COMPANY PROFILE 2018 - ZA.com

Page created by Frederick Weber
 
CONTINUE READING
COMPANY PROFILE 2018 - ZA.com
COMPANY PROFILE 2018
COMPANY PROFILE 2018 - ZA.com
ABOUT US
                                                                                Groeneveld Civil offers a comprehensive solution     With our qualified Site Engineers, trained
                                                                                to the construction of civil engineering projects.   workforce and specialized plant, we are geared
                                                                                                                                     to execute:
                                                                                We are based in Stellenbosch and operate
                                                                                throughout the Western Cape. Here in the Boland,     · earthworks
                                                                                we are surrounded by majestic mountains and          · underground services
                                                                                rivers and constantly reminded of layer upon         · roads,
                                                                                layer of history.                                    · dams
                                                                                                                                     · gabion walls – see: www.stonemasons.co.za
                                                                                We aim to celebrate our heritage, by respecting
                                                                                the resources we utilize and to consume
                                                                                responsibly.
                                                                                                                                     CERTIFICATION
                                                                                We are owner managed, versatile and focused          Groeneveld Civil has BBBEE Certificatification
                                                                                on delivering quality product, on time and within    A 7CE CIDB Rating (CRS number: 10089620)
                                                                                budget.
                                                                                                                                     We are registered with the Bargaining Council
                                                                                We are constantly striving to balance these          for the Civil Engineering Industry (BCCEI).
                                                                                outcomes with renewable construction, training
                                                                                and empowering our workforce.

                     EVENTUALLY EVERYTHING CONNECTS
People, ideas, objects. The quality of the connections is the key to quality.

                                                                Charles Eames                                                                                                      1
COMPANY PROFILE 2018 - ZA.com
MEET THE TEAM

                                                                                  Nic Latsky                        Jaco van der Watt                       Odendaal Gerber
                                                                                Contracts Manager                      Contracts Manager                    Contracts manager
                                                                                  0735779082                             0768624016                            0715579875
                                                                              nic@groeneveld.za.com                 jaco@groeneveld.za.com              odendaal@groeneveld.za.com

                 Org Groeneveld                   Jeff Price
                 Managing Director   Procurement and Administration Manager
                   0825573929                    0609603905
      org@groeneveld.za.com                  jeff@groeneveld.za.com
      
                                                                                       Joheine Albanie - Senior Site Agent         Kerwyn Muller - Senior Site Agent
                                                                                             joheine@groeneveld.za.com                  kerwyn@groeneveld.za.com
                                                                                                    0609667850                                0826202049

2                                                                                                                                                                                    3
COMPANY PROFILE 2018 - ZA.com
WHY US?

    WITH OUR QUALIFIED SITE ENGINEERS,

    TRAINED WORKFORCE AND SPECIALIZED

    PLANT, WE ARE GEARED TO EXECUTE ALL

    YOUR CIVIL ENGINEERING PROJECTS.

4                                      5
COMPANY PROFILE 2018 - ZA.com
OUR SERVICES

    Earthworks
    The key to economic earthworks construction, is to plan and move material once according to an optimised mass earth moving
    diagram. No matter how big or small the project, planning and control cannot be neglected.

    We believe in state of the art survey technology, effective excavation equipment and calculated compaction application. The above
    can only be attained with proper supervision and controlled accuracy and testing.

    We further consider recycling, dust-control and limited water resources into account throughout the process.

    We have successfully completed many challenging earthworks projects for example:

    •   Restricted excavations such as Electricity House CBD, Kelderhof SSW and The Sanctuary SSW
    •   Mass haul and compaction with very limited access and during extremely wet conditions, such as Mont Rochelle access
    •   Franchhoek, Noble Hill Paarl, RFG Simondium and Greystreet Welgemoed, Rickety Bridge Franchhoek.
    •   Sensitive eco environments such as Mills Hemel & Aarde, Skulpiesbaai Stillbay and Montagu Springs.

6                                                                                                                                 7
COMPANY PROFILE 2018 - ZA.com
Civil Underground Services
The quality of underground services construction is in level control, bedding and blanket support and proper chamber construction.
There are few operations on site as rewarding as working with a proper pipe laying team of surveyors, section leaders, pipe levellers
and artisans. These operations often target meterage and quantity and again the key to successful production of these services
lies in the planning of optimum routes and materials delivery schedules. But the key to successful completion and hand-over of
these services lies in the proper recording and testing of grades and pressure and compaction throughout the construction process.

•   Our pipe layers have completed a multiple of underground services installations with pride.
•   Storm water outfalls, Albany Bakery Bellville, Melrose Place Stellenbosch, Owloon Farm Paarl and Mont Rochelle Franchhoek
•   Sewer and stormwater, Ceres Fruit growers, Bridge House Franchhoek
•   Effluent Antonij Rupert Wines Franchhoek, RFG Simondium
•   Combined residential services, Central Park SSW, New Court Steenberg Tokai, Skulpiesbaai Stilbaai, Killarney Junction, Hope
    & Light SSW, Panorama Palms

                                                                                                                                        Roadworks
                                                                                                                                        The most expensive part of most of our comprehensive contracts turns out to be roadworks, mostly due to the cost of importing
                                                                                                                                        and exporting materials and finishing elements. Proper engineering calls for maximizing the structural ability of every layer and
                                                                                                                                        supporting installation. We concentrate on accuracy, materials selection, processing, moisture control, compaction and aesthetic
                                                                                                                                        finishing of the highest standard.

                                                                                                                                        We are proud of our many successful roadways:
                                                                                                                                        •
                                                                                                                                        • Concrete surface beds at Haute Cabriere, Albany Bakery Bellville, Chep warehouse Kraaifontein, Excelsior farm Over-hex.
                                                                                                                                        • Asphalt premix at Scottsdene residential Kraaifontein, International storage Durbanville, Sanctuary SSW, Arabella Estate
                                                                                                                                           Kleinmond, Lazer logistics Kuilsrivier
                                                                                                                                        • Industrial Brickpaving at Killarney Junction, Kempston Park, Albany bakery Bellville, CFG Ceres, marcels Yogurt Stellenbosch
                                                                                                                                        • Exposed aggregate paving at Central Park SSW, Valleisig Durbanville, Greystreet Welgemoed, Rupert & Rothschild Cellar
                                                                                                                                           road Simondium, Noble Hill Simondium, New Court Steenberg Tokai, Mont Rochelle Franchhoek, Skulpiesbaai Stilbaai.

8                                                                                                                                                                                                                                                                    9
COMPANY PROFILE 2018 - ZA.com
Landscaping
                                                                                                                                        The preparation of landscaping areas for planting or decoration or land art features, forms part of earthworks, but takes some
                                                                                                                                        additional skill and finesse to prepare the platform and irrigation mains for finishing by viticulturists and horticulturists. The
                                                                                                                                        selection of final layers and non-symmetrical shaping requires skill and careful surveying and coordination with the professionals.

                                                                                                                                        We pride ourselves in the way we approach these projects.
                                                                                                                                        •
                                                                                                                                        • Contracts that stands out are Mont Rochelle wine farm, Valleisig Durbanville, CFG Ceres, Sanctuary SSW, Tokai Estate and
                                                                                                                                           central Park SSW.

DAMS
There is no doubt that the recent droughts have drawn the awareness to proper construction of dams. A lot of surface water is lost to
seepage and evaporation and proper channelling and storage can go a long way in procuring this scarce resource. A lot of farms and
estates are on high laying areas, with the potential to salvage mountain run-off in various ways. Proper hydrological assessments
in conjunction with expert geologists and engineers can result in effective water retention. We have come to appreciate the
complexities of these constructions and the inroads made by technological materials and methods.

This field will keep growing as the need intensifies and the solutions become more exciting. We hope to keep abreast with
developments and to keep procuring and participating in these contracts.

We have to date been part of the following exciting projects:                                                                           BRIDGES
•   Kyburgh dam Stellenbosch, Mont Rochelle comprehensive Storm water drainage and outlet structures , Rhodes Food Group                We have learnt a lot from constructing bridges as far as founding and accuracy goes. The challenges of working in a high water
    wastewater facility, Antonij Rupert wines waste water management                                                                    table or cofferdam requires proper planning and engineering construction. We have had the opportunity to construct 2 bridges with
                                                                                                                                        very skilful and experienced design engineers at Montagu Springs and Rupert and Rothschild.

                                                                                                                                        Both projects turned out very successfully and we have used what we learned to construct various subsequent complex RC
                                                                                                                                        structures. We look forward confidently to taking on similar projects.

10                                                                                                                                                                                                                                                                   11
COMPANY PROFILE 2018 - ZA.com
PROJECT case study
MONT ROCHELLE
The Virgin Hotel Group was one of our first clients and they gave us an opportunity that
allowed us to really grow our operations. The farm faces north with the most stunning
views of the valley and a backdrop of dramatic mountains, yet walking distance from
the Franchhoek town centre.

The Virgin Hotel Group was one of our first clients   a swamp area adjacent to the hotel. Recently

and they gave us an opportunity that allowed us to    we returned to construct the major stormwater

really grow our operations. The farm faces north      backbone to harvest and direct the run-off from

with the most stunning views of the valley and        the farm to irrigation dams.

a backdrop of dramatic mountains, yet walking

distance from the Franchhoek town centre.             We have enjoyed working with a great team of

                                                      Professionals and Hotel and Farm management.

We started with the construction of an access road    All individuals with low egos, task driven, involved,

and services to the hotel in the early wet winter     fun and creative, they are all living proof that the

of 2015. We rained out many times but managed         Branson way works! We look forward to many

to complete the works on time and without snags.      more successful projects and we thank you for

Well done Jaco and team, no small feat! Further       shaping our destiny and inspiring us with your

works included the winery roads and services          simple philosophy of business.

as well as a tricky tennis court construction on

12                                                                                                            13
COMPANY PROFILE 2018 - ZA.com
CLIENT REFERENCES
Skulpiesbaai, Stilbaai                  Mont Rochelle Franchhoek                  Chep Warehouse Kraaifontein           The Sanctuary, Somerset West             Antonij Rupert Wines, Franchhoek
Main Contractor for roads and ser-      Access road                               Industria                             Civil works Phase 2                      Cellar Effluent network installation
vices to residential estate             www.virginlimitededition.com/en/          Roads, services                       www.abacusassetmanagement. co.za         www.rupertwines.com
www.skulpiesdbaai.co.za                 montrochelle                              www.chephelpsme.co.za/?               Contractor for access roads, services,   Main Contractor for Underground
Value R22,0m                            Main Contractor for access road con-      Main Contractor for roads and         parking.                                 Services and Roads
Consulting Engineers Integrate:         struction, winery roads, tennis court     services                              Value R4,1m                              Value R 1,8m
Andre Burrows 083 3008963               Value R9,6m                               Value R4,9m Consultant:               Consultant: ICON                         Consultant: Bart Senekal & Partners
www.integratece.co.za                   Consultant:                               Integrate, Leon Louw 083 324 5928     Nicol Jordaan 086 117 2774               Lukas Louw at 021 883 8710
                                        Clive Newsome 021 671 7791                QS: dbn Quantity Surveyors,           www.iconeng.co.za
Albany Bakery, Sacks Circle             QS: Pentad Albert Reitzma                 Pieter Badenhorst: 0825567287         QS: IQS Ilze Koekemoer 021 974           Greystreet Welgemoed
Main Contractor for access road,        021 418 9977                                                                    3560                                     Development of Erven
services and concrete construction to   www.pentadqs.co.za                        Haute Cabriere                                                                 Main Contractor for Underground
new factory                                                                       Cellar Ringroad and services          Kempston Park                            Services and Roads
www.albany.co.za                        Electricity House,                        www.cabriere.co.za                    Access roads and services to office      Value R 1,8m
Value R12,5m                            Cape Town CBD                             Main Contractor for design and        park www.kempston.co.za/properties       Consultant: Worley Parsons
Principle Agent for Tiger Brands:       Sub contract to Group 5 for Bulk dig,     supply of                             Value R3,7m                              Andries Louw at 021 912 3000
Wayne                                   Civil roads and services to multi-story   concrete ringroad, 3 phases           Client:
Myburgh 021 855 4863                    building                                  Value R 6,8m                          Lawrence Starling 083 301 6999           Panorama Palms
Consulting Engineer:                    www.g5.co.za                              Client: Riaan van Niekerk,                                                     Retirement complex extension
Dirk Taljaard 082 881 6030              Value R6,3m                               MD Clos Cabriere (Pty)Ltd 021 876     Rupert and Rothschild                    www.seniorservice.co.za/listing/
www.bcarch.co.za                        QS: Shawn Caithness 021 763 6100          8500                                  Construction of new access road and      panorama-palms-retirement-village
                                        CM: Jacques Snowden 021 763 6100          Rhodes Food Group,                    bridge                                   Sub-Contractor for services and roads
Central Park Residential Estate                                                   Groot Drakenstein                     www.rupert-rothschildvignerons.com       Main Contractor and Developer Remey
Somerset West: Main Contractor          New Court Steenberg                                                             Value R3,4m                              Group
Roads, Services, Boundary walls,        Construction of roads and services to     Wastewater Treatment Works            Client: Rupert & Rothschild              www.remey.co.za
Retention dams. www.centralparke-       new development                           www.rhodesfoodgroup.com Main          QS: Hennie Kleynhans 021 882 8538        Value R 1,8m
state.co.za Value R9,5m                 www.newcourtatsteenberg.co.za             Contractor for Underground                                                     Consultant: ICE
Client: Kings Hill Group,               Value R5,9m                               Services and Structures               Montagu Springs                          Dewald Miles at 021 914 2833 www.
John Turner 021 671 3506                Client: Innes Projects 021 761 9333       Value R 4,2m                          Construction of Concrete Bridge and      icegroup.co.za
Consultant: ICE Group                   Consultant: Peter Wium 083 454            Consultant: Bart Senekal & Partners   approach roads www.montagus-
Piet van Blerk 083 3207321              2143                                      Lukas Louw at 021 883 8710,           prings.co.za                             Valleisig Durbanville
                                                                                  Buks Schutte 082 902 2947             Value R2,4m                              Townhouse development
                                        Tokai Estate                                                                    Consultants: Bart Senekal & Venote,      Sub-Contractor for Underground
                                        Earthworks to the houses, clubhouse,      Killarney Junction Industrial Park    Bart                                     Services and Roads
                                        gatehouse and health care facilities      Main Contractor: Earthworks, Roads,   021 883 8710                             Main Contractor and Developer Remey
                                        www.tokaiestate.co.za                     Services to new Industrial Park       Kantey & Templer,                        Group www.remey.co.za
                                        Value 5,6m                                Value R4,3m                           Frank DuPlessis 021 405 9600             Value R 1,5m
                                        Client: Fair Cape,                        Principle Agent: Ray Alexander 021                                             Consultant: Element Consulting Engi-
                                        Steven Frankal 021 815 5700               465                                                                            neers Tertius Retief at 021 975 1718
                                        Main contractor: Murray & Roberts         9890 www.rayalexanderarchitect.                                                www.eceng.co.za

14                                                                                                                                                                                                       15
                                        www. murrob.com                           com Consulting Engineer:
                                                                                  David Stonestreet 021 689 2377
                                                                                  www.devs.co.za
COMPANY PROFILE 2018 - ZA.com
Excelsior Farm Over-hex              Ceres Fruit Growers                   Marcels Yogurt, Devon Valley         Reddam School SSW, P
Packing store                        Haulroad                              Roads and parking                    ool & buildings
www.dutoit.com/framework/index_      www.cfg.co.za                         www.marcels.co.za                    www.somerset.reddamhouse.co.za
dutoit_Location.asp                  Contractor for Roads and earthworks   Subcontractor for Underground        Sub Contractor Earthworks and Ser-
Contractor for Earthworks and        Value R 6,0m                          services                             vices Main Contractor: Remey Group
platform                             Client: Ockie Alberts, MD OFLA        and roadworks                        www. remey.co.za
construction                         Konstruksie                           Value R 0,4m                         Value R 1,9m
Value R 1,0m Client:                 023 313 3600/ 082 576 1015            Consultant: Hugo Lotter Architects   Consultant: Ingerop,
Ockie Alberts,                                                             Hugo: 021 880 2211                   Johan du Plessis 021 914 2833,
MD OFLA Konstruksie                  Arabella Estate, Kleinmond            www.hugolotter.co.za                 www.ingerop.co.za
023 313 3600 / 082 576 1015          Water treatment works
                                     www.arabellacountryestate.co.za       International Storage, Durbanville   Hope & Light School SSW
Rickety Bridge Wine Cellar           Main Contractor for Underground       Storage International Phase 2        www.hopeandlight.co.za
Main Contractor Civil Construction   services and drying beds              www.storageint.co.za                 Main Contractor: Earthworks and
Works www.ricketybridge.com          Value = R 2,8m                        Main Contractor for underground      Services
Value R1,6m                          Consultant: Integrate                 services and roads                   Value R 2,2m
Client: MD,                          Andre Burrows 083 300 8963            Value R 0,4m                         Consultant: Ingerop, J
Jan Van Huyssteen 021 876 2129       www.integrategroup.net                Consultant:                          ohan du Plessis 021 914 2833,
Consultant: NDV Paarl,                                                     Bart Senekal & Partners Bart at      www.ingerop.co.za
Jaco van Zyl 021 871 1323            Melrose Place, Stellenbosch           021 883 8710
                                     Stormwater upgrade                                                         Kelderhof village, SSW
Key West, Milnerton                  Main Contractor for Underground       Bridge House                         www.kelderhof.co.za
www.keywestcapetown.com              Services and Roads                    Franchhoek Primary School Service    Main Contractor: Sevices for subdi-
Sub Contractor Earthworks and Ser-   Value R 0,6m                          connections                          visons
vices Main Contractor: Remey Group   Consultant: Integrate                 www.bridgehouse.org.za               Value R 1,4m
www. remey.co.za V                   Leon Louw at 021 913 7353             Sub-Contractor for Underground       Consultant: Consultant:
alue R 1,9m                          www.integrategroup.net                Services                             Integrate Andre Burrows 083 300
Consultant: DeVos Paxton,                                                  Main Contractor: CS property Group   8963
Steven Brand 021 250 0300            Kyburg farm, Devon Valley             www.csprop.co.za                     www.integrategroup.net
                                     Rehabilitation of dam wall            Value R 0,4m
Faircape Retirement villages         www.kyburgwine.com                    Consultant: Gibb                     WCG WC Hospitals water supply
in Onrus, SSW, and Tokai:            Main Contractor Earthworks and        Dave Crombie 021 469 9101            Main contractor: reticulation and
Roadworks                            Gabions.                                                                   water storage systems
www.faircape.co.za                   Value R 0,4m                          Copacabana blvd, Somerset Lakes      Value: R 9m
Main Contractor for roadworks;       Consultant: Integrate                 www.somersetlakes.co.za              Consultant: Integrate,
design and build                     Andre Burrows 083 300 8963            Main Contractor: Earthworks, ser-    Leon Louw 083 324 5928
Value R 3,7m                         www.integrategroup.net                vices and tarmac road                www.integrategroup.net
Client: Faircape Group,                                                    Value R4m
Steven Frankal 021 815 5700                                                Consultant: Ingerop,
                                                                           Johan du Plessis 021 914 2833

16                                                                         www.ingerop.co.za
                                                                                                                                                      17
contact us

     CONTACT NUMBER

     Tel:        021 882 9344

     Info: 	admin@groeneveld.za.com

     Tenders: 	tenders@groeneveld.za.com

     Financial: 	accounts@groeneveld.za.com

     Physical Address:

     7 Schoongezicht street

     Simonswyk

     Stellenbosch 7612

18                                            19
You can also read