An Integrated Rail Plan for the Midlands - Accelerating, maximising and securing the benefits of HS2 Phase 2b - Midlands Connect
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
An Integrated Rail Plan for the Midlands Accelerating, maximising and securing the benefits of HS2 Phase 2b August 2020
Making the most of HS2 Integrated Rail Plan – the Now more than ever, the UK desperately economy, maximising benefits and ensuring swift and story so far needs an efficient, sustainable and reliable effective delivery. In February 2020, after a detailed evaluation of methodology it proposes to use to undertake its railway network. As we move to reboot the As the Sub-National Transport Body for the Midlands, the costs, benefits, challenges and opportunities review. It also shared emerging findings from the economy in the aftermath of COVID-19, Midlands Connect has worked alongside its partners presented by the construction of our new high-speed initial evidence gathering process. In the coming to gather evidence, present technical expertise and railway, Boris Johnson committed to building HS2 months, the NIC will undertake further stakeholder investment in capital infrastructure will gain consensus on the priority schemes the region in full. engagement and research into potential options for be an essential fiscal tool in supporting needs to make the most of HS2 and fully realise the the IRP before the final assessment is published and employment, encouraging development and positive impacts it will bring. The recommendations However, the publication of the eagerly-awaited submitted to the Department for Transport. Oakervee Review recommended that while the restoring business confidence. outlined in this submission - if integrated with our development and delivery of Phase One (from new high speed network - will deliver benefits sooner, Although the last to be built, Phase 2b of High Speed Two (HS2) is central to its purpose and success, connect more communities, create more jobs and London to Birmingham) and Phase 2a (from Birmingham to Crewe) should continue as planned. Our Submission crucially, change more lives for the better. linking the great cities of the North to the Midlands It was confirmed by the Prime Minister that the Midlands Connect built consensus across its and beyond, connecting millions more people to the Department for Transport would develop an partnership, which includes local enterprise high speed network, and freeing up capacity on the Integrated Rail Plan (IRP) to consider how both partnerships and local transport authorities conventional railway across the UK, to the benefit of Eastern and Western legs of Phase 2b could be best to submit a region-wide response to the NIC’s millions more. integrated within the wider network. call for evidence. This is a once-in-a-generation project, one that will The National Infrastructure Commission (NIC) The investments and interventions we create a railway fit for the next century. We must work has been tasked with undertaking a ‘Rail Needs have suggested form three ‘packages’ and collaboratively and conscientiously with Government Assessment’ for the Department for Transport, are aimed at ensuring three outcomes; to aid the development of its Integrated Rail Plan outlining the options for rail interventions the accelerating the benefits of HS2 in the which supports promises to ‘level-up’ the UK Midlands and the North require to make the most Midlands; maximising the positive impacts of HS2. This assessment will inform the final IRP, and ‘reach’ of HS2; and securing the delivery which Government is due to publish before the end of HS2 in its entirety. Sir John Peace, chairman of the year. Crucially, our response provides an account of Midlands Connect In early spring 2020, the NIC launched a ‘Call for of how Phase 2b of HS2 can be fully Evidence’; asking local authorities, businesses and integrated with Midlands Engine Rail, our “The construction of High Speed Two is a transport bodies to respond to a series of questions, rail programme composed of seven major watershed moment for the UK regions, but in and to provide the data and figures required to interventions, including the flagship Midlands the Midlands, as in the North, the full benefits justify their rail investment needs. In July 2020, Rail Hub scheme. the NIC published an interim report setting out the of our transformational new railway can only be delivered if it is integrated with other strategic improvements, namely Midlands Engine Rail. Prime Minister Boris Johnson, The Integrated Rail Plan is our chance to reap addressing Parliament on 11th the rewards of a decade’s worth of planning, February 2020 to connect more people to the high speed line, “The review recently conducted by Douglas and to bring benefits to local communities Oakervee leaves no doubt of the clinching sooner. If this Government is going to level up case for High Speed Rail.” the UK economy, it must heed the advice of its experts in the regions to deliver a truly first- “The cabinet has given high-speed rail the class transport network. green signal. We are going to get this done.” We are committed to working with the “Together, this revolution in local and Department for Transport to make this national transport has the potential to be happen.” truly transformative for the entire country.” 2 3
The proposals and evidence submitted to the NIC by Midlands Connect act to fulfil Our Submission To Scotland Key three primary ‘aims’: The strategic rail needs of the Midlands can be grouped into three Newcastle HS2Add a green line from Derby to 1) Accelerate the benefits of HS2 distinct packages. Nottingham Package West alongside the purple Under the delivery schedule outlined in the Oakervee but only add a green circle at Package East Package West, which utilises the high Durham Review, it is possible that the full HS2 network, speed infrastructure delivered in Phase Nottingham station, not Toton Package Connect particularly connections from the East Midlands One and 2a of HS2, Package East, which Darlington to the West Midlands and North of England, will utilises the high speed infrastructure not be up and running until 2040. To condemn delivered on the Eastern Leg of Phase communities that have suffered from chronic, historic 2b of HS2, and Package Connect, which underinvestment to a two decade wait for the benefits seeks to improve east-west connectivity of HS2, both in terms of connectivity, job creation across the Midlands. York and associated development would be a wasted Leeds opportunity and a betrayal of Government’s pledge to ‘level-up’ the UK economy. Manchester Our Integrated Rail Plan proposals would accelerate Doncaster connectivity improvements, bringing benefits to the Stockport Midlands and the North sooner. Sheffield 2) Maximise the positive impacts and ‘reach’ of HS2 Chesterfield Lincoln Although the high speed network will form the essential backbone of our future transport network, East Midlands Hub (Toton) there is still much work to be done to ensure Crewe Newark Castle widespread accessibility to this new railway. Much of Stoke-on-Trent the investment we seek will supplement and enhance Nottingham Derby the connectivity HS2 provides by; connecting more Our ‘accelerate’ schemes people into the high speed network; using the high Uttoxeter Burton To Wales upon Loughborough Accelerating service benefits between speed network to run new services; or utilising Wellington Trent EMA Telford Birmingham and Manchester, using new high capacity that HS2 frees up on the existing network to Shrewsbury Tamworth Leicester speed track between Birmingham and Crewe create faster, more frequent connections across the Wolverhampton Nuneaton built during Phase 2a, and increasing existing Midlands. Sandwell & Dudley network capacity between Crewe and Manchester. Birmingham Interchange Market Harborough Phase 2b of HS2 must be fully integrated with Kings Norton This would enable passengers to travel from Coventry Kettering Midlands Engine Rail for its full benefit to be realised. BHX Bromsgrove Birmingham to Manchester much faster than they Solihull Birmingham Wellingborough 3) Deliver HS2 in its entirety International can today, significantly improving journey times Droitwich Spa Leamington Spa from 2029. Worcester There is a sustained and widespread consensus Worcestershire Bedford Great Malvern Parkway Accelerating the benefits of the Eastern Leg of amongst the Midlands Connect partnership, that Hereford Banbury HS2 Phase 2b; allowing for the commencement of the full scope of benefits associated with our high Ledbury high speed services from Birmingham to the East speed network can only be achieved by delivering the Midlands Hub at Toton and on to Chesterfield, project in its entirety, an assumption evidenced in Cheltenham Spa Sheffield and Leeds (via a connection to the the HS2 business case. Although we are advocating conventional network 10 miles south of Leeds) delivering benefits earlier we must ensure that HS2 Oxford as early as 2031, deriving journey time savings, is built all the way to Manchester and Leeds, within Old Oak Common increased capacity and revenue generation earlier. the current specification, and that no measures are taken to de-scope or scale down infrastructure. Any Newport Bristol Parkway omissions or downgrading of the network would Cardiff London undermine a decade of careful planning and dilute Bristol Reading the benefits of this transformational scheme. 4 5
Birmingham Airport Connectivity Accelerate Birmingham – Manchester At present, there are no plans to enhance rail services Package West: Andy Street, To Scotland between Birmingham and Manchester until the Leveraging Phase One/2a completion of the full HS2 network. In our response Newcastle West Midlands Mayor Durham to the National Infrastructure Commission we have (Incrementally delivered “The Midlands Rail Hub is a vitally-important Darlington put forward a solution that could bring forward project. It will transform connectivity across significant journey time savings between these two from 2025-2029) the region, establishing Birmingham Moor York major economic centres, before the full HS2 network Street station as a major interchange, and Doncaster is operational. We suggest utilising the 60 miles of opening up access to the new high speed Sheffield new high speed railway between Birmingham and network at Curzon Street. It’s essential that we Crewe, built during Phase 2a, combined with a set This package will utilise the new high speed push ahead with these improvements.” of capacity enhancements on the existing network infrastructure delivered in Phase One and 2a of between Crewe and Manchester. This combination HS2, as well as utilising the additional network Derby will mean that conventional-compatible services, capacity HS2 will create on the conventional railway which run on the high speed line as far as Crewe to improve journey times between economic centres then on existing track from Crewe to Manchester can sooner, enhance local connectivity and improve provide much faster services than today before the services for commuters. Birmingham BHX Birmingham International full high speed line is up and running. Coventry Midlands Rail Hub Solihull The improvements will create both short-term Leamington Spa benefits to inter-regional connectivity and then once Banbury the full Western Leg of HS2 is complete, long-term Derby Nottingham benefits for commuters, with the new capacity being Burton Upon Trent utilised by higher-frequency commuter services in Loughborough Oxford Greater Manchester, which will also help to reduce Tamworth Leicester overcrowding in the area. Nuneaton Birmingham Transport for Greater Manchester (TfGM) has led Kings Norton Reading a study into rail capacity south of Manchester and Bromsgrove Droitwich the consensus between Midlands Connect, TfGM, Worcester Birmingham Airport Connectivity will create new Transport for the North and Network Rail is that Worcestershire Hereford Great Malvern Parkway and more frequent links to Coventry and Birmingham many important network improvements can only be Ledbury International, on the doorstep of Interchange HS2 achieved if this major bottleneck is resolved. Cheltenham Spa station, linking 2.2 million more people to the high Manchester speed network and Birmingham Airport. Derby, Sheffield, Newcastle, York, and Durham are among Stockport the places that would benefit from these new direct Newport Cardiff Bristol Parkway rail connections, while Leamington, Solihull and Bristol Coventry would be among those benefitting from Cllr George Duggins, enhanced local commuter links. Leader of Coventry City Council Midlands Engine Rail’s flagship scheme will create “Infrastructure investment is central to our space for 20 more trains every hour into and out future success, which is why it’s so important of Birmingham Moor Street station, improving that Midlands Connect’s proposals are Crewe connections to the South West, Wales, and East brought forward. This includes plans to Midlands. As Birmingham Moor Street will be reinstate direct rail connections between the adjacent to the new high speed station at Curzon cities of Coventry, Leicester and Nottingham Street, the scheme will allow communities in Cardiff, and the Birmingham Airport Connectivity Bristol, Hereford and Worcester easy access to HS2, scheme, which will open up rail access to vastly enhancing its geographical reach. Coventry and Birmingham International stations for over two million people from The Midlands Rail Hub will also drive huge benefits Derby, Sheffield, Newcastle and beyond, as for local commuters, reducing crowding and well as boosting local commuter links.” encouraging sustainable travel on a network that has seen demand double over the past decade. Birmingham 6 7
Package East: Leveraging MC Conventional Compatible Services Accelerate Birmingham – Leeds The running of these faster services up to Leeds would occur alongside the commencement of high Midlands Engine Rail includes plans for two HS2 Phase 2b Eastern Leg conventional-compatible services that will run Leeds speed services from a redeveloped London Euston station, currently scheduled for 2031. (Incrementally delivered direct from: Bedford – Leicester – East Midlands Hub – Leeds, and Nottingham – East Midlands Hub This intervention would catalyse regeneration and from 2027-2031) – Birmingham. These services would run on both development around the new HS2 station sites, electrified and high speed tracks, and would join the generate operational income sooner and benefit HS2 network at Toton via an alternative junction communities in the East Midlands that have suffered layout which allows direct connections onto the high from decades of underinvestment. This package focuses on accelerating the speed network in both directions. Sheffield commencement of high speed services to the HS2 East Midlands Hub at Toton as well as the This solution would bring HS2 trains directly into Lilian Greenwood, economic centres of Chesterfield, Sheffield, Nottingham and Leicester city centres, without the Chesterfield need for interchange and more than halve current MP for Nottingham South and Leeds, using HS2 as a catalyst for economic East Midlands development, regeneration and sorely-needed journey times between economic centres in the “The aim of the Integrated Rail Plan is to make Hub (Toton) regional transport improvements. Midlands and the North. Our proposal would see the most of HS2; connecting more people into journey times between Leicester and Leeds drop from the high speed network. Not only can these Access to Toton 120 to 50 minutes and Nottingham to Birmingham fall plans bring high speed trains directly into from 72 to 33 minutes. Nottingham and Leicester city centres, but they would more than halve current journey East Midlands Leeds times. It’s essential that Government provides Hub (Toton) Midlands Connect with the resources it needs to bring them forward.” Derby Nottingham To London Birmingham Loughborough EMA Midland Main Line Electrification We believe that there could be an interim solution which would allow high speed services to run The plans outlined in Package East require the Leicester from Birmingham to the East Midlands Hub at full electrification of the Midland Main Line, Toton, Sheffield, Chesterfield and onto Leeds (via a either to run (MC Conventional Compatible East Midlands Nottingham connection to the conventional rail network ten miles services and Accelerate Birmingham – Leeds) or This multimodal transport strategy is designed Hub (Toton) south of the city centre) as early as 2031, up to nine to operate in a carbon efficient manner (Access to support, accelerate and maximise the benefits years earlier than scheduled. to Toton). We ask that these vital plans are of HS2 in the East Midlands by connecting towns, Loughborough reinstated, and that Government commits to a cities and villages across the region to the HS2 East This can be achieved by accelerating the construction Leicester truly carbon-neutral rail network. Midlands Hub at Toton. The rail interventions in of the Eastern Leg of Phase 2b from Birmingham this plan include four shuttle services per hour from to the HS2 East Midlands Hub at Toton, all the way Birmingham Market Harborough Derby, Leicester and Nottingham to the HS2 East north to Crofton, just south of Leeds, as well as Midlands Hub; plus reopening the Maid Marian Line Kettering upgrading the conventional railway line between to passenger traffic, connecting Mansfield to the HS2 Wellingborough Sheffield and Claydon. East Midlands Hub. Phase One of the plan can be Bedford In the interim, these conventional compatible delivered in the next decade. services would run from Birmingham to Crofton on the new high speed line, then run the remaining Cllr Kay Cutts MBE, ten miles from Crofton to Leeds on the existing Leader of Nottinghamshire County Council network, terminating at two new platforms at Leeds “The arrival of High Speed Two in investment are spread far and wide. We are keen station. This would be a temporary measure until the Nottinghamshire will bring with it widespread to work alongside Government to ensure that the logistically-complex approach to Leeds’ new high regeneration, development and highly-skilled East Midlands sees benefits as soon as possible, speed terminus is completed. However, these new jobs. This comprehensive plan ensures that and that these improvements are included in its platforms will provide much-needed capacity for communities in our towns and villages can access Integrated Rail Plan” additional commuter services into Leeds once the CGI of planned HS2 East Midlands Hub at Toton, including these opportunities, and that the benefits of this full HS2 network is complete, the need for which is on-site innovation campus and new housing development reinforced by Transport for the North. 8 9
Darren Henry, MP for Broxtowe Package Connect: Birmingham – Black Country – Shrewsbury “Levelling-up the UK economy means Enhancing East – West To Wales spreading the benefits of Government investment to all corners of the country. These connectivity (Incrementally Wellington Telford plans will create a truly green and connected delivered from 2021-2033) Shrewsbury Wolverhampton transport network for generations to come. Our new high speed network will be a game- Sandwell & Dudley changer for the Midlands, we must now Birmingham ensure it is fully integrated with Midlands Sir John Peace, Maria Machancoses, Robert Jenrick MP This package includes the remaining elements of Engine Rail.” and Lilian Greenwood MP at Midlands Engine Rail launch Midlands Engine Rail that are focused on promoting east – west connectivity across the Midlands region, This scheme will increase the frequency of services often on routes where the proportion of journeys between Birmingham, the Black Country, Telford made by rail is woefully low, or where poor service and Shrewsbury, utilising the extra network capacity What now? Our ‘asks’ levels are stifling additional demand. Many of these freed up by HS2. This enhancement would also see improvements utilise network capacity released by the reintroduction of direct London – Telford services, The Midlands Engine Rail programme and this That Midlands Connect is granted the HS2 or have business cases that are strengthened and link communities to the full high speed network wider submission is the culmination of many opportunity to discuss its proposals with officials by the increase in rail patronage our new high speed via Birmingham Interchange station. years’ work, gathering in-depth evidence and in the Department for Transport and National line will create. building consensus amongst political, civic Infrastructure Commission Nottingham – Lincoln and business leaders from across the region. That Government provides the funding needed Midlands Rail Hub (Coventry-Leicester-Nottingham) Midlands Connect now seeks an open dialogue to bring forward the development of a number Lincoln with the Department for Transport as it drafts of important, and time-sensitive projects, in-line Nottingham its final Integrated Rail Plan. with its ambitions to accelerate the delivery of infrastructure projects, as part of ‘project speed’ Newark Castle Loughborough Scheme Development Stage Funding Required Leicester Nottingham Access to Toton (Phase Outline Business £4.5 million One) Case We are currently investigating the potential for Coventry line speed improvements, achieved through the installation of an enhanced signalling system, and Birmingham Airport Full Business Case £20 million The remaining improvement planned within our additional services between Nottingham and Lincoln. Connectivity Midlands Rail Hub scheme would reinstate direct Derby – Stoke - Crewe services between Coventry, Leicester and Nottingham MC Conventional Outline Business £2 million via a dive under at Nuneaton. The slow, indirect Compatible services Case service currently in place means that at present, only Crewe one per cent of journeys between these major cities Stoke-on-Trent Although not exhaustive, the ‘asks’ above relate to projects where the need for are made by rail. This intervention will increase rail mode share on this important route. Derby funding is most time sensitive. £26.5 million Cllr Ian Ward, Uttoxeter Rail scheme development lifecycle Leader of Birmingham City Council Strategic Outline Outline Business Case “Midlands Connect’s technical experts have Travellers on the Crewe-Derby rail corridor suffer Feasibility study Business Case (OBC) put these plans together using industry from a slow, infrequent service. Midlands Connect is (SOBC) insight, feedback from partners and crucially, currently examining the case for higher line speeds evidence. Government should seriously and more regular services – the latter is likely to consider these proposals as it writes its be dependent on growth in demand linked to the Full Business Case Delivery Integrated Rail Plan.” opening of HS2 services at Crewe and at the HS2 East (FBC) Midlands Hub 10 11
Immingham • • Grimsby • Glossop • Buxton • Chesterfield • Lincoln • Matlock • Mansfield Skegness • • Newark-On-Trent • Stoke-On-Trent Boston • • Nottingham • Derby • Grantham • Oswestry • Stafford • Burton upon Trent • Loughborough • Shrewsbury • Telford • Lichfield • Oakham • Tamworth • Leicester Wolverhampton • • Walsall Nuneaton • Dudley • • Oldbury • Birmingham Kidderminster • Solihull • • Coventry • Ludlow • Redditch Warwick • Worcester • Stratford- • Upon-Avon • Hereford • Ross -On-Wye Baskerville House, 2 Centenary Square, Birmingham, B1 2ND midlandsconnect.uk MCAdmin@midlandsconnect.uk @MidsConnect 12
You can also read