Annual Service Delivery Plan 2021 - Kildare County Council

Page created by Philip Hernandez
 
CONTINUE READING
Annual Service Delivery Plan 2021 - Kildare County Council
Annual Service Delivery
      Plan 2021

Kildare County Council
Annual Service Delivery Plan 2021 - Kildare County Council
ANNUAL SERVICE DELIVERY PLAN 2021

Contents

Introduction ......................................................................................................................................... 2

Department/Service Area: Transportation and Public Safety ................................................ 4

Department/Service Area: Health & Safety ................................................................................. 9

Department/Service Area: Building & Development Control ............................................... 10

Department/Service Area: Fire Service ...................................................................................... 12

Department/Service Area: Housing............................................................................................. 15

Department/Service Area: Corporate Services ........................................................................ 22

Department/Service Area: Human Resources.......................................................................... 29

Department/Service Area: Finance.............................................................................................. 32

Department/Service Area: Information Systems ..................................................................... 33

Department/Service Area: Library and Arts Service............................................................... 37

Department/Service Area: Economic Development ............................................................... 43

Department/Service Area: Environmental & Water Services ............................................... 49

Department/Service Area: Climate Action Regional Office ( CARO ) .............................. 53

Department/Service Area: Planning and Strategic Development ....................................... 55

Department/Service Area: Community Services ..................................................................... 59

                                                                                                                                       1|Page
ANNUAL SERVICE DELIVERY PLAN 2021

Introduction
Section 50 of the Local Government Reform Act, 2014 requires the local authority to prepare
a document called an Annual Service Delivery Plan. The purpose of the plan is to set out the
objectives for service delivery and performance standards to be achieved in 2021. It takes
account of and is consistent with Budget 2021 which was adopted by the members on 23
November 2020.

In preparing the document, Kildare County Council takes account of all plans, statements
and strategies that set out policies and objectives for all of its functional programmes having
full regard to its Corporate Plan in which the council’s vision is:

       “Kildare – Living; growing; leading.

        Working together towards an inclusive and sustainable County”.

A wide range of other local, regional and national plans, statements and strategies inform
and guide the council’s work, and the provisions of these plans have been considered,
reference has been made to the following documents in preparing the 2021 Annual Service
Delivery Plan:

   •   Legislative requirement of the Local Government Reform Act 2014 and other relevant
       legislation/regulation
   •   National Government Policy
   •   Kildare County Council Corporate Plan 2019-2024
   •   Kildare County Development Plan 2017-2023
   •   Local Economic and Community Plan 2016 – 2021
   •   Kildare 2025 Economic Development Strategy
   •   Service Level Agreement with Irish Water

The sections in this plan set out the high-level objectives of each service area for 2021
together with the desired performance standard. They have been compiled having regard to
the Strategic Objectives agreed in Kildare County Council’s Corporate Plan 2019-2024 and
the funding allocated to the services divisions in 2021 detailed as follows:

 Service Division                                Revenue Expenditure Approved Y2021
 Housing and Building                                         49,371,437
 Road Transport & Safety                                      34,259,161
 Water Services                                               10,407,696
 Development Management                                       19,339,949
 Environmental Services                                       20,802,812
 Recreation and Amenity                                       11,197,268
 Agriculture, Education, Health & Welfare                      1,211,937
 Miscellaneous Services                                       17,583,299
 Total Budget                                                164,173,558

                                                                                     2|Page
ANNUAL SERVICE DELIVERY PLAN 2021

The following staff resources were in place at 31 December 2020:

                                               Managerial                        7
                                    Clerical/Administrative                    484
                                    Professional/Technical                     226
                                                  Outdoor                      356
                                               Firefighters                     62
                                                Total Staff                   1135

Director of Service structure, including Municipal District responsibility:

                                                                              3|Page
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Transportation and Public Safety

The Roads, Transportation and Public Safety Directorate continues to streamline and
rationalise services, improving regulatory compliance and customer service in all areas. With
responsibility for over 2,500 kilometres of roadway in County Kildare, the Directorate delivers
an annual road improvement and restorative maintenance programme. Major capital
infrastructure projects are managed and delivered with annual funding provided by
Government Departments and related agencies, and direct funding from Kildare County
Council.

The combined technical and administrative workforce ensures the safety of vehicles and
vulnerable road users aided by an extensive traffic management system and a network of
pedestrian crossings supported by 25 school wardens. Parking in the main towns in the
county is regulated by local Bye Laws, with APCOA (private contractor) and Council traffic
and community wardens providing enforcement.

Fire Services are provided from six strategically located retained Fire Stations across the
county. The Engineer, Educate, Enforce paradigm is used in the Fire Safety section to
enhance the fire safety in the built environment including the Emergency Management and
Special Projects section which co-ordinates emergency management preparation across the
council.

The Road Safety, Cycling and Sustainable Transport role will continue to deliver road safety
measures and activities in 2021. This will include supporting Mobility Management initiatives
and other initiatives which support greater use of walking, cycling and public transport
including Bike Week, European Mobility Week and other related promotions.

The Department also plays a key role in the area of access and disability. We have
appointed an Access Officer who is responsible for providing and/or arranging for, and co-
ordinating assistance and guidance to persons with disabilities accessing our services. The
role provides assistance to departments in meeting their requirements under the Disability
Act 2005, and therefore making Kildare County Council and its services ‘accessible for all”.

Some of the key objectives for 2021include:

   •   Quarterly County Kildare Access Network (CKAN) Meetings. CKAN is comprised of
       representatives from all the local access groups across the county and is tasked with
       developing yearly objectives for each of the local access groups, as well as a way of
       sharing information and best practice between the groups.
   •   Monthly Local Access meetings
   •   Awareness campaigns

Kildare is to the forefront of the delivery of housing developments. Our Building and
Development Control section monitors the quality of these developments via a schedule of
targeted inspections.

                                                                                    4|Page
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                                        Performance
 Corporate Plan         5-year Objective                                                   Indicator
                                                                   Performance
  Supporting           (As per Corporate       2021 Objective                           (2020 unless
                                                                    Standard
    Strategy                 Plan)                                                        otherwise
                                                                                            stated)
                       Deliver the Annual      To implement      No. of routes          10 Winter
                       Winter Maintenance      the Severe        serviced               Salting
                       Programme               Weather Plan                             Routes (total
  1.2 Collaborate                              as required.                             678km)
 with agencies to                                                No. of Winter          80
  strengthen our                                                 Salting Events
 ability to sustain                                              No. of weather-         1 weather
  responsive and                                                 related alerts via     event alert to
      effective        To implement the                          MapAlerter             average of
  operations and       Severe Weather                                                   1,300
services to reduce     Plan as required                                                 subscribers
   the impacts of                              To respond to                            per alert
 extreme weather                               Major             Ensure effective       1 MEMC
  conditions and                               Emergencies as    planning and           meeting per
  climate related      Appropriate and         required.         coordination to        year and one
   emergencies.        timely response to                        deliver an efficient   Inter-agency
                       Major Emergencies                         response when          meeting per
                                                                 emergencies            year
                                                                 arise
                       Implement the                             % of public street     Measurement
   1.3 Ensure over     National Public                           lighting               commencing
 the lifetime of the   Lighting Upgrade                          infrastructure that    when project
   Corporate Plan      Project to improve                        is low energy          commences in
that climate action    energy efficiency                         (baseline stock        County
  is mainstreamed      and the safety of the                     c28,000 public         Kildare.
 into the Council's    County road network                       lights Sept 2019)      Regional
policies, buildings,                                                                    project, led by
 infrastructure and                                                                     Kilkenny
     operations to                                                                      County
    reduce energy                                                                       Council
       demand

5 Continue to plan,                            To deliver the
     deliver and                               Kildare County
    maintain key                               Council Capital
  infrastructure in                            Programme in
  our County that                              accordance
 sustains mobility                             with resources
  and access and                               available,
                                                                 Progression of         Resource
positions Kildare to   Deliver major capital   statutory
                                                                 projects on the 3      based delivery
       achieve         infrastructure          processes and
                                                                 Year Capital           of project
sustainable growth     projects                funding
                                                                 Programme              milestones

                       Deliver a Multi         To deliver        Current ratings        2,520
5.1 Optimise           Annual Road             annual road       provided in the        Kilometres of
connectivity and       Improvement and         improvement       Pavement               road (2020)

                                                                                             5|Page
ANNUAL SERVICE DELIVERY PLAN 2021

ease of access        Restoration             and restoration     Surface Condition
within and through    Programme for the       works in            Index (PSCI) at      2502km local
the County through    regional and local      accordance          www.noac.ie          and regional &
planning,             road network, in        with DTTaS                               18km of
development,          accordance with         funding                                  National
maintenance,          DTTaS funding           allocation.                              Secondary
upgrade and           allocation.                                                      (2020)
management of a
safe road network.    Continue to update      To review and
                      the Map Road            update
                      database to             MapRoad on an
                      maximize the annual     annual basis to
                                                                  Annual
                      allocation of funding   maximise
                                                                  Roadworks            €51.8M
                      Continue to identify    funding and
                                                                  Programme
                      Safety Improvement      secure annual
                      Schemes to reduce       funding for
                      the incidents of road   Safety
                      traffic collisions      Improvement
                                              Schemes
                      Survey all bridges      To deliver an       Annual % of          Reporting to
                      on local roads and      annual              surveys of bridges   commence in
                      establish a Risk        programme of        by Kildare County    2021
                      Register based on       bridge repairs in   Council on
                      vulnerability to        accordance          national database
                      failure                 with DTTaS          (Baseline no. of
                                              funding             bridges 2,000)
                                              allocation
                      Support the Kildare     To deliver TII      Annual spend on      14km of
                      National Road Office    annual              National Road        national road
                      to deliver              programme of        Network              upgrades
                      improvements and        road                                     delivered in
                      upgrades to the         improvements                             2020 in
                      National Road           and upgrades                             Kildare
    5.1 Optimise      Network
  connectivity and    Operate an effective    To issue road       No. of road          1,177
   ease of access     road licensing          opening             opening licenses
 within and through   system and              licences as         processed
the County through    management of road      required
      planning,       openings in a
    development,      coordinated way
    maintenance,
    upgrade and
 management of a
safe road network.                                                Cumulative no. of    88
                      Deliver local traffic   To provide new      signalised
                      management              pedestrian          junctions
                      projects to support     crossings           Pedestrian           110
                      mobility and ease                           crossings
                      congestion              To provide          Traffic cameras      110
                                              traffic cameras
                      Ensure the              To provide and      School flashing      56
                      continued safety of     maintain            display signs
                      vulnerable road         appropriate
                      users                   measures to         Electronic speed     40
                                              protect             display sites
                                              vulnerable road
                                              users

                                                                                             6|Page
ANNUAL SERVICE DELIVERY PLAN 2021

Promote Road           To publish a                          Completion of
Safety with the Road   five-year                             a 5-year plan
Safety Authority, An   Kildare Road
Garda Síochána and     Safety Plan
other key              (2021)             Road Safety        4 RSTWG
stakeholders in                           Working Together   Meetings per
promoting and          Deliver road       Group (RSWTG)      year.
improving road         safety
safety in the County   education in all
                       Primary, Post-
                       Primary and
                       Third level
                       schools

                       Promote road
                       safety
                       awareness in
                       the community
                       and on local
                       and social
                       media platforms

                       Coordinate
                       Road Safety
                       Week in Kildare

                       Promote the
                       School Warden
                       Crossing
                       Service for 25
                       School
                       Wardens
                       including
                       training and
                       standard
                       operational
                       guidelines

                       To publish the     Published Bye      Publication of
                       County Speed       Laws as approved   County Speed
                       Limit Bye Laws     by Elected         Limit Bye
                                          Members            Laws

                                                                 7|Page
ANNUAL SERVICE DELIVERY PLAN 2021

                        Promote and             To continue        No. of cycleway
 5.2 Promote and        support the             delivery of the    Schemes
 support the use,       development and         Greater Dublin     progress through
development and         maintenance of          Area Cycling       or to the end of     2021 plan
 maintenance of         walking/cycling/publi   Network &          current phase in     outlined to
                                                                                        elected
    sustainable         c transport routes      Transport          line with plan
                                                                                        member in
      transport         within the County in    Strategy in
                                                                                        November
    alternatives        conjunction with        Kildare in
                                                                                        2020
including walking,      other agencies.         accordance
cycling and public                              with NTA
    transport in                                annual funding     Cumulative no. of
                                                                                        30
collaboration with                              allocations        new or replaced
                                                                                        new/upgrade
   key transport                                                   bicycle
                                                                                        Bike
stakeholders and                                Optimise           parking/stand
                                                                                        parking/standi
      agencies          To ensure our           sustainable        provided
                        services, projects      alternatives to                         ng (2020)
                        and programmes          the use of
                        promote the Climate     motorized
                        Action Plan for         vehicles –         No. of new &
                                                                                        37
                        County Kildare.         walking,           existing rural bus
                                                cycling,           routes - LocalLink
                                                LocalLink and      Routes
                                                public transport

                                                                   No. of bus shelter
                                                                                        10 Shelters
                                                                   (new or
                                                                   replacement) and
                                                                   related
                                                Supporting         infrastructure
                                                BusConnects        provided

                                                                   Provision of Real
                                                                   Time Passenger       10 RTPI
                                                                   Information
                                                                   (RTPI)
                        Manage parking to
                        optimize parking
                        spaces and support
                        businesses and
   5.3 Continue to      users
        provide         Provide user friendly
 infrastructure and     options to pay for
 facilities including   parking (discs and
      car parking       Park by Phone) as
    solutions, that     well as the             To implement
                                                                   No. of towns and
        support         management of on-       Pay Parking
                                                                   villages with pay    10
     accessibility,     street parking          Bye Laws
                                                                   parking
commuters and the
  economic life of      Continue to
   our towns and        administer and
       villages.        enforce pay parking
                        and associated Bye
                        Laws Manage
                        Enforcement System
                        Manage
                        Enforcement System

                                                                                             8|Page
ANNUAL SERVICE DELIVERY PLAN 2021

   5.4 Support the      Support the              To support the    No. of road          230
  development of a      installation of          development of    opening licences
   Digital Strategy     services and rollout     a digital         for
 that enhances our      of broadband             strategy          telecommunicatio
County's economy        services by relevant                       ns companies
by enabling rollout     providers
 of broadband and
telecommunication
 s infrastructure by
 relevant providers

Department/Service Area: Health & Safety

                                                                                        Performance
 Corporate Plan         5-year Objective                                               Indicator (2020
                                                                    Performance
  Supporting           (As per Corporate        2021 Objective                             unless
                                                                     Standard
    Strategy                 Plan)                                                        otherwise
                                                                                           stated)

  6.1 Provide a
                       Drive health and        Continue to
  best practice                                                    Annual target of
                       safety best practice    review and
health and safety                                                  48 safety
                       through staff           improve the
 culture through                                                   inspections to be
                       consultation,           organisation's                          84
staff training and                                                 completed by
                       communication and       Health and Safety
    proactive                                                      Health and
                       proactive               Management
 monitoring and                                                    Safety Section
                       monitoring              System
    reporting

                                                                                              9|Page
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Building & Development Control
                      5-year
 Corporate                                                                           Performance
                    objective
    Plan                                                      Performance           Indicator (2020
                     (As per        2021 Objective
 Supporting                                                    Standard            unless otherwise
                    Corporate
  Strategy                                                                              stated)
                      Plan)
                                                          Total no. of new
                                                          buildings notified to
                                                                                   1816
                                                          Building Control
                                                          Authority
                                                          No. of new buildings
                                                          notified that were
                                                                                   305
                                                          subject to at least
                                                          one inspection
                                                          P1 No. of buildings
                                                          inspected as a
                                                          percentage of new
                                                                                   14.45% (2019
                                                          buildings notified to
                                                                                   NOAC)
                                                          the local authority
  1.6 Ensure                                              (Minimum Target
   continued                                              15%)
      robust                      Monitor compliance
enforcement,                      with the Building       Total no. of
                                                                                   2067
   licensing,                     Regulations and         inspections
  certification                   the Building Control
       and                        Regulations             Total no.of
 regulation in                                            Commencement
environmental                                             Notices received
                   To ensure                                                       461
  protection,
                   safe and
   planning,                                              No. of Valid
                   sustainable
     building                                             Commencement
                   buildings in
  control, fire                                           Notices Received
                   urban and
  safety and                                                                       454
                   rural areas
 public health
 and safety in                                            No. of Certificates of
     order to                                             Compliance received
                                                                                   426
  support our                                             No. of valid
    citizen’s                                             Certificates of
 quality of life                                          Compliance received      425
 and the built                                            No. of Disability        124
  and natural                                             Access Applications
environment.                                              received
                                                                                   1043 BERs
                                                                                   received through
                                                                                   BCMS for buildings
                                                                                   where
                                                                                   Commencement
                                  Monitor compliance                               Notices or
                                  with the Energy         No. of BER               Certificates of
                                  Performance of          Certificates received    Completion on
                                  Buildings Directive                              Compliance were
                                                                                   received during
                                                                                   2020

                                                                                   15 Agents
                                                                                   inspected during

                                                                                           10 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                                 2020 for
                                                                                 compliance with
                                                                                 legislation in
                                                                                 respect of the
                                                                                 display of BER
                                                                                 ratings.
                                                        Ongoing review of
                                 Monitor                                         Currently no
                                                        construction products
                                 performance with                                relevant metric
                                                        and CE markings as
                                 the Construction
                                                        part of site
                                 Products Directive
                                                        inspections
                                 Active Private
                                 Housing
                                 Developments:
                                 To monitor active
                                 private housing
                                 developments so
                                 that site
                                 development works      No. of Development
                                 are constructed and    Control Inspections
                                                                                 1619
                                 completed in           of active housing
                                 accordance with        developments
                                 the conditions of
                                 the granted
                                 planning
                                 permission and in
 3.8 Facilitate
                                 accordance with
 and promote
                                 the relevant
excellence in
                                 specifications
 architectural
                                 Legacy Housing
   and urban
                  To ensure      Estates:               No. of site resolution
  design and                                                                     1
                  safe and       Estates not            plans developed
    maintain
                  sustainable    completed to the
 development
                  buildings in   satisfaction of the
  controls to
                  urban and      Planning Authority/    No. of site resolution
    support
                  rural areas    where works are        plans agreed with
  sustainable                                                                    1
                                 outstanding for        Irish Water
 and quality-
                                 various reasons
     built
environments.                                           No. of estates where
       1                                                snag lists have been
                                                        prepared and passed
                                                        to the developer         23
                                 Progress the
                                 Taking in Charge
                                 process when
                                                        No. of estates Taken
                                 requested by
                                                        in Charge                10
                                 developers or the
                                 majority of
                                 homeowners
                                 (Section 180           During 2021, to
                                 request)               update the current
                                                        Kildare County
                                                                                 Deliver by Q4 2021
                                                        Council - Taking in
                                                        Charge Policy
                                                        Document 2008

                                                                                         11 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Fire Service
                          5-year                                                      Performance
 Corporate Plan         Objective                                                       Indicator
                                         2021                Performance
  Supporting             (As per                                                      (2020 unless
                                       Objective              Standard
    Strategy            corporate                                                      otherwise
                          Plan)                                                          stated)
                                     Enforce fire
                                     safety
                                     legislation in
                                                        The no. of premises
                                     premises
                                                        inspected (in
                                     through a
                                                        accordance with the       34 inspections of
                                     programme of
                                                        schedule set out in the   32 premises
     1.6 Ensure                      inspections,
                                                        Fire Safety Business
 continued robust                    licencing and
                                                        Plan)
   enforcement,                      enforcement,
      licensing,                     prioritised
 certification and                   based on risk
    regulation in
                                                         P5: A. % of
  environmental
                                                        applications for fire
     protection,
                                     Support the        safety certificates
      planning,                                                                   73.02%
                                     legislated Fire    received that were
 building control,                                                                (2019 NOAC)
                                     Safety             decided (granted or
  fire safety and
                                     requirements       refused) within two
 public health and
                                     of the Building    months of their receipt
 safety in order to
                                     Control Act,
     support our      To ensure                         P5: B - % of
                                     through
  citizen’s quality   safe and                          applications for fire
                                     providing an
   of life and the    sustainable                       safety certificates
                                     efficient Fire
 built and natural    buildings in                      received that were
                                     Safety                                       26.98%
   environment.       urban and                         decided (granted or
                                     Certification                                (2019 NOAC)
                      rural areas                       refused) within an
                                     Process
                                                        extended period
                                                        agreed with the
                                                        applicant

                                     Promote fire
                                     safety via the
                                     "Schools
                                                        Number of National
                                     Programme”
                                                        School third classes
                                                        visited as a
                                                        percentage of the total
                                                                                  0%
                                                        number of classes in
                                     Improve fire
                                                        the county
                                     safety in
                                     vulnerable
                                     communities
                                                        Number of Home Fire
                                     through the                                  0
                                                        Safety Checks
                                     promotion and
                                     implementation
                                     of Home Fire
                                     Safety Checks

                                                                                          12 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                     F2: Average time
                                                     taken, in minutes, to
                                                                                6.32 (2019
                                                     mobilise the fire
                                                                                NOAC)
                                                     brigades in respect of
                                                     fire
                                                     F2: Average time
  4.9 To protect                                     taken, in minutes, to
our citizens from                                    mobilise fire brigades     6.06 (2019
 fire through an                                     in respect of all other    NOAC)
   efficient and                                     (non-fire) emergency
  effective Fire    To protect                       incidents
Service that co-    communities                      F3: A % of cases in
  ordinates with    from fire and                    respect of fire in which
 other response     other                            first attendance at the
 services when                      Maintain         scene is within 10         16.91% (2019
                    emergencies,
  emergencies                       operational      minutes                    NOAC)
                    working with
       occur                        readiness and    F3 B % of cases in
                    partner
                                    capability to    respect of fire in which
                    agencies and
                                    deliver an       first attendance at the
                    in accordance
                                    appropriate      scene is after 10
                    with national
                                    response to      minutes but within 20      64.68% (2019
                    policies
                                    Fire Service     minutes                    NOAC)
                                    Incidents
                                                     F3 C % of cases in
                                                     respect of fire in which
                                                     first attendance at the
                                                     scene is after 20          18.40% (2019
                                                     minutes                    NOAC)
                                                     F3 D % of cases in
                                                     respect of all other
                                                     emergency incidents in
                                                     which fire attendance
                                                     at the scene is within     15.08% (2019
                                                     10 minutes                 NOAC)
                    To protect                       F3 E % of cases in
                    communities                      respect of all other
                    from fire and                    emergency incidents in
                    other           Maintain         which first attendance
                    emergencies,    operational      at the scene is after 10
                    working with    readiness and    minutes but within 20      64.82% (2019
                    partner         capability to    minutes                    NOAC)
                    agencies and    deliver an       F3 F % of cases in
                    in accordance   appropriate      respect of all other
                    with national   response to      emergency incidents in
                    policies        Fire Service     which first attendance
                                    Incidents        at the scene is after 20   20.10% (2019
                                                     minutes                    NOAC)
                                                     F1: Cost Per Capita of     €31.49 (2019
                                                     the Fire Service           NOAC)

                                                                                      13 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                    Co-ordinate
                    the emergency
                    management
                    function for
                    Kildare County
                    Council and
  4.9 To protect    arrange bi-       MEMC Meetings held       1
our citizens from   monthly Major
 fire through an    Emergency
   efficient and    Management
  effective Fire    Committee
Service that co-    (MEMC)
  ordinates with    meetings
 other response                       Internal MEM
 services when      Major
                    Emergency         exercises and training   0
  emergencies                         held
       occur        Management
                    Committee
                    (MEMC)            Interagency exercises
                                                               0
                    meetings          and training

                                                                   14 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Housing
The Housing Department aims to provide social housing support to persons who are unable
to meet their housing needs through their own resources. The Housing Department will
focus on housing delivery in accordance with the 2021 targets set by the Department of
Housing, Local Government and Heritage, having regard to the Housing for All Strategy,
anticipated to be published in mid-2021.
In addition, we will continue to work in 2021 to deliver social housing through the Housing
Assistance Payment and Rental Accommodation Schemes.
    Corporate Plan              5-year        2021 Objectives   Performance         Performance
  Supporting Strategy       Objective (as                        Standard          Indicator (2020
                            per Corporate                                               unless
                                 plan)                                                otherwise
                                                                                       stated)
                            To increase       Deliver the       To advance        86% of Build
   3.1 To increase and      and maintain      Capital           Kildare           target achieved
      maintain housing      housing           Programme         County
  provision in Kildare in   provision in Co                     Council’s
   line with the national   Kildare in line                     Capital
        objectives of       with the                            Programme         119% of Leasing
    “Rebuilding Ireland:    national                                              target achieved
 Action Plan for Housing    objectives of                       To deliver        207% of
   and Homelessness”        Housing for All                     units through     Acquisitions
 and to strive to achieve   [once                               SHIP, ie build,   target achieved
  social housing targets    published] and                      acquisition [in
       and delivery of      to have regard                      particular
    affordable housing.     to social                           turnkey] and
                            housing                             Part V. The
                            targets for the                     ability to        41 Part V
                            period 2021-                        delivery units    properties
                            2024                                through direct    provided under
                                                                build will be     this requirement
                                                                subject to
                                                                availability of
                                                                land
                                                                                  107 turnkey
                                                                To prioritise     properties
                                                                the option of     acquired
                                                                delivery of       39 properties
                                                                10% of            acquired directly
                                                                housing units     €550,000
                                                                on-site or off-   serviced site fund
                                                                site through      approval secured
                                                                Part V where      and JV
                                                                suitable.         opportunities
                                                                                  continued to be
                                                                                  considered
                                                                To assess
                                                                opportunities
                                                                for delivery of
                                                                housing

                                                                                         15 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                              through Joint
                                                              Venture (JV)
                                                              and turnkey       Single Stage
                                                              projects and      Tender process
                                                              to progress,      available for use
                                                              where             where appropriate
                                                              possible,         – not used in
                                                              delivery of       2020
                                                              affordable
                                                              housing units
                                                              having regard
                                                              to Affordable
                                                              Housing
                                                              Regulations       Number of rapid
                                                              and               build sites
                                                              Guidelines        assessed.
                                                              due to be
                                                              published

                                                              Review
                                                              tendering
                                                              options in
                                                              terms of
                                                              maximizing
                                                              tender returns
                                                              i.e.
                                                              amalgamating
                                                              different sites
                                                              into one
                                                              tender
                                                              package

                                                              To assess
                                                              opportunities
                                                              for delivery of
                                                              housing
                                                              through rapid
                                                              build
                          Renewal,        To facilitate and   Implement a       205 upgrades
   3.4 To maximise        refurbishment   support the co-     planned           completed. 108
     availability and     and             ordination of the   maintenance       vacant units and
 utilisation of housing   maintenance     response and        programme         97 house
         through          of housing      planned                               purchases
repair/refurbishment of   stock           maintenance
       vacant units                       programmes with                       6,733 repairs to
                                          other areas of                        housing stock
                                          housing in order    Provide a         completed
                                          to provide a        response
                                          comprehensive       maintenance       80 applications
                                          and efficient       service           approved
                                          service

                                                                                       16 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                Deliver the
                                                                Self-Help         97 vacant
                                                                Tenant            properties
                                                                Support           refurbished. 108
                                                                Scheme.           upgrades to
                                                                                  housing stock
                                                                                  completed.
                                                                                  Pilot scheme
                                                                Continue to       commenced
                                                                refurbish
                                                                vacant/derelic
                                                                t units subject
                                                                to the
                                                                availability of
                                                                departmental
                                                                funding.

                                                                Implement the
                                                                Climate
                                                                Action
                                                                Programme
                           Delivery of      To ensure                             2,398 active HAP
  3.1 To increase and      social housing   schemes             Targets           tenancies in 2020
     maintain housing      current          delivered under     awaited
 provision in Kildare in   expenditure      the SHCEP [i.e.                       13 new HAP
  line with the national   programme        HAP/RAS/                              tenancies per
       objectives of                        Leasing/Enhance                       week set up
   “Rebuilding Ireland:                     d
Action Plan for Housing                     Leasing/Mortgage                      360 RAS
  and Homelessness”                         to Rent and                           properties in use
and to strive to achieve                    Repair and
 social housing targets                     Leasing Scheme]                       54 AHB leased
      and delivery of                       are administered                      properties in 2020
    affordable housing                      in accordance
                                            with regulations                      436 AHB units
                                            and guidelines.                       under
                                                                                  construction/on
                                                                                  site

                                            To support
                                            approved housing
                                            bodies to deliver
                                            units in
                                            accordance with
                                            targets set under
                                            Housing for All
                                            [once published]

                                                                                         17 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                             Inspect private   To support the                     972 inspections in
                             rented            HAP scheme to      Targets         2020
                             properties to     provide rental     awaited
                             ensure that       accommodation
                             they comply       in accordance
                             with minimum      with minimum
                             rental            rental standards
                             standards

                             Facilitate        Process housing                    705 new
3.7 Facilitate access to     customers in      applications                       applications
  social housing, and        accessing         within 12 weeks                    processed within
other supports, where        social housing,   as required by                     12 weeks.
    applicants have          and other         regulation                         75 allocations
demonstrated eligibility     supports,                                            completed
  with the necessary         where they
         criteria            have
                             demonstrated      Undertake a        Summary of      Completion of
                             compliance        housing needs      Social          Housing Needs
                             with the          assessment in      Housing         Assessment
                             necessary         2021, in           Needs
                             criteria          accordance with    Assessment
                                               departmental
                                               guidelines.
                             Provide           Continue to work   Mid-East        Reduction in no.
   3.3 Continue to work      homelessness      to reduce the      Region          of
     with regional and       services to       numbers of         Homelessnes     families/individual
    sectoral partners to     those who find    people who need    s Action Plan   s in emergency
 reduce the numbers of       themselves        to be placed in    2021-2023       accommodation
 people who need to be       homeless or at    emergency
   placed in emergency       risk of being     accommodation,     Housing First   Increase in
    accommodation, by        homeless.         by increasing      targets         Family Hub units
increasing availability of                     availability of    awaited         to 11
     housing stock and                         housing stock
   working closely with                        and working                        25 bed hostel
     approved housing                          closely with                       facilities in
  bodies and advocacy                          approved housing                   operation
   groups to reduce the                        bodies and
     numbers who find                          advocacy groups                    21 supported
  themselves homeless                          to reduce the                      emergency beds
     or at risk of being                       numbers who find                   in place
 homeless, and enable                          themselves
 people to sustain their                       homeless or at                     24 winter/cold
         tenancies                             risk of being                      weather beds
                                               homeless                           available

                                               To support the                     6 Housing First
                                               Homeless HAP                       tenancies
                                               and the                            commenced
                                               Homeless HAP
                                               Placefinder
                                               service

                                                                                         18 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                                   246 Homeless
                                                                                   HAP tenancies in
                                                                                   place

                                                                                   Review of draft
                                                                                   Mid East Region
                                                                                   Homelessness
                                                                                   Action Plan 2018
                                                                                   – 2020
                                                                                   commenced
                            Implementatio     To continue to       Anti-Social     5 Tenant Liaison
3.6 Implement our anti-     n of Anti-        investigate          Behaviour       Officers in place
    social behaviour        Social            complaints           Policy
   strategy in order to     Behaviour         regarding Anti-                      Anti-Social
prevent the occurrence      Strategy as       Social Behaviour                     Behaviour Forum
of anti-social behaviour,   adopted by full   and Estate                           established
 by encouraging tenant      Council           Management
 participation in estate    February 2017     through the
    management and                            Tenant Liaison
       fostering the                          Officer Service
     development of
 balanced communities
                            To continue to    In tandem with                       €3.5m in private
3.7 Facilitate access to    deliver the       delivery of the      Expenditure     and social
  social housing, and       housing grants    grants               of 2021 grant   housing grants
 other supports where       programme,        programme            allocation      approved
    applicants have         subject to        consideration will
demonstrated eligibility    availability of   be given to                          303 Adaption
  with the necessary        departmental      allocation of a %                    grants approved
         criteria           funding           of funding to
                                              category C                           190 Older
                                              applicants in                        Persons grants
                                              2021 subject to                      approved
                                              availability of
                                              adequate funding
                                              from the
                                              Department of
                                              Housing, Local
                                              Government and
                                              Heritage

                            Continue to       Monitor the use of                   66 properties
3.9 Plan for the needs      develop           choice-based                         allocated by CBL
     of our growing         choice-based      lettings as a
     population by          lettings as a     mechanism for
 identifying strategic      mechanism for     allocation of
 sites and supporting       allocation of     social housing
 sufficient supplies of     social housing
zoned serviced land to                        Consider further
  deliver sustainable                         the use of CBL as
      communities                             a mechanism for
                                              allocation of

                                                                                          19 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                             Approved
                                             Housing Body
                                             [AHB] units. This
                                             will require the
                                             assistance of the
                                             IT Department
                                             and the support
                                             of AHBs.

                                             Consider how
                                             best to further
                                             promote the use
                                             of CBL by social
                                             housing
                                             applicants.
                            Support          Monitor capacity       TAP 2019-     Site re-allocated
   3.2 Implement the        members of       and population at      2024          to family in 2020
        Traveller           the Travelling   each halting site
    Accommodation           Community to                                          20 allocations to
   Programme (TAP)          access social    Provision of                         Traveller families
    2019 – 2024 and         housing          traveller- specific
support members of the      support          accommodation                        Quarterly
 Travelling Community,                                                            meetings of
     who have been                                                                LTACC
   approved for social
 housing to access and
    maintain housing
   supports including
  culturally appropriate
         housing
                            To deliver       To schedule            Housing and   10% acquisitions
3.5 To provide suitable,    commitments      meetings of the        Disability    target exceeded
    accessible social       contained in     Disability Strategy    Strategy
 housing and housing        the Strategic    Steering Group                       Quarterly
   supports for older       Plan for         during 2021 in                       meetings
  persons and people        Housing          order to review
 with a disability and to   Persons with     commitments
support homeowners to       Disabilities.    contained in the
  carry out necessary                        Strategic Plan for
adaptions/improvement                        Housing Persons
  s to enable them to                        with Disabilities.
  continue residing in
       their home.                           To review KCC’s
                                             Strategy for
                                             Housing People
                                             with a Disability in
                                             consultation with
                                             Steering Group.

                                                                                         20 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                            To implement     To assess vacant      Awaiting 2021   3 CPOs
   3.4 To maximise          Kildare County   homes that have       allocation      commenced
     availability and       Council’s        been identified to
 utilisation of housing     Vacant Homes     date and prioritise
         through            Strategy         those that are
repair/refurbishment of                      considered
       vacant units                          suitable for social
                                             housing needs for
                                             acquisition or
                                             CPO.

                                             CPO procedures
                                             to be commenced
                                             as appropriate in
                                             order to secure
                                             vacant homes for
                                             social housing.
                            To implement     Provision of loans    Expenditure     101 loan
3.7 Facilitate access to    the RIHL         to approved           of 2021         applications
  social housing and        scheme,          lending amount        allocation      received
 other supports where       having regard
    applicants have         to available                                           €10.3m in loans
demonstrated eligibility    funding.                                               approved in 2020
  with the necessary                                                               (49 loans
         criteria                                                                  approved in
                                                                                   principle)

                            To have          Inventories and                       Number of risk
6.7 Continue to support     regard to        risk audits of                        assessments
 strong audit, financial,   requirements     personal data to                      reviewed
risk, data and corporate    of GDPR and      be reviewed and
    governance and          ensure they      any mitigation
  reporting systems to      are introduced   actions and
build public confidence,    across the       controls be
   maximise efficiency      department       implemented for
and ensure compliance                        high risk areas
   with our obligations

                                                                                          21 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Corporate Services
The Corporate Services Department’s core activities include providing first point of contact
customer service management via email, post, phone and in person. Providing support
services for the elected members, servicing council meetings, maintaining the register of
electors, operating the media and communications function for the organisation, dealing with
Freedom of Information, Data Protection and Facilities Management along with the co-
ordination of a number of corporate wide functions across the directorates.

To meet the needs of all customers the dedicated Customer Service Units located at Level
1, Áras Chill Dara and Athy Customer Service Point will continue to provide information on
services and deal with customer enquiries in an efficient and courteous manner. In
response to Covid 19 an appointment system has been introduced for those seeking to
attend in person with various service departments. Members Services will provide a
comprehensive and accessible service to the 40 elected members of Kildare County Council
across the five Municipal Districts and in response to Covid 19 statutory and other meetings
are being held remotely on a virtual platform which will continue to be developed.

A key focus in 2021 will be continued delivery of quality services to both members and
customers, with an enhanced focus on how online services can assist the customer, as well
as a review of our internal and external communications.
                                                                                        Performance
  Corporate Plan        5-year Objective                                                  Indicator
                                                                     Performance
   Supporting               (As per           2021 Objective                            (2020 unless
                                                                      Standard
     Strategy           Corporate Plan)                                                  otherwise
                                                                                           stated)

    1.3 Ensure over     To ensure that all   Continue energy
  the lifetime of the   non-domestic         audits of buildings.   Carry out further   9 energy
    Corporate Plan      local authority      Implement new          energy audits       audits
 that climate action    owned premises       LMS and BMS            and implement       completed in
   is mainstreamed      comply with          system in Aras         actions             2020
  into the Council's    sustainability       Chill Dara.
 policies, buildings,   requirements by
 infrastructure and     undergoing
      operations to     energy audits to                                                2 EV chargers
                                                                    Increase no. of
     reduce energy      identify ways to     Install two                                installed in
                                                                    EV chargers
        demand          improve energy       additional electric                        2020
                        efficiency           vehicle chargers

   6.4 Utilise ICT to
     reduce costs,                           Implement and          No. of customer
        improve                              embed a new            cases (incl.
      operational       To ensure ICT is     CRM system for         NPPR)
  efficiency, expand    used to track and    the organisation       processed
  online and Cloud      effectively          during 2021 in         annually within
                                                                                        17996
 enabled services to    manage customer      conjunction with IT    the Customer
  make it easier for    interactions         Dept                   Relation
     customers to                                                   Management
   access services                                                  System
   and information.

                                                                                           22 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                     Facilitate data
                     cleansing of
                     legacy data in
                     CRM during Q3        Project
                     2021                 ongoing during
                     New CRM              Q4 2020
                     solution to be in
                     place by mid-
                     2021
                     Develop CRM
                     training materials
Ensure that                               Q2 2021
procedures and
                     Review
policies support
                     Customer
effective customer
                     Charter and
service                                   Q3 2021
                     Complaints
                     Process

                     Completion of
                                          Qtrly
                     ongoing reviews
                                          performance
Quarterly review     with related
                                          reporting to
of the Customer      metrics. Develop
                                          Management
Services Centre      reporting for
                                          Team ongoing
                     Senior Mgmt.
                     Forum in 2021

                     Develop an           Project
                     online customer      ongoing during
Work with            portal to go live    Q4 2020
Departments to       in 2021
develop, maintain
and expand           Maintain and         28,300
customer services    publicise online     appointments
to facilitate safe   appointments         to end Dec
access to Council    system               2020
facilities and       (Initiated June
public services      2020)

                     No. of NPPR
                     cases processed      1605
Maintain Athy
Customer Service     Phone calls          7450
Point                processed

                                             23 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

 6.5 Support local
democracy and the                                                  Complete review
  interests of the                                                 of Standing
                                               Review and                               Standing
   community by                                                    Orders for
                                               improve support                          Order for Full
assisting the role of                                              Municipal District
                                               services for                             Council
       elected                                                     Committees in Q
                                               elected members                          completed in
  representatives                                                  1 and SPCs in
                                                                                        Q4 2020
  and by growing                                                   Q3 2021
 voter registration

                        To ensure ICT is       Continue with the
                        used to track          support of IT
                        representations        section to review
                        and effectively        and improve the                          59 meetings of
                        support the            service to          No. of statutory     Council and
                        elected members        meetings of         meetings             Municipal
                        role                   council             annually             Districts in
                                               through the         serviced             2020
                                               development of
                                               Microsoft Teams     No. of remote
                                               and other IT        meetings             Reporting to
                                               solutions during    supported            commence in
                                               2021                                     2021

                                                                   No. of
                                                                   representations
                                                                   from all elected
                        To ensure ICT is                           members              5046
                                               Further develop
                        used to track                              processed
                                               and integrate
                        representations                            annually (incl.
                                               CRM system to
                        and effectively                            Oireachtas)
                                               record and
                        support the
                                               monitor members     Develop, test
                        elected members
                                               and TD reps         and launch new       Commenced
                        role
                                                                   Members Reps         in Q4 2020,
                                                                   Portal during        ongoing
                                                                   2021

                                               Publish and
                        To grow                maintain Live       No. of electors
                                                                                        150,679
                        awareness and          Register in line    on register
                                                                                        (2021-22
                        participation in the   with statutory      published Feb
                                                                                        Register)
                        electoral process      deadlines           2021

                                                                                            24 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                          Use IT solutions to
                                                                  Complete
                                          improve accuracy                            Commence in
                                                                  between Q2 and
                                          of register using                           Q2 2021
                                                                  Q4
                                          eircodes
                                          Develop new
                                          communications
                                                                  Engagement
                                          activities with
                                                                  with schools and    No. of
                                          schools and 3rd
                                                                  colleges in Q3      contacts
                                          level institutions to
                                                                  2021
                                          promote
                                          registration
                                                                  Ensure annual
                                          Monitor delivery of     progress            Complete
 6.7 Continue to                          the Corporate           reporting           Progress
                      To ensure
  support strong                          Plan 2020 – 2024        included in         Report
                      efficiency,
  audit, financial,                                               Annual Report
                      transparency and
   risk, data and                         Publish the
                      accountability is
      corporate                           organisation’s
                      upheld in
 governance and                           Annual Report
                      monitoring,
reporting systems                         including progress
                      reporting and                                                   Adoption by
  to build public                         report on ASDP          By 30.06.2021
                      meeting statutory                                               Members in
     confidence,                          2020 and
                      requirements                                                    June
      maximise                            Corporate Plan
  efficiency and                          progress report
ensure compliance                         2020
       with our
     obligations.                         Complete Annual                             Adoption by
                                          Service Delivery        By 31.03.2021       members in
                                          Plan                                        March

                                          Ensure completion
                                                                                      95% returned
                                          of Annual Ethics        By 28.02. 2021
                                                                                      on time
                                          Declarations

                                                                  Ongoing
                                          Monitor
                                                                  oversight to keep   Maintaining
                                          implementation of
                                                                  information         information
                                          Lobbying Act 2015
                                                                  updated
                                          Monitor                 Annual Report       Publication
                                          compliance with         by 30.06.21         early July
                                          the Protected
                                          Disclosure Policy

                                          Monitor
                                                                  Provision of
                                          compliance with
                                                                  online GDPR
                                          the General Data
                                                                  training and        No. trained
                                          Protection
                                                                  awareness for
                                          Regulations
                                                                  staff in 2021
                                          (GDPR)

                                                                                         25 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                          Implementation
                                          Policy on Section
                                                               Providing
                                          40 Data Protection
                                                               awareness
 6.7 Continue to                          Act, 2018.                                No. of
                                                               briefings to the
  support strong      To ensure           Management of                             briefings
                                                               elected members
  audit, financial,   efficiency,         Representations
                                                               in 2021
   risk, data and     transparency and    from Elected
      corporate       accountability is   Representatives
 governance and       upheld in                                Average no. of
reporting systems     monitoring,                              days for FOI
  to build public     reporting and                            decisions made
                                                                                    24 days
     confidence,      meeting statutory                        (statutory
                                                                                    (2020)
      maximise        requirements        To ensure            requirement is
  efficiency and                          compliance with      20 working
ensure compliance                         the FOI Act 2014     days).
       with our                                                 Provide annual
     obligations.                                               FOI training to     Number
                                                               decision makers      trained
                                                                    online
                                          To establish and     To appoint legal
                                          manage a Legal       advisors for         60% of lots
                                          Services             Code                 are from OGP
                                          Framework            Enforcement and      framework in
                                                               Debt Mgmt.           2020
                                                               when OGP
                                                               Frameworks
                                                               completed

                                                               Manage cases
                                                               for legal services   873
                                                               on behalf of all     cases created
                                                               Departments.
                                                               Ensure renewal
                                          Monitor and          or procurement
                                          manage               of service
                                                                                    Ongoing
                                          procurement          contracts when
                                          contracts            due during 2021.

                                          To conduct
                                                               % spend vs
                                          quarterly budget                          Ongoing
                                                               budget ongoing
                                          reviews

                                          To support the       No. of meetings
                                          work of the Audit    supported            4
                                          Committee            annually

                                                                                        26 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                              Adoption of
                                                              Records
                                          Complete            Management
                                          document            Policy by
                                          management          Information        Q3 2021
                                          policy and          Management
 6.7 Continue to                          progress            Committee
  support strong                          implementation      during 2021
  audit, financial,
   risk, data and                                             Complete Part 8
      corporate                                               stage in project
 governance and                                               implementation
reporting systems                                             for Records
  to build public                         Progress Records    Management
     confidence,                          Management          Centre and
                                                                                 Q4 2021
      maximise                            Centre              commence
  efficiency and                                              phase 1
ensure compliance                                             construction
       with our                                                                  New bye laws
     obligations.                                                                commenced
                                          Oversee operation
                                                              No. of fines       Q4 2020
                                          of New Alcohol
                                                              processed          Reporting to
                                          Bye Laws
                                                                                 commence
                                                                                 2021
    6.8 To work
   alongside key                          To oversee the
     partners to                          reporting of 2020
 strategically use                        Performance
   data to make                           Indicators to       By 30.04.2021
      informed,                           NOAC within
 transparent and                          statutory
   evidence led                           deadlines                              Reporting by
decisions, to inform                                                             30.04.2021
    service and
   infrastructure
     needs and
 advocate for our
   county from a
 strong evidence
        base.

                       Improve
                       communications
                       channels to        Review of           To have review
                       provide            Communications      completed during   Q4 2021
                       information to     Strategy            2021
                       support customer
                       service

                                                                                    27 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

  6.9 Review and
    improve our
  communications                             Monitor the          Visible increase    20% of press
channels to deliver                          implementation of    in the usage of     releases
 timely and useful                           the Irish            Irish language in   issued
  information that                           Language             communications      simultaneously
makes it easier for                          Scheme               channels & tools    bilingually
    customers to
  access services
  and information

                                             Review and
                                             expand use of        No. of registers
                                             MapAlerter and       users of
                                                                                      1657 (2020)
                                             other IT customer    MapAlerter
                                             information          system
                                             systems

                                                                  To have review
                                             Review of Social
                                                                  completed during    Ongoing
                                             Media Policy
                                                                  2021
   6.10 Improve
   visibility and      To increase the
awareness of the       use of social
    Council by         media and other
     effectively       communications                                                 49,395 (2019
promoting our role     tools by the                                                   NOAC).
      and our          Council and           Increase followers                       KCC central
                                                                  No. of followers
 achievements in       enhance               on KCC owned                             channels end
                                                                  on social media
  the delivery of      community             social media                             2020: FB
                                                                  pages
   projects and        awareness             channels                                 15,081 Twitter
     services.                                                                        – 8,520 Insta
                                                                                      – 1,516
                                             Develop proactive    Increase in
                                             communications       volume of
                                             opportunities to     proactive press
                                                                                      Ongoing
                                             promote KCC          releases & social
                                             services, projects   media content on
                                             and achievements     campaigns/events
                       Consult with          Review Casual        No. of MDs that
    2.5 Enabling       communities and       Trading Bye Laws     bye law reviews     3 commenced
    Business and       collaborate with      to comply with       have been           in 2020
 sustaining growth     partners to           new regulations      completed in
  “To optimise the     enhance the           and address          2021
potential of Kildare   public realm and      growing demand
and its businesses     design of our         for outdoor          Adoption of
         to            towns and             trading in the       Casual Trading
  innovate, invest,    villages and          public realm         Policy by SPC
    promote and        deliver projects
sustain growth and     and programmes
    employment,        that revitalise the
across our County      local retail
and throughout our     economy and
    community.”        rural hinterlands.

                                                                                         28 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Human Resources
The Human Resources (HR) Department’s core activities include recruitment, staff training
and development, staff welfare, industrial relations and superannuation. During 2020
activities in the department had to be adjusted due to the pandemic. The main changes
were the introduction of remote working across the organisation and the use of online
platforms to deliver training and carry out interviews.

During 2021 the HR department will continue to promote staff training and development,
good attendance, a safe and healthy work environment and stable industrial relations. We
will look to embed and refine remote working in the organisation in consultation with Health
& Safety and the IT department.

Recruitment campaigns will continue throughout the year to ensure that all available posts
are filled as required and we will look at further streamlining the recruitment process,
including the use of online applications and IT solutions to maximise efficiency.

                      5-year
  Corporate
                    Objective                                             Performance Indicator
     Plan                                             Performance
                     (As per        2021 Objective                       (2020 unless otherwise
  Supporting                                           Standard
                    Corporate                                                    stated)
   Strategy
                      Plan)

                                    To ensure best
                                                     Responsive,
                                    recruitment
                                                     effective and
                                    practice is
  6.3 Support                                        flexible
                                    followed and
 organisationa                                       recruitment
                   Build            that the human
         l                                           programme in
                   organisationa    resource needs                     No. of competitions run – 27
 effectiveness,                                      place to meet
                   l competence     of the                             No. of leavers – 51
  training and                                       organisational
                   to effectively   organisation                       No. of joiners - 85
   continuous                                        needs
                   deliver on our   are met
  professional
                   current and      To refine
 development,
                   future           remote working
    staff well-
                   services         policies and
      being,                                         Remote
                   through          procedures in
   innovation,                                       working policy
                   creating a       consultation
 flexibility and                                     and procedures
                   culture of       with other
  performance                                        reviewed and
                   training         stakeholders,
        by                                           updated in line
                   excellence       i.e. Health &
 implementing                                        with              52% of staff working
                   and              Safety and IT
  the sectoral                                       government        remotely
                   continuous       and having
     People                                          requirements      (based on Dec 2020 figures)
                   learning and     regard to
     Strategy                                        and advice of
                   development      government
                                                     LGMA
                                    requirements
                                    and advice of
                                    the LGMA

                                                                                         29 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                  Create a culture
                  of continuous
                  learning and
                  development by
                  implementing
                  the staff training
                  and
                  development
                  programme for
                  2021 which will
                  include:
                                       Implementation
                  - supporting
                                       of Training &
                  professional                           No. of average training days
                                       Development
                  staff to obtain                         per staff member – 1.95
                                       Plan 2021
                  and maintain
                  accreditation                                 No. of training
                                                         courses/seminars delivered -
                  - supporting                                       319
                  management
                  and leadership
                  capacity in the
                  organisation
 6.3 Support      through
organisationa     mentoring and
        l         capacity
effectiveness,    building training
 training and     Empower and
  continuous      enable our
 professional     managers and
                                       PMDS
development,      supervisors by
                                       implemented,
   staff well-    supporting and
                                       i.e. team plans
     being,       monitoring the
                                       and PDPs
  innovation,     operation of
                                       completed and
flexibility and   PMDS and
                                       reviewed
 performance      continuing the
                                       throughout the
       by         implementation
                                       organisation
implementing      of the
 the sectoral     competency
    People        framework
    Strategy      To ensure
                  management
                  and staff are
                  supported so
                  that the
                                       Provision and
                  organisation is
                                       promotion of
                  best placed to
                                       the Employee
                  meet current
                                       Assistance
                  workloads,
                                       Programme.
                  deadlines,
                                       Ongoing
                  change
                                       supports as
                  management
                                       required
                  and future                             Ongoing
                  challenges in a
                  healthy and
                  safe working
                  environment

                                                                          30 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

To continue to
promote
positive
employee
relations and      Ongoing
engagement         engagement
and good           and regular
industrial         meetings with
relations and to   all trade unions
continue           and Lead
consultation       Worker
and                Representative
communication      s
with the Lead
Worker
Representative                        Ongoing
s

                                                 31 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Finance
The Finance Department, under the management of the Head of Finance, has primary
responsibility for a range of functions including:

   •   Budgets
   •   Financial Management & Reporting
   •   Accounting
   •   Payments
   •   Revenue Collection (including rates, rents & housing loans)
   •   Treasury Management
   •   Development Contribution Collection
   •   Motor Tax

   Corporate Plan             5-year       2021 Objective       Performance           Performance
    Supporting            Objective (as                          Standard            Indicator (2020
      Strategy            per Corporate                                                  unless
                              Plan)                                                    otherwise
                                                                                         stated)

                          To enhance the   Procurement to     No. of relevant        Reporting to
 1.3 Ensure over the      competency of    liaise with        staff attending        commence in
     lifetime of the      staff in Green   Climate Action     Green                  2021
 Corporate Plan that      Procurement      team to            Procurement
   Climate Action is      practices        increase staff     briefings/training
  mainstreamed into                        awareness of
     the Council’s                         Green
  policies, buildings,                     Procurement
  infrastructure and                       options
 operations to reduce
   energy demand
                          To ensure that   Continue to        Collection level of    70% (2020) If
    6.7 Continue to       the Council’s    maintain and       rates                  Covid Rates
 support strong audit,    Revenue          where possible                            Waiver had
  financial, risk, data   account is in    increase                                  been treated as
     and corporate        balance over     collection rates                          cash collected
    governance and        the medium                                                 then this figure
 reporting systems to     term                                                       is 80%
      build public                                            Collection level for
      confidence,                                             rents and              92% (2020)
 maximise efficiency                                          Annuities
      and ensure
 compliance with our                                          Collection level of
      obligations                                             Housing Loans          62% (2020)
                                           AFS to be          Annual Financial       Annually March
                                           submitted to the   Statement
                                           DoHPLG within
                                           statutory          Revenue                €978.21 (2020)
                                           timeframe          expenditure per
                                                              capita

                                                                                           32 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

Department/Service Area: Information Systems
The principal focus for I.T in 2021 is the protection of council information assets. Primarily
I.T. will look to protect the organisation against a cyber security incident e.g. ransom ware.
Compliance with GDPR and the provision of robust and resilient information management
systems and solutions to protect the council in the event of an infrastructural failure is also
included in this area. An initiative, termed a ‘Disaster Recovery’ or DR solution is an ongoing
project over several years to include technologies such as virtualization, resilient links, the
use of the Cloud where appropriate. The second area of focus is in assisting service delivery
sections to examine current work practices and to look for ways to improve the flow of work,
thereby reducing delivery times and improving customer services. This initiative involves the
development of customer service channels via web, mobile and Robotic Process
Technology (RPA) technologies. The deployment of the Council’s new Microsoft Dynamics
Customer Relationship Management (CRM) system will provide the opportunity to streamline
existing processes and introduce a platform for the new technology solutions.

As a response to the Covid-19 pandemic I.T. have had to enable over 600 staff to work
remotely through the provision of VPN and other remote working options such as TEAMS as
well as the procurement, configuration and deployment of over 5000 laptops. Support for this
remote working environment will continue through 2021 with the deployment of further IT
solutions.

Finally, in 2021 I.T. will continue to provide excellent levels of technical support service to
staff and to members, will be responsive to organisational needs and will strive for maximum
up-time on all hardware and software in use in the council.

                         5-year
                                                                                    Performance
 Corporate Plan        Objective
                                                              Performance          Indicator (2020
  Supporting            (As per       2021 Objective
                                                               Standard           unless otherwise
    Strategy           Corporate
                                                                                       stated)
                         Plan)

                                     Cyber Security -
                      Support the    Implement
 6.4 Utilise ICT to   functions of   systems and            Run staff IT         Aim for 95%
   reduce costs,      Kildare        technologies to        security training    attendance
      improve         County         protect council
    operational       Council        assets and
     efficiency,      through        organise ongoing
   expand online      innovative     training
     and Cloud        ICT            programmes for
 enabled services     solutions      staff awareness to
 to make it easier                                          Change IT
                                     the dangers of                              Applied to all staff
 for customers to                                           password policy
                                     cybercrime.
 access services
 and information.
                                                            Get a third party
                                                            to perform a         Complete by Q3
                                                            second IT security   2021
                                                            risk assessment

                                                                                            33 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                 Increase security
                                                                 features
                     Services to the
                     Public - enhance                            Support the Irish
                     the new public                              Language Scheme
                     facing website for
                     public interaction      Continue to         Host new CRM
                     with the council to     enhance the         portals
                     include updates to      council website
                     library website,                            Support new library
                     new citizen and                             and sports
                     members portal                              partnerships sites
                     and GIS.
                                                                 Enhance accessibility
                                                                 features
                                                                 Continue to deploy
                                                                 open data sets to
                                                                 data.gov.ie and
                                             Open data
                                                                 complete an audit of
                                                                 all open datasets in
                                                                 the organisation

                                             CRM - develop
                                                                 Start deployment of
6.4 Utilise ICT to                           new
                                                                 new CRM solution
  reduce costs,                              communications
                                                                 Q2 2021 which will
     improve                                 channels for
                                                                 include a new citizen
   operational                               public
                                                                 portal
    efficiency,                              engagement
  expand online
    and Cloud
enabled services
to make it easier    Technical Support       Upgrade all         99% of Windows 7
for customers to     - continue to           Windows 7           machines upgraded
access services      deliver effective       machines to         to Windows 10 - Q3
and information.     technical support       Windows 10          2021
                     to elected
                     members and to
                     staff in a cost
                     effective and           Full deployment
                     efficient manner                            Teams available to
                                             of office 365
                                                                 all staff
                                             Teams

                                             Virtualisation of   All physical servers
                     Support the
                                             all servers and     virtualised by Q2
                     functions of
                                             fully hosted on     2021 and hosted on
                     Kildare County
                                             resilient SAN       resilient SAN
                     Council through
                                             environment         environment
                     innovative ICT
                     solutions

                                                                           34 | P a g e
ANNUAL SERVICE DELIVERY PLAN 2021

                                                                              Continued focus on
                                                         Continue to use      key processes
                                                         Business Process     supporting Housing,
                     Support the    Deliver Internal     Improvement          Planning and
6.4 Utilise ICT to   functions of   Efficiencies -                            Finance
  reduce costs,      Kildare        continue to work
     improve         County         closely with
   operational       Council        service delivery
    efficiency,      through        sections to
  expand online      innovative     improve                                   Start deployment of
    and Cloud        ICT            information and      Implementation of
                                                                              the new CRM
enabled services     solutions      transaction          new CRM solution
                                                                              solution - Q2 2021
to make it easier                   workflow.
for customers to
access services
 and information
                                                                              Use Microsoft Power
                                                                              BI for the
                                                         Development of
                                                                              development of all
                                                         an enterprise
                                                                              new enterprise
                                                         reporting strategy
                                                                              reporting
                                                                              requirements

                                                                              Support the Planning
                                                                              department in the
                                                                              procurement and
                                                         Procurement and
                                                                              implementation of a
                                                         implementation of
                                                                              new planning
                                                         a new Planning
                                                                              administration
                                                         Administration
                                                                              system which will
                                                         system
                                                                              have full integration
                                                                              into the new LGMA
                                                                              ePlanning solution
                                                                              Deployment of
                                                                              laptops to staff
                                                                              working remotely

                                                                              Enable electronic
                                                                              signature through
                                    Continue to                               Docusign
                                    support remote
                                    working                                   Development of on-
                                                                              line forms using
                                                         Continue to          SUBMIT.com
                                                         deploy solutions
                                                         that support         Extend the use of
                                                         remote working       Microsoft TEAMS

                                                                              Support the
                                                                              deployment of a new
                                                                              staff app.

                                                                              Build voting
                                                                              functionality through
                                                                              Teams for council
                                                                              meetings

                                                                                         35 | P a g e