarily softwood lumber). Rejuvenation in this sector may ultimately benefit the Campbell River region. 2.0 AIRPORT AUTHORITY COMMISSION In December 2010, the City of Campbell River Council appointed members to a newly formed Commission of the City, the Campbell River Airport Authority Commission. The Commission was tasked, on behalf of City Council, to manage and operate the airport. The Commission was created under Bylaw 3444. In 2016 Council and the Airport Authority Commission held a Joint Strategy Workshop resulting in an adjustment to Council’s relationship with Airport Authority Commission to better align with Council’s vision of the Commission and the Airport operations. The Commission has the following objectives: Provide an outward vision rather than internal preoccupation; Encourage a diversity in viewpoints; Offer strategic leadership more than administrative detail; Clarity of the distinction of Commission and Airport Manager roles; 2 2014 British Columbia Financial and Economic Review, 74th Edition, April 2013 – March 2014, BC Ministry of Finance, July 2014 3 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION Encourage collective rather than individual decisions; Focus efforts on the future rather than past or present; and Proactively guide the airport. The appointed Commission members come from a variety of backgrounds including private business, other professionals, government and consulting and, as such, its members offer extensive knowledge and expertise to the airport when considering airport opportunities for the future. The Airport Authority Commission reports to Council in accordance with relevant City Bylaws. As a City department the Airport is subject to Council polices, laws, and regulations applicable to local governments and airports in British Columbia. 2.1 Airport Management Structure The Airport Manager reports functionally to the General Manager, Facilities and Supply Management who reports to the City Manager. The City Manager reports directly to City Council. The Airport Manager manages a total of seven full-time equivalent staff (one Administrative Assistant, four Airport Specialists, one Airport Specialist (electrical) and one Airport Coordinator). The Airport Manager liaises with and supports the Commission. The General Manager, Facilities and Supply Management is the City Staff appointee to the Commission. In addition, some Council representatives are appointees to the Commission and attend meetings. The master plan anticipates positive development opportunities at the airport. To achieve the proposed development objectives it will be necessary for the airport to begin an aggressive program of self-marketing and business development. Many similar sized Canadian airports have dedicated staff tasked with business development and marketing responsibilities. It is therefore important that the City consider staffing levels and specific expertise for the airport to move development opportunities forward over the short-term and the twenty year planning horizon. 4 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION Figure 2-1 Airport Management Structure Council Representatives Airport Authority City Council Participate In Airport Authority Meetings City Manager General Manager General Manager Facilities & Supply Management Participates in Airport Authority Meetings Airport Manager Airport Coordinator (1) Administration (1) Airport Specialists (5) 5 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 3.0 EXISTING AIRPORT FACILITIES AND INFRASTRUCTURE Table 3-1 identifies the Campbell River Airport data. Table 3-1: Campbell River Airport (YBL) Airport Data REF N49 57 07 W125 16 23 4.5S 20°E, UTC-8 (7) Elev 357´ A5004 LO2, H13 CAP OPR District of Campbell River 250-923-5012 Certified, Landing Fees PF 1,2,3,6, ATB ltd hrs C-2,4,5 FLT PLN NOTAM FILE CYBL FIC Kamloops 866-WXBRIEF (Toll free within Canada) or 866-541-4101 (Toll free within Canada & USA) WX METAR 14-05Z TAF 16-05Z issue times 16, 19, 01Z (DT 15, 19 01Z) SERVICES FUEL 100LL, JA-1 (also by truck) 15-04Z O/T call out charge 2 hrs PN. OILS All 2,4 (ltd) RWY DATA Rwy 12 (115°)/30(295°) 6499x150 asphalt, Rwy 12 down 0.88% Rwy 12 RV 1200 (1/4 sm) day only/Rwy 30 RVR 1200 (1/4 sm) day only. Taxi C pavement width 34’, max weight 44,000 lbs. Taxi D is unlit HELI DATA Pad 1 - 23’ diameter concrete maximum aircraft length 58’ Pad 2 – 45’ diameter asphalt LIGHTING 12-AN-(TE HI) P2, 30,30-AO (TE HI) P2 30 Available 1330 – 0530Z O/T ARCAL-122.0 type K COMM RADIO Campbell rdo 122.0 (V) 1330-0530Z‡ (emerg only 250-923-3942) RCO Pacific rdo 123.55 (FISE) 126.7 (bcst) ATIS 128.55 14-05Z‡ MF Campbell rdo 1330-0530Z‡ O/T tfc 122.0 5NM 3300 ASL excluding the area below 700´ depicted on the Campbell River VTPC (CAR 602.98) TML Comox 123.7 227.6 NDB NDB YBL 203 (L) N50 00 23 W125 21 27 DME IBL 109.1 Ch 28 N49 57 19 W125 16 49 (376´) ILS IBL 109.1 (Rwy 12-30) RVR 3.1 Runways Runway 12-30 is 6,505 ft. in length and 150 ft. wide. There are no major upgrades or modifications anticipated within the plan timeframe. The runway is grooved and is in good condition. 3.1.1 Runway End Safety Area (RESA) In the long term, the effect of potential impacts of the new draft TP312 5th Edition Aerodrome Standards document and the implications of anticipated Runway End Safety Area (RESA) regulatory requirements will need to be taken into consideration. It is anticipated that the current RESAs at the runway ends will meet the requirements of the new regulation. Minor grading and diversion of drainage ditches may be required but it is unlikely that major works will be required. 6 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 3.2 Taxiways Taxiway A is the primary taxiway between the main Apron (Apron I) and the runway. Taxiway B parallels the runway and ends at the old 5,000 ft. runway threshold (prior to the recent runway extension). Taxiway C parallels the runway and connects to the Runway 30 threshold. Taxiway D provides access to airport businesses located on private lands east of the main tenant hangar line. 3.3 Airfield Electrical Recently the airport completed improvements to the airfield lighting and electrical systems. The projects ensure the airfield lighting system meets current regulatory requirements while providing expanded operating limits under low visibility conditions. Upgrades included apron, taxiway lighting, and runway edge lighting circuits. Airfield lighting components were replaced with new airfield electrical regulators and a lighting control system, as well as new runway guard lights. A new FEC was commissioned in 2014. 3.4 Aprons Apron I provides four operational stands for scheduled aircraft. The fuelling area on the north end of the apron provides service for fixed wing and rotary wing aircraft. A helipad for rotary wing aircraft is located south of the apron along the apron edge. Apron II is used primarily for itinerant aircraft. Apron crowding is a key issue at the airport and is addressed in Section 7.0. 3.5 Air Terminal Building The air terminal building (ATB) is comprised of a number of systems, each with their own processing rate capacity. The series of processors include check-in, hold baggage screening, passenger security screening, hold rooms, boarding gates and baggage retrieval. The recent airport runway extension and upgrade project (2010/11) included modernizing the airport terminal building. Based on stakeholder consultations, the ATB in its current configuration will meet the projected needs well into the medium term. The airport might consider modifications to the ATB if a successful charter service resulted in larger aircraft using the airport (e.g., B737); however, even if this was to occur, the level of service (LOS) may only be slightly impacted for a short period on a particular day. 7 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 3.5.1 Airport Security Campbell River Airport is a designated airport under the Canadian Air Transport Security Act. As such, passenger screening services are provided at the main terminal by the Canadian Air Transport Security Authority (CATSA). 3.5.2 Canada Border Services Agency (CBSA) Until October 2014, the Campbell River Airport was a designated Canada Border Services Agency (CBSA) service at the airport. The airport received a letter dated October 9, 2014 which stated, “In an effort to ensure the most efficient use of resources, while continuing to provide service excellence, the CBSA Vice-President of the Operations Branch has determined that the CBSA Campbell River office will be de-designated and the CBSA resources will be relocated to the CBSA office located at the Comox Valley Airport. CBSA service for the Campbell River Airport will continue to be provided by the CBSA Comox Valley Airport office. This change will be effective as of November 1, 2014.” Approximately 3.7% (680 aircraft) trans-border/international flights arrive at Campbell River Airport annually. The vast majority of commercial and private pilots (estimated 98%) are enrolled in either the CBSA Commercial or Private Aircraft CANPASS program. This program provides participants with the following privileges: Aircraft can land at any Airport Of Entry (AOE) in Canada. Aircraft can land at an AOE any time the airport is open for landing, regardless of the hours of business of the local CBSA office. Aircraft can land at a CANPASS-only airport, which may be nearer to your destination. Aircraft receive expedited clearance. Aircraft can proceed to the final destination if there is no CBSA officer waiting for the aircraft by the reported time of arrival, without the pilot having to make a second call to the CBSA after landing. As part of this program, CBSA will on occasion randomly select a particular aircraft for inspection. CBSA maintains an office at the airport for this purpose. During the master plan consultations, it was noted that CBSA has only conducted random inspections for about 2% of trans-border and international aircraft landings. At this time CBSA has not recovered costs associated with these inspections; however, with the move of their “store-front” office from Campbell River to Comox there may be some inclination to recover costs whenever the CBSA decides to conduct an inspection. The airport will have to determine how the removal of CBSA services will impact overall costs. 3.6 Combined Service Building (CSB) The lower section of the combined service building (CSB) located at the south end of the building is approximately 3,950 sq. ft. in size. This part of the CSB is used to maintain and store equipment (e.g., tandem trucks, light vehicles, snow plows, etc.). The building was likely constructed in the 1960s or 1970s and as such may require major rehabilitation during the master plan timeline, depending on the outcome of the City’s Facility Master Plan review. 8 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION The newer, upper north part of the CSB houses emergency vehicles. The north section of the CSB will not require major rehabilitation during the plan timeframe. 3.7 Services (Water and Sewer) Water and sewer services are available at the airport. Both water and sewer are provided to the BC Forestry Service to the south. Water and sewer services end at Taxiway E near the old threshold, end of Taxiway B to the northwest. Sewer, water, and utility lines would be extended to the north with the construction of the Northwest Development area. 3.8 Aircraft Services 3.8.1 Aircraft Fuel Both Jet A and Avgas are available at the airport through an Esso owned concession located on the northwest side of Apron 1. The facility is operated by airport staff. Jet-A fuel is delivered to the aircraft via a fuel truck and the Avgas is dispensed at the cabinet on the apron. The airport is currently tendering the procurement of two refuelling trucks and fuel storage for Jet A only. The objective is for the airport to operate the fuel concession for Jet A only while the sale and provision of Av gas may be devolved to private enterprise. As the sole provider of Jet A fuel the airport may be able to negotiate better market based pricing based on larger volumes purchased. As an example, the airport currently dispenses approximately 500,000 L of fuel annually. Helifor purchases an additional 250,000 L of fuel for its operations. In 2013, the airport generated approximately $774,000 in revenue from fuel sales. Esso determines the wholesale price for the fuel. The airport then considers costs associated with managing and operating the fuel depot to determine a final retail cost for users. Table 3- 2 shows the operating expenses and revenues for the period 2010 to 2013. Table 3-2: Fuel Sales Margins Description 2010 2011 2012 2013 Total Fuel-related expenses $423,468 $557,877 $666,354 $744,634 Total Fuel Revenue $510,138 $605,244 $741,738 $773,770 Surplus (Deficit) $86,670 $47,367 $75,384 $29,136 9 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION 3.8.2 Aircraft De-icing At present, aircraft de-icing activities occur immediately in front of the airport administration building. The airport uses approximately 10,000 L de-icing fluids annually. Water contaminated with glycol flows to a storage basin located adjacent to the apron. It is then pumped out and the fluids are removed for approved disposal. Campbell River’s climate is such that de-icing is not a regular activity and weather is normally wet during the months November to March with snowfalls minor as compared to rainfall (reference Table 3-3). When de-icing activities do occur, the glycol-contaminated water has usually dissipated before reaching the storage tanks. Table 3-3: Weather History 1981-2010 Description Nov Dec Jan Feb Mar Days with Precipitation 21.6 21.2 20.8 16.4 19.7 Rainfall (cm) 222.1 204.2 194.6 135.5 128.4 Days with Snowfall 1.8 4.1 4.3 3 2.7 Snowfall (cm) 11 23 23 14 12 Average High (deg. C) 4.4 2.1 2.4 3.2 5.2 Average Low (deg. C) 1.0 -0.8 -0.8 -0.7 0.7 3.8.3 Access Roads The airport is within City limits and is located approximately 12 km south of the City of Campbell River downtown core and 1 km west of the Inland Island Highway on the Jubilee Parkway. Airside Drive generally follows the airport northeast boundary. The tenant hangar line is located along Airside Drive. Private airport lands located east of Airside Drive use Airside Drive as a main access roadway. There are currently five blocks of land in the TimberWest development areas available for private investors. Sealand Aviation occupies one of these parcels. Agreements are in place to rehabilitate Airside Drive south of Jubilee Parkway. Airside Drive north of Jubilee Parkway will be rehabilitated in conjunction with the north development area expansion. 3.8.4 Air Terminal Building Parking Figure 7-4 shows the overall available vehicle parking at the main terminal area. The main parking lot accommodates approximately 192 vehicles. A parking area on the east side of the terminal is allocated for terminal tenants and accommodates 31 vehicles. A third parking area located next to the Administration Building holds 12 vehicles. The City will be conducting a Vehicle Parking Study in 2016. In general, determining the optimum number of parking spaces at an airport is difficult. As an example, at large international airports studies3 have shown an average of 558 vehicle parking spaces per 1,000,000 passengers. This ratio does not correlate to smaller airports. A number of factors must be considered: Smaller airports generally provide more parking because proportionally there may be a larger number of long- term parking patrons. 3 Airport Service Quality Best Practice Report, Airports Council International/DKMA, 2009 10 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION There is generally land available to expand parking areas. There is often poor public transportation available. The distance to the city centre is generally greater. The cost of parking is generally lower. As an illustration of the variability, North Bay Jack Garland Airport handles approximately 70,000 passengers annually and their main parking lot can accommodate 165 vehicles which appears adequate for their medium term needs. Nanaimo Airport has approximately the same area for vehicle parking as Campbell River and accommodates more than twice as many passengers. 4.0 STAKEHOLDER CONSULTATIONS In September 2014, Tetra Tech EBA Inc. conducted a series of consultations held at the airport so that key stakeholder input could be incorporated into this plan. Stakeholders included the Commission, City of Campbell River staff, Campbell River Economic Development Corporation, Campbell River Chamber of Commerce, NAV CANADA and key tenants (Sealand and Helifor). Based on the consultations, a strength, weakness, opportunity and threats (SWOT) analysis was developed. In addition, stakeholders reviewed an opportunities scan comprising of 45 potential development opportunities where participants were able to rate the likelihood of success for a particular opportunity. Discussion on the high and medium rated opportunities is included in Section 6-1. Airport Authority Commission Commission Members City Council Liaison(s) City Staff Liaison(s) Airport Tenants Helifor Industries Ltd. Sealand Aviation Ltd. Nav Canada Economic Development Organizations Campbell River Economic Development Corp. Campbell River Chamber of Commerce 4.1 Strength, Weakness, Opportunities and Threats Analysis (SWOT) The SWOT workshops allowed airport stakeholders a means of logically assessing how the airport fits into the overall air transportation network and focused participants on a structured analysis of likely opportunities for the airport. With significant competition within a 3-hour drive from Campbell River, it is essential that the airport focus on its strengths, work on strategies to minimize weaknesses, incorporate policies and plan to maximize development opportunities and influence how potential threats can be mitigated. Table 4-1 shows the results of the SWOT analysis. This analysis is fundamental when determining realistic development opportunities at the airport. 11 AirportMasterplan2016-09-06-Final.docx
FILE: 704-C31103369-01 | SEPTEMBER 6, 2016 | FOR DISTRIBUTION Table 4-1: Results of SWOT Analysis Strengths Weaknesses Airport is well run and the Airport Manager has an Staffing levels form part of the financial plan as approved by excellent rapport with staff, tenants and the City Council. Commission. Required financial reporting complies with Municipal Available lands – the airport has abundant lands that requirements. can be developed for both aviation related and non- Much of the Airport Manager’s job is tied to airport aviation related uses. operations leading to a limited focus on marketing and Runway length – at 6,505 ft. in length, the runway business development. can accommodate most aircraft. Esso establishes the cost of AvGas and Jet A fuel. The City Regional resources – abundant resources: mining, may be able to negotiate better rates with a City-owned fisheries, tourism. system. Geographical location – reduces fog issues than can Relatively small catchment area (+/- 50,000). be a constraint at other island airports. The airport has not achieved wide community recognition. Existing scheduled service to Vancouver. The ATB hold room may be limited if larger aircraft (e.g., Connections to North Island locations. B737) were used to transport passengers. Float Plane connections. Jubilee Parkway is part the City’s road network and falls Corporate jet apron/parking area. under Council’s snow management policy, however subject Proximity to Island Highway and City. to availability Airport staff removes snow from the Parkway. City of Campbell River financing rates. There is a relatively small aviation community in Campbell Business oriented, friendly atmosphere. River. ATB meets medium term needs. CBSA decision to relocate service to Comox Airport. Campbell River is a shopping destination for North Potential costs associated with Perfluorooctanesulfonic acid Island/First Nation residents. (PFOS) cleanup. Both Jet A and Av Gas fuel available. Main apron can be constrained in summer. The new airport Relatively flat topography is favourable to tug and relocated fuel system will improve this situation. development. NAV CANADA maintains a Flight Service Station at airport. Relatively well-off retirement demographic. 12 AirportMasterplan2016-09-06-Final.docx